CN107207205B - The assemble method of elevator protection plate and protective plate - Google Patents
The assemble method of elevator protection plate and protective plate Download PDFInfo
- Publication number
- CN107207205B CN107207205B CN201580075179.XA CN201580075179A CN107207205B CN 107207205 B CN107207205 B CN 107207205B CN 201580075179 A CN201580075179 A CN 201580075179A CN 107207205 B CN107207205 B CN 107207205B
- Authority
- CN
- China
- Prior art keywords
- panel
- reinforcer
- muti
- piece
- pair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B7/00—Other common features of elevators
Landscapes
- Elevator Door Apparatuses (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
With a pair of 1st reinforcer (61), it is mounted on muti-piece panel (21) respective both ends in such a way that the link direction along panel (21) is perforative, and the muti-piece panel is the state that connection is arranged in the lower end of the toeguard (10) set on stop sill and is set between the landing door device (8,9) on the top of lower layer's stop.In addition, having the 2nd reinforcer (62), in the respective region of muti-piece panel of state for being equipped with a pair of 1st reinforcer (61), it is mounted between a pair of 1st reinforcer (61) in crossing manner.The hook (43) that the one end of uppermost panel (21) is set in link direction is hooked in setting in the connecting hole (11) of the lower end of toeguard (10), and the hook (43) that the one end of the panel (21) other than most higher level is arranged in, which is successively hooked in, is arranged in the connection of the other end of panel (21) of upper level with connecting hole (53).
Description
Technical field
The present invention relates to the elevator protection plate for preventing user from falling between carriage and hoistway inner wall and protective plates
Installation method.
Background technique
Because of the failure and other reasons of earthquake, power failure or elevator, there are carriages to stop at floor gap, user is intended to from carriage
The case where entrance comes out.At this point, user falls between carriage and hoistway inner wall in order to prevent, applied in building standard method
In playing drinking games, in the case where the gap of the ground front edge of board of carriage and well enclosure is more than 12.5cm, there is setting elevator protection plate
Obligation.Provide that the width of protective plate is wider than the width of carriage entrance.
Therefore, it previous known following elevator protection plate: is leaned on being configured at the width direction both ends than carriage entrance
Inside and the frame for being fixed on the fixed short transverse configuration along hoistway on the fastener of hoistway inner wall, will be more using bolt
A panel is fixed on the frame (referring for example to patent document 1).
But in protective plate disclosed in patent document 1, as the process before installation panel, it joined solid by welding etc.
Determine the process of fastener and frame.In addition, each panel is fixed on frame using bolt.Flow chart is more as a result, operator
Effort is spent, the installation exercise of protective plate is taken time.
In order to solve this point, proposes following protective plate: hook tabs being set on the top of panel, and under panel
The connecting hole that can be engaged with hook tabs is arranged in portion, suspends multiple panels in midair and is linked.(referring for example to patent document 2).In patent
In protective plate disclosed in document 2, pass through the part being overlapped between the fixed panel suspended in midair of fixing piece.
Protective plate disclosed in Patent Document 2 can omit the process before installation panel shown in patent document 1, so as to subtract
Few flow chart.Moreover, each panel can only be linked by the way that hook tabs is hooked in connecting hole, so as to be easy to carry out installation work
Industry.
Existing technical literature
Patent document
Patent document 1: Japanese Unexamined Patent Publication 6-255936 bulletin
Patent document 2: Japanese Patent Publication 6-56073 bulletin
Summary of the invention
Problems to be solved by the invention
But in the prior art, there are following such projects.The panel of protective plate disclosed in Patent Document 2 is not
It is reinforced.There is the insufficient risk of intensity of protective plate as a result,.Also, the panel of protective plate disclosed in Patent Document 2 utilizes
The part being overlapped between the panel of the fixed suspention of fixing piece, has that installation exercise is taken time.
The present invention is completed to solve the problems, such as described above, it is therefore intended that obtains being easy to carry out installation exercise simultaneously
And it can ensure that the elevator protection plate of intensity and the installation method of protective plate.
Means for solving the problems
Elevator protection plate of the invention includes muti-piece panel, they, which link, is arranged in the toeguard set on stop sill
Lower end and set between the landing door device on the top for being equipped with the adjacent lower layer's stop of the stop of toeguard;A pair the 1st adds
Strong part, it is respective that they are installed on muti-piece panel in a manner of running through the muti-piece panel of connecting state along the link direction of panel
Both ends;And the 2nd reinforcer, in the respective region of muti-piece panel of state for being equipped with a pair of 1st reinforcer, to hand over
The mode of fork is mounted between a pair of 1st reinforcer, and the one end in link direction has hook to muti-piece panel respectively, another
End has connection connecting hole, and the hook for the uppermost panel being set in muti-piece panel, which is hooked in, to be arranged under toeguard
The connecting hole of end, the hook for being set to the panel other than most higher level are successively hooked in the connection that the panel of upper level is arranged in
Use connecting hole.
