CN107230007A - The early warning system and its method of goal task amount - Google Patents
The early warning system and its method of goal task amount Download PDFInfo
- Publication number
- CN107230007A CN107230007A CN201610169977.5A CN201610169977A CN107230007A CN 107230007 A CN107230007 A CN 107230007A CN 201610169977 A CN201610169977 A CN 201610169977A CN 107230007 A CN107230007 A CN 107230007A
- Authority
- CN
- China
- Prior art keywords
- total amount
- goal task
- amount
- time window
- early warning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06311—Scheduling, planning or task assignment for a person or group
- G06Q10/063114—Status monitoring or status determination for a person or group
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0637—Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
Abstract
The present invention relates to monitoring technology field, a kind of early warning system and its method of goal task amount are disclosed.In the present invention, the method for early warning of goal task amount is comprised the steps of:A. the corresponding very first time window of goal task amount is obtained;Wherein, the initial time of very first time window correspondence goal task amount and deadline;B. obtain very first time window in, from initial time to the current statistic time in completion total amount, be used as the first total amount;C. obtain very first time window in, from current statistic time to deadline in estimated completion total amount, be used as the second total amount;D. the first total amount, the second total amount and goal task amount are utilized, the completion probability of goal task amount is estimated;If E. completing probability is less than predetermined threshold value, early warning is sent.Embodiments of the present invention can be exercised supervision to pending task in task implementation procedure, managed and early warning, improve operating efficiency, it is ensured that normal effective execution of whole task.
Description
Technical field
The present invention relates to the early warning system and its method in monitoring technology field, more particularly to goal task amount.
Background technology
, not only can be with the performance of writing task task in the monitoring management of enterprise, can also be to complete
Into work effectively assessed, bring convenient to business administration.However, in existing monitoring technology,
Completed workload can only be counted and assessed, and can not know that goal task is possible complete in advance
Into situation.But some tasks are due to closely bound up with the time, less than deadline, can not know task
Whether it is done, but if waiting until that deadline is just known unfinished, can but causes serious consequence.Than
Such as, the completion for sales goal amount is monitored, and less than deadline and can not know whether aim parameter can be complete
Into, if but waited until that deadline is known again, the loss caused by unfinished portion can not be retrieved.
So, prior art especially possibly can not be timely completed target for unfinished task
During task, it is impossible to be automatically fed to task supervision side, so that can not be in task implementation procedure to pending
Task carries out effective supervision and oversight.
The content of the invention
It is an object of the invention to provide a kind of early warning system and its method of goal task amount so that in office
During business is performed, the possible performance of goal task can be known in advance, possibly can not be completed
Early warning of the Shi Shixian to goal task.
In order to solve the above technical problems, embodiments of the present invention provide a kind of early warning of goal task amount
Method, is comprised the steps of:
A. the corresponding very first time window of goal task amount is obtained;Wherein, the very first time window correspondence institute
State initial time and the deadline of goal task amount;
B. obtain in the very first time window, from initial time to the current statistic time in completion it is total
Amount, is used as the first total amount;
C. obtain in the very first time window, from current statistic time to deadline in estimated completion
Total amount, is used as the second total amount;
D. first total amount, the second total amount and goal task amount are utilized, the goal task amount is estimated
Completion probability;
If E. the completion probability is less than predetermined threshold value, early warning is sent.
Embodiments of the present invention additionally provide a kind of early warning system of goal task amount, comprising:Management clothes
Business device and remote terminal;
The management server is included with lower module:
First acquisition module, for obtaining the corresponding very first time window of goal task amount;Wherein, described
The initial time of the one time window correspondence goal task amount and deadline;
Second acquisition module, for obtaining in the very first time window, during from initial time to current statistic
Interior completion total amount, is used as the first total amount;
3rd acquisition module, for obtaining in the very first time window, from the current statistic time to during cut-off
Interior estimated completion total amount, is used as the second total amount;
Estimation block, for using first total amount, the second total amount and goal task amount, estimation to be described
The completion probability of goal task amount;
Warning module, when the completion probability for being estimated in the estimation block is less than predetermined threshold value, to institute
State remote terminal and send early warning.
When in terms of existing technologies, by obtaining in very first time window from initial time to current statistic
Interior completion total amount, can be counted to completed work.By obtaining in very first time window
Estimated completion total amount in from current statistic time to deadline, can be carried out pre- to unfinished work
Estimate, and know the possible performance of goal task in advance using these data.It is less than in advance completing probability
If early warning is sent during threshold value can inform that user is possible to that goal task can not be completed, so as in task
Effective supervision and management is carried out in implementation procedure to pending task.It can be seen that, embodiment of the present invention makes
Obtain during tasks carrying, the possible performance of goal task can be known in advance, in possible nothing
The early warning to goal task is realized when method is completed.
In addition, being comprised the steps of in the method for early warning:It is determined that it is expected that completing the transformation ratio of total amount;
Among the step D, following sub-step is included:Determined using second total amount and conversion coefficient estimated
Convert total amount;Using first total amount, estimated conversion total amount and goal task amount, the target is estimated
The completion probability of task amount.
By the estimated transformation ratio for completing total amount, it can be carried with the estimated conversion total amount of more practical estimation
The accuracy that height is estimated.
In addition, the estimated transformation ratio for completing total amount is determined by following steps:Default second time window;
Wherein, second time window is earlier than the current statistic time;The reality obtained in second time window is complete
Into total amount, the 3rd total amount is used as;The estimated completion total amount in second time window is obtained, the 4th is used as
Total amount;Using the 3rd total amount and the 4th total amount, the transformation ratio is determined.
By count the second time window in actually accomplish total amount and it is expected that complete total amount, determine transformation system
Number, can calculate transformation ratio according to actual data, and the degree of accuracy is high, and referring to property is strong.
In addition, the width of the second time window is more than the width of very first time window.
Can in longer historical time statistics, expand data statistics scope, to improve into one
Step calculates degree of accuracy during conversion ratio.
In addition, according to default N number of the second different time window, determining N number of transformation ratio, utilizing N
Individual transformation ratio determines average transformation coefficient;In the step of transformation ratio of the estimated completion total amount of determination,
Identified transformation ratio is average transformation coefficient.
By N number of the second different time window, N number of transformation ratio is determined, then calculate N number of transformation system
Several average transformation coefficients, as the estimated transformation ratio for completing total amount, further increases transformation ratio
The degree of accuracy, estimated complete total amount so as to more accurately estimate.
In addition, the account of first user at least corresponds to the account of a second user;
It is described the step of send early warning in, send early warning to the account of the second user.
The account of first user at least corresponds to the account of a second user, can be when early warning is sent
So that other specific user is it can be seen that warning information, enters so as to the implementation status to goal task
One step is supervised, and has expanded the application prospect of embodiment of the present invention.
Brief description of the drawings
Fig. 1 is the method for early warning flow chart of the goal task amount according to first embodiment;
Fig. 2 is that the first total amount, the second total amount and goal task amount estimation target are utilized in second embodiment
The flow chart of the completion probability of task amount;
Fig. 3 is the management system structural representation of the goal task amount according to the 5th embodiment.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with accompanying drawing to this hair
Bright each embodiment is explained in detail.However, it will be understood by those skilled in the art that
In each embodiment of the invention, in order that reader more fully understands the application and to propose many technologies thin
Section.But, even if many variations and modification without these ins and outs and based on following embodiment,
Each claim of the application technical scheme claimed can also be realized.
The first embodiment of the present invention is related to a kind of method for early warning of goal task amount.Its flow such as Fig. 1
It is shown, it is specific as follows:
In a step 101, the corresponding very first time window of goal task amount is obtained.Wherein, very first time window
The initial time of correspondence goal task amount and deadline.Such as:Certain company's plan in March completes 100
Part order, then the goal task amount in March is 100, and very first time window is March 1 to March 31
Day.
In a step 102, the first total amount is obtained.Specifically, obtain in very first time window from during starting
Between to completion total amount in the current statistic time, be used as the first total amount.Such as, current statistic when
Between be March 10, then the order total amount that the first total amount was completed by March 1 to March 10.
In step 103, the second total amount is obtained.
Specifically, the estimated completion in acquisition very first time window from current statistic time to deadline
Total amount is as the second total amount, the value that the estimated completion total amount in present embodiment can be inputted by the first user
Obtain, the first user can be staff, project leader etc..
In particular, the first user can input estimated performances of M and its correspondingly in a management system
Time, from each estimated performance, filtering out the correspondence time is in very first time window, from current
Estimated performance in timing statisticses to deadline, the cumulative each estimated performance filtered out, as
Second total amount, wherein, the M is natural number.
Such as, M estimated performances of the first user input and its correspondence time are as shown in table 1,
Assuming that the time of current statistic is March 10, then the second total amount is estimated for March 10 to March 31
The order total amount of completion.Then all corresponding estimated performances in March 10 to March 31 are added,
I.e.:5+8+22+15+10=60 (part).It should be noted that each estimated performance in present embodiment can
Estimated with the conventional work achievement according to staff, ability to work and the business of company prospect.
Such as, in marketing system, sales force can according to consulting client (if new client,
Can be according to the purchase intention of client, can be according to conventional cooperation if frequent customer) estimate
It is expected that the sales volume completed.
Table 1:Process of work statistical form
At step 104, goal task amount is estimated using the first total amount, the second total amount and goal task amount
Completion probability.Specifically, can with the first total amount plus the second total amount and divided by goal task amount
Estimate and complete probability, such as, the goal task amount in March is 100 orders, current statistic
Time is March 10, as shown in table 1:The total amount actually accomplished to March 10 March 1 is
13+17=30 (part), March 10 to March 31, the estimated total amount that completes was 60, then completed probability
For (30+60)/100, as 90%.
In step 105, judge to complete whether probability is less than predetermined threshold value, if being then directly entered step
106, if otherwise terminating the early warning flow of goal task amount in present embodiment.
Specifically, the process of work of staff, this reality can substantially be understood by completing probability
Applying the predetermined threshold value in mode can set in a management system, for example, the predetermined threshold value set as
100%, then enter step 106 when the completion probability estimated is less than 100%, otherwise explanation completes general
Rate is 100%, i.e., staff is estimated can be timely completed goal task, then target end task amount
Early warning flow.In addition, in actual applications, must be completed for guarantee task, 100% can also be set higher than
Threshold value, will not enumerate herein.
In step 106, early warning is sent.
Specifically, so that the user for inputting estimated performance is the first user as an example, the account of the first user
The account of a second user can be at least corresponded to, when completing probability and being less than predetermined threshold value to second user
Account send early warning.Second user in present embodiment can manage for leader, project leader etc.
Personnel.The sending method of early warning can be auditory tone cues, message push etc., by being sent to second user
Early warning, can allow administrative staff to know actual conditions in advance when being possible to and can not complete task, so as to
Timely to adjust work arrangements, such as:Staff is urged to accelerate the progress of work, or according to reality
Border situation adjustment action etc., task is timely completed with maximum possible.
It is seen that, compared with prior art, present embodiment to unfinished workload by estimating
Calculate, calculate and complete probability, the process of work of staff can be carried out based on specific numeral
Estimate so that more accurate to the assessment of the ability to work of staff, conveniently, with practical significance.
And for unfinished task, it is automatic to send pre- when possibly goal task can not be timely completed
Police feeds back to task supervision side so that pending task can be carried out effectively in task implementation procedure
Supervision and oversight, to adjust work arrangements in time when that possibly can not be timely completed goal task, is improved
Operating efficiency, adds the practicality of present embodiment.
Second embodiment of the present invention is related to a kind of method for early warning of goal task amount.Second embodiment
Improve, the improvement is that on the basis of first embodiment:In present embodiment,
In the step of completion probability of goal task amount being estimated using the first total amount, the second total amount and goal task amount,
Need first to determine the estimated transformation ratio for completing total amount, recycle the second total amount and conversion coefficient to determine estimated
Total amount is converted, then using the first total amount, estimated conversion total amount and goal task amount, goal task is estimated
The completion probability of amount, improves the degree of accuracy for completing Probability estimate.In present embodiment using the first total amount,
The flow of the completion probability of second total amount and goal task amount estimation goal task amount is as shown in Figure 2.
In step 201, the second time window is preset.Wherein, the second time window is earlier than the current statistic time,
And second time window width can be more than very first time window width.In actual applications, the second time
The period of window can be more than the very first time window corresponding period, so as in longer historical time section
Statistics, expands the scope of data statistics.Such as, the second time window is on January 1 to 2 months 15
Day, it is 46 days, 31 days than very first time window are wide, and the process of work in the second time window is such as
Shown in table 2.
Table 2:January 1 was to 15 days 2 months process of work statistical forms
In step 202., the 3rd total amount is obtained.Specifically, the 3rd total amount is in the second time window
The total amount actually accomplished.In particular, the 3rd total amount is corresponding reality of all times in the second time window
The summation of border performance, as shown in table 2, January 1, all times corresponding reality was complete to 15 days 2 months
Summation into amount is that 115, i.e. the 3rd total amount are 115.
In step 203, the 4th total amount is obtained.Specifically, the 4th total amount is in the second time window
It is expected that completing total amount.In particular, the 4th total amount is corresponding estimated for all times in the second time window
The summation of performance, as shown in table 2, the corresponding estimated completion of January 1 to 2 months 15 all times
The summation of amount is that 120, i.e. the 4th total amount are 120.
In step 204, transformation ratio is determined using the 3rd total amount and the 4th total amount.Specifically, may be used
So that by the ratio of the 3rd total amount and the 4th total amount, as transformation ratio, such as in table 2, the 3rd total amount is
115, the 4th total amount is 120, then 115/120=0.96, i.e. transformation ratio are 0.96.
In step 205, estimated conversion total amount is determined using the second total amount and conversion coefficient.Specifically,
Be multiplied by with the second total amount conversion coefficient can with to estimated conversion total amount.Such as, it is as shown in table 1, false
Time such as current statistic is March 10, then the second total amount is to be counted in advance within 31st to March March 10
Into total amount, i.e., 60, then estimated conversion total amount is 60*0.96=57.6 parts.
In step 206, appointed using the first total amount, estimated conversion total amount and goal task amount estimation target
The completion probability of business amount.Specifically, can be with the first total amount plus estimated convert total amount and divided by mesh
Mark task amount, which is estimated, completes probability.Such as, as shown in table 1, if the time of current statistic is 3
The moon 10, then the first total amount is the order total amount actually accomplished to March 10 March 1, i.e., 30
Part, then it is (30+60*0.96)/100=87.6% to complete probability.
It should be noted that the second time window in present embodiment can also be set to it according to actual conditions
His historical time section, in actual applications, the width of the second time window can be more than very first time window
Width, might be less that or equal to the width of very first time window, do not do in embodiments of the present invention
Limit.
By presetting the second time window in present embodiment, transformation system can be calculated according to actual data
Number, the degree of accuracy is high, and referring to property is strong so that more accurate in the estimated conversion total amount of estimation, so as to
Probability is completed with accurate estimation, is conducive to estimating the working condition of staff, further carries
The high practicality of embodiment of the present invention.
Third embodiment of the present invention is related to a kind of method for early warning of goal task amount, the 3rd embodiment
Roughly the same with second embodiment, the main distinction is:In this second embodiment, by presetting 1
Individual second time window determines transformation ratio, and in third embodiment of the invention, by it is default it is multiple not
The second same time window determines transformation ratio, can more accurately calculate transformation ratio.
Specifically, in the present embodiment, N (N is natural number) individual different second can be preset
Time window, determines N number of transformation ratio, then determines average transformation coefficient using N number of transformation ratio, and
Average transformation system is defined as transformation ratio.Such as:N is 3, the step in second embodiment
The method that rapid 201- steps 204 are provided can determine that 3 transformation ratios, then seek the flat of 3 transformation ratios
Average, is defined as final transformation ratio, it is necessary to illustrate by the average value, in practical application, N
Other natural numbers can also be taken as needed.
Present embodiment determines transformation ratio by presetting multiple the second different time windows, further improves
The degree of accuracy of transformation ratio, so as to which more accurately estimation goal task completes probability, is improved
The practicality of embodiment of the present invention.
The 4th embodiment of the present invention is related to a kind of method for early warning of goal task amount.4th embodiment
Improve, the improvement is that on the basis of first embodiment:In the first embodiment, it is right
Goal task amount is only once estimated to be judged with early warning, and in four embodiment of the invention, can be with
The different goal task amount by repeatedly obtaining, is persistently estimated to each goal task amount.Expand
The application prospect of embodiment of the present invention.
Specifically, in the present embodiment, after judging that completing probability is more than predetermined threshold value, Huo Zhe
Send after early warning, can also determine whether to obtain the corresponding time window of next goal task amount, when sentencing
Disconnected result is appointed then to obtain next goal task amount corresponding time window when being by next target
The first total amount, the second total amount and target total amount estimation completion probability in the corresponding time window of business amount, and
Complete to send early warning during probability efficiency predetermined threshold value.Such as, January 1 to January 31 can be obtained
Goal task amount in the time window of day completes probability, is obtained again 1 day to 2 months 28 2 months after having estimated
Goal task amount in the time window of day completes probability.Go down successively, can continue to goal task
Performance is estimated, and is estimated so as to the lasting process of work to staff,
And then the ability to work of staff can scientifically be judged, it is more beneficial for carrying out staff
Supervision and management.
Present embodiment allows the calculating for completing probability to goal task amount to circulate progress, by default
Different very first time windows, it is estimated that the completion probability of the corresponding goal task amount of time windows,
Estimated so as to the lasting task performance to staff, by the work to staff
The assessment of ability is set up on the basis of based on objective data, can more scientifically judge staff's
Ability to work, so as to advantageously expand implementation of the present invention in exercising supervision and managing to staff
The application prospect of mode.
The step of various methods are divided above, be intended merely to describe clear, one is can be merged into when realizing
Step is split to some steps, is decomposed into multiple steps, as long as comprising identical logical relation,
All in the protection domain of this patent;To adding inessential modification in algorithm or in flow or drawing
Enter inessential design, but do not change the core design of its algorithm and flow all in the protection model of the patent
In enclosing.
Fifth embodiment of the invention is related to a kind of early warning system of goal task amount, as shown in figure 3, bag
Contain:Management server and remote terminal, wherein management server are included with lower module:
First acquisition module, for obtaining the corresponding very first time window of goal task amount, wherein, when first
Between window correspondence goal task amount initial time and deadline.
Second acquisition module, for obtaining in very first time window, from initial time to the current statistic time in
Completion total amount, be used as the first total amount.
3rd acquisition module, for obtaining in very first time window, from current statistic time to deadline in
Estimated completion total amount, be used as the second total amount.
Estimation block, for using the first total amount, the second total amount and goal task amount, estimating goal task
The completion probability of amount.
Warning module, for when the completion probability that estimation block is estimated is less than predetermined threshold value, to long-range end
End sends early warning.
It is seen that, present embodiment is the system embodiment corresponding with first embodiment, this implementation
Mode can work in coordination implementation with first embodiment.The relevant technical details mentioned in first embodiment
In the present embodiment still effectively, in order to reduce repetition, repeat no more here.Correspondingly, this implementation
The relevant technical details mentioned in mode are also applicable in first embodiment.
It is noted that each module involved in present embodiment is logic module, in reality
In, a logic unit can be one of a physical location or a physical location
Point, it can also be realized with the combination of multiple physical locations.In addition, the innovative part in order to protrude the present invention,
Not by with solving technical problem relation proposed by the invention less close unit in present embodiment
Introduce, but this is not intended that in present embodiment and other units is not present.
It will be understood by those skilled in the art that the respective embodiments described above are to realize that the present invention's is specific
Embodiment, and in actual applications, can to it, various changes can be made in the form and details, without inclined
From the spirit and scope of the present invention.
Claims (10)
1. a kind of method for early warning of goal task amount, it is characterised in that comprise the steps of:
A. the corresponding very first time window of goal task amount is obtained;Wherein, the very first time window correspondence institute
State initial time and the deadline of goal task amount;
B. obtain in the very first time window, from initial time to the current statistic time in completion it is total
Amount, is used as the first total amount;
C. obtain in the very first time window, from current statistic time to deadline in estimated completion
Total amount, is used as the second total amount;
D. first total amount, the second total amount and goal task amount are utilized, the goal task amount is estimated
Completion probability;
If E. the completion probability is less than predetermined threshold value, early warning is sent.
2. the method for early warning of goal task amount according to claim 1, it is characterised in that described
Comprised the steps of in method for early warning:It is determined that it is expected that completing the transformation ratio of total amount;
Among the step D, following sub-step is included:
Estimated conversion total amount is determined using second total amount and conversion coefficient;
Using first total amount, estimated conversion total amount and goal task amount, the goal task amount is estimated
Completion probability.
3. the method for early warning of goal task amount according to claim 2, it is characterised in that described
It is expected that the transformation ratio for completing total amount is determined by following steps:
Default second time window;Wherein, second time window is earlier than the current statistic time;
Obtain in second time window and actually accomplish total amount, be used as the 3rd total amount;
The estimated completion total amount in second time window is obtained, the 4th total amount is used as;
Using the 3rd total amount and the 4th total amount, the transformation ratio is determined.
4. the method for early warning of goal task amount according to claim 3, it is characterised in that described
Using the 3rd total amount and the 4th total amount, in the step of determining the transformation ratio, following sub-step is included
Suddenly:
It regard the ratio of the 3rd total amount and the 4th total amount as the transformation ratio.
5. the method for early warning of goal task amount according to claim 3, it is characterised in that described
The width of second time window is more than the width of the very first time window.
6. the method for early warning of goal task amount according to claim 3, it is characterised in that according to
Default N number of the second different time window, determines N number of transformation ratio, true using N number of transformation ratio
Allocate equal transformation ratio;
In the step of transformation ratio of the estimated completion total amount of determination, identified transformation ratio is average
Transformation ratio.
7. the method for early warning of goal task amount according to claim 1, it is characterised in that described
It is expected that completing the value acquisition that total amount is inputted by the first user.
8. the method for early warning of goal task amount according to claim 7, it is characterised in that described
Before step C, comprise the steps of:
Obtain the M estimated performances inputted from first user and its corresponding time;
Among the step C, following sub-step is included:
From each estimated performance, filtering out the correspondence time is in the very first time window, from current
Estimated performance in timing statisticses to deadline;
The cumulative each estimated performance filtered out, is used as second total amount;Wherein, the M is
Natural number.
9. the method for early warning of goal task amount according to claim 7, it is characterised in that described
The account of first user at least corresponds to the account of a second user;
It is described the step of send early warning in, send early warning to the account of the second user.
10. a kind of early warning system of goal task amount, it is characterised in that the management system is included:Pipe
Manage server and remote terminal;
The management server is included with lower module:
First acquisition module, for obtaining the corresponding very first time window of goal task amount;Wherein, described
The initial time of the one time window correspondence goal task amount and deadline;
Second acquisition module, for obtaining in the very first time window, during from initial time to current statistic
Interior completion total amount, is used as the first total amount;
3rd acquisition module, for obtaining in the very first time window, from the current statistic time to during cut-off
Interior estimated completion total amount, is used as the second total amount;
Estimation block, for using first total amount, the second total amount and goal task amount, estimation to be described
The completion probability of goal task amount;
Warning module, when the completion probability for being estimated in the estimation block is less than predetermined threshold value, to institute
State remote terminal and send early warning.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610169977.5A CN107230007A (en) | 2016-03-23 | 2016-03-23 | The early warning system and its method of goal task amount |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610169977.5A CN107230007A (en) | 2016-03-23 | 2016-03-23 | The early warning system and its method of goal task amount |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107230007A true CN107230007A (en) | 2017-10-03 |
Family
ID=59931484
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610169977.5A Pending CN107230007A (en) | 2016-03-23 | 2016-03-23 | The early warning system and its method of goal task amount |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107230007A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108304394A (en) * | 2018-02-08 | 2018-07-20 | 环宇爱译(北京)信息技术有限责任公司 | Translation project process control system and its job step time collocation method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1567313A (en) * | 2003-06-14 | 2005-01-19 | 鸿富锦精密工业(深圳)有限公司 | Project management control system and method |
CN102110015A (en) * | 2009-12-29 | 2011-06-29 | 北大方正集团有限公司 | Method and device for determining task progress and task processing time |
CN102385720A (en) * | 2010-09-06 | 2012-03-21 | 杨瑞宁 | Project planning, tracking and predicating method |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
CN102945516A (en) * | 2012-10-19 | 2013-02-27 | 北京神舟航天软件技术有限公司 | Multistage network planned schedule analysis method |
CN103632200A (en) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | Method for building engineering construction progress early-warning model on basis of time probabilities |
-
2016
- 2016-03-23 CN CN201610169977.5A patent/CN107230007A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1567313A (en) * | 2003-06-14 | 2005-01-19 | 鸿富锦精密工业(深圳)有限公司 | Project management control system and method |
CN102110015A (en) * | 2009-12-29 | 2011-06-29 | 北大方正集团有限公司 | Method and device for determining task progress and task processing time |
CN102385720A (en) * | 2010-09-06 | 2012-03-21 | 杨瑞宁 | Project planning, tracking and predicating method |
CN102799966A (en) * | 2012-06-29 | 2012-11-28 | 厦门易用软件技术有限公司 | Monitoring and early-warning system of enterprise project executing schedule |
CN102945516A (en) * | 2012-10-19 | 2013-02-27 | 北京神舟航天软件技术有限公司 | Multistage network planned schedule analysis method |
CN103632200A (en) * | 2013-12-05 | 2014-03-12 | 国家电网公司 | Method for building engineering construction progress early-warning model on basis of time probabilities |
Non-Patent Citations (1)
Title |
---|
张晓华 等: ""基于AHP 的天波雷达装备维修保障能力评估"", 《火力与指挥控制》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108304394A (en) * | 2018-02-08 | 2018-07-20 | 环宇爱译(北京)信息技术有限责任公司 | Translation project process control system and its job step time collocation method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chavez-Demoulin et al. | Quantitative models for operational risk: extremes, dependence and aggregation | |
US7689384B1 (en) | Managing the performance of an electronic device | |
CN1955932B (en) | Method and apparatus for performance and policy analysis in distributed computing systems | |
US9219663B1 (en) | Managing the performance of an electronic device | |
US20040122647A1 (en) | Apparatus and method for managing the performance of an electronic device | |
EP2273431B1 (en) | Model determination system | |
CN108038040A (en) | Computer cluster performance indicator detection method, electronic equipment and storage medium | |
US20130166350A1 (en) | Cluster based processing for forecasting intermittent demand | |
CN106570778A (en) | Big data-based data integration and line loss analysis and calculation method | |
DE112018000125B4 (en) | Quantifying a combined impact of interdependent uncertain resources in an electric power grid | |
Möllering et al. | An optimal constant level rationing policy under service level constraints | |
CN103729796A (en) | Method and system for sample survey | |
CN109684320A (en) | The method and apparatus of monitoring data on-line cleaning | |
CN108989092A (en) | A kind of wireless network predicting method, electronic equipment and storage medium | |
CN112287503B (en) | Dynamic space network construction method for traffic demand prediction | |
CN107230007A (en) | The early warning system and its method of goal task amount | |
Kasemset et al. | Simulation-based procedure for bottleneck identification | |
CN114757448B (en) | Manufacturing inter-link optimal value chain construction method based on data space model | |
Hartmann et al. | CSAR: The cross-sectional autoregression model | |
CN112801415A (en) | Ultra-short-term load prediction method and system based on Markov chain distribution model | |
CN110378612A (en) | A kind of customer visit mission dispatching method and device | |
KR20200020367A (en) | Production management system using real time power consumption alalysys of production facilities installed in industry site | |
CN112965810B (en) | Multi-kernel browser data integration method based on shared network channel | |
Genquan et al. | Applying genetic algorithm to optimise personal worklist management in workflow systems | |
KR20040069483A (en) | The management method of the stock |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20171003 |