CN107199617A - The preparation method of hollow square pile - Google Patents
The preparation method of hollow square pile Download PDFInfo
- Publication number
- CN107199617A CN107199617A CN201710269784.1A CN201710269784A CN107199617A CN 107199617 A CN107199617 A CN 107199617A CN 201710269784 A CN201710269784 A CN 201710269784A CN 107199617 A CN107199617 A CN 107199617A
- Authority
- CN
- China
- Prior art keywords
- external mold
- preparation
- hollow square
- core
- square pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B1/00—Producing shaped prefabricated articles from the material
- B28B1/08—Producing shaped prefabricated articles from the material by vibrating or jolting
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/16—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
- B28B7/168—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes for holders or similar hollow articles, e.g. vaults, sewer pits
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/16—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
- B28B7/18—Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/28—Cores; Mandrels
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B7/00—Moulds; Cores; Mandrels
- B28B7/38—Treating surfaces of moulds, cores, or mandrels to prevent sticking
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
- Piles And Underground Anchors (AREA)
Abstract
The invention provides a kind of preparation method of hollow square pile, belong to technical field of buildings.It solves prior art and there is the problem of product quality is not high.Hollow square pile is included in the pile body of flat column and positioned at pile body center and through the manhole at its two ends, and the preparation method of this hollow square pile comprises the following steps:A, preparation:Prepare external mold and core, the above-mentioned external mold U-shaped profile and U-shaped in external mold is internally formed the forming cavity matched with pile body, above-mentioned core is cylindrical;B, matched moulds:By external mold it is horizontal and make the U-shaped opening of external mold upwards, then core is inserted at above-mentioned forming cavity and fixes core;C, casting;D, ram-jolt;E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, split out the hollow square pile of shaping by external mold when concrete material solidifies completely.Hollow square pile quality prepared by the preparation method of this hollow square pile is high.
Description
Technical field
The invention belongs to technical field of buildings, it is related to a kind of preparation method of hollow square pile.
Background technology
Hollow square pile is the elongated coagulation of a kind of hollow cylinder being made of pretensioned prestressing technique and centrifugal casting
Native prefabricated components, are made up of square pile body, end plate and steel hoop etc..
Due to existing hollow square pile because the centrifuging process of its own causes pile body structure uneven.Specifically, by
There is coarse aggregate and fine aggregate in concrete itself, above-mentioned technique causes coarse aggregate to be concentrated mainly on four corners of pile body,
Coarse aggregate and fine aggregate skewness on pile body, influence its intensity.
The content of the invention
The purpose of the present invention is that there is provided a kind of low manufacture cost and product quality in view of the above-mentioned problems existing in the prior art
The preparation method of high hollow square pile.
The purpose of the present invention can be realized by following technical proposal:
A kind of preparation method of hollow square pile, hollow square pile is including the pile body in flat column and positioned at pile body center and runs through
The manhole at its two ends, this preparation method comprises the following steps:
A, preparation:Prepare external mold and core, above-mentioned external mold U-shaped profile and be internally formed and pile body in the U-shaped of external mold
The forming cavity matched, above-mentioned core is cylindrical;
B, matched moulds:By external mold it is horizontal and make the U-shaped opening of external mold upwards, then core is inserted at above-mentioned forming cavity simultaneously
Core is fixed;
C, casting:In the forming cavity that concrete material is uniformly injected into above-mentioned external mold, and make above-mentioned concrete material abundant
It is wrapped on the outside of core;
D, ram-jolt:Concrete material ram-jolt using existing concrete ram-jolt equipment to above-mentioned forming cavity everywhere;
E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, treat concrete material
The hollow square pile of shaping is split out by external mold when solidifying completely.
This preparation method creativeness uses external mold and core, and external mold with forming and hollow side therebetween after core matched moulds
The cavity that stake matches.
Concrete material is directly injected at above-mentioned cavity, then by mixed mud ram-jolt.Certainly, concrete ram-jolt is
Existing mature technology.For example, ram-jolt directly can be carried out to it using existing concrete shock club.
After first splitting out core after concrete initial set, the pile body after shaping is torn open by external mold after after concrete completely solidification
Unload.Due to external mold upper opening, therefore, the pile body after shaping conveniently can be separated smoothly with external mold.
It is uniform on the inside of external mold and on the outside of core in described step A in the preparation method of above-mentioned hollow square pile
It is coated with separating medium.
In the preparation method of above-mentioned hollow square pile, described separating medium is graphite powder.
In the preparation method of above-mentioned hollow square pile, described separating medium is lubricant grease.
In the preparation method of above-mentioned hollow square pile, external mold is stretched out at the two ends of the step B core moulds.
Such structure can mold complete pile body, while the support that the core end stretched out can also be stablized.
In the preparation method of above-mentioned hollow square pile, end plate, two pieces are respectively mounted in the step B at the two ends of external mold
It is connected between end plate by prestressed steel bar.
In the preparation method of above-mentioned hollow square pile, the end matches with external mold port.
In the preparation method of above-mentioned hollow square pile, the two ends of the step B core moulds are carried out by corresponding support
Support positioning.
In the preparation method of above-mentioned hollow square pile, the presetting period of concrete is 3-4 hours in the step E.
In the preparation method of above-mentioned hollow square pile, the complete setting time of concrete is 4-10 small in the step E
When.
Compared with prior art, the preparation method of this hollow square pile is horizontal by external mold due to only needing to, then core is loaded
In external mold, the pile body uniform with fine aggregate distribution with regard to coarse aggregate can be molded after casting concrete raw material, therefore, using our legal system
The hollow square pile quality of work is high.
Simultaneously as just first tearing core open place when concrete material is pre-hardening, therefore, demoulding stability is also higher, tool
There is very high practical value.
Brief description of the drawings
Fig. 1 is the sectional structure structural representation after the preparation method matched moulds of this hollow square pile.
Fig. 2 is the cross section structure schematic diagram after the preparation method matched moulds of this hollow square pile.
In figure, 1, external mold;2nd, core.
Embodiment
Embodiment one
As depicted in figs. 1 and 2, the preparation method of hollow square pile, hollow square pile is included in the pile body of flat column and positioned at stake
Body center and the manhole for running through its two ends, this preparation method comprise the following steps:
A, preparation:Prepare external mold 1 and core 2, the above-mentioned U-shaped profile of external mold 1 and the U-shaped in external mold 1 be internally formed with
The forming cavity that pile body matches, above-mentioned core 2 is cylindrical;
In described step A uniformly separating medium is coated with the inner side of external mold 1 and the outside of core 2.
Described separating medium is graphite powder.According to actual conditions, described separating medium is that lubricant grease is also feasible
's.
B, matched moulds:By external mold 1 it is horizontal and make the U-shaped opening of external mold upwards, then core 2 is inserted at above-mentioned forming cavity
And fix core;
External mold is stretched out at the two ends of the step B core moulds 2.
It is respectively mounted between end plate, two end plates and is connected by prestressed steel bar at the two ends of external mold 1 in the step B.
The end matches with external mold port.
The two ends of the step B core moulds are supported positioning by corresponding support.
C, casting:In the forming cavity that concrete material is uniformly injected into above-mentioned external mold, and make above-mentioned concrete material abundant
It is wrapped on the outside of core;
D, ram-jolt:Concrete material ram-jolt using existing concrete ram-jolt equipment to above-mentioned forming cavity everywhere;
E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, treat concrete material
The hollow square pile of shaping is split out by external mold when solidifying completely.
The presetting period of concrete is 2 hours in the step E.
The complete setting time of concrete is 5 hours in the step E.
This preparation method creativeness uses external mold and core, and external mold with forming and hollow side therebetween after core matched moulds
The cavity that stake matches.
Concrete material is directly injected at above-mentioned cavity, then by mixed mud ram-jolt.Certainly, concrete ram-jolt is
Existing mature technology.For example, ram-jolt directly can be carried out to it using existing concrete shock club.
After first splitting out core after concrete initial set, the pile body after shaping is torn open by external mold after after concrete completely solidification
Unload.Due to external mold upper opening, therefore, the pile body after shaping conveniently can be separated smoothly with external mold.
Embodiment two
As depicted in figs. 1 and 2, the preparation method of hollow square pile, hollow square pile is included in the pile body of flat column and positioned at stake
Body center and the manhole for running through its two ends, this preparation method comprise the following steps:
A, preparation:Prepare external mold 1 and core 2, the above-mentioned U-shaped profile of external mold 1 and the U-shaped in external mold 1 be internally formed with
The forming cavity that pile body matches, above-mentioned core 2 is cylindrical;
In described step A uniformly separating medium is coated with the inner side of external mold 1 and the outside of core 2.
Described separating medium is graphite powder.According to actual conditions, described separating medium is that lubricant grease is also feasible
's.
B, matched moulds:By external mold 1 it is horizontal and make the U-shaped opening of external mold upwards, then core 2 is inserted at above-mentioned forming cavity
And fix core;
External mold is stretched out at the two ends of the step B core moulds 2.
It is respectively mounted between end plate, two end plates and is connected by prestressed steel bar at the two ends of external mold 1 in the step B.
The end matches with external mold port.
The two ends of the step B core moulds are supported positioning by corresponding support.
C, casting:In the forming cavity that concrete material is uniformly injected into above-mentioned external mold, and make above-mentioned concrete material abundant
It is wrapped on the outside of core;
D, ram-jolt:Concrete material ram-jolt using existing concrete ram-jolt equipment to above-mentioned forming cavity everywhere;
E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, treat concrete material
The hollow square pile of shaping is split out by external mold when solidifying completely.
The presetting period of concrete is 3 hours in the step E.
The complete setting time of concrete is 10 hours in the step E.
This preparation method creativeness uses external mold and core, and external mold with forming and hollow side therebetween after core matched moulds
The cavity that stake matches.
Concrete material is directly injected at above-mentioned cavity, then by mixed mud ram-jolt.Certainly, concrete ram-jolt is
Existing mature technology.For example, ram-jolt directly can be carried out to it using existing concrete shock club.
After first splitting out core after concrete initial set, the pile body after shaping is torn open by external mold after after concrete completely solidification
Unload.Due to external mold upper opening, therefore, the pile body after shaping conveniently can be separated smoothly with external mold.
Embodiment three
As depicted in figs. 1 and 2, the preparation method of hollow square pile, hollow square pile is included in the pile body of flat column and positioned at stake
Body center and the manhole for running through its two ends, this preparation method comprise the following steps:
A, preparation:Prepare external mold 1 and core 2, the above-mentioned U-shaped profile of external mold 1 and the U-shaped in external mold 1 be internally formed with
The forming cavity that pile body matches, above-mentioned core 2 is cylindrical;
In described step A uniformly separating medium is coated with the inner side of external mold 1 and the outside of core 2.
Described separating medium is graphite powder.According to actual conditions, described separating medium is that lubricant grease is also feasible
's.
B, matched moulds:By external mold 1 it is horizontal and make the U-shaped opening of external mold upwards, then core 2 is inserted at above-mentioned forming cavity
And fix core;
External mold is stretched out at the two ends of the step B core moulds 2.
It is respectively mounted between end plate, two end plates and is connected by prestressed steel bar at the two ends of external mold 1 in the step B.
The end matches with external mold port.
The two ends of the step B core moulds are supported positioning by corresponding support.
C, casting:In the forming cavity that concrete material is uniformly injected into above-mentioned external mold, and make above-mentioned concrete material abundant
It is wrapped on the outside of core;
D, ram-jolt:Concrete material ram-jolt using existing concrete ram-jolt equipment to above-mentioned forming cavity everywhere;
E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, treat concrete material
The hollow square pile of shaping is split out by external mold when solidifying completely.
The presetting period of concrete is 2.5 hours in the step E.
The complete setting time of concrete is 7 hours in the step E.
This preparation method creativeness uses external mold and core, and external mold with forming and hollow side therebetween after core matched moulds
The cavity that stake matches.
Concrete material is directly injected at above-mentioned cavity, then by mixed mud ram-jolt.Certainly, concrete ram-jolt is
Existing mature technology.For example, ram-jolt directly can be carried out to it using existing concrete shock club.
After first splitting out core after concrete initial set, the pile body after shaping is torn open by external mold after after concrete completely solidification
Unload.Due to external mold upper opening, therefore, the pile body after shaping conveniently can be separated smoothly with external mold.
Claims (10)
1. a kind of preparation method of hollow square pile, hollow square pile is included in the pile body of flat column and positioned at pile body center and through it
The manhole at two ends, this preparation method comprises the following steps:
A, preparation:Prepare external mold and core, the above-mentioned external mold U-shaped profile and U-shaped in external mold is internally formed and pile body phase
The forming cavity matched somebody with somebody, above-mentioned core is cylindrical;
B, matched moulds:External mold is horizontal and make the U-shaped opening of external mold upwards, then core is inserted at above-mentioned forming cavity and by core
Mould is fixed;
C, casting:In the forming cavity that concrete material is uniformly injected into above-mentioned external mold, and above-mentioned concrete material is set fully to wrap up
On the outside of core;
D, ram-jolt:Concrete material ram-jolt using existing concrete ram-jolt equipment to above-mentioned forming cavity everywhere;
E, form removal:When concrete material at chamber to be formed is pre-hardening, then core is extracted out in external mold, treat that concrete material is complete
The hollow square pile of shaping is split out by external mold during solidification.
2. the preparation method of hollow square pile according to claim 1, it is characterised in that in described step A in external mold
Uniformly separating medium is coated with the outside of side and core.
3. the preparation method of hollow square pile according to claim 2, it is characterised in that described separating medium is graphite
Powder.
4. the preparation method of hollow square pile according to claim 2, it is characterised in that described separating medium is lubricating oil
Fat.
5. the preparation method of hollow square pile according to claim 1, it is characterised in that the two ends of the step B core moulds
Stretch out external mold.
6. the preparation method of hollow square pile according to claim 5, it is characterised in that the two of external mold in the step B
It is respectively mounted between end plate, two end plates and is connected by prestressed steel bar at end.
7. the preparation method of hollow square pile according to claim 6, it is characterised in that the end and external mold port phase
Matching.
8. the preparation method of hollow square pile according to claim 5, it is characterised in that the two ends of the step B core moulds
Positioning is supported by corresponding support.
9. the preparation method of hollow square pile according to claim 1, it is characterised in that concrete is first in the step E
The solidifying time is 3-4 hours.
10. the preparation method of hollow square pile according to claim 1, it is characterised in that concrete is complete in the step E
Full setting time is 4-10 hours.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710269784.1A CN107199617A (en) | 2017-04-24 | 2017-04-24 | The preparation method of hollow square pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710269784.1A CN107199617A (en) | 2017-04-24 | 2017-04-24 | The preparation method of hollow square pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107199617A true CN107199617A (en) | 2017-09-26 |
Family
ID=59906318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710269784.1A Pending CN107199617A (en) | 2017-04-24 | 2017-04-24 | The preparation method of hollow square pile |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107199617A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115319909A (en) * | 2022-04-28 | 2022-11-11 | 江苏东浦管桩有限公司 | Pre-tensioning method prestressed precast pile manufacturing equipment and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63218306A (en) * | 1986-11-26 | 1988-09-12 | 三菱マテリアル株式会社 | Manufacture of concrete pile |
JP2004051461A (en) * | 2002-07-23 | 2004-02-19 | Takamura Kenzai Kogyo Kk | Concrete using shell and method of manufacturing its formed body |
CN101054800A (en) * | 2007-05-11 | 2007-10-17 | 上海中技桩业发展有限公司 | Prestress high intensity concrete square pile and its production method and moulding die |
CN201044968Y (en) * | 2007-05-11 | 2008-04-09 | 上海中技桩业发展有限公司 | Hollow concrete square pile vibration forming die |
CN104760134A (en) * | 2015-02-09 | 2015-07-08 | 江苏龙冠新型材料科技有限公司 | Centrifuging-free manufacturing method of prestressed concrete pipe pile |
-
2017
- 2017-04-24 CN CN201710269784.1A patent/CN107199617A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS63218306A (en) * | 1986-11-26 | 1988-09-12 | 三菱マテリアル株式会社 | Manufacture of concrete pile |
JP2004051461A (en) * | 2002-07-23 | 2004-02-19 | Takamura Kenzai Kogyo Kk | Concrete using shell and method of manufacturing its formed body |
CN101054800A (en) * | 2007-05-11 | 2007-10-17 | 上海中技桩业发展有限公司 | Prestress high intensity concrete square pile and its production method and moulding die |
CN201044968Y (en) * | 2007-05-11 | 2008-04-09 | 上海中技桩业发展有限公司 | Hollow concrete square pile vibration forming die |
CN104760134A (en) * | 2015-02-09 | 2015-07-08 | 江苏龙冠新型材料科技有限公司 | Centrifuging-free manufacturing method of prestressed concrete pipe pile |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115319909A (en) * | 2022-04-28 | 2022-11-11 | 江苏东浦管桩有限公司 | Pre-tensioning method prestressed precast pile manufacturing equipment and method |
CN115319909B (en) * | 2022-04-28 | 2024-04-16 | 江苏东浦管桩有限公司 | Pretensioned prestressing precast pile manufacturing equipment and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103582548A (en) | Method and system for forming a support structure | |
CN101758544A (en) | Core pulling molding device of pressure-type hollow brick machine | |
CN203887184U (en) | Ingot mold for round casting blank with large height-diameter ratio | |
CN201573266U (en) | Core-pulling forming device of pressure-type hollow brick machine | |
CN107199617A (en) | The preparation method of hollow square pile | |
CN104742248A (en) | Production method of concrete cylindrical product with base | |
CN104532831A (en) | Large-diameter hollow screw pile and manufacturing method | |
CN104550762B (en) | Oil flooded compressors fine and close negative and positive rotor running gate system high and casting method | |
CN217512810U (en) | Water-soluble sand mandrel of serial-type | |
CN106696063A (en) | Integrated prefabricated mold utilizing indirect extrusion vibration method and processing method thereof | |
CN206690283U (en) | A kind of integral prefabricated mould using indirect extrusion vibratory drilling method | |
CN220841159U (en) | A mould for shaping paddle blade foam core | |
CN207105209U (en) | A kind of precast stair mould | |
CN103817791A (en) | Machining method for pre-stress concrete solid cylindrical pile | |
US2941253A (en) | Method for the production of lightweight concrete | |
US4883416A (en) | Slip-form casting machine for fabrication of elongated concrete products | |
CN219038569U (en) | Hollow cylinder sample preparation mould of bi-component polyurethane solidification beach sand | |
CN105729622A (en) | Production process of concrete hollow square pile | |
CN205414322U (en) | Taper sleeve foundry sand mould | |
CN220030607U (en) | Concrete triangle block manufacturing die | |
CN110480973A (en) | A kind of production method of the modified reinforced polypropylene filter plate of high-content roving glass fiber | |
CN104802302B (en) | A kind of external mold of the concrete tapered rod entirety demoulding | |
CN114951555B (en) | Tandem type water-soluble sand core mould and manufacturing method thereof | |
CN204585527U (en) | The external mold of the overall demoulding of a kind of concrete tapered rod | |
CN108672658A (en) | A kind of thrust power water inlet end pieces precision casting process method peculiar to vessel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170926 |