CN107237508A - The building energy-saving renovation construction method changed based on whole window - Google Patents
The building energy-saving renovation construction method changed based on whole window Download PDFInfo
- Publication number
- CN107237508A CN107237508A CN201710497876.5A CN201710497876A CN107237508A CN 107237508 A CN107237508 A CN 107237508A CN 201710497876 A CN201710497876 A CN 201710497876A CN 107237508 A CN107237508 A CN 107237508A
- Authority
- CN
- China
- Prior art keywords
- window
- frame
- energy saving
- protector
- energy
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0277—Repairing or restoring window or door frames
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B1/00—Border constructions of openings in walls, floors, or ceilings; Frames to be rigidly mounted in such openings
- E06B1/56—Fastening frames to the border of openings or to similar contiguous frames
- E06B1/58—Fastening frames to the border of openings or to similar contiguous frames by filling up the joints, e.g. by cementing
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Door And Window Frames Mounted To Openings (AREA)
- Building Environments (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of building energy-saving renovation construction method changed based on whole window, comprise the following steps:Set up scaffold in building outside;Remove the finish coat that the windowsill of existing window is plastered with surrounding;Measure dimension of opening at existing window;Energy Saving Windows are made according to the dimension of opening of measurement;Energy Saving Windows are installed, and external wall insulating layer is set on the outside of external wall;Energy Saving Windows edge treated;The position for corresponding to Energy Saving Windows indoors is installed by the protector with hermatic door;Inwardly remove existing window;Windowsill inside edge is handled;Remove protector;Scaffold is set up in outdoor, and protector is installed indoors, outside work is carried out on scaffold, indoor dismounting is operated in progress in protector, and sealing space is formed between protector and existing window the week side of boss wall, it is to avoid the dust influence indoor environment produced in transformation process, and transformation process is without outwards taking out of indoor article, it is time saving and energy saving, speed of application can be accelerated, moreover it is possible to shorten construction period.
Description
Technical field
The present invention relates to energy-saving building technology field, more particularly to a kind of building energy-saving renovation construction changed based on whole window
Method.
Background technology
With the continuous quickening of modern urban construction process, the quantity of architectural engineering is more and more, and building trade belongs to energy
The larger industry of source, resource consumption;According to statistics, China's existing constructions area is about more than 50,000,000,000 m2, wherein energy saving building is only about
For 6,900,000,000 m2, during China's building trade flourishes, energy-output ratio is huge, and building energy consumption accounts for whole society's total energy consumption
More than 27%;Under normal circumstances, window is the position of heat insulation effect relatively weakness in architectural exterior-protecting construction, and energy consumption has accounted for whole
40% or so of individual building energy consumption, and building energy consumption 50% or so can be reduced using Energy Saving Windows, important ratio is accounted in building energy conservation
Weight, is also that building energy conservation needs an important step to be processed, applicating energy-saving type window material and Energy Saving Windows construction technology are also
The inexorable trend that building trade is continued to develop.
The reducing energy consumption job site situation of existing building is complicated, it is generally the case that when existing building reducing energy consumption is constructed
It is required that resident withdraws from building, but because indoor article is more, the inconvenience of some large items is mobile, and this just brings perhaps to reducing energy consumption
It is more inconvenient.If indoor article does not take out of, dust can be produced in reducing energy consumption work progress, it will indoor environment is caused not
Good influence, therefore, exploitation design one kind need not take out of indoor article and indoor environment will not be impacted in transformation process
Construction method, be this area urgent problem.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of building energy-saving renovation construction method changed based on whole window,
Scaffold is set up in outdoor, and protector is installed indoors, outside work is carried out on scaffold, and indoor dismounting is operated in anti-
Carried out in protection unit, sealing space is formed between protector and existing window the week side of boss wall, it is to avoid ash is produced in transformation process
Dirt influences indoor environment, and transformation process is without outwards taking out of indoor article, time saving and energy saving, can accelerate speed of application, also
Construction period can be shortened.
In order to solve the above technical problems, the technical solution used in the present invention is:A kind of building section changed based on whole window
Energy rebuilding construction method, comprises the following steps:
S1:Set up scaffold in building outside;
S2:Remove the finish coat that the windowsill of existing window is plastered with surrounding;
S3:Measure dimension of opening at existing window;
S4:The dimension of opening measured according to step S3 makes Energy Saving Windows;
S5:Energy Saving Windows are installed, and external wall insulating layer is set on the outside of external wall;
S6:Energy Saving Windows edge treated;
S7:The position for corresponding to Energy Saving Windows indoors is installed by the protector with hermatic door;
S8:Inwardly remove existing window;
S9:Windowsill inside edge is handled;
S10:Remove protector.
The protector is the U-frame frame surrounded using steel truss, and it, which is open, rectifies on the inside of External Wall, on U-frame frame
End and lower end are respectively equipped with top spiral ejection pin and lower part helical push rod, and top spiral ejection pin and lower part helical push rod are set respectively
Four sets and top spiral ejection pin and lower part helical push rod are mounted opposite, and lower part helical push rod is used for support protecting apptss, top spiral shell
Revolving push rod is used to compress top plate upwards, and top seal body is set between U-frame frame and top plate, lower seal is set between bottom plate
Body, two of U-shaped frame front end vertical to set end sealing body between truss and inner side of outer wall face, U-frame frame front sets close
Closure door, the outer gusset of U-frame frame sets sealant, U-frame frame, sealant, top seal body, lower seal body and end sealing body with
Inner side of outer wall face forms confined space.
The top seal body, lower seal body and end sealing body use air bag, and air bag fixes shape with top truss
Into top seal body, air bag is fixed to form end sealing body with front end truss, and air bag is fixed to form lower seal with lower truss
Body.
The Energy Saving Windows made in the step S4 are aluminium parting bead medi-empty glass window or glue strip type hollow glass window, and window frame is used
Break hot aluminum alloy window frame or plastic window frame.
The step S2 includes removing coat of plaster on the outside of existing window, and with wire brush by the residual of existing window opening inwall
Slag is removed totally, and the hole of existing window opening inwall is blocked using gel rubber material.
The step S5 is included embedded expansion bolt, installs Energy Saving Windows, Energy Saving Windows and gap closure are fixed using connector,
The expansion bolt is separately mounted on the inside of existing window opening and exterior wall outer surface, on each face on the inside of existing window opening
Two expansion bolts are buried, the expansion bolt of exterior wall outer surface sets up separately on four sides of existing window opening, each side
Upper correspondence buries two expansion bolts, and the connector is included in L-shaped connector and " one " font connector, existing window opening
Side uses L-shaped connector, and exterior wall outer surface is used in " one " font connector, the energy-conservation window frame and existing window opening of installation
Fluid sealant is applied at filling-foam resin between side, connector, external wall insulating layer is overlapped with window frame, external wall insulating layer covering
The window frame lap-joint of " one " font connector, external wall insulating layer and Energy Saving Windows is handled using sealant sealing.
The step S8 is carried out on the inside of protector, and to carrying out encapsulation process on the inside of Energy Saving Windows, window frame with it is both fenestrate
Filling-foam resin in gap between on the inside of hole, encapsulation process installs exterior window trim and window after finishing on the inside of existing window opening
Platform, exterior window trim is Nian Jie with inner side of outer wall using building adhesive, and window platen is installed after Indoor sill mortar levelling.
The step S10 uses the order opposite with installing protector to dismantle, and has dismantled after protector, according to backward
Mode dismantle scaffold.
It is using the beneficial effect produced by above-mentioned technical proposal:Pacify by setting up scaffold in outdoor, and indoors
Fill protector, outside work carries out on scaffold, indoor dismounting is operated in protector and carried out, protector with it is existing
Sealing space is formed between window the week side of boss wall, it is to avoid dust influence indoor environment, and transformation process are produced in transformation process
It is time saving and energy saving without outwards taking out of indoor article, speed of application can be accelerated, moreover it is possible to shorten construction period;Still further aspect, this
After Energy Saving Windows in invention are installed, on the outside of Energy Saving Windows and on the inside of existing window opening between filling-foam resin, and will connection
Part coats fluid sealant, blocks connector and air contact, it is to avoid corrosion, increases the service life;The Foamex of filling forms disconnected
Heat bridge, blocks inner air and outer air to be circulated by gap, improves energy-saving effect;Energy Saving Windows side dimension in the present invention is less than both fenestrate
Indoor-side size 5-10 ㎜, it is ensured that Energy Saving Windows are smoothly installed;Protector in the present invention sets up into U-shaped structure using truss,
And sealant is gone along with sb. to guard him on the outside of U-shaped structure, sealant uses transparent plastic cloth or other soft light materials, forms substantially empty
Between, top seal is installed, under being installed between inner side of outer wall between mounting end seal, with bottom plate between truss and top plate
Portion's seal, forms independent confined space with this, prevents the dust produced in transformation process from getting in space.
Brief description of the drawings
Fig. 1 is existing window mounting structure schematic diagram;
Fig. 2 is that existing window removes the structural representation after finish coat;
Fig. 3 is Energy Saving Windows installment state schematic diagram;
Fig. 4 is Energy Saving Windows alien invasion structural representation;
Fig. 5 is external wall insulating layer mounting structure schematic diagram;
Fig. 6 is to install the structural representation after protector;
Fig. 7 is Fig. 6 1-1 sectional views;
Fig. 8 is to remove the structural representation after existing window;
Fig. 9 is Fig. 8 2-2 sectional views;
Figure 10 is to remove the structural representation after protector;
Figure 11 is protector positive structure schematic;
Figure 12 is guard sideways structural representation;
Wherein:1st, exterior wall;2nd, existing window;3rd, finish coat;4th, Energy Saving Windows;5th, connector;6th, external wall insulating layer;7th, top plate;
8th, top seal body;9th, U-frame frame;10th, lower seal body;11st, bottom plate;12nd, hermatic door;13rd, lower part helical push rod;14th, on
Portion's spiral ejection pin;15th, end sealing body;16th, protector.
Embodiment
With reference to the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Ground is described, it is clear that described embodiment is only a part of embodiment of the present invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
Many details are elaborated in the following description to facilitate a thorough understanding of the present invention, still the present invention can be with
It is different from other manner described here using other to implement, those skilled in the art can be without prejudice to intension of the present invention
In the case of do similar popularization, therefore the present invention is not limited by following public specific embodiment.
As shown in figure 1, the invention discloses a kind of building energy-saving renovation construction method changed based on whole window, it is including as follows
Step:
S1:Set up scaffold in building outside;
S2:The finish coat 3 that the windowsill of existing window 2 is plastered with surrounding is removed, referring to accompanying drawing 1-2, including the existing family of window 2 is removed
Outside coat of plaster, and the residue of the existing hole inwall of window 2 is removed to clean, the hole of the existing hole inwall of window 2 with wire brush
Mouth is blocked using gel rubber material;
S3:The Energy Saving Windows side dimension measured in dimension of opening at existing window 2, the present invention is less than existing window inside dimensions 5-
10 ㎜, it is ensured that Energy Saving Windows are smoothly installed;
S4:The dimension of opening measured according to step S3 makes Energy Saving Windows 4, the Energy Saving Windows 4 of making for aluminium parting bead medi-empty glass window or
Glue strip type hollow glass window, window frame is using the hot aluminum alloy window frame or plastic window frame of breaking;
S5:Energy Saving Windows 4 are installed, and external wall insulating layer 6 is set on the outside of external wall, referring to accompanying drawing 3-5, including embedded expansion
Bolt, Energy Saving Windows 4 are installed, Energy Saving Windows 4 and gap are fixed using connector blocks, the expansion bolt is separately mounted to both fenestrate
Two expansion bolts, exterior wall appearance are buried on each face on the inside of on the inside of the hole of family 2 and exterior wall outer surface, the existing hole of window 2
The expansion bolt in face sets up separately on four sides at the existing hole of window 2, and correspondence buries two expansion bolts, institute on each side
Stating connector includes using L-shaped connector, exterior wall appearance on the inside of L-shaped connector and " one " font connector, the existing hole of window 2
Filling-foam resin between face is used on the inside of " one " font connector, the window frame of Energy Saving Windows 4 of installation and the hole of existing window 2, even
Fluid sealant is applied at fitting, external wall insulating layer 6 is overlapped with window frame, and external wall insulating layer 6 covers " one " font connector, exterior wall
External thermal insulation 6 and the window frame lap-joint of Energy Saving Windows 4 are handled using sealant sealing;After Energy Saving Windows are installed, set outside exterior wall
Heat-insulation layer, external wall insulating layer does overlap joint processing with window frame at window, outer connectors is completely covered, to existing window hole
Handled at oral area position external wall insulating layer closing in window frame handing-over position using sealant sealing, to reduce or avoid to produce heat bridge
Effect, makes existing window opening position have good heat-insulating property.Stainless steel windowsill is set at external wall insulating layer closing in
Plate, is fixed by structure glue, is blocked rainwater, is prevented heat bridge.At gap, handled on the inside of window using sealant sealing.
S6:The edge treated of Energy Saving Windows 4;
S7:The protector 16 with hermatic door 12 is installed in the position for corresponding to Energy Saving Windows 4 indoors, referring to accompanying drawing 6-9;
S8:Existing window 2 is inwardly removed, is carried out in the inner side of protector 16, and encapsulation process, window are carried out to the inner side of Energy Saving Windows 4
Filling-foam resin in gap between on the inside of frame and existing window hole, encapsulation process finish after on the inside of the existing hole of window 2
Exterior window trim and windowsill are installed, exterior window trim is Nian Jie with inner side of outer wall using building adhesive, and window platen is installed after Indoor sill mortar levelling;
S9:Windowsill inside edge is handled;
S10:Remove protector 16;Dismantled, dismantled after protector 16 using the order opposite with installing protector 16,
Scaffold is dismantled in the way of backward.
Referring to accompanying drawing 11-12, the protector 16 is the U-frame frame 9 surrounded using steel truss, and it, which is open, rectifies external
Side within the walls, the top and bottom of U-frame frame 9 are respectively equipped with top spiral ejection pin 14 and lower part helical push rod 13, top spiral ejection pin
14 and lower part helical push rod 13 sets four sets respectively and top spiral ejection pin 14 and lower part helical push rod 13 are mounted opposite, bottom
Spiral ejection pin 13 is used for support protecting apptss 16, and top spiral ejection pin 14 is used to compress top plate 7 upwards, U-frame frame 9 and top plate 7
Between top seal body 8 is set, lower seal body 10 is set between bottom plate 11, two vertical truss of the front end of U-frame frame 9 and
End sealing body 15 is set between inner side of outer wall face, and the front of U-frame frame 9 sets hermatic door 12, and the outer gusset of U-frame frame 9 sets sealing
Layer, U-frame frame 9, sealant, top seal body 8, lower seal body 10 and end sealing body 15 form closed with inner side of outer wall face
Space;Top seal body 8, lower seal body 10 and end sealing body 15 use air bag, and air bag is fixed to be formed with top truss
Top seal body 8, air bag is fixed to form end sealing body 15 with front end truss, and air bag is fixed to form lower seal with lower truss
Body 10.
During concrete application, the present invention installs protector indoors by setting up scaffold in outdoor, outdoor
It is operated on scaffold and carries out, indoor dismounting is operated in progress in protector, protector and window the week side of boss wall to be rebuilt
Between form sealing space, it is to avoid dust influence indoor environment is produced in transformation process, and transformation process is without outwards taking out of
Indoor article, it is time saving and energy saving, speed of application can be accelerated, moreover it is possible to shorten construction period;Energy-conservation in still further aspect, the present invention
After window is installed, on the outside of Energy Saving Windows and on the inside of existing window opening between filling-foam resin, and connector is coated into fluid sealant,
Block connector and air contact, it is to avoid corrosion, increase the service life;The Foamex of filling forms disconnected heat bridge, blocks inside and outside
Air is circulated by gap, improves energy-saving effect;Energy Saving Windows side dimension in the present invention is less than existing window inside dimensions 5-
10 ㎜, it is ensured that Energy Saving Windows are smoothly installed;Protector in the present invention sets up into U-shaped structure using truss, and outside U-shaped structure
Gusset protects sealant, and sealant uses transparent plastic cloth or other soft light materials, forms fundamental space, truss and top plate
Between install top seal, between inner side of outer wall between mounting end seal, with bottom plate install lower seal body, with this
Independent confined space is formed, prevents the dust produced in transformation process from getting in space.
Claims (8)
1. a kind of building energy-saving renovation construction method changed based on whole window, it is characterised in that:Comprise the following steps:
S1:Set up scaffold in building outside;
S2:Remove existing window(2)The finish coat plastered with surrounding of windowsill(3);
S3:Measure existing window(2)Locate dimension of opening;
S4:The dimension of opening measured according to step S3 makes Energy Saving Windows(4);
S5:Energy Saving Windows are installed(4), and external wall insulating layer is set on the outside of external wall(6);
S6:Energy Saving Windows(4)Edge treated;
S7:Energy Saving Windows are corresponded to indoors(4)Position install have hermatic door(12)Protector(16);
S8:Inwardly remove existing window(2);
S9:Windowsill inside edge is handled;
S10:Remove protector(16).
2. the building energy-saving renovation construction method according to claim 1 changed based on whole window, it is characterised in that:It is described anti-
Protection unit(16)For the U-frame frame surrounded using steel truss(9), it, which is open, rectifies on the inside of External Wall, U-frame frame(9)Upper end and
Lower end is respectively equipped with top spiral ejection pin(14)With lower part helical push rod(13), top spiral ejection pin(14)With lower part helical push rod
(13)Four sets and top spiral ejection pin are set respectively(14)With lower part helical push rod(13)It is mounted opposite, lower part helical push rod
(13)For support protecting apptss(16), top spiral ejection pin(14)For compressing top plate upwards(7), U-frame frame(9)With top plate
(7)Between set top seal body(8), with bottom plate(11)Between set lower seal body(10), U-frame frame(9)The two of front end
End sealing body is set between individual vertical truss and inner side of outer wall face(15), U-frame frame(9)Front sets hermatic door(12), U-shaped
Framework(9)Outer gusset sets sealant, U-frame frame(9), sealant, top seal body(8), lower seal body(10)It is close with end
Feng Ti(15)Confined space is formed with inner side of outer wall face.
3. the building energy-saving renovation construction method according to claim 2 changed based on whole window, it is characterised in that:On described
Portion's seal(8), lower seal body(10)And end sealing body(15)Air bag is used, air bag is fixed to be formed with top truss
Portion's seal(8), air bag and front end truss are fixed to form end sealing body(15), air bag fixes that to form bottom close with lower truss
Feng Ti(10).
4. the building energy-saving renovation construction method according to claim 3 changed based on whole window, it is characterised in that:The step
The Energy Saving Windows made in rapid S4(4)For aluminium parting bead medi-empty glass window or glue strip type hollow glass window, window frame is using the hot aluminium alloy that breaks
Window frame or plastic window frame.
5. the building energy-saving renovation construction method according to claim 4 changed based on whole window, it is characterised in that:The step
Rapid S2 includes removing existing window(2)Outdoor side coat of plaster, and with wire brush by existing window(2)The residue of hole inwall is removed
Totally, existing window(2)The hole of hole inwall is blocked using gel rubber material.
6. the building energy-saving renovation construction method according to claim 5 changed based on whole window, it is characterised in that:The step
Rapid S5 includes embedded expansion bolt, installs Energy Saving Windows(4), use connector fix Energy Saving Windows(4)With gap closure, the expansion
Bolt is separately mounted to existing window(2)On the inside of hole and exterior wall outer surface, existing window(2)Buried on each face on the inside of hole
If two expansion bolts, the expansion bolt of exterior wall outer surface sets up separately in existing window(2)On four sides at hole, each side
Upper correspondence buries two expansion bolts, and the connector includes L-shaped connector and " one " font connector, existing window(2)Hole
Intraoral side uses L-shaped connector, and exterior wall outer surface uses " one " font connector, the Energy Saving Windows of installation(4)Window frame with it is both fenestrate
Family(2)Fluid sealant, external wall insulating layer are applied at filling-foam resin between on the inside of hole, connector(6)Overlapped with window frame, outside
Wall external thermal insulation(6)Cover " one " font connector, external wall insulating layer(6)With Energy Saving Windows(4)Window frame lap-joint using close
Sealing encapsulation process.
7. the building energy-saving renovation construction method according to claim 6 changed based on whole window, it is characterised in that:The step
Rapid S8 is in protector(16)Inner side is carried out, and to Energy Saving Windows(4)Inner side carries out encapsulation process, window frame and existing window hole inner side
Between gap in filling-foam resin, encapsulation process finish after in existing window(2)Exterior window trim and windowsill, window are installed on the inside of hole
Set is Nian Jie with inner side of outer wall using building adhesive, and window platen is installed after Indoor sill mortar levelling.
8. the building energy-saving renovation construction method according to claim 7 changed based on whole window, it is characterised in that:The step
Rapid S10 is used with installing protector(16)Opposite order dismounting, has dismantled protector(16)Afterwards, in the way of backward
Dismantle scaffold.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710497876.5A CN107237508B (en) | 2017-06-27 | 2017-06-27 | Building energy-saving renovation construction method based on the replacement of whole window |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710497876.5A CN107237508B (en) | 2017-06-27 | 2017-06-27 | Building energy-saving renovation construction method based on the replacement of whole window |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107237508A true CN107237508A (en) | 2017-10-10 |
CN107237508B CN107237508B (en) | 2019-04-23 |
Family
ID=59987248
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710497876.5A Active CN107237508B (en) | 2017-06-27 | 2017-06-27 | Building energy-saving renovation construction method based on the replacement of whole window |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107237508B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306828A (en) * | 2019-07-10 | 2019-10-08 | 上海建为历保科技股份有限公司 | A kind of steel sash repairerment construction method |
CN113216683A (en) * | 2021-05-21 | 2021-08-06 | 申燕青 | Old district of construction transformation is with window expansion strutting arrangement |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2330842A1 (en) * | 1974-09-21 | 1977-06-03 | Alfemo Fenster | Window for use with existing frame - has additional pane clear of main one to damp out noise |
JPS61257588A (en) * | 1985-05-10 | 1986-11-15 | 新日軽株式会社 | Method of replacing window frame |
SE0700846L (en) * | 2007-04-05 | 2008-03-11 | Allan Erikanders | Instickskarm |
KR101076408B1 (en) * | 2011-06-21 | 2011-10-25 | 한국건설기술연구원 | Window with easily replaceable blind |
CN104265120A (en) * | 2014-07-30 | 2015-01-07 | 连云港市临洪水利工程管理处 | Energy-saving reconstruction technology of existing building push-pull type aluminum alloy single-glass old window |
CN206091728U (en) * | 2016-09-28 | 2017-04-12 | 上海朗绿建筑科技股份有限公司 | Be suitable for existing door and window's energy -conserving window |
-
2017
- 2017-06-27 CN CN201710497876.5A patent/CN107237508B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2330842A1 (en) * | 1974-09-21 | 1977-06-03 | Alfemo Fenster | Window for use with existing frame - has additional pane clear of main one to damp out noise |
JPS61257588A (en) * | 1985-05-10 | 1986-11-15 | 新日軽株式会社 | Method of replacing window frame |
SE0700846L (en) * | 2007-04-05 | 2008-03-11 | Allan Erikanders | Instickskarm |
KR101076408B1 (en) * | 2011-06-21 | 2011-10-25 | 한국건설기술연구원 | Window with easily replaceable blind |
CN104265120A (en) * | 2014-07-30 | 2015-01-07 | 连云港市临洪水利工程管理处 | Energy-saving reconstruction technology of existing building push-pull type aluminum alloy single-glass old window |
CN206091728U (en) * | 2016-09-28 | 2017-04-12 | 上海朗绿建筑科技股份有限公司 | Be suitable for existing door and window's energy -conserving window |
Non-Patent Citations (3)
Title |
---|
王旭: "20世纪遗产建筑围护结构节能改造技术策略研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
王翔等: "既有居住建筑外窗改造经济技术研究", 《中华民居(下旬刊)》 * |
黄胜岚: "既有建筑节能改造实践", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110306828A (en) * | 2019-07-10 | 2019-10-08 | 上海建为历保科技股份有限公司 | A kind of steel sash repairerment construction method |
CN113216683A (en) * | 2021-05-21 | 2021-08-06 | 申燕青 | Old district of construction transformation is with window expansion strutting arrangement |
CN113216683B (en) * | 2021-05-21 | 2022-12-16 | 广东忠沅建设工程有限公司 | Old district of construction transformation is with window expansion strutting arrangement |
Also Published As
Publication number | Publication date |
---|---|
CN107237508B (en) | 2019-04-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113646A (en) | Outer window structure suitable for passive-type low-energy-consumption buildings and installation method thereof | |
CN103867072B (en) | The manufacture method of the outer wall window of a kind of heat preservation energy-saving and structure | |
CN211287246U (en) | Window attaches frame structure | |
CN205713845U (en) | Aluminium alloy window edge frame Hermetical connecting structure | |
CN107237508A (en) | The building energy-saving renovation construction method changed based on whole window | |
CN104818855A (en) | Construction method of gas tightness heat-proof bridge waterproof heat preservation energy-saving external window | |
CN201209368Y (en) | Water-proof structure | |
CN205000477U (en) | Exterior window structure suitable for passive form low energy consumption building | |
CN105401828B (en) | A kind of door and window energy-conservation enhancing composite water-proof pair frame | |
CN111075309A (en) | Method for mounting aluminum alloy door and window | |
CN207228888U (en) | A kind of installation node of waterproof exterior window trim | |
CN205558650U (en) | Prevention of seepage water outer wall window mounting structure | |
CN212802942U (en) | Assembled energy-conserving aluminium frame for window | |
CN213868355U (en) | Bathtub node waterproof construction | |
CN211623083U (en) | Connecting buckle slot at joint of external wall tile and door panel | |
CN101705777B (en) | Method for anti-seepage construction between hidden frame glass window and building structure | |
CN211549468U (en) | Non-heat-insulation broken bridge aluminum fireproof window profile | |
CN105003166B (en) | A kind of seal sliding window | |
CN206928872U (en) | A kind of installation node of lower frame of window window covering plate and window covering plate | |
CN208251944U (en) | A kind of novel window screen integrated combination window | |
CN206607693U (en) | A kind of construction engineering water-proof structure | |
CN206928825U (en) | A kind of installation node of window upper ledge window covering plate and window covering plate | |
CN205349096U (en) | Waterproof building structure of windowsill | |
CN206928831U (en) | A kind of windowsill waterproof construction | |
CN112031594A (en) | Installation and construction method for passive building external-hanging door and window |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 050021 No. 244 Huaizhong Road, Shijiazhuang City, Hebei Province Patentee after: Hebei Academy of Architectural Sciences Co., Ltd. Address before: 050021 No. 244 Huaizhong Road, Shijiazhuang City, Hebei Province Patentee before: Hebei Prov. Architecture Science Academy |
|
CP01 | Change in the name or title of a patent holder |