In addition, the installation method of protective plate of the invention is a kind of assemble method of elevator protection plate, the elevator protection plate
Include muti-piece panel, they link the lower end that the toeguard set on stop sill is set and set on be equipped with toeguard
Between the landing door device on the top of the adjacent lower layer's stop of stop;A pair of 1st reinforcer, they are along the connection side of panel
The both ends of muti-piece panel are installed on to the mode of the muti-piece panel through connecting state;And the 2nd reinforcer, it is being equipped with
In the respective region of muti-piece panel of the state of a pair of 1st reinforcer, be mounted in crossing manner a pair of 1st reinforcer it
Between, one end of each piece of panel in link direction in muti-piece panel has hook, there is connection connecting hole in the other end,
The installation method of protective plate is with the following process: the hook for the uppermost panel being set in muti-piece panel being hooked in setting and is existed
The connecting hole of the lower end of toeguard;The hook for the panel being set to other than most higher level is successively hooked in and is arranged in upper level
Panel connection connecting hole, to link muti-piece panel;Connection muti-piece panel both ends to be passed through along link direction
The mode for wearing muti-piece panel installs a pair of 1st reinforcer, to reinforce muti-piece panel in link direction;And in muti-piece panel
In respective region, the 2nd reinforcer is installed across between a pair of 1st reinforcer, to reinforce muti-piece panel respectively.
Invention effect
According to the present invention, with structure below: will there is hook in the one end of link direction and have in the other end
The muti-piece panel of connection connecting hole is suspended in midair and is linked successively from the lower end for the toeguard for being set to stop sill.Also,
Each piece of panel in the muti-piece panel of connecting state is provided with along perforative a pair of 1st reinforcer of link direction of panel and in face
2nd reinforcer intersected with each other in the region of plate.Thereby, it is possible to obtain being easy installation exercise and can ensure that the elevator of intensity
The installation method of protective plate and protective plate.
Detailed description of the invention
Fig. 1 is the overall diagram for being shown provided with the elevator of elevator protection plate of embodiments of the present invention 1.
Fig. 2 is the side view for showing the elevator protection plate of Fig. 1.
Fig. 3 is the main view for showing the state of protective plate from III direction of arrow of Fig. 2.
Fig. 4 is the enlarged drawing for showing the part surrounded by the circle IV of Fig. 2.
Fig. 5 is the side view for showing the elevator protection plate of embodiments of the present invention 2.
Fig. 6 is the main view for showing the state of protective plate from VI direction of arrow of Fig. 5.
Fig. 7 is the side view for showing the elevator protection plate of embodiments of the present invention 3.
Fig. 8 is the main view for showing the state of protective plate from VIII direction of arrow of Fig. 7.
Specific embodiment
Embodiment 1
Fig. 1 is the overall diagram for being shown provided with the elevator of elevator protection plate of embodiments of the present invention 1.As shown in Figure 1,
Carriage 2 is provided in hoistway 1, carriage 2 is arranged on the rail guidance (not shown) in hoistway 1 and can move along the vertical direction
It is dynamic.In addition, the direction arrow A of Fig. 1 to be referred to as to the short transverse of hoistway 1, the direction arrow B is referred to as to the depth direction of hoistway 1.
Carriage 2, which is provided with, to be enabled a user to enter and leave the carriage entrance 3 in carriage 2.It is provided in carriage entrance 3
The car door 4 of opening and closing freely.
On depth direction, the face opposite with car door 4 is provided with the stop 5 of each floor.In the stop 5 of each floor
The opening and closing of landing doorway 6 is provided with stop door 7 freely.Stop door 7 utilizes the stop door for being set to the top of landing doorway 6
Device 8, can be along the frontal width direction of landing doorway 6, i.e. width direction (the arrow side C of aftermentioned Fig. 3 of hoistway 1
To) mobile.In addition, stop door 7 slides movement on the stop sill 9 for be set to the lower part of landing doorway 6.
On depth direction, the end of 2 side of carriage of each stop sill 9 is provided with toeguard 10, when stopping for carriage 2
Stop bit is set just in case when offset, the toeguard 10 prevent the foot of user enter on depth direction stop sill 9 and carriage 2 it
Between.Toeguard 10 uses the plate object extended downward in the height direction from the lower end of stop sill 9 (referring to Fig. 2).
Herein, carriage 2 exists between adjacent stop 5, i.e. because of such as reasons such as earthquake, power failure or elevator faults
The case where floor gap stops.At this point, there are users to open car door 4, carriage entrance 3 is opened wide, it is mobile to nearest stop 5
The case where.
But on depth direction, there is Fig. 1 between the end 2a and well enclosure 1a of 5 side of stop on the floor of carriage 2
Arrow D shown in gap, there are the risks that user enters by mistake through gap.Therefore, in the present invention, by pacifying in toeguard 10
Fill protective plate 20 so that on depth direction from end 2a to the distance of protective plate 20 be building standard method defined 12.5cm with
Under.
Fig. 2 is the side view for showing the elevator protection plate 20 of Fig. 1.In addition, Fig. 3 is to show from III direction of arrow of Fig. 2 to see
Examine the main view of the state of protective plate 20.Fig. 2 and Fig. 3 used below, illustrate the specific structure of protective plate 20.
The lower end for the toeguard 10 for being installed on stop sill 9 is provided with the frontal width side along landing doorway 6
To connecting hole 11.In Fig. 3, connecting hole 11 is that long hole is set to spats on the frontal width direction of landing doorway 6
The central portion of plate 10.
In addition, protective plate 20 makes muti-piece panel 21 link along short transverse and constitute.In present embodiment 1, make 3
Block panel 21 links.In addition, the block number of panel 21 can be set to desired block number according to adjacent the distance between stop 5,
It is also possible to 2 pieces or 4 pieces or more.
