CN107237544A - A kind of concrete wire pole fast transportation is with installing equipment - Google Patents
A kind of concrete wire pole fast transportation is with installing equipment Download PDFInfo
- Publication number
- CN107237544A CN107237544A CN201710588327.9A CN201710588327A CN107237544A CN 107237544 A CN107237544 A CN 107237544A CN 201710588327 A CN201710588327 A CN 201710588327A CN 107237544 A CN107237544 A CN 107237544A
- Authority
- CN
- China
- Prior art keywords
- welding
- screw rod
- way
- clamping plate
- block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Heating, Cooling, Or Curing Plastics Or The Like In General (AREA)
Abstract
Equipment, more particularly to a kind of concrete wire pole fast transportation are installed with installing equipment the present invention relates to a kind of electric pole.The technical problem to be solved in the present invention is to provide higher multiple conevying efficiency, a kind of vertical straight time saving and energy saving concrete wire pole fast transportation of installation process equipment and installation equipment need not be carried out to concrete wire pole.In order to solve the above-mentioned technical problem, the invention provides such a concrete wire pole fast transportation with installing equipment, include installing plate, the first support base, wheel shaft, tire, supporting plate, fixed plate, the second support base, the first guide rail, the first guide pin bushing, first clamping plate, first screw rod etc.;The left and right sides and front and rear sides, which are provided with side rotary under the first support base, the first support base by way of welding and are connected with wheel shaft, wheel shaft, on the downside of installing plate is connected with tire.Invention achieves needing to carry out concrete wire pole, multiple conevying efficiency is higher, the vertical straight time saving and energy saving effect of installation process equipment.
Description
Technical field
Equipment is installed the present invention relates to a kind of electric pole, more particularly to a kind of concrete wire pole fast transportation is set with installation
It is standby.
Background technology
Electric pole is exactly as its name suggests the bar installed electricity lines.Each rural area-field-road-street is come across, is early stage China
One of important infrastructure.The various electric poles of early stage, it, from rod starting, or even including voltage class is not too high to be all
High-voltage line electric pole.Later due to the development of steel and armored concrete, and it is technical require, both materials instead of greatly
Part rod, and applicable timber is progressively rare, and just substantially difficulty is shown in rod inside city.But it is less flourishing at some
Place put up telephone lines and also use rod, be and load-bearing and the pulling force of telephone wire because rod is lightweight, set up convenient
Small, rod can be competent at, if telephone line has change, move bar and be also convenient for.So, there is the wooden phone mast in part now.
At present when being transported and being installed to concrete wire pole, most of is all to use concrete wire pole being placed on
On truck wagon box, transport certain position Shang Shi collectives and put down, then manually transported on the position of required installation, so
Carry out manually carrying out electric pole to stand straight afterwards, but so have the drawback that the transport cement electronic box bar for needing progress multiple,
Cause installation effectiveness very low, and be also required to during installation artificial vertical straight, very waste time and energy.
Therefore need badly to research and develop and a kind of need not carry out that multiple conevying efficiency is higher, installation process equipment to concrete wire pole
Vertical straight time saving and energy saving concrete wire pole fast transportation overcomes transport and installation at present to concrete wire pole with installing equipment
During exist need to carry out concrete wire pole that multiple conevying efficiency is relatively low, installation process is manually vertical directly wastes time and energy
Shortcoming.
The content of the invention
(1)The technical problem to be solved
The present invention needs to enter concrete wire pole to during the transport and installation of concrete wire pole existing at present in order to overcome
The multiple conevying efficiency of row is relatively low, installation process manually founds the shortcoming directly wasted time and energy, and the technical problem to be solved in the present invention is
There is provided need not carry out that multiple conevying efficiency is higher, a kind of vertical straight time saving and energy saving water of installation process equipment to concrete wire pole
Mud electric pole fast transportation is with installing equipment.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the invention provides such a concrete wire pole fast transportation with installing equipment, bag
Installing plate, the first support base, wheel shaft, tire, supporting plate, fixed plate, the second support base, the first guide rail, the first guide pin bushing, are included
One clamping plate, the first screw rod, second clamping plate, the first nut, the first contiguous block, placement block, bearing block, rotating ring, connecting rod, the 3rd
The left and right sides and front and rear sides are pacified by way of welding on the downside of clamping plate, the second screw rod, the 4th clamping plate and the second nut, installing plate
Equipped with the first support base, under the first support base, side rotary, which is connected with wheel shaft, wheel shaft, is connected with tire, on installing plate behind right side
Side is provided with supporting plate by way of welding, and supporting plate upper end is provided with by way of welding on front side of fixed plate, fixed plate
It is provided with the upside of left by way of welding on the right side of the second support base, the second support base and first is provided with by way of welding
Slidingtype is connected with right on front side of some first guide pin bushings, the first guide pin bushing and is provided with by way of welding on guide rail, the first guide rail
First clamping plate, the mode that first clamping plate passes on left welding is provided with the first screw rod, and the first screw rod upper left side is connected with the second folder
First through hole is provided with plate, second clamping plate, second clamping plate is connected on the first screw rod by first through hole, the first screw rod upper left side
The first nut is rotary with, the first nut and the first screw rod coordinate, and the first nut is located on front side of second clamping plate left, fixed plate under left
Side is provided with the first contiguous block by way of welding, and the first contiguous block lower end is provided with placement plate by way of welding, put
Put and bearing block is placed with plate, be connected in bearing block on the first contiguous block, the mode being bolted on the outside of bearing block is pacified
Equipped with rotating ring, left is provided with connecting rod by way of welding on the outside of rotating ring, and connecting rod left end is by way of welding
Three-ply board is installed, the mode that three-ply board passes on left welding is provided with the left of the second screw rod, the second screw rod and is connected with the
The second through hole is provided with four clamping plates, the 4th clamping plate, the 4th clamping plate is connected on the second screw rod by the second through hole, on the second screw rod
Left side is rotary with the second nut, and the second nut and the second screw rod coordinate, and the second screw rod is located at the 4th clamping plate left.
Preferably, also include and be connected with the first block rubber on the right side of the first block rubber and the second block rubber, second clamping plate, the
The second block rubber is connected with the left of one clamping plate.
Preferably, mobile device is also included, mobile device includes first rotating shaft, the first runner, the first rack, the 3rd
Support base, the second rotating shaft, the second runner, transmission bar, rotating disk, crank and the second rack, fixed plate front side top are filled provided with mobile
Put, the fixed plate front side top left and right sides, which is rotatably connected with first rotating shaft, first rotating shaft, is connected with the first runner, first turn
Right on the upside of the first rack, fixed plate is connected between wheel the 3rd support base, the 3rd support base are installed by way of welding
Upper side rotary is connected with the second rotating shaft, the second rotating shaft and right side first rotating shaft and is connected with the second runner, and the second runner is located at
On front side of first runner, it is connected between the second runner on rear side of transmission bar, the second rotating shaft and rotating disk is installed by way of welding, turned
Rotary be connected with the upside of crank, the first guide pin bushing is provided with the second rack by way of welding on rear side of disk, the second rack and the
One rack is engaged.
Preferably, top on the right side of the second contiguous block, fixed block, the 3rd screw rod and the first briquetting, fixed plate is also included logical
The mode for crossing welding is provided with the second contiguous block, the second contiguous block right side fixed block is provided with by way of welding, fixed
It is provided with block in screwed hole, screwed hole and is rotary with the 3rd screw rod, the 3rd screw rod coordinates with screwed hole, the 3rd screw rod left end rotatably connects
It is connected to the first briquetting.
Preferably, also include extension fixture, extension fixture includes slide rail, sliding block, push rod, sliding sleeve and handle, connect
Bar is provided with the mode being bolted in extension fixture, connecting rod and is provided with slide rail, and slide rail inner sliding type is connected with sliding block,
Sliding block left end is provided with push rod by way of welding, and the mode that slide rail passes on left welding is provided with sliding sleeve, and push rod passes through cunning
Set reaches to be provided with above sliding sleeve left, connecting rod on the upside of a word hole, sliding block is provided with handle by way of welding, and handle passes through
One word hole is reached above connecting rod.
Preferably, also include above on the left of the 3rd nut, the 4th screw rod and the second briquetting, handle by way of welding
It is provided with the 3rd nut, the 3rd nut and is rotary with the 4th screw rod, the 4th screw rod and the 3rd nut coordinates, the rotation of the 4th screw rod lower end
Formula is connected with above the second briquetting, the second briquetting contacts-side-down to connecting rod.
Preferably, lowering means is also included, lowering means includes the second guide pin bushing, the second guide rail, the 3rd rack, first
Lowering means is provided with the left of motor, gear, L-shaped mobile bar and the 3rd contiguous block, push rod, push rod left end is pacified by way of welding
Equipped with the second guide pin bushing, the second guide pin bushing inner sliding type, which is connected with the mode being bolted on the right side of the second guide rail, the second guide rail, pacifies
Equipped with the 3rd rack, the mode that is bolted of right side is provided with the on front side of the first motor, the first motor on the second guide pin bushing
One motor output shaft is connected with gear by shaft coupling, and gear is engaged with the 3rd rack, and top passes through welding on the left of the second guide rail
Mode L-shaped mobile bar is installed, lower section is provided with the 3rd contiguous block by way of welding on the left of L-shaped mobile bar, and the 3rd connects
Connect block left end and three-ply board right side central is arranged on by way of welding.
Preferably, also include and be connected with the 3rd block rubber on the right side of the 3rd block rubber and the 4th block rubber, the 4th clamping plate, the
The 4th block rubber is connected with the left of three-ply board.
Operation principle:When user needs that concrete wire pole transport or installed, user can be in factory
Concrete wire pole is placed between first clamping plate and second clamping plate, the first nut is then rotated, the first nut by with the first spiral shell
The cooperation of bar precession to the right, the first nut promotes second clamping plate to move right, and second clamping plate is touched on the right side of concrete wire pole,
So as to which concrete wire pole be fixed, then user can just carry out transporting to concrete wire pole, then promote the equipment to move
The position of required installation is moved, then user promotes connecting rod rotate counterclockwise, connecting rod is revolved by rotating ring on bearing block
Turn, connecting rod drives three-ply board and the 4th clamping plate rotate counterclockwise, three-ply board and the 4th clamping plate is rotated to before supporting plate
Side, then user promote the first guide pin bushing movement of the rightmost side, make the first guide pin bushing move into place in three-ply board and the 4th clamping plate it
Between top, then user rotate the first nut, the first nut is no longer fixed concrete wire pole, make concrete wire pole downward
Mobile, between three-ply board and the 4th clamping plate, now user rotates the second nut, the second nut by with the second screw rod
Coordinate precession, make the second nut promote the 4th clamping plate to touch concrete wire pole and be fixed, then user's rotation connects
Extension bar turns clockwise, and cement three-ply board and the 4th clamping plate is driven concrete wire pole rotation, concrete wire pole is located at peace
The left of plate is filled, then proceedes to promote the equipment into the empty wiping of required installation, then rotates the second nut, make concrete wire pole
Moved down between three-ply board and the 4th clamping plate, into the dead slot of required installation, then user rotates out of connecting rod, and
By electric pole in dead slot it is fixed, being banketed and be compacted just can be with.
Because also including the first block rubber and the second block rubber, the first block rubber, first are connected with the right side of second clamping plate
The second block rubber is connected with the left of clamping plate, when first clamping plate and second clamping plate are clamping concrete wire pole, the first rubber
Block and the second block rubber can make the fixation of concrete wire pole have more stability.
Because also including mobile device, mobile device include first rotating shaft, the first runner, the first rack, the 3rd
Seat, the second rotating shaft, the second runner, transmission bar, rotating disk, crank and the second rack are supportted, fixed plate front side top is provided with mobile device,
The fixed plate front side top left and right sides, which is rotatably connected with first rotating shaft, first rotating shaft, is connected with the first runner, the first runner
Between be connected with the first rack, right is provided with by way of welding on the 3rd support base, the 3rd support base on the upside of fixed plate
Side rotary, which is connected with the second rotating shaft, the second rotating shaft and right side first rotating shaft, is connected with the second runner, and the second runner is located at the
On front side of one runner, it is connected between the second runner on rear side of transmission bar, the second rotating shaft and rotating disk, rotating disk is installed by way of welding
Rear side is rotatably connected with the upside of crank, the first guide pin bushing and the second rack, the second rack and first is provided with by way of welding
Rack is engaged, and when user needs mobile first guide pin bushing so as to drive concrete wire pole to move, user can be shaken with rotate counterclockwise
Crank drives turntable rotation, driven by rotary disc the second rotating shaft rotate counterclockwise, and the second rotating shaft drives the second runner of upside counterclockwise
Rotation, the runner of upside second rotation drives the second runner rotate counterclockwise of downside, downside the second runner rotating band by being driven bar
Dynamic right side first rotating shaft rotate counterclockwise, downside first rotating shaft rotation drives the first runner rotate counterclockwise of right side, right side first
Runner rotation is rotated by the first runner on the left of the first rack drives, so as to drive the first rack rotate counterclockwise, the first rack
The second gear being engaged with is driven to move right, so as to drive the first guide pin bushing to be moved right on the first guide rail, so as to drive
Concrete wire pole moves right.
Because also including the second contiguous block, fixed block, the 3rd screw rod and the first briquetting, top passes through weldering on the right side of fixed plate
The mode connect is provided with right side on the second contiguous block, the second contiguous block and is provided with by way of welding on fixed block, fixed block
It is provided with screwed hole, screwed hole and is rotary with the 3rd screw rod, the 3rd screw rod coordinates with screwed hole, the 3rd screw rod left end is rotatably connected with
First briquetting, when user's rotation crank makes concrete wire pole reach on desired position, user can rotate the 3rd screw rod, the
Three screw rods promote the first briquetting to be moved to the left by the precession to the left of the cooperation with screwed hole, the 3rd screw rod, and the first briquetting is touched
Rotating disk and fixing rotating disk makes it no longer be rotated, is no longer moved so as to fix concrete wire pole.
Because also including extension fixture, extension fixture includes in slide rail, sliding block, push rod, sliding sleeve and handle, connecting rod
Provided with extension fixture, the mode being bolted in connecting rod is provided with slide rail, and slide rail inner sliding type is connected with sliding block, sliding block
Left end is provided with push rod by way of welding, and the mode that slide rail passes on left welding is provided with sliding sleeve, and push rod is stretched by sliding sleeve
To sliding sleeve left, connecting rod top is provided with the upside of a word hole, sliding block and handle is provided with by way of welding, and handle passes through a word
Hole is reached above connecting rod, when concrete wire pole, which is located at, to be needed to be installed between three-ply board and the 4th clamping plate, particularly
Need to be installed to farther place, but the equipment is when can not but move, user can promote handle to be moved to the left,
Handle grip movable slider is moved to the left in slide rail, and sliding block drives push rod to be moved to the left in sliding sleeve, so as to drive three-ply board
It is moved to the left with the 4th clamping plate, so as to drive concrete wire pole to be moved to the left, so as to realize more remote install.
Because also including the 3rd nut, the 4th screw rod and the second briquetting, top is pacified by way of welding on the left of handle
Equipped with the 3rd nut, the 4th screw rod is rotary with the 3rd nut, the 4th screw rod and the 3rd nut coordinate, and the 4th screw rod lower end is rotary
It is connected with the second briquetting, is concrete wire pole to required when user promotes handle above the second briquetting contacts-side-down to connecting rod
Install more distant positions on when, user can rotate the 4th screw rod, the 4th screw rod by the downward precession of cooperation with the 3rd nut,
4th screw rod promotes the second briquetting to move down, and the second briquetting is touched connecting rod, so that handle and sliding block are fixed on into this
No longer move, no longer moved so as to fix concrete wire pole on individual position.
Because also including lowering means, lowering means includes the second guide pin bushing, the second guide rail, the 3rd rack, the first electricity
Lowering means is provided with the left of machine, gear, L-shaped mobile bar and the 3rd contiguous block, push rod, push rod left end is installed by way of welding
There is the second guide pin bushing, the second guide pin bushing inner sliding type is connected with the mode being bolted on the right side of the second guide rail, the second guide rail and installed
There is the mode that right side is bolted on the 3rd rack, the second guide pin bushing to be provided with first on front side of the first motor, the first motor
Motor output shaft is connected with gear by shaft coupling, and gear is engaged with the 3rd rack, and top passes through welding on the left of the second guide rail
Mode is provided with lower section on the left of L-shaped mobile bar, L-shaped mobile bar and the 3rd contiguous block, the 3rd connection is provided with by way of welding
Block left end is arranged on three-ply board right side central by way of welding, when concrete wire pole is located at three-ply board and the 4th clamping plate
Between when needing to carry out landing to install, user can open the first motor, the first motor driven gear rotate counterclockwise, gear rotation
Turn on the 3rd rack, so as to drive the 3rd rack to move down, the 3rd the second guide pin bushing of rack drives is downward in the second guide rail
Mobile, the second guide pin bushing drives L-shaped mobile bar and the 3rd contiguous block to move down, the 3rd contiguous block band three-ply board and the 4th clamping plate
Move down, so that drive concrete wire pole to enter in the required dead slot installed, so can be more accurate and more stable by water
Needed for mud electric pole is put into the dead slot of installation.
Because also including the 3rd block rubber and the 4th block rubber, the 3rd block rubber, the 3rd are connected with the right side of the 4th clamping plate
The 4th block rubber is connected with the left of clamping plate, when concrete wire pole is located between three-ply board and the 4th clamping plate, the 3rd block rubber
And the 4th block rubber can make concrete wire pole is more stable to be fixed between three-ply board and the 4th clamping plate.
The control mode of the present invention is automatically controlled by controller, control skill of the circuit by this area of controller
Art personnel's simple programming is that can be achieved, and belongs to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute
Control mode and circuit connection are not explained with the present invention.
(3)Beneficial effect
Invention achieves needing to carry out concrete wire pole, multiple conevying efficiency is higher, the vertical straight time saving province of installation process equipment
The effect of power, by using concrete wire pole is fixed between first clamping plate and second clamping plate and just starts to be exactly straight progress
The mode of transport, is not only able to directly transport concrete wire pole on the position of required installation, moreover it is possible to installed when
Wait in the dead slot of installation needed for being just placed on, it is to avoid carry out it is artificial vertical directly cause waste time and energy.
Brief description of the drawings
Fig. 1 is main structure diagram of the invention.
Fig. 2 is second of main structure diagram of the first block rubber of the invention and the second block rubber.
Fig. 3 is the main structure diagram of mobile device of the present invention.
Fig. 4 is the main structure diagram of fixed block of the present invention.
Fig. 5 is the first main structure diagram of extension fixture of the present invention.
Fig. 6 is second of main structure diagram of extension fixture of the present invention.
Fig. 7 is the main structure diagram of lowering means of the present invention.
Fig. 8 is the main structure diagram of the 3rd block rubber of the invention and the 4th block rubber.
Mark in accompanying drawing for:1- installing plates, the support bases of 2- first, 3- wheel shafts, 4- tires, 5- supporting plates, 6- fixed plates,
The support bases of 7- second, the guide rails of 8- first, the guide pin bushings of 9- first, 10- first clamping plates, the screw rods of 11- first, 12- second clamping plates, 13-
One through hole, the nuts of 14- first, the contiguous blocks of 15- first, 16- places block, 17- bearing blocks, 18- rotating rings, 19- connecting rods, 20-
Three-ply board, the screw rods of 21- second, the clamping plates of 22- the 4th, the through holes of 23- second, the nuts of 24- second, the block rubbers of 121- first, 122-
Second block rubber, 25- mobile devices, 251- first rotating shafts, the runners of 252- first, the racks of 253- first, the support bases of 254- the 3rd,
The rotating shafts of 255- second, the runners of 256- second, 257- transmission bars, 258- rotating disks, 259- cranks, the racks of 2510- second, 2581- the
Two contiguous blocks, 2582- fixed blocks, 2583- screwed holes, the screw rods of 2584- the 3rd, the briquettings of 2585- first, 26- extension fixtures, 261-
Slide rail, 262- sliding blocks, 263- push rods, 264- sliding sleeves, the word holes of 265- mono-, 266- handles, the nuts of 2661- the 3rd, the spiral shells of 2662- the 4th
Bar, the briquettings of 2663- second, 27- lowering means, the guide pin bushings of 271- second, the guide rails of 272- second, the racks of 273- the 3rd, 274- first
Motor, 275- gears, 276-L shape mobile bars, the contiguous blocks of 277- the 3rd, the block rubbers of 2711- the 3rd, the block rubbers of 2712- the 4th.
Embodiment
The present invention is further illustrated with reference to the accompanying drawings and examples.
Embodiment 1
A kind of concrete wire pole fast transportation is with installing equipment, as shown in figures 1-8, includes installing plate 1, the first support base 2, wheel
Axle 3, tire 4, supporting plate 5, fixed plate 6, the second support base 7, the first guide rail 8, the first guide pin bushing 9, first clamping plate 10, the first screw rod
11st, second clamping plate 12, the first nut 14, the first contiguous block 15, place block 16, bearing block 17, rotating ring 18, connecting rod 19, the
Three-ply board 20, the second screw rod 21, the 4th clamping plate 22 and the second nut 24, the downside left and right sides of installing plate 1 and front and rear sides pass through
The mode of welding is provided with the first support base 2, and the first side rotary of support base 2 times is connected with wheel shaft 3, wheel shaft 3 and is connected with wheel
Right side rear is provided with supporting plate 5 by way of welding on tire 4, installing plate 1, and the upper end of supporting plate 5 is pacified by way of welding
Equipped with fixed plate 6, the second support base 7 is installed by way of welding on the upside of the front side left of fixed plate 6, the second support base 7 is right
Side is provided with slidingtype on the first guide rail 8, the first guide rail 8 by way of welding and is connected with some first guide pin bushings 9, the first guide pin bushing
9 front sides right are provided with first clamping plate 10 by way of welding, and the mode that first clamping plate 10 passes on left welding is provided with
One screw rod 11, the upper left side of the first screw rod 11 is connected with second clamping plate 12, second clamping plate 12 and is provided with first through hole 13, second clamping plate
12 are connected on the first screw rod 11 by first through hole 13, and the upper left side of the first screw rod 11 is rotary with the first nut 14, the first nut 14
Coordinate with the first screw rod 11, the first nut 14 is located at the side by welding on the downside of the left of second clamping plate 12, the front side left of fixed plate 6
Formula is provided with the first contiguous block 15, and the lower end of the first contiguous block 15 is provided with placement plate by way of welding, places and is placed on plate
Have in bearing block 17, bearing block 17 and be connected on the first contiguous block 15, the mode that the outside of bearing block 17 is bolted is installed
There is rotating ring 18, the outside left of rotating ring 18 is provided with connecting rod 19 by way of welding, and the left end of connecting rod 19 passes through welding
Mode three-ply board 20 is installed, the mode that three-ply board 20 passes on left welding is provided with the second screw rod 21, the second screw rod
21 left sides, which are connected with the 4th clamping plate 22, the 4th clamping plate 22, is provided with the second through hole 23, and the 4th clamping plate 22 is connected by the second through hole 23
It is connected on the second screw rod 21, the upper left side of the second screw rod 21 is rotary with the second nut 24, the second nut 24 coordinates with the second screw rod 21, the
Two screw rods 21 are located at the left of the 4th clamping plate 22.
Embodiment 2
A kind of concrete wire pole fast transportation is with installing equipment, as shown in figures 1-8, includes installing plate 1, the first support base 2, wheel
Axle 3, tire 4, supporting plate 5, fixed plate 6, the second support base 7, the first guide rail 8, the first guide pin bushing 9, first clamping plate 10, the first screw rod
11st, second clamping plate 12, the first nut 14, the first contiguous block 15, place block 16, bearing block 17, rotating ring 18, connecting rod 19, the
Three-ply board 20, the second screw rod 21, the 4th clamping plate 22 and the second nut 24, the downside left and right sides of installing plate 1 and front and rear sides pass through
The mode of welding is provided with the first support base 2, and the first side rotary of support base 2 times is connected with wheel shaft 3, wheel shaft 3 and is connected with wheel
Right side rear is provided with supporting plate 5 by way of welding on tire 4, installing plate 1, and the upper end of supporting plate 5 is pacified by way of welding
Equipped with fixed plate 6, the second support base 7 is installed by way of welding on the upside of the front side left of fixed plate 6, the second support base 7 is right
Side is provided with slidingtype on the first guide rail 8, the first guide rail 8 by way of welding and is connected with some first guide pin bushings 9, the first guide pin bushing
9 front sides right are provided with first clamping plate 10 by way of welding, and the mode that first clamping plate 10 passes on left welding is provided with
One screw rod 11, the upper left side of the first screw rod 11 is connected with second clamping plate 12, second clamping plate 12 and is provided with first through hole 13, second clamping plate
12 are connected on the first screw rod 11 by first through hole 13, and the upper left side of the first screw rod 11 is rotary with the first nut 14, the first nut 14
Coordinate with the first screw rod 11, the first nut 14 is located at the side by welding on the downside of the left of second clamping plate 12, the front side left of fixed plate 6
Formula is provided with the first contiguous block 15, and the lower end of the first contiguous block 15 is provided with placement plate by way of welding, places and is placed on plate
Have in bearing block 17, bearing block 17 and be connected on the first contiguous block 15, the mode that the outside of bearing block 17 is bolted is installed
There is rotating ring 18, the outside left of rotating ring 18 is provided with connecting rod 19 by way of welding, and the left end of connecting rod 19 passes through welding
Mode three-ply board 20 is installed, the mode that three-ply board 20 passes on left welding is provided with the second screw rod 21, the second screw rod
21 left sides, which are connected with the 4th clamping plate 22, the 4th clamping plate 22, is provided with the second through hole 23, and the 4th clamping plate 22 is connected by the second through hole 23
It is connected on the second screw rod 21, the upper left side of the second screw rod 21 is rotary with the second nut 24, the second nut 24 coordinates with the second screw rod 21, the
Two screw rods 21 are located at the left of the 4th clamping plate 22.
Also include the first block rubber 121 and the second block rubber 122, the right side of second clamping plate 12 is connected with the first block rubber
121, the left side of first clamping plate 10 is connected with the second block rubber 122.
Embodiment 3
A kind of concrete wire pole fast transportation is with installing equipment, as shown in figures 1-8, includes installing plate 1, the first support base 2, wheel
Axle 3, tire 4, supporting plate 5, fixed plate 6, the second support base 7, the first guide rail 8, the first guide pin bushing 9, first clamping plate 10, the first screw rod
11st, second clamping plate 12, the first nut 14, the first contiguous block 15, place block 16, bearing block 17, rotating ring 18, connecting rod 19, the
Three-ply board 20, the second screw rod 21, the 4th clamping plate 22 and the second nut 24, the downside left and right sides of installing plate 1 and front and rear sides pass through
The mode of welding is provided with the first support base 2, and the first side rotary of support base 2 times is connected with wheel shaft 3, wheel shaft 3 and is connected with wheel
Right side rear is provided with supporting plate 5 by way of welding on tire 4, installing plate 1, and the upper end of supporting plate 5 is pacified by way of welding
Equipped with fixed plate 6, the second support base 7 is installed by way of welding on the upside of the front side left of fixed plate 6, the second support base 7 is right
Side is provided with slidingtype on the first guide rail 8, the first guide rail 8 by way of welding and is connected with some first guide pin bushings 9, the first guide pin bushing
9 front sides right are provided with first clamping plate 10 by way of welding, and the mode that first clamping plate 10 passes on left welding is provided with
One screw rod 11, the upper left side of the first screw rod 11 is connected with second clamping plate 12, second clamping plate 12 and is provided with first through hole 13, second clamping plate
12 are connected on the first screw rod 11 by first through hole 13, and the upper left side of the first screw rod 11 is rotary with the first nut 14, the first nut 14
Coordinate with the first screw rod 11, the first nut 14 is located at the side by welding on the downside of the left of second clamping plate 12, the front side left of fixed plate 6
Formula is provided with the first contiguous block 15, and the lower end of the first contiguous block 15 is provided with placement plate by way of welding, places and is placed on plate
Have in bearing block 17, bearing block 17 and be connected on the first contiguous block 15, the mode that the outside of bearing block 17 is bolted is installed
There is rotating ring 18, the outside left of rotating ring 18 is provided with connecting rod 19 by way of welding, and the left end of connecting rod 19 passes through welding
Mode three-ply board 20 is installed, the mode that three-ply board 20 passes on left welding is provided with the second screw rod 21, the second screw rod
21 left sides, which are connected with the 4th clamping plate 22, the 4th clamping plate 22, is provided with the second through hole 23, and the 4th clamping plate 22 is connected by the second through hole 23
It is connected on the second screw rod 21, the upper left side of the second screw rod 21 is rotary with the second nut 24, the second nut 24 coordinates with the second screw rod 21, the
Two screw rods 21 are located at the left of the 4th clamping plate 22.
Also include the first block rubber 121 and the second block rubber 122, the right side of second clamping plate 12 is connected with the first block rubber
121, the left side of first clamping plate 10 is connected with the second block rubber 122.
Also include mobile device 25, mobile device 25 includes first rotating shaft 251, the first runner 252, the first rack
253rd, the 3rd support base 254, the second rotating shaft 255, the second runner 256, transmission article 257, rotating disk 258, the rack of crank 259 and second
2510, the front side top of fixed plate 6 is provided with mobile device 25, and the front side top left and right sides of fixed plate 6 is rotatably connected with first turn
It is connected with axle 251, first rotating shaft 251 between first runner 252, the first runner 252 and is connected with the first rack 253, fixed plate 6
Upside right is provided with side rotary on the 3rd support base 254, the 3rd support base 254 by way of welding and is connected with second turn
The second runner 256 is connected with axle 255, the second rotating shaft 255 and right side first rotating shaft 251, the second runner 256 is located at the first runner
Transmission bar 257 is connected between 252 front sides, the second runner 256, the rear side of the second rotating shaft 255 is provided with by way of welding to be turned
Disk 258, the rear side of rotating disk 258 is rotary to be connected with crank 259, and the upside of the first guide pin bushing 9 is provided with the second tooth by way of welding
Bar 2510, the second rack 2510 is engaged with the first rack 253.
Embodiment 4
A kind of concrete wire pole fast transportation is with installing equipment, as shown in figures 1-8, includes installing plate 1, the first support base 2, wheel
Axle 3, tire 4, supporting plate 5, fixed plate 6, the second support base 7, the first guide rail 8, the first guide pin bushing 9, first clamping plate 10, the first screw rod
11st, second clamping plate 12, the first nut 14, the first contiguous block 15, place block 16, bearing block 17, rotating ring 18, connecting rod 19, the
Three-ply board 20, the second screw rod 21, the 4th clamping plate 22 and the second nut 24, the downside left and right sides of installing plate 1 and front and rear sides pass through
The mode of welding is provided with the first support base 2, and the first side rotary of support base 2 times is connected with wheel shaft 3, wheel shaft 3 and is connected with wheel
Right side rear is provided with supporting plate 5 by way of welding on tire 4, installing plate 1, and the upper end of supporting plate 5 is pacified by way of welding
Equipped with fixed plate 6, the second support base 7 is installed by way of welding on the upside of the front side left of fixed plate 6, the second support base 7 is right
Side is provided with slidingtype on the first guide rail 8, the first guide rail 8 by way of welding and is connected with some first guide pin bushings 9, the first guide pin bushing
9 front sides right are provided with first clamping plate 10 by way of welding, and the mode that first clamping plate 10 passes on left welding is provided with
One screw rod 11, the upper left side of the first screw rod 11 is connected with second clamping plate 12, second clamping plate 12 and is provided with first through hole 13, second clamping plate
12 are connected on the first screw rod 11 by first through hole 13, and the upper left side of the first screw rod 11 is rotary with the first nut 14, the first nut 14
Coordinate with the first screw rod 11, the first nut 14 is located at the side by welding on the downside of the left of second clamping plate 12, the front side left of fixed plate 6
Formula is provided with the first contiguous block 15, and the lower end of the first contiguous block 15 is provided with placement plate by way of welding, places and is placed on plate
Have in bearing block 17, bearing block 17 and be connected on the first contiguous block 15, the mode that the outside of bearing block 17 is bolted is installed
There is rotating ring 18, the outside left of rotating ring 18 is provided with connecting rod 19 by way of welding, and the left end of connecting rod 19 passes through welding
Mode three-ply board 20 is installed, the mode that three-ply board 20 passes on left welding is provided with the second screw rod 21, the second screw rod
21 left sides, which are connected with the 4th clamping plate 22, the 4th clamping plate 22, is provided with the second through hole 23, and the 4th clamping plate 22 is connected by the second through hole 23
It is connected on the second screw rod 21, the upper left side of the second screw rod 21 is rotary with the second nut 24, the second nut 24 coordinates with the second screw rod 21, the
Two screw rods 21 are located at the left of the 4th clamping plate 22.
Also include the first block rubber 121 and the second block rubber 122, the right side of second clamping plate 12 is connected with the first block rubber
121, the left side of first clamping plate 10 is connected with the second block rubber 122.
Also include mobile device 25, mobile device 25 includes first rotating shaft 251, the first runner 252, the first rack
253rd, the 3rd support base 254, the second rotating shaft 255, the second runner 256, transmission article 257, rotating disk 258, the rack of crank 259 and second
2510, the front side top of fixed plate 6 is provided with mobile device 25, and the front side top left and right sides of fixed plate 6 is rotatably connected with first turn
It is connected with axle 251, first rotating shaft 251 between first runner 252, the first runner 252 and is connected with the first rack 253, fixed plate 6
Upside right is provided with side rotary on the 3rd support base 254, the 3rd support base 254 by way of welding and is connected with second turn
The second runner 256 is connected with axle 255, the second rotating shaft 255 and right side first rotating shaft 251, the second runner 256 is located at the first runner
Transmission bar 257 is connected between 252 front sides, the second runner 256, the rear side of the second rotating shaft 255 is provided with by way of welding to be turned
Disk 258, the rear side of rotating disk 258 is rotary to be connected with crank 259, and the upside of the first guide pin bushing 9 is provided with the second tooth by way of welding
Bar 2510, the second rack 2510 is engaged with the first rack 253.
Also include the second contiguous block 2581, fixed block 2582, the 3rd screw rod 2584 and the first briquetting 2585, fixed plate 6
On the right side of being provided with above right side by way of welding on the second contiguous block 2581, the second contiguous block 2581 by way of welding
It is provided with fixed block 2582, fixed block 2582 and is provided with screwed hole 2583, the 3rd screw rod 2584, the 3rd is rotary with screwed hole 2583
Screw rod 2584 coordinates with screwed hole 2583, and the left end of the 3rd screw rod 2584 is rotatably connected with the first briquetting 2585.
Also include extension fixture 26, extension fixture 26 includes slide rail 261, sliding block 262, push rod 263, the and of sliding sleeve 264
Handle 266, connecting rod 19 is provided with the mode being bolted in extension fixture 26, connecting rod 19 and is provided with slide rail 261, sliding
The inner sliding type of rail 261 is connected with sliding block 262, and the left end of sliding block 262 is provided with push rod 263, the left side of slide rail 261 by way of welding
Sliding sleeve 264 is installed by way of welding, push rod 263 reaches the left of sliding sleeve 264 by sliding sleeve 264, and the top of connecting rod 19 is opened
There is a word hole 265, the upside of sliding block 262 is provided with handle 266 by way of welding, and handle 266 passes through the company of reaching of a word hole 265
The top of extension bar 19.
Also include the 3rd nut 2661, the 4th screw rod 2662 and the second briquetting 2663, the left side of handle 266 top passes through weldering
The mode connect, which is provided with the 3rd nut 2661, the 3rd nut 2661, is rotary with the 4th screw rod 2662, the 4th screw rod 2662 and the 3rd
Nut 2661 coordinates, and the lower end of the 4th screw rod 2662 is rotatably connected with the second briquetting 2663, and the contacts-side-down of the second briquetting 2663 is arrived
The top of connecting rod 19.
Also include lowering means 27, lowering means 27 includes the second guide pin bushing 271, the second guide rail 272, the 3rd rack
273rd, the first motor 274, gear 275, the contiguous block 277 of L-shaped mobile bar 276 and the 3rd, the left side of push rod 263 are provided with lowering means
27, the left end of push rod 263 is provided with the second guide pin bushing 271 by way of welding, and the inner sliding type of the second guide pin bushing 271 is connected with second and led
Rail 272, it is logical that the mode that the right side of the second guide rail 272 is bolted is provided with right side on the 3rd rack 273, the second guide pin bushing 271
Cross bolted mode and the first motor 274 is installed, the output shaft of the first motor 274 of the front side of the first motor 274 passes through shaft coupling
Device is connected with gear 275, and gear 275 is engaged with the 3rd rack 273, and the left side of the second guide rail 272 top is pacified by way of welding
Equipped with L-shaped mobile bar 276, the left side of L-shaped mobile bar 276 lower section is provided with the 3rd contiguous block 277 by way of welding, and the 3rd connects
Connect the left end of block 277 and the right side central of three-ply board 20 is arranged on by way of welding.
Also include the 3rd block rubber 2711 and the 4th block rubber 2712, the right side of the 4th clamping plate 22 is connected with the 3rd block rubber
2711, the left side of three-ply board 20 is connected with the 4th block rubber 2712.
Operation principle:When user needs that concrete wire pole transport or installed, user can be in factory
Concrete wire pole is placed between first clamping plate 10 and second clamping plate 12, the first nut 14 is then rotated, the first nut 14 passes through
With the cooperation precession to the right of the first screw rod 11, the first nut 14 promotes second clamping plate 12 to move right, contacts second clamping plate 12
On the right side of to concrete wire pole, so that concrete wire pole be fixed, then user can just carry out transporting to concrete wire pole,
Then the equipment is promoted to be moved to the position of required installation, then user promotes the rotate counterclockwise of connecting rod 19, connecting rod 19 is led to
Cross rotating ring 18 to rotate on bearing block 17, connecting rod 19 drives three-ply board 20 and the rotate counterclockwise of the 4th clamping plate 22, make the
The clamping plate 22 of three-ply board 20 and the 4th rotates to the front of supporting plate 5, and then user promotes the first guide pin bushing 9 of the rightmost side to move, and makes the
One guide pin bushing 9 moves into place the top between the clamping plate 22 of three-ply board 20 and the 4th, and then user rotates the first nut 14, makes the
One nut 14 no longer fixes concrete wire pole, moves down concrete wire pole, into the clamping plate 22 of three-ply board 20 and the 4th
Between, now user rotates the second nut 24, and the second nut 24 makes the second nut 24 by the cooperation precession with the second screw rod 21
The 4th clamping plate 22 is promoted to touch concrete wire pole and be fixed, then user's rotatable connection bar 19 turns clockwise,
Cement three-ply board 20 and the 4th clamping plate 22 is driven concrete wire pole rotation, concrete wire pole is located at the left of installing plate 1,
Then proceed to promote the equipment into the empty wiping of required installation, then rotate the second nut 24, make concrete wire pole in the 3rd folder
Moved down between the clamping plate 22 of plate 20 and the 4th, into the dead slot of required installation, then user rotates out of connecting rod 19, and will
Electric pole is fixed in dead slot, and being banketed and be compacted just can be with.
Because also including the first block rubber 121 and the second block rubber 122, the right side of second clamping plate 12 is connected with the first rubber
Block 121, the left side of first clamping plate 10 is connected with the second block rubber 122, when first clamping plate 10 and second clamping plate 12 are clamping cement electricity
When line bar, the first block rubber 121 and the second block rubber 122 can make the fixation of concrete wire pole have more stability.
Because also including mobile device 25, mobile device 25 includes first rotating shaft 251, the first runner 252, the first tooth
Article the 253, the 3rd support base 254, the second rotating shaft 255, the second runner 256, transmission article 257, rotating disk 258, the tooth of crank 259 and second
Bar 2510, the front side top of fixed plate 6 is provided with mobile device 25, and the front side top left and right sides of fixed plate 6 is rotatably connected with first
It is connected with rotating shaft 251, first rotating shaft 251 between first runner 252, the first runner 252 and is connected with the first rack 253, it is fixed
The upside right of plate 6 is provided with side rotary on the 3rd support base 254, the 3rd support base 254 by way of welding and is connected with
The second runner 256 is connected with two rotating shafts 255, the second rotating shaft 255 and right side first rotating shaft 251, the second runner 256 is located at first
Transmission bar 257 is connected between the front side of runner 252, the second runner 256, the rear side of the second rotating shaft 255 is installed by way of welding
There is a rotating disk 258, the rear side of rotating disk 258 is rotary to be connected with crank 259, the upside of the first guide pin bushing 9 is provided with the by way of welding
Two racks 2510, the second rack 2510 is engaged with the first rack 253, when user needs mobile first guide pin bushing 9 to drive cement
When electric pole is moved, user can drive rotating disk 258 to rotate with rotate counterclockwise crank 259, crank 259, and rotating disk 258 drives second
The rotate counterclockwise of rotating shaft 255, the second rotating shaft 255 drives the upside rotate counterclockwise of the second runner 256, and the second runner of upside 256 revolves
Turn to drive the downside rotate counterclockwise of the second runner 256 by being driven bar 257, the rotation of the second runner of downside 256 drives right side first
The rotate counterclockwise of rotating shaft 251, the rotation of downside first rotating shaft 251 drives the right side rotate counterclockwise of the first runner 252, first turn of right side
The rotation of wheel 252 drives the first runner 252 of left side to rotate by the first rack 253, so as to drive the first rotation counterclockwise of rack 253
Turn, the first rack 253 drives the second gear 275 being engaged with to move right, so as to drive the first guide pin bushing 9 in the first guide rail 8
On move right, so as to drive concrete wire pole to move right.
It is fixed because also including the second contiguous block 2581, fixed block 2582, the 3rd screw rod 2584 and the first briquetting 2585
The right side of plate 6 top is provided with right side on the second contiguous block 2581, the second contiguous block 2581 by way of welding and passes through welding
Mode, which is provided with fixed block 2582, fixed block 2582, is provided with screwed hole 2583, and the 3rd screw rod 2584 is rotary with screwed hole 2583,
3rd screw rod 2584 coordinates with screwed hole 2583, and the left end of the 3rd screw rod 2584 is rotatably connected with the first briquetting 2585, works as user
When rotation crank 259 is made on concrete wire pole arrival desired position, user can rotate the 3rd screw rod 2584, the 3rd screw rod
2584 promote the first briquetting 2585 to be moved to the left by the precession to the left of the cooperation with screwed hole 2583, the 3rd screw rod 2584, and first
Briquetting 2585 touches rotating disk 258 and fixing rotating disk 258 makes it no longer be rotated, so as to fix concrete wire pole not
Move again.
Because also including extension fixture 26, extension fixture 26 includes slide rail 261, sliding block 262, push rod 263, sliding sleeve
264 and handle 266, connecting rod 19 is provided with the mode being bolted in extension fixture 26, connecting rod 19 and is provided with slide rail
261, the inner sliding type of slide rail 261 is connected with sliding block 262, and the left end of sliding block 262 is provided with push rod 263, slide rail by way of welding
261 modes for passing on left welding are provided with sliding sleeve 264, and push rod 263 reaches the left of sliding sleeve 264, connecting rod 19 by sliding sleeve 264
Top is provided with a word hole 265, and the upside of sliding block 262 is provided with handle 266 by way of welding, and handle 266 passes through a word hole 265
The top of connecting rod 19 is reached, it is special when needing to be installed between concrete wire pole is located at the clamping plate 22 of three-ply board 20 and the 4th
Be not to need to be installed to farther place, but the equipment is when can not but move, user can promote handle 266 to
Move left, handle 266 is moved to the left with movable slider 262 in slide rail 261, sliding block 262 drive push rod 263 in the sliding sleeve 264 to
Move left, so that drive the clamping plate 22 of three-ply board 20 and the 4th to be moved to the left, so that drive concrete wire pole to be moved to the left, from
And realize and more install at a distance.
Because also including the 3rd nut 2661, the 4th screw rod 2662 and the second briquetting 2663, the left side of handle 266 top is logical
The mode for crossing welding is provided with the 3rd nut 2661, the 3rd nut 2661 and is rotary with the 4th screw rod 2662, the 4th screw rod 2662 with
3rd nut 2661 coordinates, and the lower end of the 4th screw rod 2662 is rotatably connected with the second briquetting 2663, the second side joint of briquetting 2663 times
The top of connecting rod 19 is contacted, when it is concrete wire pole in the more distant positions of required installation that user, which promotes handle 266, Yong Huke
To rotate the 4th screw rod 2662, the 4th screw rod 2662 passes through the downward precession of cooperation with the 3rd nut 2661, the 4th screw rod 2662
Promote the second briquetting 2663 to move down, the second briquetting 2663 is touched connecting rod 19, so that by handle 266 and sliding block 262
It is fixed on this position and no longer moves, is no longer moved so as to fix concrete wire pole.
Because also including lowering means 27, lowering means 27 includes the second guide pin bushing 271, the second guide rail 272, the 3rd tooth
Article the 273, first motor 274, gear 275, the contiguous block 277 of L-shaped mobile bar 276 and the 3rd, the left side of push rod 263 are provided with lowering means
27, the left end of push rod 263 is provided with the second guide pin bushing 271 by way of welding, and the inner sliding type of the second guide pin bushing 271 is connected with second and led
Rail 272, it is logical that the mode that the right side of the second guide rail 272 is bolted is provided with right side on the 3rd rack 273, the second guide pin bushing 271
Cross bolted mode and the first motor 274 is installed, the output shaft of the first motor 274 of the front side of the first motor 274 passes through shaft coupling
Device is connected with gear 275, and gear 275 is engaged with the 3rd rack 273, and the left side of the second guide rail 272 top is pacified by way of welding
Equipped with L-shaped mobile bar 276, the left side of L-shaped mobile bar 276 lower section is provided with the 3rd contiguous block 277 by way of welding, and the 3rd connects
Connect the left end of block 277 and the right side central of three-ply board 20 is arranged on by way of welding, when concrete wire pole is located at three-ply board 20
And the 4th when needing between clamping plate 22 to carry out landing to install, user can open the first motor 274, and the first motor 274 drives tooth
275 rotate counterclockwises are taken turns, gear 275 is rotated on the 3rd rack 273, so that drive the 3rd rack 273 to move down, the 3rd tooth
Bar 273 drives the second guide pin bushing 271 to be moved down in the second guide rail 272, and the second guide pin bushing 271 drives L-shaped mobile bar 276 and the 3rd
Contiguous block 277 is moved down, and the band three-ply board 20 of the 3rd contiguous block 277 and the 4th clamping plate 22 are moved down, so as to drive cement
Electric pole enters in the required dead slot installed, so can it is more accurate and it is more stable concrete wire pole is put into needed for installation
In dead slot.
Because also including the 3rd block rubber 2711 and the 4th block rubber 2712, the right side of the 4th clamping plate 22 is connected with the 3rd rubber
Blob of viscose 2711, the left side of three-ply board 20 is connected with the 4th block rubber 2712, when concrete wire pole is located at three-ply board 20 and the 4th
When between clamping plate 22, the 3rd block rubber 2711 and the 4th block rubber 2712 can make concrete wire pole it is more stable be fixed on the 3rd
Between the clamping plate 22 of clamping plate 20 and the 4th.
The control mode of the present invention is automatically controlled by controller, control skill of the circuit by this area of controller
Art personnel's simple programming is that can be achieved, and belongs to the common knowledge of this area, and the present invention is mainly used to protect mechanical device, institute
Control mode and circuit connection are not explained with the present invention.
Embodiment described above only expresses the preferred embodiment of the present invention, and it describes more specific and detailed, but simultaneously
Therefore the limitation to the scope of the claims of the present invention can not be interpreted as.It should be pointed out that for one of ordinary skill in the art
For, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these belong to this hair
Bright protection domain.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.
Claims (8)
1. a kind of concrete wire pole fast transportation is with installing equipment, it is characterised in that include installing plate(1), the first support base
(2), wheel shaft(3), tire(4), supporting plate(5), fixed plate(6), the second support base(7), the first guide rail(8), the first guide pin bushing
(9), first clamping plate(10), the first screw rod(11), second clamping plate(12), the first nut(14), the first contiguous block(15), place block
(16), bearing block(17), rotating ring(18), connecting rod(19), three-ply board(20), the second screw rod(21), the 4th clamping plate(22)
With the second nut(24), installing plate(1)The downside left and right sides and front and rear sides are provided with the first support base by way of welding
(2), the first support base(2)Lower side rotary is connected with wheel shaft(3), wheel shaft(3)On be connected with tire(4), installing plate(1)It is upper right
Side rear is provided with supporting plate by way of welding(5), supporting plate(5)Upper end is provided with fixed plate by way of welding
(6), fixed plate(6)The second support base is installed by way of welding on the upside of the left of front side(7), the second support base(7)Right side
First guide rail is installed by way of welding(8), the first guide rail(8)Upper slidingtype is connected with some first guide pin bushings(9), first
Guide pin bushing(9)Front side right is provided with first clamping plate by way of welding(10), first clamping plate(10)Pass on left the side of welding
Formula is provided with the first screw rod(11), the first screw rod(11)Upper left side is connected with second clamping plate(12), second clamping plate(12)On be provided with
First through hole(13), second clamping plate(12)Pass through first through hole(13)It is connected to the first screw rod(11)On, the first screw rod(11)On
Left side is rotary with the first nut(14), the first nut(14)With the first screw rod(11)Coordinate, the first nut(14)Positioned at second clamping plate
(12)Left, fixed plate(6)The first contiguous block is installed by way of welding on the downside of the left of front side(15), the first contiguous block
(15)Lower end is provided with placement plate by way of welding, places and is placed with bearing block on plate(17), bearing block(17)Interior connection
In the first contiguous block(15)On, bearing block(17)The mode that outside is bolted is provided with rotating ring(18), rotating ring
(18)Outside left is provided with connecting rod by way of welding(19), connecting rod(19)Left end is provided with by way of welding
Three-ply board(20), three-ply board(20)The mode for passing on left welding is provided with the second screw rod(21), the second screw rod(21)It is left
Side is connected with the 4th clamping plate(22), the 4th clamping plate(22)On be provided with the second through hole(23), the 4th clamping plate(22)Pass through the second through hole
(23)It is connected to the second screw rod(21)On, the second screw rod(21)Upper left side is rotary with the second nut(24), the second nut(24)With
Two screw rods(21)Coordinate, the second screw rod(21)Positioned at the 4th clamping plate(22)Left.
2. a kind of concrete wire pole fast transportation according to claim 1 is with installing equipment, it is characterised in that also include
First block rubber(121)With the second block rubber(122), second clamping plate(12)Right side is connected with the first block rubber(121), the first folder
Plate(10)Left side is connected with the second block rubber(122).
3. a kind of concrete wire pole fast transportation according to claim 2 is with installing equipment, it is characterised in that also include
Mobile device(25), mobile device(25)Include first rotating shaft(251), the first runner(252), the first rack(253), the 3rd
Support base(254), the second rotating shaft(255), the second runner(256), transmission bar(257), rotating disk(258), crank(259)With second
Rack(2510), fixed plate(6)Front side top is provided with mobile device(25), fixed plate(6)The front side top left and right sides is rotary
It is connected with first rotating shaft(251), first rotating shaft(251)On be connected with the first runner(252), the first runner(252)Between connect
There is the first rack(253), fixed plate(6)Upside right is provided with the 3rd support base by way of welding(254), the 3rd support
Seat(254)Upper side rotary is connected with the second rotating shaft(255), the second rotating shaft(255)With right side first rotating shaft(251)On be connected with
Second runner(256), the second runner(256)Positioned at the first runner(252)Front side, the second runner(256)Between be connected with transmission
Bar(257), the second rotating shaft(255)Rear side is provided with rotating disk by way of welding(258), rotating disk(258)Rear side rotatably connects
It is connected to crank(259), the first guide pin bushing(9)Upside is provided with the second rack by way of welding(2510), the second rack
(2510)With the first rack(253)Engagement.
4. a kind of concrete wire pole fast transportation according to claim 3 is with installing equipment, it is characterised in that also include
Second contiguous block(2581), fixed block(2582), the 3rd screw rod(2584)With the first briquetting(2585), fixed plate(6)On right side
Side is provided with the second contiguous block by way of welding(2581), the second contiguous block(2581)Pacified by way of welding on upper right side
Equipped with fixed block(2582), fixed block(2582)On be provided with screwed hole(2583), screwed hole(2583)Inside it is rotary with the 3rd screw rod
(2584), the 3rd screw rod(2584)With screwed hole(2583)Coordinate, the 3rd screw rod(2584)Left end is rotatably connected with the first pressure
Block(2585).
5. a kind of concrete wire pole fast transportation according to claim 4 is with installing equipment, it is characterised in that also include
Extension fixture(26), extension fixture(26)Include slide rail(261), sliding block(262), push rod(263), sliding sleeve(264)And handle
(266), connecting rod(19)It is provided with extension fixture(26), connecting rod(19)The mode being inside bolted is provided with slide rail
(261), slide rail(261)Inner sliding type is connected with sliding block(262), sliding block(262)Left end is provided with push rod by way of welding
(263), slide rail(261)The mode for passing on left welding is provided with sliding sleeve(264), push rod(263)Pass through sliding sleeve(264)Reach cunning
Set(264)Left, connecting rod(19)Top is provided with a word hole(265), sliding block(262)Upside is provided with handle by way of welding
Hand(266), handle(266)Pass through a word hole(265)Reach connecting rod(19)Top.
6. a kind of concrete wire pole fast transportation according to claim 5 is with installing equipment, it is characterised in that also include
3rd nut(2661), the 4th screw rod(2662)With the second briquetting(2663), handle(266)Above left side by way of welding
3rd nut is installed(2661), the 3rd nut(2661)Inside it is rotary with the 4th screw rod(2662), the 4th screw rod(2662)With the 3rd
Nut(2661)Coordinate, the 4th screw rod(2662)Lower end is rotatably connected with the second briquetting(2663), the second briquetting(2663)Under
Side joint contacts connecting rod(19)Top.
7. a kind of concrete wire pole fast transportation according to claim 6 is with installing equipment, it is characterised in that also include
Lowering means(27), lowering means(27)Include the second guide pin bushing(271), the second guide rail(272), the 3rd rack(273), first
Motor(274), gear(275), L-shaped mobile bar(276)With the 3rd contiguous block(277), push rod(263)Left side is provided with lowering means
(27), push rod(263)Left end is provided with the second guide pin bushing by way of welding(271), the second guide pin bushing(271)Inner sliding type is connected
There is the second guide rail(272), the second guide rail(272)The mode that right side is bolted is provided with the 3rd rack(273), second leads
Set(271)The mode that upper right side is bolted is provided with the first motor(274), the first motor(274)First electricity of front side
Machine(274)Output shaft is connected with gear by shaft coupling(275), gear(275)With the 3rd rack(273)Engagement, the second guide rail
(272)L-shaped mobile bar is installed by way of welding above left side(276), L-shaped mobile bar(276)Pass through weldering below left side
The mode connect is provided with the 3rd contiguous block(277), the 3rd contiguous block(277)Left end is arranged on three-ply board by way of welding
(20)Right side central.
8. a kind of concrete wire pole fast transportation according to claim 7 is with installing equipment, it is characterised in that also include
3rd block rubber(2711)With the 4th block rubber(2712), the 4th clamping plate(22)Right side is connected with the 3rd block rubber(2711), the
Three-ply board(20)Left side is connected with the 4th block rubber(2712).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710588327.9A CN107237544A (en) | 2017-07-19 | 2017-07-19 | A kind of concrete wire pole fast transportation is with installing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710588327.9A CN107237544A (en) | 2017-07-19 | 2017-07-19 | A kind of concrete wire pole fast transportation is with installing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107237544A true CN107237544A (en) | 2017-10-10 |
Family
ID=59991601
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710588327.9A Pending CN107237544A (en) | 2017-07-19 | 2017-07-19 | A kind of concrete wire pole fast transportation is with installing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107237544A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907819A (en) * | 2017-10-17 | 2018-04-13 | 郑世珍 | A kind of integrated circuit plate power path detection device |
CN108166828A (en) * | 2017-12-26 | 2018-06-15 | 彭素珍 | A kind of power engineering moves erecting device with concrete wire pole |
CN108179916A (en) * | 2017-12-06 | 2018-06-19 | 刘良南 | A kind of transport burial equipment for electric pole |
CN108179917A (en) * | 2017-12-07 | 2018-06-19 | 蒋安绍 | It is a kind of for the electric pole displacement of urban architecture and vertical vessel |
CN108222639A (en) * | 2017-12-06 | 2018-06-29 | 肖笃康 | A kind of grooving for concrete wire pole is with stablizing installation equipment |
CN108247452A (en) * | 2018-02-24 | 2018-07-06 | 晋江盾研机械设计有限公司 | A kind of iron staff upper and lower ends polish equipment |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2316341Y (en) * | 1997-09-11 | 1999-04-28 | 樊广谡 | Multifunctional pole erecting vehicle |
CN104088501A (en) * | 2014-06-28 | 2014-10-08 | 国家电网公司 | Cement telegraph pole erecting cart |
CN204001950U (en) * | 2014-08-25 | 2014-12-10 | 国家电网公司 | A kind of dolly of installation and transportation electric pole easy to use |
EP2990566A1 (en) * | 2014-08-29 | 2016-03-02 | CPD Powerline Ltd | Pole erection apparatus and method |
CN105863363A (en) * | 2016-04-24 | 2016-08-17 | 羊丁 | Telegraph pole installation work vehicle |
CN106013816A (en) * | 2016-06-02 | 2016-10-12 | 济宁山云宇内机电科技有限公司 | Novel stand column robot |
CN106088788A (en) * | 2016-07-12 | 2016-11-09 | 张学衡 | A kind of electric pole mounting robot |
CN106274627A (en) * | 2016-09-28 | 2017-01-04 | 国网山东省电力公司龙口市供电公司 | The device of auxiliary electric pole is set up between power circuit electric pole |
-
2017
- 2017-07-19 CN CN201710588327.9A patent/CN107237544A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2316341Y (en) * | 1997-09-11 | 1999-04-28 | 樊广谡 | Multifunctional pole erecting vehicle |
CN104088501A (en) * | 2014-06-28 | 2014-10-08 | 国家电网公司 | Cement telegraph pole erecting cart |
CN204001950U (en) * | 2014-08-25 | 2014-12-10 | 国家电网公司 | A kind of dolly of installation and transportation electric pole easy to use |
EP2990566A1 (en) * | 2014-08-29 | 2016-03-02 | CPD Powerline Ltd | Pole erection apparatus and method |
CN105863363A (en) * | 2016-04-24 | 2016-08-17 | 羊丁 | Telegraph pole installation work vehicle |
CN106013816A (en) * | 2016-06-02 | 2016-10-12 | 济宁山云宇内机电科技有限公司 | Novel stand column robot |
CN106088788A (en) * | 2016-07-12 | 2016-11-09 | 张学衡 | A kind of electric pole mounting robot |
CN106274627A (en) * | 2016-09-28 | 2017-01-04 | 国网山东省电力公司龙口市供电公司 | The device of auxiliary electric pole is set up between power circuit electric pole |
Non-Patent Citations (3)
Title |
---|
国家信息中心: "《中国产品信息年鉴 1997》", 30 June 1997, 中国计划出版社 * |
才家刚: "《电工口诀》", 31 January 2010, 机械工业出版社 * |
无: "《中华人民共和国道路交通管理条例附条文释义》", 30 April 1988, 中国政法大学出版社 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107907819A (en) * | 2017-10-17 | 2018-04-13 | 郑世珍 | A kind of integrated circuit plate power path detection device |
CN107907819B (en) * | 2017-10-17 | 2021-02-09 | 苏州巴涛信息科技有限公司 | Power supply path detection equipment for integrated circuit board |
CN108179916A (en) * | 2017-12-06 | 2018-06-19 | 刘良南 | A kind of transport burial equipment for electric pole |
CN108222639A (en) * | 2017-12-06 | 2018-06-29 | 肖笃康 | A kind of grooving for concrete wire pole is with stablizing installation equipment |
CN108179917A (en) * | 2017-12-07 | 2018-06-19 | 蒋安绍 | It is a kind of for the electric pole displacement of urban architecture and vertical vessel |
CN108166828A (en) * | 2017-12-26 | 2018-06-15 | 彭素珍 | A kind of power engineering moves erecting device with concrete wire pole |
CN108247452A (en) * | 2018-02-24 | 2018-07-06 | 晋江盾研机械设计有限公司 | A kind of iron staff upper and lower ends polish equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107237544A (en) | A kind of concrete wire pole fast transportation is with installing equipment | |
CN107288407A (en) | A kind of installation for electric pole and equipment of banketing | |
CN107023712A (en) | A kind of transport burial equipment buried for underground piping | |
CN107060477B (en) | A kind of open air electric pole installation equipment | |
CN107386761A (en) | A kind of concrete wire pole efficient transportation and installation equipment | |
CN107327202A (en) | It is a kind of that the vertical equipment directly installed can be carried out to concrete wire pole | |
CN108179917A (en) | It is a kind of for the electric pole displacement of urban architecture and vertical vessel | |
CN207309008U (en) | A kind of elbow tee pipe fitting process equipment | |
CN206395808U (en) | A kind of new nuclear medicine fume hood radiopharmaceutical source lifter | |
CN107476641A (en) | A kind of pair directly makes real equipment with the vertical of electric pole installation with grooving | |
CN204891140U (en) | Tennis apparatus for launching balls | |
CN207119384U (en) | A kind of physical experiment table with defencive function | |
CN107472655B (en) | A kind of transport installation equipment for electric pole | |
CN204538529U (en) | Combined insulating carrier | |
CN203758692U (en) | Sand and dust test chamber | |
CN107336960B (en) | A kind of transport device convenient for sharing bicycle quick despatch | |
CN206628808U (en) | A kind of adjustable support of screw rod transmission | |
CN107916824B (en) | A kind of installation equipment of construction site concrete wire pole | |
CN206855704U (en) | A kind of automatic blank remedying device of black glue cup | |
CN209937775U (en) | Tire forming clamp | |
CN106514475A (en) | Iron rod high-efficient polishing and rust-removing device for sintered neodymium-iron-boron production | |
CN206358882U (en) | A kind of conveying skeleton that automatic putting is set up for AMT screens | |
CN206673366U (en) | A kind of power distribution cabinet of power scheduling | |
CN204768866U (en) | Old and useless pole reducing mechanism | |
CN215107115U (en) | Construction platform convenient to remove |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171010 |