CN107202924A - A kind of terminal test method, equipment and system - Google Patents
A kind of terminal test method, equipment and system Download PDFInfo
- Publication number
- CN107202924A CN107202924A CN201710368095.6A CN201710368095A CN107202924A CN 107202924 A CN107202924 A CN 107202924A CN 201710368095 A CN201710368095 A CN 201710368095A CN 107202924 A CN107202924 A CN 107202924A
- Authority
- CN
- China
- Prior art keywords
- golden machine
- terminal test
- transmission power
- power output
- test equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The embodiments of the invention provide a kind of terminal test method, equipment and system.Terminal test method provided in an embodiment of the present invention is applied to terminal test equipment, and the terminal test equipment is connected by connecting system with golden machine;Methods described includes:By the equipment identification information for obtaining the golden machine, afterwards, according to the equipment identification information, the transmission power of the golden machine is obtained, afterwards, the golden machine is controlled to carry out power output according to the transmission power, afterwards, the power output of the specified location of the connection system is obtained, afterwards, according to the transmission power and the power output, the line loss value of the golden machine is obtained.Therefore, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by the way that testing efficiency caused by tester's manual measurement line loss value is relatively low and the problem of higher human cost.
Description
【Technical field】
The present invention relates to technical field of measurement and test, more particularly to a kind of terminal test method, equipment and system.
【Background technology】
At present, when carrying out the production test of terminal, it is necessary to which the connection system that is made up of some fastening means is connected
Terminal and test equipment.In this process, the signal that terminal is sent is delivered to test equipment by connection system and will necessarily produced
Loss, only accurately calculates the line loss value of whole connection system, just can guarantee that calibration or comprehensive survey of production test etc. other
Work station can be smoothly completed;Otherwise, when other work stations carry out the work such as follow-up calibration or comprehensive survey based on the line loss value, by
There is relatively large deviation in initial information, the larger test result of deviation can be obtained.
In the prior art, the mode surveyed generally by manual point realizes the test to line loss value.Specifically, when needs
, it is necessary to the transmission power of tester's manually determined terminal when carrying out the measure of line loss value to terminal, and control terminal is according to this
Transmission power carries out power output, afterwards, and manual test is carried out to the power output of terminal in specified location, and based on test knot
Fruit obtains line loss value.
In process of the present invention is realized, inventor has found that at least there are the following problems in the prior art:
Existing line loss value method of testing rely primarily on tester carry out manually point survey and manual calculations, testing efficiency compared with
It is low, also, requirement of the test process to tester of line loss value is higher, consumes substantial amounts of human cost.
【The content of the invention】
In view of this, the embodiments of the invention provide a kind of terminal test method, equipment and system, to solve existing skill
By the way that testing efficiency caused by tester's manual measurement line loss value is relatively low and the problem of higher human cost in art.
On the one hand, the embodiments of the invention provide a kind of terminal test method, methods described is applied to terminal test equipment,
The terminal test equipment is connected by connecting system with golden machine;Methods described includes:
Obtain the equipment identification information of the golden machine;
According to the equipment identification information, the transmission power of the golden machine is obtained;
The golden machine is controlled to carry out power output according to the transmission power;
Obtain the power output of the specified location of the connection system;
According to the transmission power and the power output, the line loss value of the golden machine is obtained.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, set according to described
Standby identification information, obtains the transmission power of the golden machine, including:
In manufacturing system MES, golden machine fileinfo corresponding with the equipment identification information is obtained;
The golden machine fileinfo is converted into text formatting, the text message of the golden machine file is obtained;
Extract the transmission power in the text message.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, control the gold
Machine carries out power output according to the transmission power, including:
Radio frequency command is sent to the golden machine, in order to which the golden machine is according to the transmitting carried in the radio frequency command
Power carries out power output.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, according to the hair
Power and the power output are penetrated, the line loss value of the golden machine is obtained, including:
The difference of the transmission power and the power output is obtained, using the line loss value as the golden machine.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, methods described is also
Including:
The line loss value is write into testing workstation, to complete the line loss configuration to the testing workstation.
A technical scheme in above-mentioned technical proposal has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
On the other hand, the embodiments of the invention provide a kind of terminal test equipment, the terminal test equipment passes through connection
System is connected with golden machine;The terminal test equipment includes:
First acquisition unit, the equipment identification information for obtaining the golden machine;
Second acquisition unit, for according to the equipment identification information, obtaining the transmission power of the golden machine;
Control unit, for controlling the golden machine according to transmission power progress power output;
3rd acquiring unit, the power output of the specified location for obtaining the connection system;
4th acquiring unit, for according to the transmission power and the power output, obtaining the line loss value of the golden machine.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, described second obtains
Unit is taken, specifically for:
In manufacturing system MES, golden machine fileinfo corresponding with the equipment identification information is obtained;
The golden machine fileinfo is converted into text formatting, the text message of the golden machine file is obtained;
Extract the transmission power in the text message.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, the control list
Member, specifically for:
Radio frequency command is sent to the golden machine, in order to which the golden machine is according to the transmitting carried in the radio frequency command
Power carries out power output.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, the described 4th obtains
Unit is taken, specifically for:
The difference of the transmission power and the power output is obtained, using the line loss value as the golden machine.
Aspect as described above and any possible implementation, it is further provided a kind of implementation, the terminal are surveyed
Examination equipment also includes:
Dispensing unit, for the line loss value to be write into testing workstation, to complete the line loss to the testing workstation
Configuration.
A technical scheme in above-mentioned technical proposal has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
Another further aspect, the embodiments of the invention provide a kind of terminal test system, including:Any one above-mentioned implementation
Terminal test equipment, golden machine with being connected system, wherein, the terminal test equipment is connected by connecting system with gold machine.
A technical scheme in above-mentioned technical proposal has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
【Brief description of the drawings】
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment
Figure is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for this area
For those of ordinary skill, without having to pay creative labor, it can also be obtained according to these accompanying drawings other attached
Figure.
Fig. 1 is the structural representation of the embodiment one for the terminal test system that the embodiment of the present invention is provided;
Fig. 2 is the schematic flow sheet for the terminal test method that the embodiment of the present invention is provided;
Fig. 3 is the structural representation of the embodiment two for the terminal test system that the embodiment of the present invention is provided;
Fig. 4 is the functional block diagram for the terminal test equipment that the embodiment of the present invention is provided;
Fig. 5 is the structural representation of the embodiment three for the terminal test system that the embodiment of the present invention is provided.
【Embodiment】
In order to be better understood from technical scheme, the embodiment of the present invention is retouched in detail below in conjunction with the accompanying drawings
State.
It will be appreciated that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.Base
Embodiment in the present invention, those of ordinary skill in the art obtained under the premise of creative work is not made it is all its
Its embodiment, belongs to the scope of protection of the invention.
The term used in embodiments of the present invention is the purpose only merely for description specific embodiment, and is not intended to be limiting
The present invention." one kind ", " described " and "the" of singulative used in the embodiment of the present invention and appended claims
It is also intended to including most forms, unless context clearly shows that other implications.
It should be appreciated that term "and/or" used herein is only a kind of incidence relation for describing affiliated partner, represent
There may be three kinds of relations, for example, A and/or B, can be represented:Individualism A, while there is A and B, individualism B these three
Situation.In addition, character "/" herein, it is a kind of relation of "or" to typically represent forward-backward correlation object.
Depending on linguistic context, word as used in this " if " can be construed to " ... when " or " when ...
When " or " in response to determining " or " in response to detection ".Similarly, depending on linguistic context, phrase " if it is determined that " or " if detection
(condition or event of statement) " can be construed to " when it is determined that when " or " in response to determine " or " when the detection (condition of statement
Or event) when " or " in response to detection (condition or event of statement) ".
For in the prior art by the way that testing efficiency caused by tester's manual measurement line loss value is relatively low and human cost
Higher the problem of, the embodiments of the invention provide following resolving ideas:Obtain the transmitting of golden machine automatically using terminal test equipment
Power, and control golden machine to carry out power output according to the transmission power, and then measure its output in the specified location of connection system
Power, so that, get line loss value automatically according to transmission power and power output.
Under the guiding of the thinking, this programme embodiment provides following feasible embodiment.
Embodiment one
The embodiment of the present invention provides a kind of terminal test method, applied to including:Golden machine, terminal test equipment and connection system
In the terminal test system of system, this method is implemented on terminal test equipment.
It should be noted that golden machine refers to an indices and parameter all reaches optimal terminal.Wherein, the present invention is implemented
Involved terminal can include but is not limited to personal computer (Personal Computer, PC), personal digital assistant in example
(Personal Digital Assistant, PDA), radio hand-held equipment, tablet personal computer (Tablet Computer), mobile phone
Deng.
Can be according to actual needs golden machine by terminal profile, the present invention is implemented during actually this programme is realized
Example is to this without being particularly limited to.For example, if terminal is mobile phone, golden machine now can be the stable survey of a performance comparision
Test-run a machine.
In the embodiment of the present invention, connection system is used to connect golden machine and terminal test equipment, connection system can include but
It is not limited to:At least one in RF radio frequency lines, radio-frequency maser and tool.
During a concrete implementation, Fig. 1 is refer to, its terminal test system provided by the embodiment of the present invention
Embodiment one structural representation.As shown in figure 1, the terminal test system includes:Golden machine 11, terminal test equipment 12, company
Welding system 13, manufacturing system (Manufacturing Execution System, MES) 13 and testing workstation 15.
Wherein, connection system 13 includes:Radio-frequency maser 131 and tool 132.
As shown in figure 1, the golden machine 11 of one end connection of connection system 13, other end connection terminal test equipment 12;Also, eventually
End test equipment 12 is also connected with MES13, and terminal test equipment 12 is also connected with testing workstation 15.
The schematic flow sheet for the terminal test method that the embodiment of the present invention is provided refer to Fig. 2, as shown in Fig. 2 the party
Method comprises the following steps:
S201, obtains the equipment identification information of golden machine.
S202, according to equipment identification information, obtains the transmission power of golden machine.
S203, the golden machine of control carries out power output according to transmission power.
S204, obtains the power output of the specified location of connection system.
S205, according to transmission power and power output, obtains the line loss value of golden machine.
In the embodiment of the present invention, the equipment identification information of golden machine is used for unique mark terminal.In a concrete implementation mistake
Cheng Zhong, the equipment identification information can be International Mobile Station Equipment Identification (International Mobile Equipment
Identity, IMEI).
As depicted in figs. 1 and 2, based on the annexation between terminal test equipment 12 and manufacturing system 14, holding
During row S202, the corresponding golden machine fileinfo of equipment identification information can be obtained in manufacturing system, and by the Jin Jiwen
Part information is converted to text formatting, obtains the text message of golden machine file, so that, extract the transmission power in text information.
Information later related to the golden machine is stored due to being stored in manufacturing system in golden machine fileinfo, therefore, is extracted
Transmission power in text message is exactly the transmission power of the golden machine.
It should be noted that the annexation between terminal test equipment 12 as shown in Figure 1 and manufacturing system 14
Only schematical, during actually this programme is realized, manufacturing system 14 can be arranged at except golden machine 11 and terminal
In other equipment outside test equipment 12, or, manufacturing system 14 can also be arranged in terminal test equipment 12.
Specifically, being arranged at answering when in the other equipment in addition to golden machine and terminal test equipment with manufacturing system
With being illustrated exemplified by scene.Now, be previously stored with manufacturing system each golden machine equipment identification information and
Corresponding golden machine fileinfo, also, terminal test equipment can access the information in manufacturing system.
During a concrete implementation, the equipment identification information of acquisition can be sent to production by terminal test equipment
Manufacture system, the information stored by manufacturing system based on itself obtains golden machine file corresponding with the equipment identification information
Information, and the golden machine fileinfo got is sent to terminal test equipment, in this way, terminal test equipment can get with
The corresponding golden machine fileinfo of the equipment identification information.
During another concrete implementation, terminal test equipment can directly read the letter in manufacturing system
Breath, based on this, terminal test equipment can be according to the equipment identification information of acquisition, the letter voluntarily stored in manufacturing system
In breath, golden machine fileinfo corresponding with the equipment identification information is obtained.
It should be noted that when in the other equipment that manufacturing system is arranged in addition to golden machine and terminal test equipment
When, golden machine file information storage manages golden machine data file energy by using manufacturing system in manufacturing system
It is enough highly precisely to obtain golden machine file, and the workload of the golden machine fileinfo of plant maintenance is reduced, also, due to being not required to
To go to deposit these information in developing zone on golden machine, use more facilitates.Also, now, due to golden machine file information storage
, can also be locally downloading by the golden machine fileinfo got in manufacturing system, afterwards, then perform and be converted to text
The step of form.
The embodiment of the present invention for text formatting specific manifestation form without being particularly limited to.If for example, getting
The form of golden machine fileinfo is EXCEL forms, golden machine fileinfo can be converted to the text of INI forms, to obtain
Get the text message of the golden machine file.During actually this programme is realized, golden machine file can also be set to TXT lattice
Formula, the embodiment of the present invention is to this without being particularly limited to.
Based on the transmission power of the golden machine got in S202, in the embodiment of the present invention, terminal test equipment also needs to control
The golden machine of system carries out power output according to the transmission power.
, can be based on the company between terminal test equipment as shown in Figure 1 and golden machine during a concrete implementation
Relation is connect, terminal test equipment sends radio frequency command to golden machine, in order to which golden machine is received after the radio frequency command, according to the radio frequency
The transmission power carried in instruction carries out power output.
So, compared in the prior art, being golden machine addition SIM card, and by setting up anolog base station, and by simulating base
The calling stood between golden machine is communicated, and this signalling communication mode can consume a large amount of length of testing speech.By contrast, it is of the invention
Embodiment uses the comprehensive survey mode of non-signaling, it is not necessary to set up virtual base station, it is not required that enter SIM card for the golden machine transplanting of rice, it is not required that
The call communication set up between virtual base station and golden machine, but directly pass through the connection system between golden machine and terminal test equipment
The transmission of radio frequency command is carried out, which greatly simplifies testing procedure, length of testing speech is reduced, improves testing efficiency.
Power output is carried out according to the transmission power of golden machine based on golden machine in S203, before S204 is performed, it is thus necessary to determine that
The specified location of connection system, the specified location can carry out selection determination as needed.
In actual implementation process, the specified location can be the connection between the connection system and terminal test equipment
Point.Or, when if desired measuring the line loss value in the part connection member in the connection system, specified location can also be set
For the end points of the one end of these part connection members away from golden machine.
It should be noted that the output work of the specified location of connection system is obtained in the embodiment of the present invention in S204 is performed
During rate, following two schemes can be included but is not limited to:
The first, refer to the terminal test system shown in Fig. 1, in the terminal test system, terminal test equipment tool
The detection function of standby power output, the test equipment of terminal directly can carry out power output in the specified location of connection system
Detection, with the power output for the specified location for getting connection system.
Second, Fig. 3 is refer to, the structure of the embodiment two of its terminal test system provided by the embodiment of the present invention
Schematic diagram, as shown in figure 3, the terminal test system includes:Golden machine 11, terminal test equipment 12, connection system 13, MES13, survey
Try work station 15 and comprehensive test instrument 16.Wherein, connection system 13 includes:Tool 132 and RF connecting lines 133.End as shown in Figure 3
Hold in test system, the connection between golden machine 11, terminal test equipment 12, connection system 13, MES13 and testing workstation 15
Relation is essentially identical with Fig. 1, is no longer repeated herein.Also, in the terminal test system shown in Fig. 3, terminal test equipment
12 are also connected with comprehensive test instrument 16, and the specified location that comprehensive test instrument 16 is used in connection system 13 determines power output.
Based on this, in terminal test system as shown in Figure 3, terminal test equipment 12 can be sent when performing S204
Test instruction determines power output, and will detect to comprehensive test instrument 16 by specified location of the comprehensive test instrument 16 in connection system 13
To power output be sent to terminal test equipment 12, in this way, terminal test equipment 12 just obtained connect system specific bit
The power output put.
During a concrete implementation, in test system as shown in Figure 3, terminal test equipment 12 can be arranged at
In computer, the model of comprehensive test instrument 16 can be 8960 comprehensive test instruments.
, can be by obtaining the difference of transmission power and power output, to be used as gold when performing S205 in the embodiment of the present invention
The line loss value of machine.
As shown in figure 1, terminal test equipment 12 is also connected with testing workstation 15, now, terminal test equipment 12 exists
Execution S205 is obtained after the line loss value of golden machine, the line loss value can also be write into testing workstation 15, with complete pairwise testing work
Make the line loss configuration at station 15.In this way, reducing the line loss configuration operation of testing workstation, human cost is further saved.
The technical scheme of the embodiment of the present invention has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
Embodiment two
The terminal test method provided based on above-described embodiment one, the embodiment of the present invention, which is further provided, realizes above-mentioned side
The device embodiment of each step and method in method embodiment.
Fig. 4 is refer to, the functional block diagram of its terminal test equipment provided by the embodiment of the present invention.The test of terminal
Annexation between device and golden machine, connection system, manufacturing system and testing workstation is as shown in figure 1, such as Fig. 4 institutes
Show, the terminal test equipment includes:
First acquisition unit 41, the equipment identification information for obtaining golden machine;
Second acquisition unit 42, for according to equipment identification information, obtaining the transmission power of golden machine;
Control unit 43, for controlling golden machine according to transmission power progress power output;
3rd acquiring unit 44, the power output of the specified location for obtaining connection system;
4th acquiring unit 45, for according to transmission power and power output, obtaining the line loss value of golden machine.
Specifically, in the embodiment of the present invention, second acquisition unit 42, specifically for:
In manufacturing system MES, golden machine fileinfo corresponding with equipment identification information is obtained;
Golden machine fileinfo is converted into text formatting, the text message of golden machine file is obtained;
Extract the transmission power in text message.
Wherein, control unit 43, specifically for:
Radio frequency command is sent to golden machine, in order to which golden machine is defeated according to the transmission power progress power carried in radio frequency command
Go out.
In the embodiment of the present invention, the 4th acquiring unit 45, specifically for:
The difference of transmission power and power output is obtained, using the line loss value as golden machine.
During a concrete implementation, the terminal test equipment also includes:
Dispensing unit 46, for line loss value to be write into testing workstation, to complete the line loss configuration to testing workstation.
Because each unit in the present embodiment is able to carry out the method shown in Fig. 2, the part that the present embodiment is not described in detail,
Refer to the related description to Fig. 2.
The technical scheme of the embodiment of the present invention has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
Embodiment three
The terminal test equipment that the terminal test method and embodiment two provided based on above-described embodiment one is provided,
The embodiment of the present invention further provides the system embodiment for realizing each step and method in above method embodiment.
The structural representation of the embodiment three for the terminal test system that the embodiment of the present invention is provided refer to Fig. 5, the end
End test system includes:Golden machine 11, the terminal test equipment 12 as shown in embodiment two, connection system 13, wherein, the terminal
Test equipment 12 is connected by connecting system 13 with golden machine 11.
In the implementation process of specific this programme, the terminal test system can also refer to Fig. 1 or Fig. 3, and its structure exists
This is repeated again.
The part that the present embodiment is not described in detail, refers to the related description to Fig. 2.
The technical scheme of the embodiment of the present invention has the advantages that:
In the embodiment of the present invention, terminal test equipment can get golden machine automatically according to the equipment identification information of golden machine
Transmission power, and golden machine can be automatically controlled carry out power output according to the transmission power so that, by connecting system and golden machine
The terminal test equipment of connection can just be automatically determined in specified location to the power output of golden machine, and based on the defeated of measure
Go out power and automatically obtain line loss value.In the embodiment of the present invention, the survey to line loss value can be realized automatically by terminal test equipment
It is fixed, the workload and the technical requirements to tester of tester is greatly reduced, testing cost is reduced, also, be based on
The automated process flow, reduces the length of testing speech of line loss value, improves testing efficiency, also reduces human error to test
As a result harmful effect.Based on this, technical scheme provided in an embodiment of the present invention can solve the problem that in the prior art by tester
Testing efficiency is relatively low caused by member's manual measurement line loss value and the problem of higher human cost.
It is apparent to those skilled in the art that, for convenience and simplicity of description, the system of foregoing description,
The specific work process of device and unit, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In several embodiments provided by the present invention, it should be understood that disclosed system, apparatus and method can be with
Realize by another way.For example, device embodiment described above is only schematical, for example, the unit
Divide, only a kind of division of logic function there can be other dividing mode when actually realizing, for example, multiple units or group
Part can combine or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown
Or the coupling each other discussed or direct-coupling or communication connection can be by some interfaces, device or unit it is indirect
Coupling is communicated to connect, and can be electrical, machinery or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also
That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list
Member can both be realized in the form of hardware, it would however also be possible to employ hardware adds the form of SFU software functional unit to realize.
The above-mentioned integrated unit realized in the form of SFU software functional unit, can be stored in an embodied on computer readable and deposit
In storage media.Above-mentioned SFU software functional unit is stored in a storage medium, including some instructions are to cause a computer
Device (can be personal computer, server, or network equipment etc.) or processor (Processor) perform the present invention each
The part steps of embodiment methods described.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (Read-
Only Memory, ROM), random access memory (Random Access Memory, RAM), magnetic disc or CD etc. it is various
Can be with the medium of store program codes.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention
God is with principle, and any modification, equivalent substitution and improvements done etc. should be included within the scope of protection of the invention.
Claims (11)
1. a kind of terminal test method, it is characterised in that methods described is applied to terminal test equipment, the terminal test equipment
It is connected by connecting system with golden machine;Methods described includes:
Obtain the equipment identification information of the golden machine;
According to the equipment identification information, the transmission power of the golden machine is obtained;
The golden machine is controlled to carry out power output according to the transmission power;
Obtain the power output of the specified location of the connection system;
According to the transmission power and the power output, the line loss value of the golden machine is obtained.
2. according to the method described in claim 1, it is characterised in that according to the equipment identification information, obtain the golden machine
Transmission power, including:
In manufacturing system MES, golden machine fileinfo corresponding with the equipment identification information is obtained;
The golden machine fileinfo is converted into text formatting, the text message of the golden machine file is obtained;
Extract the transmission power in the text message.
3. according to the method described in claim 1, it is characterised in that the control golden machine carries out power according to the transmission power
Output, including:
Radio frequency command is sent to the golden machine, in order to which the golden machine is according to the transmission power carried in the radio frequency command
Carry out power output.
4. according to the method described in claim 1, it is characterised in that according to the transmission power and the power output, obtain
The line loss value of the golden machine, including:
The difference of the transmission power and the power output is obtained, using the line loss value as the golden machine.
5. according to the method described in claim 1, it is characterised in that methods described also includes:
The line loss value is write into testing workstation, to complete the line loss configuration to the testing workstation.
6. a kind of terminal test equipment, it is characterised in that the terminal test equipment is connected by connecting system with golden machine;It is described
Terminal test equipment includes:
First acquisition unit, the equipment identification information for obtaining the golden machine;
Second acquisition unit, for according to the equipment identification information, obtaining the transmission power of the golden machine;
Control unit, for controlling the golden machine according to transmission power progress power output;
3rd acquiring unit, the power output of the specified location for obtaining the connection system;
4th acquiring unit, for according to the transmission power and the power output, obtaining the line loss value of the golden machine.
7. terminal test equipment according to claim 6, it is characterised in that the second acquisition unit, specifically for:
In manufacturing system MES, golden machine fileinfo corresponding with the equipment identification information is obtained;
The golden machine fileinfo is converted into text formatting, the text message of the golden machine file is obtained;
Extract the transmission power in the text message.
8. terminal test equipment according to claim 6, it is characterised in that described control unit, specifically for:
Radio frequency command is sent to the golden machine, in order to which the golden machine is according to the transmission power carried in the radio frequency command
Carry out power output.
9. terminal test equipment according to claim 6, it is characterised in that the 4th acquiring unit, specifically for:
The difference of the transmission power and the power output is obtained, using the line loss value as the golden machine.
10. terminal test equipment according to claim 6, it is characterised in that the terminal test equipment also includes:
Dispensing unit, for the line loss value to be write into testing workstation, to complete the line loss configuration to the testing workstation.
11. a kind of terminal test system, it is characterised in that the terminal test system includes:It is any in such as claim 6 to 10
Terminal test equipment, golden machine described in is with being connected system;
Wherein, the terminal test equipment is connected by connecting system with golden machine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368095.6A CN107202924A (en) | 2017-05-23 | 2017-05-23 | A kind of terminal test method, equipment and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710368095.6A CN107202924A (en) | 2017-05-23 | 2017-05-23 | A kind of terminal test method, equipment and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107202924A true CN107202924A (en) | 2017-09-26 |
Family
ID=59906246
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710368095.6A Pending CN107202924A (en) | 2017-05-23 | 2017-05-23 | A kind of terminal test method, equipment and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107202924A (en) |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108242960A (en) * | 2017-12-29 | 2018-07-03 | 广东欧珀移动通信有限公司 | Channel line loss modification method, device, storage medium and computer equipment |
CN109739194A (en) * | 2019-01-10 | 2019-05-10 | Oppo(重庆)智能科技有限公司 | Verify method and apparatus, the control system, computer readable storage medium of golden machine |
CN111225060A (en) * | 2020-01-10 | 2020-06-02 | 杭州涂鸦信息技术有限公司 | Radio frequency-based index safety testing method and system |
CN111257672A (en) * | 2020-02-11 | 2020-06-09 | 深圳市广和通无线股份有限公司 | Line loss point inspection method and device, computer equipment and storage medium |
CN111327372A (en) * | 2020-03-11 | 2020-06-23 | 杭州涂鸦信息技术有限公司 | Radio frequency test method, system and device |
CN112946405A (en) * | 2021-03-23 | 2021-06-11 | 深圳市广和通无线股份有限公司 | Radio frequency test method and related device |
CN113098633A (en) * | 2021-04-28 | 2021-07-09 | 德明通讯(上海)股份有限公司 | Intelligent coupling test method and device and computer readable storage medium |
CN115356561A (en) * | 2022-08-12 | 2022-11-18 | 上海移柯通信技术股份有限公司 | Line loss calibration method, system, electronic device and computer-readable storage medium |
CN115372740A (en) * | 2022-08-19 | 2022-11-22 | 上海物骐微电子有限公司 | RF chip line loss test method, system, readable storage medium and electronic device |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102386982A (en) * | 2011-10-14 | 2012-03-21 | 中兴通讯股份有限公司 | Metering device and method for radio frequency testing system errors in mobile terminal production |
CN103974289A (en) * | 2014-05-27 | 2014-08-06 | 上海斐讯数据通信技术有限公司 | Automatic line loss point inspection method and automatic line loss point inspection system of mobile equipment test system |
CN105301377A (en) * | 2014-06-19 | 2016-02-03 | 联想移动通信科技有限公司 | Method, apparatus and system for measuring RF line loss |
-
2017
- 2017-05-23 CN CN201710368095.6A patent/CN107202924A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102386982A (en) * | 2011-10-14 | 2012-03-21 | 中兴通讯股份有限公司 | Metering device and method for radio frequency testing system errors in mobile terminal production |
CN103974289A (en) * | 2014-05-27 | 2014-08-06 | 上海斐讯数据通信技术有限公司 | Automatic line loss point inspection method and automatic line loss point inspection system of mobile equipment test system |
CN105301377A (en) * | 2014-06-19 | 2016-02-03 | 联想移动通信科技有限公司 | Method, apparatus and system for measuring RF line loss |
Non-Patent Citations (1)
Title |
---|
袁永红: "FDD-LTE终端射频快速测试方法", 《中国优秀硕士学位论文全文数据库 信息科技辑》 * |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108242960A (en) * | 2017-12-29 | 2018-07-03 | 广东欧珀移动通信有限公司 | Channel line loss modification method, device, storage medium and computer equipment |
CN109739194A (en) * | 2019-01-10 | 2019-05-10 | Oppo(重庆)智能科技有限公司 | Verify method and apparatus, the control system, computer readable storage medium of golden machine |
CN111225060A (en) * | 2020-01-10 | 2020-06-02 | 杭州涂鸦信息技术有限公司 | Radio frequency-based index safety testing method and system |
CN111257672A (en) * | 2020-02-11 | 2020-06-09 | 深圳市广和通无线股份有限公司 | Line loss point inspection method and device, computer equipment and storage medium |
CN111327372A (en) * | 2020-03-11 | 2020-06-23 | 杭州涂鸦信息技术有限公司 | Radio frequency test method, system and device |
CN111327372B (en) * | 2020-03-11 | 2022-07-08 | 杭州涂鸦信息技术有限公司 | Radio frequency test method, system and device |
CN112946405A (en) * | 2021-03-23 | 2021-06-11 | 深圳市广和通无线股份有限公司 | Radio frequency test method and related device |
CN113098633A (en) * | 2021-04-28 | 2021-07-09 | 德明通讯(上海)股份有限公司 | Intelligent coupling test method and device and computer readable storage medium |
CN113098633B (en) * | 2021-04-28 | 2023-03-07 | 德明通讯(上海)股份有限公司 | Intelligent coupling test method and device and computer readable storage medium |
CN115356561A (en) * | 2022-08-12 | 2022-11-18 | 上海移柯通信技术股份有限公司 | Line loss calibration method, system, electronic device and computer-readable storage medium |
CN115372740A (en) * | 2022-08-19 | 2022-11-22 | 上海物骐微电子有限公司 | RF chip line loss test method, system, readable storage medium and electronic device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107202924A (en) | A kind of terminal test method, equipment and system | |
CN111459794B (en) | Communication network testing method, device, computer equipment and storage medium | |
CN107566053A (en) | Method and system for testing radio frequency index and computer readable storage medium | |
CN104732603A (en) | Position coordinate-based method of checking attendance of outworkers | |
CN109361562A (en) | A kind of automated testing method based on the access of related network equipment | |
CN106787199A (en) | A kind of portable substation simulated testing system and method | |
CN201985871U (en) | RF line loss calibrating device | |
CN111092767B (en) | Method and device for debugging equipment | |
CN106776350A (en) | The accurate method of testing and device of a kind of program | |
CN108199789B (en) | Bluetooth signal adjusting method, device, test terminal, system and readable medium | |
CN101986757A (en) | Positioning method and device for mobile terminal | |
CN112735406B (en) | Device control method and apparatus, storage medium, and electronic apparatus | |
CN108762205A (en) | A kind of Laboratory Instruments automatic data collection and intelligent managing and control system | |
CN110068851B (en) | Method and system for safely acquiring position of mobile terminal | |
CN105356955B (en) | Suitable for the service analogue apparatus and method of short-wave radio set applied in network performance test | |
CN110334385B (en) | Test method, device and equipment for central controller of comprehensive energy system | |
TW201321765A (en) | Automatic test system of communication device | |
CN110289890B (en) | Near field communication test method, system, mobile terminal and storage medium | |
CN102026144A (en) | Roaming performance test method, equipment and system thereof | |
CN107222269A (en) | A kind of GSM APC quick accurate calibration implementation methods based on saturation PA | |
CN103974416B (en) | Obtain location information of mobile terminal method, apparatus and system | |
CN104424387A (en) | Method and device for sharing test result of medical equipment | |
CN110705232A (en) | Method and system for generating service state analysis report of power communication network maintenance influence | |
CN103220715A (en) | Method and device for reporting network performance testing result | |
CN109979444A (en) | Voice instruction automatic testing method, terminal and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170926 |
|
RJ01 | Rejection of invention patent application after publication |