Panel 21 includes main panel portion 30;It is set to the 1st link surface of the upper end in main panel portion 30 in the height direction
Plate portion 40;And it is set to the 2nd connection panel part 50 of the lower end in main panel portion 30 in the height direction.In addition, each face
Plate 21 is reinforced by strengthening part 60.
Strengthening part 60 includes a pair of 1st reinforcer 61, they are to run through the muti-piece panel 21 being concatenated along short transverse
Mode configure;And the 2nd reinforcer 62, it is by the region configuration of each panel 21 and between a pair of 1st reinforcer 61
The inclined strut of intersection.
Following situation is exemplified in Fig. 3: on the frontal width direction of landing doorway 6, the length and shield of panel 21
The length of sole 10 is consistent.In addition, the length of panel 21 is configured to compare carriage on the frontal width direction of landing doorway 6
Length between the both ends of entrance is long, can be different from the length of toeguard 10.Main panel portion 30 is section substantially square
The plate of shape.
1st connection panel part 40 include on depth direction with main panel portion 30 separated by a distance and configure the 1st panel part
41 and connect the 1st panel part 41 lower end and main panel portion 30 upper end the 2nd panel part 42.
The configuration of 1st panel part 41 is on depth direction than main panel portion 30 close to the position of stop 5.In landing doorway 6
Frontal width direction on, the hole for being inserted into the 1st reinforcer 61 is offered at the both ends of the 2nd panel part 42.
On the other hand, the 2nd connection panel part 50 include on depth direction with main panel portion 30 separated by a distance and configure
1st panel part 51 and the 2nd panel part 52 for connecting the upper end of the 1st panel part 51 and the lower end in main panel portion 30.
The lower end of 1st panel part 51 is provided with connection connecting hole 53 identical with 11 shape of connecting hole.That is, connection
It is long hole with connecting hole 53.
In addition, both ends and the 2nd panel part 42 on the frontal width direction of landing doorway 6, in the 2nd panel part 52
Similarly offer the hole for being inserted into the 1st reinforcer 61.The hole of 2nd panel part 52 is configured in the height direction with the 2nd
The hole of panel part 42 is located along the same line.
Therefore, panel 21 is the plate that both ends are used to link and be bent into substantially Z-shaped in the height direction.
Fig. 4 is the enlarged drawing for showing the part surrounded by the circle IV of Fig. 2.As shown in figure 4, in the upper of the 1st panel part 41
End is provided with the hook 43 that can be embedded in the section substantially U-shaped of connecting hole 11 and connection connecting hole 53.In landing doorway 6
Frontal width direction on, the length of the length of hook 43 and connecting hole 11 and connection connecting hole 53 is substantially uniform, prevents panel
21 offset on the frontal width direction of landing doorway 6.
In addition, as shown in figure 4, each panel 21 is concatenated and hook 43 is hooked in connection with connecting hole 53.It is each
The link direction of panel 21 is consistent with short transverse.
In present embodiment 1, link 3 pieces of panels 21, therefore only the hook 43 of uppermost panel 21 is hooked in toeguard
10 connecting hole 11.It is being set in addition, the 1st panel part 51 of the panel 21 of most junior is fixed on setting by installation part (not shown)
There is next layer of landing door device 8 of the floor of toeguard 10.
As long as the 1st panel part 51 can be fixed on landing door device 8 by installation part, it is not particularly limited.Such as enumerate as
Under method: in the 1st panel part 51, open up bolt hole at position corresponding with the bolt for being installed on landing door device 8 in advance,
After making bolt passing through bolt hole, fastened by nut.That is, the fixation of the panel 21 carried out using installation part is only for most lower
The panel 21 of grade, can minimally fix.
A pair of 1st reinforcer 61 is configured relative to one another on the frontal width direction of landing doorway 6 in panel 21
Both ends.In addition, the 1st reinforcer 61 uses the rodlike round tube or square tube formed by steel or reinforcing bar.In Fig. 2, respectively
A 1st reinforcer 61 is configured as running through the 2nd panel part 42 and the most junior in addition to uppermost panel 21 along short transverse
The state of the 2nd panel part 42 and the 2nd panel part 52 except 2nd panel part 52 of panel 21.Therefore, the 1st reinforcer 61 has
The effect of fixed muti-piece panel 21.
At this point, the 1st reinforcer 61 falls off and blocks the hole of the 2nd panel part 52 of the panel 21 of most junior in order to prevent.Separately
Outside, only the panel 21 of most junior can be the hole of not set 2nd panel part 52 and the structure of connection connecting hole 53.In this reality
It applies in mode 1, the panel 21 of most junior uses the structure of connecting hole 53 using the hole and connection of not set 2nd panel part 52.
In addition, being provided with prevents the 1st at the position in the hole for the 2nd panel part 42 of the panel 21 of most junior blocked
Reinforcer 61 is skidded off along the 2nd panel part 52 and the retainer 54 that falls.
As long as retainer 54 is able to maintain the 1st reinforcer 61 so that the 1st reinforcer 61 is not skidded off along the 2nd panel part 52
And fall, then it is not particularly limited, but the shape as retainer 54, such as include corresponding with the shape of the 1st reinforcer 61
Tubular.
In addition, being provided with multiple 2 on the 1st reinforcer 61 with being separated from each other distance in the height direction and reinforcing installation
Hole 63.2nd, which reinforces mounting hole 63, has upper mounting holes 63a and Lower mounting hole 63b, in the 1st reinforcer 61 by retainer 54
In the state of holding, the upper mounting holes 63a is set to the position of the upper end in main panel portion 30 in the height direction, described
Lower mounting hole 63b is set to the position of the lower end in main panel portion 30 in the height direction.
Therefore, in present embodiment 1, due to being provided with 3 pieces of panels 21,3 are offered in each 1st reinforcer 61
A upper mounting holes 63a, 3 Lower mounting hole 63b amount to 6 the 2nd reinforcement mounting holes 63.
2nd reinforcer 62 is configured to two inclined strut main body 62a and intersects in main panel portion 30.Specifically, the 2nd adds
Strong part 62 is made of following reinforcer: by the upper mounting holes of the 1st reinforcer 61 in the 1st opposite reinforcer 61
The reinforcer that 63a is connect with the Lower mounting hole 63b of another the 1st reinforcer 61;And by the upper of another the 1st reinforcer 61
The reinforcer that portion mounting hole 63a is connect with the Lower mounting hole 63b of the 1st reinforcer 61.
In addition, each inclined strut main body 62a is bent into the rodlike pipe of substantially V-shaped using one end.Each inclined strut master
The part for being bent into substantially V-shaped in body 62a is configured to be hooked in the respective upper mounting holes of a pair of 1st reinforcer 61
63a.On the other hand, the part not bent in each inclined strut main body 62a is configured to be inserted into the 1st reinforcer 61 of a pair respectively
Lower mounting hole 63b.Each inclined strut main body 62a is fixed between a pair of 1st reinforcer 61 as a result,.
Then, the installation method of protective plate 20 is illustrated.Firstly, the operating of elevator is switched to maintenance by operator
Operation mode makes carriage 2 be moved to the position for being able to carry out the installation exercise of protective plate 20.Also, operator makes car door 4
It is mobile, open wide carriage entrance 3.
Then, operator picks up uppermost 1 piece of panel 21, and hook 43 is hooked in the connecting hole 11 of toeguard 10.It connects
, operator picks up 1 piece of panel 21 of next stage, and hook 43 is hooked in the 1st panel for being suspended to the panel 21 of toeguard 10
The connection in portion 51 connecting hole 53.Operator is repeated in the operation until the panel 21 of most junior.In this stage, it constitutes
The muti-piece panel 21 of protective plate 20 becomes the state for being suspended to toeguard 10.
At this point, the panel 21 of most junior is using the connection connecting hole 53 for having blocked the 1st panel part 51 in advance and is mounted with
The panel of the state of retainer 54.In addition, operator can also be blocked most junior in the installation exercise of protective plate 20
Panel 21 connection connecting hole 53 and the process of installing retainer 54.
Later, the 1st panel part 51 of the panel 21 of most junior is fixed on setting using installation part and is being equipped with by operator
Next layer of landing door device 8 of the floor of toeguard 10.
Then, operator makes each the 2nd panel part 42 from uppermost panel 21 in a pair of 1st reinforcer 61
Hole passes through, and sequentially passes through the hole of the 2nd panel part 42 and the 2nd panel part 52, and benefit from most higher level to most junior in the height direction
Lower end is kept with retainer 54.
Finally, operator on the frontal width direction of landing doorway 6 from the outside of panel 21 by each inclined strut
Under the part of main body 62a not bent is from the upper mounting holes 63a of the 1st reinforcer 61 to another the 1st reinforcer 61
Portion mounting hole 63b insertion.At this point, the part for being bent into substantially V-shaped of inclined strut main body 62a be hooked in the 1st reinforcer 61 and
Do not deviate from from upper mounting holes 63a.
Therefore, protective plate 20, can be without using installation other than the fixation of the panel 21 of most junior and landing door device 8
Part it is installed on toeguard 10.The method for dismantling protective plate 20 is step contrary to the above.
In this way, the elevator protection plate in present embodiment 1 has following structure: can will be set on the top of link direction
There is hook, suspend in midair and be configured from the toeguard for being set to stop sill in the muti-piece panel that lower part is equipped with connection mounting hole.
On the other hand, the panel of most junior has following structure: it can be fixed on landing door device using installation part, the stop door
Next layer of stop for being equipped with the stop for the toeguard for being mounted with protective plate is arranged in device.
Also, each panel has following structure: it is fixed along perforative a pair of 1st reinforcer of link direction, and
And reinforced by the 2nd reinforcer being set to across in the region of each panel between a pair of 1st reinforcer.
Therefore, process when operator installs protective plate, before installation panel shown in patent document 1 can be omitted.This
Outside, when operator keeps panel connected to each other so that hook is hooked in connection mounting hole, can easily by panel each other
Connection.
In addition, the fixation between panel need to only make the 1st reinforcer along link direction through each panel, it is not necessary to by
The fixed each panel in one ground, additionally it is possible to be easy the fixation between panel.
Also, only the panel of most junior must be fixed by fixing piece, but other positions do not need fixing piece.
Therefore, operator can be saved beyond the effort for needing ground fastening bolt etc..As a result, the installation exercise of protective plate can be made
It is easy.
In addition, each panel is reinforced by the 2nd reinforcer as inclined strut, therefore also ensure the intensity of protective plate.
In addition, the lower end of the 1st reinforcer is kept by the retainer for being set to the lower end of the panel of most junior.Its result
It is that can prevent the 1st reinforcer from falling off.
Also, the one end of the 2nd reinforcer bends to section substantially V-shaped, is hooked in the top for being set to the 1st reinforcer
Mounting hole, thus, it is possible to be fixed on the 1st reinforcer.Therefore, operator can fix the 2nd reinforcer without using fixing piece
In the 1st reinforcer.
Embodiment 2
In embodiment 1 in front, to by the part for being bent into substantially V-shaped of the one end of inclined strut main body 62a
Upper mounting holes 63a is hooked in which the example that the 2nd reinforcer 62 is fixed on the 1st reinforcer 61 to be illustrated.
Therefore, when the inclined strut main body 62a of the embodiment 1 of front being installed on 1 reinforcer 61, it is necessary to by inclined strut
It is installed on the frontal width direction of landing doorway 6 from the outside of panel 21 insertion top the part of main body 62a not bent
Hole 63a.
But on the frontal width direction of landing doorway 6, inclined strut main body 62a is inserted into from the outside of panel 21
In the case where upper mounting holes 63a, the space of approximately equal length with panel 21 is needed in the outside of panel 21.Therefore, in well
Road 1 is small and in the elevator that the outside of panel 21 is not provided with space necessary to for being inserted into inclined strut main body 62a, in front
Embodiment 1 structure in, it is difficult to by inclined strut main body 62a be inserted into upper mounting holes 63a.
Therefore, in present embodiment 2, the one end by the fixed inclined strut main body 62a of fixing piece is made in face
The example that the outside of plate 21 does not need the space for being inserted into inclined strut main body 62a is illustrated.Fig. 5 is to show reality of the invention
Apply the side view of the elevator protection plate 20 of mode 2.In addition, Fig. 6 is the shape for showing the protective plate 20 from VI direction of arrow of Fig. 5
The main view of state.
As shown in Figures 5 and 6, it is being inserted into the upper mounting holes 63a of the 1st reinforcer 61 and is running through the 1st reinforcer 61
The end of inclined strut main body 62a is equipped with fixing piece 64.Fixing piece 64 is configured to cannot be by the big of upper mounting holes 63a
It is small.Being inserted into upper mounting holes 63a as a result, and being equipped with the inclined strut main body 62a of fixing piece 64 will not fall from the 1st reinforcer 61
Under.
In present embodiment 2, fixing piece 64 is internal screw thread, the end of the fixed inclined strut main body 62a of fixture 64
For external screw thread.Other structures are identical as the embodiment 1 of front.
Then, the installation method of the protective plate 20 of present embodiment 2 is illustrated.Make in a pair of 1st reinforcer 61
The hole of each the 2nd panel part 42 from uppermost panel 21 passes through, and successively passes through from most higher level to most junior in the height direction
The hole of the 2nd panel part 42 and the 2nd panel part 52 is worn, and keeps lower end, the reality of process and front so far using retainer 54
It is identical to apply mode 1.
Then, by each inclined strut main body 62a be not provided with externally threaded partial insertion Lower mounting hole 63b after, will be outer
Threaded portion is inserted into upper mounting holes 63a.Later, by run through the 1st reinforcer 61 male thread portion mounting fixing parts 64,
To which inclined strut main body 62a is fixed on the 1st reinforcer 61.
In the elevator protection plate of such present embodiment 2, the 2nd reinforcer is fixed using fixing piece.Even if as a result,
It is that can not obtain the well in space identical with panel length in the outside of panel on the frontal width direction of landing doorway
2nd reinforcer also easily can be fixed on the 1st reinforcer by road.Its result is identical as the embodiment 1 of front, can obtain
It is easy installation exercise and can ensure that the effect of intensity.
In addition, fixing piece 64 is separately installed by operator in assembling, but fixing piece 64 in present embodiment 2
It can be fixed on the corresponding position in the 1st reinforcer 61 or main panel portion 30 in advance.
Embodiment 3
In embodiment 2 in front, main panel portion 30 realizes the upper and lower between panel 21 by strengthening part 60
To reinforcement.But and linking portion, that is, horizontal direction reinforcement between unrealized panel 21.Therefore, in present embodiment 3
In, reinforcer 65 reinforces the example of the linking part between panel 21 being also provided with panel to the linking portion between panel 21
It is illustrated.
Fig. 7 is the side view for showing the elevator protection plate 20 of embodiments of the present invention 3.In addition, Fig. 8 is shown from Fig. 7
VIII direction of arrow observation protective plate 20 state main view.
As shown in Figures 7 and 8, the linking portion between panel 21 is provided with reinforcer between the panel for reinforcing linking portion
65.Reinforcer 65 is configured along frontal width direction between panel, i.e., vertically configures with the link direction of panel 21.Present embodiment
Reinforcer 65 is externally threaded rodlike pipe using one end between 3 panel.
Herein, on the 1st reinforcer 61, other than the 2nd reinforces mounting hole 63, be additionally provided with for installing between panel plus
The panel of strong part 65 reinforces mounting hole 66.Panel reinforces mounting hole 66 and is configured to the upper-end part of driving with hook 43 in the height direction
In same position.
In addition, as shown in Figures 7 and 8, in order to also be installed between uppermost panel 21 and toeguard 10 between panel plus
The upper-end part of driving of the 65, the 1st reinforcer 61 of strong part is in the position more against the top than the upper end in uppermost main panel portion 30.
Panel reinforces mounting hole 66 in the same manner as the inclined strut main body 62a of the embodiment 2 of front, is inserted into panel reinforcement
Mounting hole 66, and reinforce fixing piece 67 in the male thread portion installation panel through the 1st reinforcer 61, to be fixed in the 1st
Reinforcer 61.
It is internal screw thread in the same manner as fixing piece 64 that panel, which reinforces fixing piece 67, is configured to reinforce installing by panel
The size in hole 66.Insertion panel reinforces mounting hole 66 and is equipped with reinforcer 65 between the panel of panel reinforcement fixing piece 67 as a result,
It will not be fallen from the 1st reinforcer 61.Other structures are identical as the embodiment 2 of front.
Then, the installation method of the protective plate 20 of present embodiment 3 is illustrated.By fixed in the 1st reinforcer 61
The process of inclined strut main body 62a is identical as the embodiment 2 of front.
Then, identical as inclined strut main body 62a, reinforcer 65 is also that will be not provided with externally threaded partial insertion one between panel
After reinforcing mounting hole 66 to the panel of the side in the 1st reinforcer 61, the panel for being inserted into another party reinforces mounting hole 66.Later,
Reinforce fixing piece 67 by installing panel in the male thread portion through the 1st reinforcer 61, and reinforcer 65 between panel is fixed
In the 1st reinforcer 61.
In the elevator protection plate of such present embodiment 3, reinforce between the linking portion setting panel between panel
Part.As a result, can make to become secured to the reinforcement of protective plate.
In addition, the embodiment 2 with front is identical, reinforce fixing piece using panel to fix reinforcer 65 between panel.By
This, even sky identical with panel length can not be obtained in the outside of panel on the frontal width direction of landing doorway
Between hoistway, also reinforcer between panel easily can be fixed on the 1st reinforcer.2 phase of embodiment of its result and front
Together, it can obtain being easy installation exercise and can ensure that the effect of intensity.
In addition, reinforcer 65 is externally threaded pipe using one end between panel in present embodiment 3.But such as front
Embodiment 1 like that, on the frontal width direction of landing doorway 6, the outside of panel 21 can obtain will between panel plus
In the case that strong part 65 is inserted into the space that panel reinforces mounting hole 66, the one end of reinforcer 65 can be bent into substantially between panel
V-shaped.At this point, the 2nd reinforcer in the embodiment 1 of front can be used in the 2nd reinforcer 62.Therefore, this can be implemented
Reinforcer 65 is added in the structure of embodiment 1 of front between the panel of mode 3.
In addition, the 1st reinforcer 61 uses 1 rodlike round tube or square tube, but not in above embodiment 1~3
It is limited to this.For example, the more tubing that can be combined can be used in the 1st reinforcer 61.As a result, floor gap it is separate, be difficult to 1
In the case that 1st reinforcer 61 is inserted into the panel 21 of most junior from the hole of the 2nd panel part 42 of uppermost panel 21, also can
Tubing is inserted into the hole of the 2nd panel part 42 and the hole of the 2nd panel part 52 on one side, assembles the 1st reinforcer 61 on one side.
In addition, on landing door device 8, i.e., from carriage 2 and the back side in protective plate 20 is set in general elevator
It is equipped with the equipment such as electronics sound bell or stop power supply box.When carrying out the maintenance of the equipment class, in the feelings using 1 the 1st reinforcer 61
Under condition, operator extracts the 1st reinforcer 61 from uppermost 21 side of panel out.It is as a result, loose shape between panel 21
State.Therefore, it is necessary to dismantle all panels 21.
This is because in the case where operator bumps against panel 21 suspended in midair, since the 1st reinforcer 61 does not enter,
Therefore there are the risks that panel 21 is fallen.As a result, in the maintenance of the equipment class on landing door device 8, not only operator is spent
Effort, and the activity duration extends.
But using the more tubing that can be combined, by dismantling necessary tubing, can only it dismantle most
The panel 21 of small limit.At this point, dismantle retainer 54 from the panel 21 that removes of most junior, be installed on temporarily become it is most lower
The panel 21 of grade.
Even if being also fixed between panel 21 as a result, in the case where operator bumps against panel 21 suspended in midair.Cause
This, even if also can prevent panel 21 from falling in the case where operator bumps against panel 21 suspended in midair.As a result, can save
The effort of operator, and the activity duration is shortened.
In addition, not used especially in above embodiment 1~3, but it can paste and subtract in the position that each component is in contact
Shake piece, for example thin elastomeric element.This is because in above embodiment 1,2, except the panel 21 and stop door of most junior fill
It sets other than 8 fixation, installation part is not used, therefore in the usual operating of elevator, it is possible to create abnormal sound caused by vibrating is for example
Trill.
In addition, connecting hole 11 and connection use connecting hole 53 for 1 long hole, but are not limited in above embodiment 1~3
This.For example, it can be multiple circular holes to configure while distance is separated from each other on the frontal width direction of landing doorway 6.The feelings
Under condition, hook 43 is also correspondingly arranged with connecting hole 11 and connection connecting hole 53 multiple.
Also, in above embodiment 1~3, the 1st reinforcer 61 is not secured to well enclosure 1a.But in floor gap
In the case that interval is big, well enclosure 1a can be fixed on via bracket.Thus, it is possible to further increase the intensity of protective plate.
Claims (10)
1. a kind of elevator protection plate, which is included
Muti-piece panel, they link the lower end that the toeguard set on stop sill is arranged in and are set to and are equipped with the toeguard
The adjacent lower layer's stop of stop top landing door device between;
A pair of 1st reinforcer, they with along the link direction of the panel through the side of the muti-piece panel of connecting state
Formula is installed on the respective both ends of muti-piece panel;And
2nd reinforcer, in the respective region of muti-piece panel for being equipped with the state of the pair of 1st reinforcer, with
The mode of intersection is mounted between the pair of 1st reinforcer,
One end of each piece of panel in the link direction in the muti-piece panel has hook, has connection in the other end
With connecting hole,
The hook for the uppermost panel being set in the muti-piece panel is hooked in the lower end that the toeguard is arranged in
Connecting hole,
The hook for being set to the panel other than the most higher level, which is successively hooked in, to be arranged in described in the panel of upper level
Connecting hole is used in connection.
2. elevator protection plate according to claim 1, wherein
The lower end of the panel of most junior in the muti-piece panel is installed on the landing door device by installation part.
3. elevator protection plate according to claim 2, wherein
The retainer for keeping the lower end of the 1st reinforcer is provided in the lower end of the panel of the most junior.
4. according to claim 1 to elevator protection plate described in any one in 3, wherein
1st reinforcer is constituted in conjunction with more root canals.
5. according to claim 1 to elevator protection plate described in any one in 3, wherein
On each 1st reinforcer in the pair of 1st reinforcer, distance is separated from each other in the link direction it is arranged
There is the be inserted into the 2nd reinforcer the 2nd to reinforce mounting hole,
2nd reinforcer is the inclined strut that 2 root canals for being bent into V-shaped by one end are constituted,
The side constituted in the 2nd reinforcer of the inclined strut is arranged by the way that one end to be hooked at one the described 1st
Mounting hole is reinforced in the described 2nd of the top of reinforcer, and the other end insertion is set to the lower section of another the 1st reinforcer
The described 2nd reinforce mounting hole, to be fixed configuration,
Another party in the 2nd reinforcer of the inclined strut is constituted to be set to described in another by the way that one end to be hooked in
Mounting hole is reinforced in the described 2nd of the top of 1st reinforcer, and the other end insertion is set under the 1st reinforcer
Mounting hole is reinforced in the described 2nd of side, to be fixed configuration.
6. according to claim 1 to elevator protection plate described in any one in 3, wherein
On each 1st reinforcer in the pair of 1st reinforcer, distance is separated from each other in the link direction it is arranged
There is the be inserted into the 2nd reinforcer the 2nd to reinforce mounting hole,
2nd reinforcer is the inclined strut being made of 2 root canals,
The side in the 2nd reinforcer of the inclined strut is constituted by adding one end through set on one the described 1st
It is fixed after the 2nd reinforcement mounting hole of the top of strong part using fixing piece, and by the other end insertion set on described in another
Mounting hole is reinforced in the described 2nd of the lower section of 1st reinforcer, so that it is fixed configuration,
Constitute another party of the 2nd reinforcer of the inclined strut by by one end through be set to another the described 1st
It is fixed after the 2nd reinforcement mounting hole of the top of reinforcer using the fixing piece, and the other end insertion is set to one
Mounting hole is reinforced in the described 2nd of the lower section of 1st reinforcer, to be fixed configuration.
7. according to claim 1 to elevator protection plate described in any one in 3, wherein
Linking part between the muti-piece panel is provided with reinforcer between panel,
Reinforcer configures between the pair of 1st reinforcer along the direction vertical with the link direction between the panel,
It is consistent with the upper end of the hook in link direction on each 1st reinforcer in the pair of 1st reinforcer
It is provided with the panel for being inserted into reinforcer between the panel at position and reinforces mounting hole.
8. elevator protection plate according to claim 7, wherein
Reinforcer is by reinforcing installation through the panel for being set to the 1st reinforcer for one end between the panel
Reinforce fixing piece using panel behind hole to fix, and the other end insertion is set to the panel of another the 1st reinforcer
Reinforce mounting hole, to be fixed configuration.
9. according to claim 1 to elevator protection plate described in any one in 3, wherein
At least the two phase in the toeguard, the muti-piece panel, the pair of 1st reinforcer and the 2nd reinforcer
The part of contact is provided with vibration-damping sheet.
10. the assemble method of a kind of assemble method of protective plate, the protective plate is the assemble method of elevator protection plate, the elevator
Protective plate includes
Muti-piece panel, they link the lower end that the toeguard set on stop sill is arranged in and are set to and are equipped with the toeguard
The adjacent lower layer's stop of the stop top landing door device between;
A pair of 1st reinforcer, they with along the link direction of the panel through the side of the muti-piece panel of connecting state
Formula is installed on the both ends of the muti-piece panel;And
2nd reinforcer, in the respective region of muti-piece panel for being equipped with the state of the pair of 1st reinforcer, with
The mode of intersection is mounted between the pair of 1st reinforcer,
One end of each piece of panel in the link direction in the muti-piece panel has hook, has connection in the other end
With connecting hole,
The assemble method of the protective plate is with the following process:
The hook for the uppermost panel being set in the muti-piece panel is hooked in the lower end that the toeguard is arranged in
The connecting hole in portion;
The hook for the panel being set to other than the most higher level is successively hooked in the institute that the panel of upper level is arranged in
Connection connecting hole is stated, to link the muti-piece panel;
Institute is installed in a manner of running through the muti-piece panel along the link direction at the both ends of the muti-piece panel of connection
A pair of 1st reinforcer is stated, to reinforce the muti-piece panel in the link direction;And
In the respective region of muti-piece panel, installs the described 2nd across between the pair of 1st reinforcer and reinforce
Part, to reinforce the muti-piece panel respectively.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/JP2015/052816 WO2016125229A1 (en) | 2015-02-02 | 2015-02-02 | Elevator fascia plate and fascia plate assembling method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107207205A CN107207205A (en) | 2017-09-26 |
CN107207205B true CN107207205B (en) | 2019-06-07 |
Family
ID=56563595
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201580075179.XA Active CN107207205B (en) | 2015-02-02 | 2015-02-02 | The assemble method of elevator protection plate and protective plate |
Country Status (3)
Country | Link |
---|---|
JP (1) | JP6218161B2 (en) |
CN (1) | CN107207205B (en) |
WO (1) | WO2016125229A1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102017210140A1 (en) | 2017-06-16 | 2018-12-20 | Fidlock Gmbh | Closure device for detachably connecting two parts |
JP6483222B1 (en) * | 2017-11-09 | 2019-03-13 | 東芝エレベータ株式会社 | Fescher plate |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201961930U (en) * | 2010-12-30 | 2011-09-07 | 沈阳博林特电梯股份有限公司 | Telescopic kick plate |
CN103562110A (en) * | 2011-03-22 | 2014-02-05 | 奥的斯电梯公司 | Toe guard assembly for an elevator system |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3382631A (en) * | 1966-05-04 | 1968-05-14 | Williamsburg Steel Products Co | Facia and cover plate for elevator shaft construction |
JPS54144559U (en) * | 1978-03-29 | 1979-10-06 | ||
JPS5841765U (en) * | 1981-09-12 | 1983-03-19 | フジテツク株式会社 | Fetish plate device for elevators |
JPS58154269U (en) * | 1982-04-10 | 1983-10-15 | フジテツク株式会社 | Fetish plate device for elevators |
JPH0656073U (en) * | 1993-01-19 | 1994-08-02 | オーチス エレベータ カンパニー | Hoistway protection plate |
JPH06255936A (en) * | 1993-03-08 | 1994-09-13 | Hitachi Building Syst Eng & Service Co Ltd | Facia plate of elevator |
JP3373092B2 (en) * | 1995-08-31 | 2003-02-04 | 株式会社東芝 | Elevator car floor |
JPH09194161A (en) * | 1996-01-16 | 1997-07-29 | Hitachi Building Syst Co Ltd | Hoistway device for elevator |
JP3714776B2 (en) * | 1997-07-29 | 2005-11-09 | 三菱電機ビルテクノサービス株式会社 | Retractable Fesher Plate and its mounting method |
JP2004244188A (en) * | 2003-02-14 | 2004-09-02 | Toshiba Elevator Co Ltd | Elevator car |
JP2005187104A (en) * | 2003-12-24 | 2005-07-14 | Mitsubishi Electric Corp | Fall prevention device for elevator |
-
2015
- 2015-02-02 WO PCT/JP2015/052816 patent/WO2016125229A1/en active Application Filing
- 2015-02-02 JP JP2016572959A patent/JP6218161B2/en active Active
- 2015-02-02 CN CN201580075179.XA patent/CN107207205B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201961930U (en) * | 2010-12-30 | 2011-09-07 | 沈阳博林特电梯股份有限公司 | Telescopic kick plate |
CN103562110A (en) * | 2011-03-22 | 2014-02-05 | 奥的斯电梯公司 | Toe guard assembly for an elevator system |
Also Published As
Publication number | Publication date |
---|---|
JPWO2016125229A1 (en) | 2017-04-27 |
CN107207205A (en) | 2017-09-26 |
WO2016125229A1 (en) | 2016-08-11 |
JP6218161B2 (en) | 2017-10-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6223571B2 (en) | Elevator cab and its assembly method | |
CN107207205B (en) | The assemble method of elevator protection plate and protective plate | |
CN106829698B (en) | Elevator car apparatus and method for suppressing vibration | |
KR101068077B1 (en) | Combined aseismic structural system for electrical and communication equipments without power interruption and removal | |
CN106304738B (en) | Lineation assembly | |
CN104233968B (en) | Box-based base for maintenance of sound barrier foundation connecting bolts | |
CN105908962A (en) | External corner externally-hanging safety net connecting assembly for ring lock scaffold and externally-hanging safety net device | |
CN105804416B (en) | The attachment structure of prefabrication tower crane | |
CN108678362B (en) | Fixed installation method for construction elevator and wall | |
JP2018021352A (en) | Support and stairway construction method | |
KR101907355B1 (en) | Steel Building Structure Having Reinforcing Frame | |
CN205776197U (en) | Idle discharge frame is hung in a kind of rock anchorage beam concrete construction | |
JP6355264B2 (en) | Suspended scaffolding, suspension scaffold installation method and suspension bracket | |
CN203095368U (en) | Door sleeve of elevator | |
KR20100080992A (en) | Pipe supporting apparatus for construct | |
CN204897100U (en) | No computer lab car fag end seat | |
CN206830176U (en) | Suitable for the anti-collapse cementing unit of oil-gas mining | |
CN104499724A (en) | Edge protection fence | |
CN206879259U (en) | A kind of standard cabinet of signalling arrangement | |
CN104030125B (en) | Lift facility | |
CN106764066A (en) | A kind of aerial piping lane | |
CN107084651A (en) | For deep-foundation pit engineering support beam demolition blasting flyrock protection device and method | |
KR20100125677A (en) | Rail climbing system | |
JP5123149B2 (en) | Construction method of partition wall | |
JP2019090218A (en) | Temporary passage to service platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |