CN107217831B - Super high-rise building Core Walls Structure horizontal structure construction method - Google Patents

Super high-rise building Core Walls Structure horizontal structure construction method Download PDF

Info

Publication number
CN107217831B
CN107217831B CN201710298482.7A CN201710298482A CN107217831B CN 107217831 B CN107217831 B CN 107217831B CN 201710298482 A CN201710298482 A CN 201710298482A CN 107217831 B CN107217831 B CN 107217831B
Authority
CN
China
Prior art keywords
steel
construction
horizontal
core walls
horizontal structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710298482.7A
Other languages
Chinese (zh)
Other versions
CN107217831A (en
Inventor
苏川
戴超
王丹
谭健
罗茂华
刘五常
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201710298482.7A priority Critical patent/CN107217831B/en
Publication of CN107217831A publication Critical patent/CN107217831A/en
Application granted granted Critical
Publication of CN107217831B publication Critical patent/CN107217831B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons
    • E04G3/243Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons following the outside contour of a building
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/36Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for floors, ceilings, or roofs of plane or curved surfaces end formpanels for floor shutterings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/28Mobile scaffolds; Scaffolds with mobile platforms
    • E04G3/30Mobile scaffolds; Scaffolds with mobile platforms suspended by flexible supporting elements, e.g. cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The present invention discloses a kind of super high-rise building Core Walls Structure horizontal structure construction method, it is characterised in that includes the following steps: S1: Construction Arrangement;S2: steel member embedded part installation;S3: equipment installation;S5: profiled sheet construction;S6: horizontal hard protection construction;S7: horizontal structure floor slab construction.This method constructs after being segmented horizontal structure by floor, region division difference construction section when super high-rise building uses backform or climbing formwork for construction, thus substantially accelerates speed of application.Meanwhile in order to be inserted into high-altitude segmented horizontal structure construction, concrete structure, the support platform of construction of the structure adjusted as upper level structure and the protection canopy of lower floor are substituted using girder steel, profiled sheet composite structure.After above-mentioned technological means, horizontal structure construction is accelerated, and the rigidity of structure is enhanced, and structure entirety stress is strengthened, while every layer of horizontal structure setting measurement control point substantially reduces measurement work difficulty, it is ensured that measurement accuracy.

Description

Super high-rise building Core Walls Structure horizontal structure construction method
Technical field
The invention belongs to building field more particularly to a kind of super high-rise building Core Walls Structure horizontal structure construction methods.
Background technique
With the development of the city, population is more and more, and soil is fewer and fewer, and (i.e. height is greater than 100m's for super high-rise building Building) it continues to bring out.Super high-rise building is designed as frame core wall structure more, and Core Walls Structure mainly uses the systems such as creeping formwork or backform It constructs, Core Walls Structure vertical structure is suitble to construct in advance, horizontal structure lag construction, and speed of application is slow compared with vertical structure. Core Walls Structure wall is constructed in advance, is inserted into not in time if constructing after horizontal structure, and Core Walls Structure wall will be more next with horizontal structure height difference Bigger, wall stiffness weakens, and design margin evaluation reduces, while measurement accuracy is not easy to control;Construction reinforced bar is planted after horizontal structure Muscle connects that project amount is big, time-consuming work consuming, and will affect structure tension performance and safe service life;Pre-buried moment reinforcement straightening Afterwards, plasticity seriously reduces and brittleness increases, and is not able to satisfy mechanical property requirements.
Summary of the invention
Technical problem to be solved by the present invention lies in providing a kind of super high-rise building Core Walls Structure horizontal structure construction method, Prior art progress to be solved is slow, the uppity defect of construction quality.Technical scheme is as follows: a kind of Super High is built Build Core Walls Structure horizontal structure construction method, it is characterised in that include the following steps:
S1: Construction Arrangement, Core Walls Structure horizontal structure section construction technology, super-high building structure use backform or creeping formwork system When system construction, when Core Walls Structure wall is constructed with backform to index bed n-layer, according to construction horizontal layout and design feature, choosing Select the girder steel of Deepen Design, profiled sheet composite structure replaces original (n-m) layer concrete horizontal structure, be that support is flat with the layer Platform carries out (n-m+1) layer horizontal structure support for shuttering and sets up;When Core Walls Structure wall is constructed with backform to index bed (n+m) layer, It selects the girder steel of Deepen Design, profiled sheet composite structure to replace original Ln layer concrete horizontal structure, is that support is flat with the layer Platform carries out (n+1) layer horizontal structure support for shuttering and sets up.With (n-m), Ln layers for boundary layer, horizontal structure multistage in Core Walls Structure is realized After construct;Wherein, A is segmented: horizontal structure in (n-m) following floor Core Walls Structure;B segmentation: (n-m) and the section Ln floor Core Walls Structure Interior horizontal structure;C segmentation: horizontal structure in n or more floor Core Walls Structure;
S2: steel member embedded part installation;After the completion of the binding of Core Walls Structure reinforcing bar, the installation of steel member embedded part, peace are carried out It is positioned when dress according to drawing, using total station, theodolite, draws center control line and absolute altitude control line from measurement base network, And check correction;Firstly, plug welding hole is arranged on the pre-embedded steel slab of shear wall two sides respectively, by the pre-embedded steel slab plug of reinforcing bar and side Weldering connection, is then installed in the designated position of shear force wall reinforcing steel bar, finally installs other side pre-embedded steel slab and carries out perforation plug Weldering welds temporary pallet on embedded part plate after backform jacking, for being fixed temporarily for girder steel;
S3: equipment installation, in which:
S3a: hanging basket is arranged in girder steel side wall when specific implementation, is moved according to steel girder erection position by horizontal layout; When actual installation, hanging basket number of units, the precedence of installation, need to according to labour's situation, material structure situation and process flow with And construction period is specifically designated;Meanwhile the length of hanging basket platform should be made accordingly according to the needs for meeting operation side Adjustment;Hoist engine is arranged on top mould system steel platform truss, is moved according to steel girder erection position;
S3b: suspension mechanism is specifically hung over truss under backform steel platform with 2 sets of 16# wirerope by hanging basket special suspension mechanism Or in skid beam, 2 16# wirerope to be fastened on dedicated square steel tube in hanger bottom, dangle two wirerope again on square steel, and one For elevator load cable, one is safety lock wirerope.
S3c: checking and accepting, and during the installation process, worker teams and groups carry out self-test to each procedure, and confirmation qualification carries out next again Procedure;It is complete reliable to review and validate correct electric wiring wiring, platform and each connector of hanging bracket;Point operation control case is pressed Button checks whether electric elements, motor and brake operation are normal, and checks whether safety lock lock rope and slack rope work are normal; Hanging basket installs, and first checks through installation teams and groups and test running is debugged, after self-test is qualified, reinform project management department administrative staff and phase Pass personnel inspect for acceptance;
S4: steel member transhipment and installation;After the completion of the binding of Core Walls Structure shear wall (n-m) layer reinforcing bar, filled in using perforation Weldering carries out the installation of girder steel embedded part, welds temporary pallet on embedded part plate after backform or mould climbing jacking, for the interim solid of steel member It is fixed;Due to being constructed using backform or climbing form system, steel member can not be directly hung in Core Walls Structure by tower crane, therefore in outline border (n- M) after the completion of lamination shape steel plate is laid with, template and sleeper are being laid on shear wall hole part profiled sheet, as core The interim turnover area of cylinder steel member;Steel member is transported in Core Walls Structure using tower crane and a hoist engine, tower crane breaks off relations, and utilizes Two hoist engines lift steel member in place, and use Core Walls Structure setting driven hanging basket and tool-type horizontal safety channel cooperation peace Welding equipment connects, and accelerates Core Walls Structure horizontal structure construction speed;Horizontal structure beam reinforced steel bar is embedded in advance when vertical structure is constructed The blocking of rubber bowl, groove addition cystosepiment or extruded sheet is arranged in wall in embedded sleeve barrel connector;This layer of level to be onstructed When structure, the connection of embedded bar head after sleeve is dug out;
S5: profiled sheet construction;
S6: horizontal hard protection construction;
S7: horizontal structure floor slab construction.
In the above-mentioned technical solutions, when super high-rise building uses backform or climbing formwork for construction, horizontal structure is pressed into floor, region It divides after different construction sections are segmented and constructs, thus substantially accelerate speed of application.Meanwhile it is high-altitude segmented in order to be inserted into Horizontal structure construction substitutes concrete structure using girder steel, profiled sheet composite structure, and the structure adjusted is as upper water The support platform of the construction of flat structure and the protection canopy of lower floor.After above-mentioned technological means, horizontal structure construction is accelerated, The rigidity of structure is enhanced, structure entirety stress is strengthened, while every layer of horizontal structure setting measurement control point substantially reduces Measure work difficulty, it is ensured that measurement accuracy.
Preferably, wire rope rope hanging basket uses galvanized steel wire rope in the S3b.
The utility model has the advantages that this method presses floor, region when super high-rise building uses backform or climbing formwork for construction, by horizontal structure It divides after different construction sections are segmented and constructs, thus substantially accelerate speed of application.Meanwhile it is high-altitude segmented in order to be inserted into Horizontal structure construction substitutes concrete structure using girder steel, profiled sheet composite structure, and the structure adjusted is as upper water The support platform of the construction of flat structure and the protection canopy of lower floor.After above-mentioned technological means, horizontal structure construction is accelerated, The rigidity of structure is enhanced, structure entirety stress is strengthened, while every layer of horizontal structure setting measurement control point substantially reduces Measure work difficulty, it is ensured that measurement accuracy.
Specific embodiment
Below with reference to embodiment, the invention will be further described:
A kind of super high-rise building Core Walls Structure horizontal structure construction method, it is characterised in that include the following steps:
S1: Construction Arrangement, Core Walls Structure horizontal structure section construction technology, super-high building structure use backform or creeping formwork system When system construction, when Core Walls Structure wall is constructed with backform to index bed n-layer, according to construction horizontal layout and design feature, choosing Select the girder steel of Deepen Design, profiled sheet composite structure replaces original n-m layer concrete horizontal structure, using the layer as support platform N-m+1 layers of horizontal structure support for shuttering are carried out to set up;When Core Walls Structure wall is constructed with backform to n+m layers of index bed, selection is deep Change the girder steel designed, profiled sheet composite structure instead of original Ln layer concrete horizontal structure, carries out n by support platform of the layer + 1 layer of horizontal structure support for shuttering is set up.With n-m, Ln layers for boundary layer, realizes in Core Walls Structure and construct after horizontal structure multistage;Its In, A segmentation: horizontal structure in n-m or less floor Core Walls Structure;B segmentation: n-m and horizontal structure in the floor Core Walls Structure of the section Ln;C Segmentation: horizontal structure in n or more floor Core Walls Structure;
S2: steel member embedded part installation;After the completion of the binding of Core Walls Structure reinforcing bar, the installation of steel member embedded part, peace are carried out It is positioned when dress according to drawing, using total station, theodolite, draws center control line and absolute altitude control line from measurement base network, And check correction;Firstly, plug welding hole is arranged on the pre-embedded steel slab of shear wall two sides respectively, by the pre-embedded steel slab plug of reinforcing bar and side Weldering connection, is then installed in the designated position of shear force wall reinforcing steel bar, finally installs other side pre-embedded steel slab and carries out perforation plug Weldering welds temporary pallet on embedded part plate after backform jacking, for being fixed temporarily for girder steel;
S3: equipment installation, in which:
S3a: hanging basket is arranged in girder steel side wall when specific implementation, is moved according to steel girder erection position by horizontal layout; When actual installation, hanging basket number of units, the precedence of installation, need to according to labour's situation, material structure situation and process flow with And construction period is specifically designated;Meanwhile the length of hanging basket platform should be made accordingly according to the needs for meeting operation side Adjustment;Hoist engine is arranged on top mould system steel platform truss, is moved according to steel girder erection position;
S3b: suspension mechanism is specifically hung over truss under backform steel platform with 2 sets of 16# wirerope by hanging basket special suspension mechanism Or in skid beam, 2 16# wirerope to be fastened on dedicated square steel tube in hanger bottom, dangle two wirerope again on square steel, and one For elevator load cable, one is safety lock wirerope.
S3c: checking and accepting, and during the installation process, worker teams and groups carry out self-test to each procedure, and confirmation qualification carries out next again Procedure;It is complete reliable to review and validate correct electric wiring wiring, platform and each connector of hanging bracket;Point operation control case is pressed Button checks whether electric elements, motor and brake operation are normal, and checks whether safety lock lock rope and slack rope work are normal; Hanging basket installs, and first checks through installation teams and groups and test running is debugged, after self-test is qualified, reinform project management department administrative staff and phase Pass personnel inspect for acceptance;
S4: steel member transhipment and installation;After the completion of the n-m layers of reinforcing bar binding of Core Walls Structure shear wall, using perforation plug welding The installation of girder steel embedded part is carried out, temporary pallet is welded on embedded part plate after backform or mould climbing jacking, for being fixed temporarily for steel member; Due to being constructed using backform or climbing form system, steel member can not be directly hung in Core Walls Structure by tower crane, therefore be laminated in outline border n-m After the completion of shape steel plate is laid with, template and sleeper are being laid on shear wall hole part profiled sheet, as core tube steel structure The interim turnover area of part;Steel member is transported in Core Walls Structure using tower crane and a hoist engine, tower crane breaks off relations, and is rolled up using two It raises machine to lift steel member in place, and is coupled weldering using Core Walls Structure setting driven hanging basket and tool-type horizontal safety channel It connects, accelerates Core Walls Structure horizontal structure construction speed;Horizontal structure beam reinforced steel bar is embedded in pre-buried in advance when vertical structure is constructed The blocking of rubber bowl, groove addition cystosepiment or extruded sheet is arranged in wall in sleeve connector;This layer of horizontal structure to be onstructed When, dig out the connection of embedded bar head after sleeve;
S5: profiled sheet construction;
S6: horizontal hard protection construction;
S7: horizontal structure floor slab construction.
In addition, wire rope rope hanging basket uses galvanized steel wire rope in S3b, in the present case, n and m are natural number.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not limitation with the present invention, all in essence of the invention Made any modifications, equivalent replacements, and improvements etc., should all be included in the protection scope of the present invention within mind and principle.

Claims (2)

1. a kind of super high-rise building Core Walls Structure horizontal structure construction method, it is characterised in that include the following steps:
S1: Construction Arrangement, Core Walls Structure horizontal structure section construction technology, super-high building structure are applied using backform or climbing form system In working hour, when Core Walls Structure wall is constructed with backform to index bed n-layer, according to construction horizontal layout and design feature, selection is deep Change design girder steel, profiled sheet composite structure replace original (n-m) layer concrete horizontal structure, using the layer as support platform into Row (n-m+1) layer horizontal structure support for shuttering is set up;When Core Walls Structure wall is constructed with backform to index bed (n+m) layer, selection The girder steel of Deepen Design, profiled sheet composite structure replace original Ln layer concrete horizontal structure, using the layer as support platform into Row (n+1) layer horizontal structure support for shuttering is set up, and with (n-m), Ln layers for boundary layer, is realized in Core Walls Structure after horizontal structure multistage Construction;Wherein, A is segmented: horizontal structure in (n-m) following floor Core Walls Structure;B segmentation: in (n-m) and the section Ln floor Core Walls Structure Horizontal structure;C segmentation: horizontal structure in n or more floor Core Walls Structure;
S2: steel member embedded part installation;After the completion of the binding of Core Walls Structure reinforcing bar, the installation of steel member embedded part is carried out, when installation It is positioned according to drawing, using total station, theodolite, center control line and absolute altitude control line is drawn from measurement base network, and multiple Core correction;Firstly, plug welding hole is arranged on the pre-embedded steel slab of shear wall two sides respectively, the pre-embedded steel slab plug welding of reinforcing bar and side is connected It connects, is then installed in the designated position of shear force wall reinforcing steel bar, other side pre-embedded steel slab is finally installed and carries out perforation plug welding, push up Temporary pallet is welded on embedded part plate after mould jacking, for being fixed temporarily for girder steel;
S3: equipment installation, in which:
S3a: hanging basket is arranged in girder steel side wall when specific implementation, is moved according to steel girder erection position by horizontal layout;It is practical When installation, hanging basket number of units, the precedence of installation need to be according to labour's situation, material structure situation and process flow and works Phase requirement is specifically designated;Meanwhile the length of hanging basket platform should be adjusted accordingly according to the needs for meeting operation side; Hoist engine is arranged on top mould system steel platform truss, is moved according to steel girder erection position;
S3b: suspension mechanism is specifically hung over truss or cunning under backform steel platform with 2 sets of 16# wirerope by hanging basket special suspension mechanism Liang Shang fastens 2 16# wirerope on dedicated square steel tube in hanger bottom, and dangle two wirerope again on square steel tube, and one is Elevator load cable, one is safety lock wirerope;
S3c: checking and accepting, and during the installation process, worker teams and groups carry out self-test to each procedure, and confirmation qualification carries out down one of work again Sequence;It is complete reliable to review and validate correct electric wiring wiring, platform and each connector of hanging bracket;Point operation control case button, Check whether electric elements, motor and brake operation are normal, and checks whether safety lock lock rope and slack rope work are normal;Hanging basket It installs, is first checked through installation teams and groups and test running is debugged, after self-test is qualified, reinform project management department administrative staff and relevant people Member inspects for acceptance;
S4: steel member transhipment and installation;Core Walls Structure shear wall (n-m) layer reinforcing bar binding after the completion of, using perforation plug welding into Row girder steel embedded part is installed, and temporary pallet is welded on embedded part plate after backform or mould climbing jacking, for being fixed temporarily for steel member;By It constructs in using backform or climbing form system, steel member can not be directly hung in Core Walls Structure by tower crane, therefore be laminated at outline border (n-m) After the completion of shape steel plate is laid with, template and sleeper are being laid on shear wall hole part profiled sheet, as core tube steel structure The interim turnover area of part;Steel member is transported in Core Walls Structure using tower crane and a hoist engine, tower crane breaks off relations, and is rolled up using two It raises machine to lift steel member in place, and is coupled weldering using Core Walls Structure setting driven hanging basket and tool-type horizontal safety channel It connects, accelerates Core Walls Structure horizontal structure construction speed;Horizontal structure beam reinforced steel bar is embedded in pre-buried in advance when vertical structure is constructed The blocking of rubber bowl, groove addition cystosepiment or extruded sheet is arranged in wall in sleeve connector;This layer of horizontal structure to be onstructed When, dig out the connection of embedded bar head after sleeve;
S5: profiled sheet construction;
S6: horizontal hard protection construction;
S7: horizontal structure floor slab construction.
2. super high-rise building Core Walls Structure horizontal structure construction method according to claim 1, it is characterised in that including as follows Step: wire rope rope hanging basket uses galvanized steel wire rope in the S3b.
CN201710298482.7A 2017-04-28 2017-04-28 Super high-rise building Core Walls Structure horizontal structure construction method Active CN107217831B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710298482.7A CN107217831B (en) 2017-04-28 2017-04-28 Super high-rise building Core Walls Structure horizontal structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710298482.7A CN107217831B (en) 2017-04-28 2017-04-28 Super high-rise building Core Walls Structure horizontal structure construction method

Publications (2)

Publication Number Publication Date
CN107217831A CN107217831A (en) 2017-09-29
CN107217831B true CN107217831B (en) 2019-09-17

Family

ID=59944717

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710298482.7A Active CN107217831B (en) 2017-04-28 2017-04-28 Super high-rise building Core Walls Structure horizontal structure construction method

Country Status (1)

Country Link
CN (1) CN107217831B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109838098B (en) * 2019-01-15 2024-02-13 上海建工一建集团有限公司 Material distribution platform system for super high-rise barrel structure construction
CN112160594B (en) * 2020-09-23 2022-04-12 成都建工第四建筑工程有限公司 Construction method beneficial to resisting horizontal force of multi-layer special-shaped steel structure building
CN115492387B (en) * 2022-09-15 2023-08-11 中建八局第一建设有限公司 Climbing form integrated material hoisting system and construction method thereof

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101691813A (en) * 2009-09-11 2010-04-07 上海建工(集团)总公司 Device and method for elevation synchronous compensation for super-high structure construction
CN201762974U (en) * 2010-07-29 2011-03-16 中建三局建设工程股份有限公司 System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN103741945A (en) * 2013-12-29 2014-04-23 山西四建集团有限公司 External control construction method of super high-rise building core tube shaft net
CN106013450A (en) * 2016-07-14 2016-10-12 中国建筑第八工程局有限公司 Core tube skip-floor construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101691813A (en) * 2009-09-11 2010-04-07 上海建工(集团)总公司 Device and method for elevation synchronous compensation for super-high structure construction
CN201762974U (en) * 2010-07-29 2011-03-16 中建三局建设工程股份有限公司 System for simultaneous construction of upper horizontal structure and lower horizontal structure in core tube
CN103741945A (en) * 2013-12-29 2014-04-23 山西四建集团有限公司 External control construction method of super high-rise building core tube shaft net
CN106013450A (en) * 2016-07-14 2016-10-12 中国建筑第八工程局有限公司 Core tube skip-floor construction method

Also Published As

Publication number Publication date
CN107217831A (en) 2017-09-29

Similar Documents

Publication Publication Date Title
CN103291076B (en) Multilayer steel truss fragmented reverse hoisting construction method in arc-shaped frame
CN106677070B (en) A kind of high-altitude long-span heavy duty construction of beam bracket and construction method
CN105569358B (en) The construction method on the special-shaped curved roof of large span multi-curvature
CN104141383B (en) A kind of Bailey beam pendent form support system and construction thereof
CN104088467B (en) A kind of large Steel Cantilever truss structure high-altitude construction Deformation monitoring method
CN103635643A (en) Constructing method for concrete cylinder of construction steel bar of high-rise steel structure
CN112900692B (en) Large-span special-shaped steel structure building, supporting device thereof and construction method
CN102535845A (en) Construction method of bearing frame of corridor structure
CN107217831B (en) Super high-rise building Core Walls Structure horizontal structure construction method
CN104947926B (en) A kind of Core Walls Structure inner core top formwork system hard protection device and its construction method
CN109610834A (en) The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN114232805B (en) Construction method of ultrahigh-height large-span steel concrete beam hanging structure
CN205558304U (en) Hoist and mount system of large -scale steel gallery truss
CN106087752A (en) Multispan cable-carried arch bridge construction method
CN214220561U (en) Building slope facade diversion rail formula hanging flower basket construction platform
CN110886227B (en) Main tower cast-in-place lower cross beam support system and construction method
CN106812328A (en) The overall two step lifting construction methods of a string prestressed steel structure rack with hanging layer
CN111395730A (en) Curtain wall construction system and method suitable for high-rise building with special-shaped giant columns
CN205558306U (en) Big profiled steel structure vestibule hoist and mount hoisting frame
CN102337782A (en) Lift system for constructing truss platform on top of tall and large space and construction method for lift system
CN114197634A (en) Construction method of high-rise conjoined large steel structure installation monitoring system
CN105347142A (en) Plate penetrating installing method for installing construction lifting machine on basement top plate
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN106120573A (en) Multispan cable-carried arch bridge self-balancing button over strait hangs construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant