CN107201779A - A kind of batter post couples the structure of stress with wide span house cap - Google Patents

A kind of batter post couples the structure of stress with wide span house cap Download PDF

Info

Publication number
CN107201779A
CN107201779A CN201710254721.9A CN201710254721A CN107201779A CN 107201779 A CN107201779 A CN 107201779A CN 201710254721 A CN201710254721 A CN 201710254721A CN 107201779 A CN107201779 A CN 107201779A
Authority
CN
China
Prior art keywords
batter post
truss
steel
house cap
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710254721.9A
Other languages
Chinese (zh)
Other versions
CN107201779B (en
Inventor
蒋炳丽
杨霄
赵天文
朱朵娥
何晓洪
刘召军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Architectural Design and Research Institute of Tsinghua University
Original Assignee
Architectural Design and Research Institute of Tsinghua University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Architectural Design and Research Institute of Tsinghua University filed Critical Architectural Design and Research Institute of Tsinghua University
Priority to CN201710254721.9A priority Critical patent/CN107201779B/en
Publication of CN107201779A publication Critical patent/CN107201779A/en
Application granted granted Critical
Publication of CN107201779B publication Critical patent/CN107201779B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/342Structures covering a large free area, whether open-sided or not, e.g. hangars, halls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/11Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with non-parallel upper and lower edges, e.g. roof trusses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to the structure that a kind of batter post couples stress with wide span house cap, reduce the thickness of wide span house cap, reduce the tilting moment that batter post is produced to overall structure, batter post is added to contribute integrally-built integral rigidity, larger post bottom moment of flexure and horizontal force that batter post is caused to basis are also reduced simultaneously, structure ductility is added, reliability of structure is improved.

Description

A kind of batter post couples the structure of stress with wide span house cap
Technical field
The invention belongs to Structural Engineering long strands field, more particularly to a kind of batter post couples stress with wide span house cap Structure.
Background technology
With a large amount of constructions of large span spatial structure, building is sent out towards complicated, the vdiverse in function comprehensive direction of build Exhibition, architect has been not content with the shape of rule, larger span, or even is not content with and only makes an issue of in the plane, examines Consider the aesthetic effect on facade, so that batter post component is by bold utilization, but batter post overall structure produces outside power of toppling Square, weakens integrally-built integral rigidity, while oblique pillar causes larger post bottom moment of flexure and horizontal thrust to basis.Such as What reduces the tilting moment that batter post is produced to overall structure, and increase is contributed integrally-built integral rigidity, and is reduced to base Larger post bottom moment of flexure and horizontal force that plinth is caused, while ensureing batter post degree of safety again, increase ductility, improve safety stock, It is the problem of needing in engineering to solve.
The content of the invention
The present invention relates to the structure that a kind of batter post couples stress with wide span house cap, the thickness of wide span house cap is reduced, The tilting moment that batter post is produced to overall structure is reduced, batter post is added and integrally-built integral rigidity is contributed, also simultaneously Larger post bottom moment of flexure and horizontal force that batter post is caused to basis are reduced, structure ductility is added, improves the reliable of structure Property.
The structure that a kind of batter post couples stress with wide span house cap is made up of wide span house cap, batter post, right cylinder, described Wide span house cap be large span steel truss, be made up of plane girder, space truss, plane girder include main couple, jack truss, Space truss includes outer ring annular stereo truss and internal straight across space truss composition, and the ring truss and inside are straight across three-dimensional purlin Frame is inverted triangle space truss, and described peripheral batter post is formed by hypomere steel reinforced concrete batter post and epimere steel batter post, described Hypomere steel reinforced concrete column length accounts for 1/5th of whole peripheral batter post length, and epimere steel batter post accounts for whole peripheral batter post length 4/5ths, the right cylinder be uiform section reinforced column.The large span steel truss and uiform section armored concrete are straight Post is connected by hinged-support, and the large span steel truss is connected with batter post by bridle iron.The batter post and right cylinder pass through Long-span roof forms the structure that a kind of batter post couples stress with long-span roof.A kind of batter post coupled with wide span house cap by The structure erection sequence of power is then pacified to set up peripheral batter post hypomere, batter post epimere and right cylinder and internal framework successively Wide span house cap is filled, the internal framework and right cylinder reach intensity rear collapsible die, and the outer shroud batter post need to be in large span Just collapsible die after steel worm-gearing is installed completely.
Further, the lower ear plate of the hinged-support is connected with uiform section armored concrete capital slugging, the hinge The upper ear plate of bearing is with the lower boom on wide span house cap ring truss by being welded to connect, and the upper ear plate passes through pin with lower ear plate Axle is connected.
Further, the main couple top boom of the wide span house cap with jack truss top boom by mutually passing through steel node weld Connection, the main couple lower edge and jack truss lower edge are connected by mutually passing through steel node weld.The main couple winds up and ring truss Wind up and connected by mutually passing through steel node weld, the main couple lower edge meets node weld company with ring truss lower edge by mutually passing through steel Connect, the jack truss winds up to wind up with ring truss and is connected by mutually passing through steel node weld, and the jack truss lower edge passes through two circles Steel pipe is welded to connect with ring truss lower edge.
Beneficial effect
(1)The batter post is when without wide span house cap, and batter post is equivalent to cantilever batter post, it is impossible to independently undertake load, to foundation Into larger post bottom moment of flexure and horizontal force, larger tilting moment is produced to overall structure, at the same batter post capital produce it is larger Displacement, much larger than the capital limit displacement value of code requirement.When batter post and right cylinder by long-span roof form a kind of batter post with it is big During the structure of across roof system coupling stress, wide span house cap forms a sidewise restraint to batter post capital, by the displacement of batter post capital Very little is reduced to, the capital limit displacement value of code requirement is met.
So that batter post significantly reduces to the tilting moment that overall structure is produced, the relatively huge pillar bottom moment of flexure that is caused to basis and Horizontal force also accordingly reduces.Simultaneously because sidewise restraint of the wide span house cap to batter post capital so that batter post can undertake roofing The vertical load transmitted, now batter post is while also serve as a strong point of wide span house cap, this coupling stress so that Truss top-bottom chord between right cylinder and batter post is in tension state, reduces truss member section and thickness.
(2)The structure that a kind of batter post couples stress with wide span house cap not only meets architectural appearance requirement, also carries The high safety and reliability of total.
(3)Standard construction form is provided, facilitates engineers and technicians to use.
Brief description of the drawings
Fig. 1 is the structure partial graphics that batter post couples stress with wide span house cap;
Fig. 2 is the section of structure that batter post couples stress with wide span house cap;
Fig. 3 is the overall graphics of structure that batter post couples stress with wide span house cap;
Fig. 4 is the overall side view of structure that batter post couples stress with wide span house cap;
Fig. 5 pivoting support lateral plans.
In each accompanying drawing:1 plane girder(Main couple);2 plane girders(Jack truss);3 ring truss;4 straight across space truss;5 Long-span steel roof;6 batter post epimeres;7 batter post hypomeres;8 batter posts;9 right cylinders;10 pivoting supports;11 affixed bearings;12 round steel Pipe;13 upper ear plates;14 lower ear plates;15 bearing pins;16 internal frameworks;
Embodiment
By taking certain stadium project as an example, to illustrate that the batter post of the present invention couples the structure of stress with wide span house cap.
Set up peripheral batter post hypomere 7, batter post epimere 6 and right cylinder 9 successively first, wherein integral planar is ellipse, week Enclosing batter post, totally 52 and ground angle are 50 ° or so, in diverging, as shown 1, diagram 2, diagram 3.And internal framework 16, as shown 4, internal framework 16 and right cylinder reach intensity rear collapsible die, and outer shroud batter post 8 need to be in long-span steel roof 5 Rear collapsible die is installed completely.Wherein batter post is put on when only individually being calculated with substructure using roof system as load Batter post top, capital displacement is 125mm to the maximum, when the overall calculation together with wide span house cap, takes corresponding measure by batter post and big During across roof system coupling stress, capital displacement is 36.3mm to the maximum.Maximum horizontal displacement limit value in capital as defined in specification is that batter post is high 51 percent, threshold limit value is 75mm in this project.
Hold-down support 11 is then installed on batter post top, then outer collarette truss 3, periphery are installed on hold-down support 11 The erection sequence of ring truss 3 is that Liang Ge fitting-up gangs install since the peak of gymnasium, is symmetrically installed successively from periphery from high to low Complete.
Complete after outer shroud truss installa-tion, hinged-support 10 then is installed on the top of right cylinder 9, then installed on hinged-support 10 Straight across space truss 4.
After being installed straight across space truss 4 use gliding construction method, successively the main couple of mounting plane truss and Jack truss so that the shape integral framework of wide span house cap 5.
After each concealed work detection is finished, form removal is carried out to batter post, batter post is formed and couples stress with wide span house cap Structure.

Claims (5)

1. a kind of batter post couples the structure of stress with wide span house cap, it is made up of wide span house cap, batter post, right cylinder, its feature exists In:Described wide span house cap be large span steel truss, be made up of plane girder, space truss, plane girder include main couple, Jack truss, space truss includes outer ring annular stereo truss and internal straight across space truss composition, and the ring truss and inside are straight It is inverted triangle space truss across space truss, described peripheral batter post is by hypomere steel reinforced concrete batter post and epimere steel batter post shape Into the hypomere steel reinforced concrete column length accounts for 1/5th of whole peripheral batter post length, and epimere steel batter post accounts for whole periphery 4/5ths of batter post length, the right cylinder is uiform section reinforced column;The large span steel truss and uiform section reinforcing bar Concrete right cylinder is connected by hinged-support, and the large span steel truss is connected with batter post by bridle iron;The batter post and Right cylinder forms the structure that a kind of batter post couples stress with long-span roof by long-span roof.
2. a kind of batter post as claimed in claim 1 couples the structure of stress with wide span house cap, it is characterised in that:Described one kind Batter post the structure erection sequence of stress is coupled with wide span house cap for set up successively peripheral batter post hypomere, batter post epimere and right cylinder with And internal framework, wide span house cap is subsequently mounted, the internal framework and right cylinder reach intensity rear collapsible die, institute State outer shroud batter post need to after long-span steel roof is installed completely ability collapsible die.
3. a kind of batter post as described in claim 1-2 couples the structure of stress with wide span house cap, it is characterised in that:The hinge The lower ear plate of bearing is connected with uiform section armored concrete capital slugging, the upper ear plate and wide span house cap of the hinged-support Lower boom on ring truss is by being welded to connect, and the upper ear plate is connected with lower ear plate by bearing pin.
4. a kind of batter post as described in claim 1-3 couples the structure of stress with wide span house cap, it is characterised in that:It is described big The main couple top boom of span roof system is connected with jack truss top boom by mutually passing through steel node weld, the main couple lower edge and time Truss lower edge is connected by mutually passing through steel node weld;The main couple winds up to wind up with ring truss to be connected by mutually passing through steel node weld Connect, the main couple lower edge and ring truss lower edge connect node weld by mutually passing through steel and be connected, and the jack truss winds up and ring truss Wind up and connected by mutually passing through steel node weld, the jack truss lower edge is welded to connect by two round steel pipes with ring truss lower edge.
5. a kind of batter post as described in claim 1- couples the structure of stress with wide span house cap, it is characterised in that:1. first Set up peripheral batter post hypomere 7, batter post epimere 6 and right cylinder 9 successively, wherein integral planar is ellipse, border batter post totally 52 with Ground angle is 50 ° or so, in diverging;And internal framework 16, internal framework 16 and right cylinder are reached after intensity Can form removal, outer shroud batter post 8 need to install rear collapsible die completely in long-span steel roof 5.
2. hold-down support 11 is then installed on batter post top, then outer collarette truss 3, outer collarette purlin are installed on hold-down support 11 The erection sequence of frame 3 is that Liang Ge fitting-up gangs install since peak, is symmetrically installed completion successively from periphery from high to low.
3. complete outer shroud truss installa-tion after, then right cylinder 9 top on install hinged-support 10, then installed on hinged-support 10 straight across Space truss 4.
4. gliding construction method is used after being installed straight across space truss 4, successively the main couple of mounting plane truss and time purlin Frame so that the shape integral framework of wide span house cap 5.
5. after each concealed work detection is finished, form removal is carried out to batter post, the structure that batter post couples stress with wide span house cap is formed.
CN201710254721.9A 2017-04-18 2017-04-18 A kind of batter post couples the structure of stress with wide span house cap Active CN107201779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710254721.9A CN107201779B (en) 2017-04-18 2017-04-18 A kind of batter post couples the structure of stress with wide span house cap

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710254721.9A CN107201779B (en) 2017-04-18 2017-04-18 A kind of batter post couples the structure of stress with wide span house cap

Publications (2)

Publication Number Publication Date
CN107201779A true CN107201779A (en) 2017-09-26
CN107201779B CN107201779B (en) 2019-06-14

Family

ID=59904899

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710254721.9A Active CN107201779B (en) 2017-04-18 2017-04-18 A kind of batter post couples the structure of stress with wide span house cap

Country Status (1)

Country Link
CN (1) CN107201779B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110573683A (en) * 2017-08-30 2019-12-13 四国化成工业株式会社 Roof structure and construction method thereof
CN114775801A (en) * 2022-03-28 2022-07-22 中建二局安装工程有限公司 Horseshoe-shaped truss structure steel roof truss and construction method thereof
CN114837304A (en) * 2022-04-08 2022-08-02 上海建工一建集团有限公司 Batter post truss cable large-span steel construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111943A (en) * 1995-10-19 1997-04-28 Taisei Corp Building having domed roof
CN204703297U (en) * 2015-03-30 2015-10-14 江南大学 Large space light cantilever grid and rope encircle the hybrid structure of self equilibrium systems
CN105064728A (en) * 2015-07-15 2015-11-18 中国建筑第二工程局有限公司 Skiing field assembling structure and construction method of skiing field assembling structure
CN205171674U (en) * 2015-10-14 2016-04-20 中建二局第三建筑工程有限公司 Many curved surfaces of encorbelmenting pipe truss net shell
CN105780995A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Curved surface space pipe truss structure and mounting method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09111943A (en) * 1995-10-19 1997-04-28 Taisei Corp Building having domed roof
CN105780995A (en) * 2014-12-22 2016-07-20 五冶集团上海有限公司 Curved surface space pipe truss structure and mounting method thereof
CN204703297U (en) * 2015-03-30 2015-10-14 江南大学 Large space light cantilever grid and rope encircle the hybrid structure of self equilibrium systems
CN105064728A (en) * 2015-07-15 2015-11-18 中国建筑第二工程局有限公司 Skiing field assembling structure and construction method of skiing field assembling structure
CN205171674U (en) * 2015-10-14 2016-04-20 中建二局第三建筑工程有限公司 Many curved surfaces of encorbelmenting pipe truss net shell

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李新利等: "大型钢结构整体平移安装技术在浦东国际机场航站楼工程的应用", 《上海建设科技》 *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110573683A (en) * 2017-08-30 2019-12-13 四国化成工业株式会社 Roof structure and construction method thereof
CN110573683B (en) * 2017-08-30 2021-10-22 四国化成工业株式会社 Roof structure and construction method thereof
CN114775801A (en) * 2022-03-28 2022-07-22 中建二局安装工程有限公司 Horseshoe-shaped truss structure steel roof truss and construction method thereof
CN114775801B (en) * 2022-03-28 2023-03-28 中建二局安装工程有限公司 Horseshoe-shaped truss structure steel roof truss and construction method thereof
CN114837304A (en) * 2022-04-08 2022-08-02 上海建工一建集团有限公司 Batter post truss cable large-span steel construction
CN114837304B (en) * 2022-04-08 2024-02-06 上海建工一建集团有限公司 Stay cable large-span steel structure of inclined column truss

Also Published As

Publication number Publication date
CN107201779B (en) 2019-06-14

Similar Documents

Publication Publication Date Title
CN202108115U (en) Bamboo truss string structure
CN104912190A (en) Dry type joggle frame structure
CN201785865U (en) Structure and system for house combining external prestress post tensioning method steel beam and pretensioning method prestress composite beam
CN104499413A (en) Modularized steel die and concrete combined arch bridge and suspending construction method of suspension cable thereof
CN202324340U (en) Combined type large steel-pipe truss
CN206903022U (en) A kind of steel bar truss floor support plate
US9366027B2 (en) Lattice girder structure using innovative multiple joints for roof covering purposes
CN106368348B (en) A kind of superposed type compound shear wall with two benches stress characteristic
CN102605885B (en) Large-sized closed roof formed by light steel truss arch for building
CN107201779B (en) A kind of batter post couples the structure of stress with wide span house cap
CN102912972A (en) Multifunctional lifting steel platform switching jig and construction method
CN104988984A (en) U-shaped steel and concrete combined orthogonal-diagonal spatial grid box type structure and manufacturing method
CN107762161B (en) A kind of energy-saving assembled system of steel residential structure and installation method
CN106284838A (en) A kind of lattice Honeycomb Beam sections and large span lattice girder steel and fabrication and installation method thereof
CN103741970A (en) Assembled machining shed for building construction and manufacture and installation method thereof
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN107355009B (en) Steel construction archaize building roof apex angle post roof beam crossing node structure
CN211285977U (en) Tapered weakening beam column joint for high-strength steel beam flange
CN211736290U (en) Shell cross-section large-span cornice high-altitude formwork erecting operation platform
CN103225344A (en) Hollow steel section-concrete combined framework and construction method thereof
CN114837483B (en) High-low span portal steel frame building structure and construction process thereof
CN202913677U (en) Multifunctional conversion scaffold capable of lifting steel platform
CN105220609B (en) Combined beam self-anchored suspension bridge and construction process thereof
CN210658671U (en) Hub type precast concrete beam column assembly type self-resetting system
CN105275113A (en) Rhombus steel grid shear wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant