CN107235401A - 连接施工电梯与爬模架体的滑动附墙装置及其使用方法 - Google Patents
连接施工电梯与爬模架体的滑动附墙装置及其使用方法 Download PDFInfo
- Publication number
- CN107235401A CN107235401A CN201710630431.XA CN201710630431A CN107235401A CN 107235401 A CN107235401 A CN 107235401A CN 201710630431 A CN201710630431 A CN 201710630431A CN 107235401 A CN107235401 A CN 107235401A
- Authority
- CN
- China
- Prior art keywords
- construction elevator
- creeping formwork
- support body
- lateral connection
- wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010276 construction Methods 0.000 title claims abstract description 32
- 238000009415 formwork Methods 0.000 title claims abstract description 29
- 238000000034 method Methods 0.000 title claims abstract description 6
- 238000005096 rolling process Methods 0.000 claims description 9
- 238000009435 building construction Methods 0.000 abstract description 2
- 230000009194 climbing Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000000903 blocking effect Effects 0.000 description 1
- 206010016256 fatigue Diseases 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000010008 shearing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
Abstract
本发明提供一种连接施工电梯与爬模架体的滑动附墙装置及其使用方法,包括两个沿竖向分布的横向连接部,两个横向连接部的一端均固定于爬模架体上,另一端通过限位滚轮沿竖向滑动设置于施工电梯标节侧面的片式辅助节上,每个横向连接部的所述另一端上设置有至少四个限位滚轮,片式辅助节的竖杆上任意相对两侧均滑动设置有至少一个限位滚轮,其中一个横向连接部的两端分别通过伸缩杆与另一个横向连接部的一端相连接。以解决为了保证施工电梯与爬模架体之间的同步爬升,现有附墙结构在核心筒剪力墙截面发生变化的过程中,势必将进行拆卸,而且拆卸难度较大的问题。本发明属于建筑施工技术领域。
Description
技术领域
本发明涉及一种施工电梯和爬模结构,属于建筑施工技术领域。
背景技术
在超高层建筑采用爬模施工时,传统的施工电梯常规情况下均设置在爬模底部,通过下吊笼进出爬模架体,同时受结构形式限制,和减少施工电梯预留洞口封堵时间,通常在电梯井位置设置单笼电梯(必要时需要定做),单笼电梯安装和拆除工程量较大,同时不能满足现场劳动力运输需要,只能增加单笼电梯设置个数,增加单电梯安装个数同时增加成本。为加快施工进度、确保工程质量,发明人对爬模体系结构进行了多方面研究,并针对各项技术进行改进与创新,成功的设计了一种能够将施工电梯上升至爬模操作平台上的组合结构。为了保证施工电梯与爬模架体之间的同步爬升,普通附墙两端一段与施工电梯标准节相连接,另一端与爬模架体相连接。如果两端均选择固定铰支座相连接,在核心筒剪力墙截面发生变化的过程中,势必将进行拆卸,而且拆卸难度较大。因此,在进行考虑与爬模架体相连的两道附着时,为了方便拆卸,引进了一种连接施工电梯与爬模的滑动附墙。
发明内容
本发明的目的在于:提供一种连接施工电梯与爬模架体的滑动附墙装置及其使用方法,以解决为了保证施工电梯与爬模架体之间的同步爬升,现有附墙结构在核心筒剪力墙截面发生变化的过程中,势必将进行拆卸,而且拆卸难度较大的问题。
为解决上述问题,拟采用这样一种连接施工电梯与爬模的滑动附墙,包括两个沿竖向分布的横向连接部,两个横向连接部的一端均固定于爬模架体上,另一端通过限位滚轮沿竖向滑动设置于施工电梯标节侧面的片式辅助节上,每个横向连接部的所述另一端上设置有至少四个限位滚轮,片式辅助节的竖杆上任意相对两侧均滑动设置有至少一个限位滚轮,其中一个横向连接部的两端分别通过伸缩杆与另一个横向连接部的一端相连接。
前述滑动附墙中,所述附墙在爬模架体和施工电梯标节之间沿竖向分布设置有至少两组。
上述滑动附墙在使用时,施工电梯与爬模架体同步爬升,在核心筒剪力墙截面发生变化的过程中,由于每一片滚动附墙都具有一定的可调量,只要核心筒剪力墙截面内缩量在滚动附墙的可调节范围内时,滚动附墙无需进行更换;当塔楼核心筒部位从下至上累计内缩量超过滚动附墙的可调节范围时,根据内缩量的超出值判断需配备滑动附墙的套数并进行更换即可。
与现有技术相比,本发明提供的滑动附墙一端与爬模架体上的附墙支座相连,另一端则是安装有滑轮,通过滑轮与施工电梯标准节相连接,并通过伸缩杆保证滑动附墙具有一定可调节量,每一片滑动附墙的可调量一般为300mm,在核心筒剪力墙截面内缩量在300mm范围内时滑动附墙不需要进行更换,仅需将附着进行进行调节即可,使用十分方便,且方便拆卸,降低施工和维护成本。
附图说明
图1是本发明安装后的结构示意图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将通过附图对发明作进一步地详细描述。
实施例:
参照图1,本实施例提供一种连接施工电梯与爬模的滑动附墙,所述附墙在爬模架体2和施工电梯标节4之间沿竖向分布设置有至少两组,每组附墙包括两个沿竖向分布的横向连接部1,两个横向连接部1的一端均通过螺栓与爬模架体2上的附墙支座相连,另一端通过限位滚轮3沿竖向滑动设置于施工电梯标节4侧面的片式辅助节5上,每个横向连接部1的所述另一端上设置有至少四个限位滚轮3,片式辅助节5的竖杆上任意相对两侧均滑动设置有至少一个限位滚轮3,其中一个横向连接部1的两端分别通过伸缩杆6与另一个横向连接部1的一端相连接。
每一片滑动附墙的可调量为300mm,在核心筒剪力墙截面内缩量在300mm范围内时滑动附墙不需要进行更换,仅需将附着进行调节即可。由于塔楼核心筒部位从下至上累计内缩量达850mm,因此需要更换三套不同尺寸的滑动附着。
上述滑动附墙在使用时,施工电梯与爬模架体同步爬升,在核心筒剪力墙截面发生变化的过程中,由于每一片滚动附墙都具有300mm的可调量,只要核心筒剪力墙截面内缩量在滚动附墙的可调节范围内时,滚动附墙无需进行更换;由于塔楼核心筒部位从下至上累计内缩量达850mm,因此需要更换三套不同尺寸的滑动附着。
Claims (3)
1.一种连接施工电梯与爬模的滑动附墙装置,包括两个沿竖向分布的横向连接部(1),两个横向连接部(1)的一端均固定于爬模架体(2)上,另一端通过限位滚轮(3)沿竖向滑动设置于施工电梯标节(4)侧面的片式辅助节(5)上,每个横向连接部(1)的所述另一端上设置有至少四个限位滚轮(3),片式辅助节(5)的竖杆上任意相对两侧均滑动设置有至少一个限位滚轮(3),其中一个横向连接部(1)的两端分别通过伸缩杆(6)与另一个横向连接部(1)的一端相连接。
2.根据权利要求1所述一种连接施工电梯与爬模的滑动附墙装置,其特征在于:所述附墙在爬模架体(2)和施工电梯标节(4)之间沿竖向分布设置有至少两组。
3.权利要求1或2中所述滑动附墙的使用方法,其特征在于,具体方法如下:
使用时,施工电梯与爬模架体同步爬升,在核心筒剪力墙截面发生变化的过程中,由于每一片滚动附墙都具有一定的可调量,只要核心筒剪力墙截面内缩量在滚动附墙的可调节范围内时,滚动附墙无需进行更换;当塔楼核心筒部位从下至上累计内缩量超过滚动附墙的可调节范围时,根据内缩量的超出值判断需配备滑动附墙的套数并进行更换即可。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710630431.XA CN107235401A (zh) | 2017-07-28 | 2017-07-28 | 连接施工电梯与爬模架体的滑动附墙装置及其使用方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710630431.XA CN107235401A (zh) | 2017-07-28 | 2017-07-28 | 连接施工电梯与爬模架体的滑动附墙装置及其使用方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107235401A true CN107235401A (zh) | 2017-10-10 |
Family
ID=59989403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710630431.XA Pending CN107235401A (zh) | 2017-07-28 | 2017-07-28 | 连接施工电梯与爬模架体的滑动附墙装置及其使用方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107235401A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108840202A (zh) * | 2018-08-29 | 2018-11-20 | 中国建筑第二工程局有限公司 | 施工电梯爬升式附墙 |
CN112160579A (zh) * | 2020-09-17 | 2021-01-01 | 上海建工集团股份有限公司 | 一种超高层施工防护作业平台系统及施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103342269A (zh) * | 2013-07-11 | 2013-10-09 | 中建三局建设工程股份有限公司 | 一种超高层施工电梯的附着机构及顶升方法 |
CN206220257U (zh) * | 2016-09-19 | 2017-06-06 | 华南理工大学 | 一种用于顶模施工电梯的可滑移附着装置 |
CN207142567U (zh) * | 2017-07-28 | 2018-03-27 | 中建四局第一建筑工程有限公司 | 一种连接施工电梯与爬模架体的滑动附墙装置 |
-
2017
- 2017-07-28 CN CN201710630431.XA patent/CN107235401A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103342269A (zh) * | 2013-07-11 | 2013-10-09 | 中建三局建设工程股份有限公司 | 一种超高层施工电梯的附着机构及顶升方法 |
CN206220257U (zh) * | 2016-09-19 | 2017-06-06 | 华南理工大学 | 一种用于顶模施工电梯的可滑移附着装置 |
CN207142567U (zh) * | 2017-07-28 | 2018-03-27 | 中建四局第一建筑工程有限公司 | 一种连接施工电梯与爬模架体的滑动附墙装置 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108840202A (zh) * | 2018-08-29 | 2018-11-20 | 中国建筑第二工程局有限公司 | 施工电梯爬升式附墙 |
CN112160579A (zh) * | 2020-09-17 | 2021-01-01 | 上海建工集团股份有限公司 | 一种超高层施工防护作业平台系统及施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107235401A (zh) | 连接施工电梯与爬模架体的滑动附墙装置及其使用方法 | |
US9637936B1 (en) | Apparatus for unrolling rolls of insulation in vertical strips from the top down | |
CN103342269B (zh) | 一种超高层施工电梯的附着机构及顶升方法 | |
CN207142567U (zh) | 一种连接施工电梯与爬模架体的滑动附墙装置 | |
CN109537865A (zh) | 一种超高层多曲率变化弧线外爬架 | |
US10767361B2 (en) | Emergency escape tunnel | |
CN107338868B (zh) | 一种大型球形屏幕安装体系及其施工方法 | |
CN206539032U (zh) | 钢筋间距定位控制器及其系统 | |
US11248382B1 (en) | Climbing support subsystem | |
EP1233122A3 (en) | Facade scaffolding | |
CN104929353A (zh) | 可拆卸楼梯式电梯井自动爬升操作平台 | |
CN207348225U (zh) | 一种大型球形屏幕安装体系 | |
US20160264261A1 (en) | Boarding bridge | |
CN203213622U (zh) | 施工物料装卸设备 | |
EP1179647B1 (de) | Verstellbare Arbeitsbühne | |
CN102238749A (zh) | 一种信道竞争的方法及接入点设备 | |
CN103849709B (zh) | 炼钢转炉的倾动系统的安装方法 | |
EP1967479A1 (de) | Fangrahmen für eine Mehrdeckkabine | |
CN209874433U (zh) | 一种组拼式整体移动操作架 | |
CN210105254U (zh) | 一种移动可调高度式施工爬梯 | |
CN2209702Y (zh) | 交替爬升脚手架 | |
CN210105259U (zh) | 移动式脚手架 | |
ES2074748T3 (es) | Procedimiento para evitar la acumulacion local de cabinas de ascensor en un grupo de ascensores con volumen de trafico variable. | |
CH711401A2 (de) | Beton-Verbundelement für ein Deckenelement zur Raumtemperierung. | |
CN206521934U (zh) | 一种跨天井移动式操作平台 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171010 |