CN107199609A - A kind of control system and control method for being used to control raw bamboo shear - Google Patents

A kind of control system and control method for being used to control raw bamboo shear Download PDF

Info

Publication number
CN107199609A
CN107199609A CN201710505616.8A CN201710505616A CN107199609A CN 107199609 A CN107199609 A CN 107199609A CN 201710505616 A CN201710505616 A CN 201710505616A CN 107199609 A CN107199609 A CN 107199609A
Authority
CN
China
Prior art keywords
spoke
magnetic valve
testing result
raw bamboo
level signal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710505616.8A
Other languages
Chinese (zh)
Other versions
CN107199609B (en
Inventor
李军章
李光荣
辜忠春
王宵
刘谊
杨柳
蔡芳
蒋承定
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI PROV INST OF FORESTRY SCIENCES
Original Assignee
HUBEI PROV INST OF FORESTRY SCIENCES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI PROV INST OF FORESTRY SCIENCES filed Critical HUBEI PROV INST OF FORESTRY SCIENCES
Priority to CN201710505616.8A priority Critical patent/CN107199609B/en
Publication of CN107199609A publication Critical patent/CN107199609A/en
Application granted granted Critical
Publication of CN107199609B publication Critical patent/CN107199609B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B27WORKING OR PRESERVING WOOD OR SIMILAR MATERIAL; NAILING OR STAPLING MACHINES IN GENERAL
    • B27JMECHANICAL WORKING OF CANE, CORK, OR SIMILAR MATERIALS
    • B27J7/00Mechanical working of tree or plant materials not otherwise provided for
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/054Input/output
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/11Plc I-O input output
    • G05B2219/1105I-O

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Forests & Forestry (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)
  • Chemical And Physical Treatments For Wood And The Like (AREA)

Abstract

The embodiment of the present application provides a kind of control system and control method for being used to control raw bamboo shear, and efficiency is blocked to improve the automatic of raw bamboo.Control method includes:Sensor non-contact formula detects examination target and gives PLC programmable logic controller (PLC)s by testing result signal output;PLC receives testing result signal and exported after being converted to the first level signal or second electrical level signal to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, testing result signal is converted into the first level signal, second electrical level signal is otherwise converted to;Magnetic valve opens the path between air compressor and cylinder when receiving the first level signal;Otherwise the path closed between air compressor and cylinder.Because the sensor-based testing result signals of PLC carry out centralized Control to each magnetic valve, and then clamping and release of the cylinder of same position on each spoke disk to raw bamboo are controlled, therefore, without artificial operation, improve the automatic of raw bamboo and block efficiency.

Description

A kind of control system and control method for being used to control raw bamboo shear
Technical field
The application is related to raw bamboo processing technique field, more particularly to a kind of control system for being used to control raw bamboo shear and Control method.
Background technology
China is bamboo resource the abundantest country in the world, is also that global bamboo resource develops most sufficient state Family.In recent years, Chinese bamboo wood cutting increases substantially, and the bamboo industry output value also accordingly reaches hundreds billion of members, new as forestry industry Growth point, but bamboo processing material papering section automation degree of equipment is low, low production efficiency seriously constrains China's bamboo wood industry Development.
A kind of continous way raw bamboo automatic cutter is disclosed in the patent document of Application No. 201410398984.3, is wrapped Include:Air compressor and magnetic valve, clamping cylinder and touching switch;Wherein, air compressor gas circuit passes through magnetic valve and clamping The clamping cylinder of same position on cylinders, eight width disks of a solenoid valve control, namely 8 clampings of a solenoid valve control 30 magnetic valves, 30 touching switch, 240 clamping cylinder (explanations are installed altogether in cylinder, the gas circuit of a raw bamboo loading plate 0076 section of book), magnetic valve is connected with the touching switch of spoke end, controlled by controlling magnetic valve the clamping of clamping cylinder with Unclamp.
In the scheme of above-mentioned automatic cutter, by operating touching switch to realize clamping and release of the loading plate to raw bamboo, And then blocking automatically to raw bamboo is reached using amputating saw, realize the automatic of raw bamboo and block, however, touching switch needs manually Operational control, the features such as being limited by manually-operated precision and fatiguability to above-mentioned automatic cutter, it is necessary to enter traveling one Step is improved, in order to further improve the automaticity of above-mentioned raw bamboo automatic cutter, is further improved the automatic of raw bamboo and is cut Disconnected efficiency.
The content of the invention
The embodiment of the present application provide it is a kind of be used to control the control system and control method of raw bamboo shear, to realize into The automaticity of one step raw bamboo shear, improve raw bamboo blocks efficiency.
A kind of control system for being used to control raw bamboo shear, the raw bamboo shear includes driving motor, rotating shaft, air Compressor, at least two spoke disks and the magnetic valve being installed on the spoke of spoke disk, cylinder and raw bamboo clamp system, wherein, pass Dynamic motor drives each spoke disk by same rotating shaft, and magnetic valve is connected by pipeline with the air compressor;Cylinder passes through pipeline It is connected with magnetic valve, for driving a raw bamboo clamp system;
The control system includes:Programmable logic controller (PLC) (Programmable Logic Controllers, PLC), examination target and the sensor being installed on spoke;
The sensor, is electrically connected with the PLC, and for examination target described in non-contact detection, testing result is believed Number export to the PLC;
The PLC, its input wires terminal electrically connects the output end of sensor, its output wiring terminal electrical connection electromagnetism Valve, for receiving the testing result signal, is converted to the first level signal by the testing result signal or second electrical level is believed Exported after number to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, by testing result signal Be converted to the first level signal;When the testing result signal represents to be not detected by the examination target, testing result is believed Number be converted to second electrical level signal;
The magnetic valve, for receiving the first level signal or second electrical level signal, is performed based on the signal received and beaten Closed operation is opened or closed, wherein, when receiving the first level signal, the path between air compressor and cylinder is opened, is being received To the path closed during second electrical level signal between air compressor and cylinder.
A kind of control method for being used to control raw bamboo shear, the raw bamboo shear includes driving motor, rotating shaft, air Compressor, at least two spoke disks and the magnetic valve being installed on the spoke of spoke disk, cylinder and raw bamboo clamp system, wherein, pass Dynamic motor drives each spoke disk by same rotating shaft, and magnetic valve is connected by pipeline with the air compressor;Cylinder passes through pipeline It is connected with the magnetic valve, for driving a raw bamboo clamp system;
The control method includes:
Sensor non-contact formula detects examination target, and
PLC programmable logic controller (PLC)s are given by testing result signal output;
PLC receives the testing result signal, and the testing result signal is converted into the first level signal or the second electricity Exported after ordinary mail number to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, by testing result Signal is converted to the first level signal, when the testing result signal represents to be not detected by the examination target, and detection is tied Fruit signal is converted to second electrical level signal;
Magnetic valve receives the first level signal or second electrical level signal, is performed based on the signal received and opens or closes behaviour Make, wherein, when receiving the first level signal, the path between air compressor and cylinder is opened, second electrical level is being received The path closed during signal between air compressor and cylinder.
Beneficial effect:
In the scheme that the embodiment of the present application is provided, the touching of spoke end will be located in existing raw bamboo automatic cutter Switch replaces with the sensor on spoke, and sets examination target and the testing result for receiving sensor accordingly The sensor-based testing result signal of the PLC of signal, PLC carries out centralized Control to each magnetic valve, and then controls on each spoke disk Clamping and release of the cylinder of same position to raw bamboo, without artificial operation, realize the clamping and release of raw bamboo, improve automatically The automaticity of raw bamboo automatic cutter, improves the automatic of raw bamboo and blocks efficiency.
Brief description of the drawings
The structural representation for the raw bamboo shear that Fig. 1 provides for the embodiment of the present application;
The structural representation for the spoke disk that Fig. 2 provides for the embodiment of the present application;
The schematic diagram of the annexation for the device being arranged on spoke that Fig. 3 provides for the embodiment of the present application;
Fig. 4 blocks the electronic schematic diagram of control system for the raw bamboo that the embodiment of the present application is provided;
Fig. 5 blocks the pneumatic principle schematic diagram of control system for the raw bamboo that the embodiment of the present application is provided;
Fig. 6 blocks the control method schematic diagram of control system for the raw bamboo that the embodiment of the present application is provided.
Embodiment
In order to solve the problem of prior art is present, the embodiment of the present application provides a kind of control for being used to control raw bamboo shear System and control method processed.
The raw bamboo shear provided in the embodiment of the present application is relative in the patent document of application number 201410398984.3 Improvement mainly includes:It will be changed positioned at the touching switch of spoke end for the sensor (such as optoelectronic switch) on spoke, The PLC for receiving the testing result signal that sensor is sent correspondingly is added, PLC is based on testing result signal to each magnetic valve Carry out centralized Control, wherein, the position of examination target can sensor-based position, the demand of actually blocking and decontrol raw bamboo enter Row is set.
The preferred embodiment of the application is illustrated below in conjunction with Figure of description, it will be appreciated that described herein Preferred embodiment is merely to illustrate and explained the application, is not used to limit the application.And in the case where not conflicting, this Shen Please in embodiment and the feature in embodiment can be mutually combined.
As Figure 1-3, the structure of its raw bamboo shear provided for the embodiment of the present application, spoke disk, device on spoke Schematic diagram, wherein:
The raw bamboo shear includes driving motor 1, rotating shaft, air compressor 3, at least two spoke disks 4 and is installed on Magnetic valve 10, cylinder 9 and raw bamboo clamp system 8 on the spoke 7 of spoke disk 4, wherein, driving motor is driven each by same rotating shaft Spoke disk, magnetic valve 10 is connected by pipeline with the air compressor 3;Cylinder 9 is connected by pipeline with magnetic valve 10, for driving A dynamic raw bamboo clamp system 8;
Here, driving motor drives spoke to rotate by axle, and driving motor is connected with general supply, and driving motor, which can be installed additional, to be subtracted Fast machine, needs to adjust driving motor output speed according to production.
Because the length of raw bamboo is usually 10 meters or so, 2 sections are cut into, it is considered to clip bamboo head and bamboo pocket, it is necessary to 4 spoke disks, If being cut into 3 sections, it is necessary to 6 spoke disks.
Above-mentioned raw bamboo clamp system is used to clamp raw bamboo in raw bamboo processing and raw bamboo transportation, general, no matter In raw bamboo processing unit (plant) and raw bamboo transportation, tens are needed at least, at most need hundreds of raw bamboo clamp systems 8, raw bamboo Clamp system 8 is the existing structure of raw bamboo processing and transport field, and the present embodiment does not repeat its concrete structure.Specifically, raw bamboo Clamp system may include dynamic clamping element and quiet clamping element, and both abut the two opposite side surfaces of raw bamboo to clamp raw bamboo, gas respectively Cylinder is used to drive dynamic clamping element to move back and forth it, is provided with so that it clamps or unclamped on raw bamboo, the admission line of cylinder The startup and closing of magnetic valve, i.e. magnetic valve can control the working condition of cylinder.
In each spoke disk of raw bamboo shear, can be respectively mounted on each spoke a magnetic valve, a cylinder and One raw bamboo clamp system, now a solenoid valve control unique corresponding cylinder therewith;It can also be the spoke in part spoke disk On bar, the cylinder on a magnetic valve, each spoke disk same position of the solenoid valve control is installed, as in background technology, Multiple cylinders on one solenoid valve control same position, the embodiment of the present application is defined not to this.
The control system includes:PLC2, examination target 6 and the sensor 11 being installed on spoke;
The sensor 11, is electrically connected with the PLC, for examination target described in non-contact detection, by testing result Signal output gives the PLC;
The PLC2, its input wires terminal electrically connects the output end of sensor, its output wiring terminal electrical connection electromagnetism Valve, for receiving the testing result signal, is converted to the first level signal by the testing result signal or second electrical level is believed Exported after number to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, by testing result signal Be converted to the first level signal;When the testing result signal represents to be not detected by the examination target, testing result is believed Number be converted to second electrical level signal;
The magnetic valve 10, the first level signal or second electrical level signal for receiving the PLC outputs, is being received The path between air compressor and cylinder is opened during the first level signal;Air compression is closed when receiving second electrical level signal Path between machine and cylinder.
Here, magnetic valve is opened after the path between air compressor and cylinder, and raw bamboo is clamped, during clamping, raw bamboo It is cut into bamboo section.After path between closed electromagnetic valve air compressor and cylinder, raw bamboo is released, during unclamping, bamboo section quilt Import conveyer belt.
Above-mentioned examination target is installed to target position, when the spoke in spoke disk moves to the position for needing to clamp raw bamboo When, examination target is to detect state by being not detected by State Transferring by sensor, when the spoke in spoke disk moves to needs When unclamping the position of raw bamboo, examination target is to be not detected by state by detecting State Transferring by sensor, and State Transferring causes Sensor is sent to the corresponding testing result signals of PLC.
Specifically, examination target can be installed on ground on support or by support, do not rotated with spoke disk, it is quiet with respect to ground Only.
The sensor, may be mounted on each spoke of any of multiple spoke disks spoke disk or installed in many On the spoke in part or all of spoke disk in individual spoke disk.In view of saving sensor resource and simplifying PLC logic control, this Apply on each spoke for the spoke disk that sensor is arranged in multiple spoke disks by embodiment selection, on the spoke of remaining spoke disk not Installed, the cylinder on each spoke disk on the spoke of same position is controlled based on the testing result signal of same sensor. Preferably, the sensor 11 is optoelectronic switch, optoelectronic switch can detect corresponding examination target 6 such as sense as sensor 11 The position of tabula rasa.
It should be noted that the quantity in magnetic valve is more, can be right when PLC input/output binding post is not enough PLC input/output binding post is extended.PLC2 points of lead-out terminal is partly installed on axle for three, is rotated with axle.Fig. 1 In, i.e., PLC is extended, PLC control cabinet 21 therein is installed between spoke disk 1 and 2, the input of install sensor and The output of one spoke disk and the second spoke disk solenoid, but because magnetic valve is too many, input with lead-out terminal not enough, the 3rd spoke disk and The magnetic valve of PLC extended terminals 22, the input of install sensor and the 3rd spoke disk and the 4th spoke disk is installed between the 4th spoke disk Output, being installed also between the 5th spoke disk and the 6th spoke disk has PLC extended terminals 22, the input of install sensor and the 5th spoke disk and The output of the magnetic valve of 6th spoke disk.
In the scheme of the embodiment of the present application, the touching switch in existing raw bamboo automatic cutter positioned at spoke end is replaced The sensor on spoke is changed to, and examination target is set accordingly, and for receiving the testing result signal of sensor PLC, the sensor-based testing result signals of PLC carry out centralized Control to each magnetic valve, and then control same on each spoke disk Clamping and release of the cylinder of position to raw bamboo, without artificial operation, realize the clamping and release of raw bamboo, improve raw bamboo automatically The automaticity of automatic cutter, improves the automatic of raw bamboo and blocks efficiency.
In view of after raw bamboo is blocked, if simultaneously closing off after each magnetic valve, the bamboo intercepted section is imported simultaneously and conveyed Band, may occur situation about mutually disturbing, preferably, the raw bamboo shear includes because of effect of inertia between each bamboo section At least two spoke disks being arranged side by side successively from front to back, wherein being provided with sensor on the spoke of a spoke disk;
The PLC, specifically for by second electrical level signal lag when being set installed in the previous magnetic valve on spoke disk Long, output gives the previous latter magnetic valve to spoke disk on adjacent to spoke disk.
By relative to the previous magnetic valve on spoke disk, delay export second electrical level signal to adjacent latter to spoke disk On magnetic valve so that each closed electromagnetic valve cylinder is different with the time of the path between air compressor, so to raw bamboo carry out Each bamboo time for being released of section after blocking is different, when avoiding bamboo section and importing conveyer belt at the same time, because of effect of inertia, bamboo section Situation about mutually disturb appearance.
Here, each delayed setting duration can be the same or different.
It is less than or equal to 5 seconds preferably, the setting duration is more than 0 second.For example be set to 0.5 second, 0.3 second, second, 1 second, 3 Second etc..
Assuming that have 6 spoke disks, and the respectively first to the 6th spoke disk, then here, the PLC gives second electrical level signal output Magnetic valve on first spoke disk and the second spoke disk, afterwards, by second electrical level signal lag on the first spoke disk and the second spoke disk Magnetic valve is exported to the magnetic valve on the 3rd spoke disk and the 4th spoke disk for 0.5 second, next, by second electrical level signal lag in the 3rd Magnetic valve on spoke disk and the 4th spoke disk is exported to the magnetic valve on the 5th spoke disk and the 6th spoke disk for 0.5 second.
Certainly, the magnetic valve that the PLC can also give second electrical level signal output on the first spoke disk and the second spoke disk, it Afterwards, second electrical level signal lag is exported to the 3rd spoke disk and the 4th for 0.5 second in the magnetic valve on the first spoke disk and the second spoke disk Magnetic valve on spoke disk, next, second electrical level signal lag is defeated in the magnetic valve 0.3 second on the 3rd spoke disk and the 4th spoke disk Go out to the magnetic valve on the 5th spoke disk and the 6th spoke disk.
In view of in practice, each spoke disk is under the drive of driving motor, with axis of rotation, to operate for convenience, preferably, The PLC is installed in the rotating shaft, and the control system also includes:Transformer and the current-collector being installed in the rotating shaft, Now the electronic schematic diagram of control system is as shown in figure 4, wherein, M1 is driving motor, M2, M3, M4, M5, M6, M7 are Circular sawing machine 5, M8 is air compressor, and air compressor is directly connected with general supply, air compressor gas outlet tube and triplet Connection, triplet separates 6 tracheaes respectively to 6 spoke disks, and every tracheae separates 28 road gas to 28 magnetic valve one end, magnetic valve The other end and cylinders;6 circular sawing machines 5 are directly connected with general supply.
The transformer, its input is connected with power supply, and its output end is connected with the input of current-collector;
The current-collector, its output end is connected with the energization input of the PLC.
Usual PLC power demands voltage is tens volts, accordingly, it would be desirable to carry out voltage transformation to civil power, PLC, which is arranged on, to be turned On axle, therefore need current-collector to facilitate electric energy to export to PLC.
One air compressor is only set in the present embodiment, and cylinder is supplied by an air compressor, magnetic valve On the steam line for being arranged at each cylinder, such the present embodiment realizes the unification of centralized Control and decentralised control, centralized Control Concentrate and supplied by an air compressor for all cylinders, air compressor is closed then all cylinders and run out of steam, Decentralised control is the unlatching of each cylinder or the co-located cylinder of each spoke disk and pass in the state of air compressor unlatching Closing to control alone, unaffected each other with other cylinders.
In the present embodiment, preferably, each cylinder is arranged in a ring, such as multiple spokes in Fu Panshangcheng centers radial arrangement Bar, the examination target is arc, and the arc and the part sensor are positioned opposite, the two ends difference position of arc The position for needing to clamp and unclamp in raw bamboo clamp system, cylinder starts to cause when first time optoelectronic switch detects arc Raw bamboo clamp system clamps raw bamboo, and optoelectronic switch then disconnects cylinder when being not detected by arc so that raw bamboo clamp system pine Kaiyuan bamboo.
In the present embodiment, optionally, the examination target has two, and two examination targets are placed in the movable row of spoke Different detection positions in journey, i.e., start magnetic valve when detecting examination target for the first time, and detects examination target for the second time When close magnetic valve, so move in circles.
It is apparent that sensor, examination target are the prior art of sensory field more maturation, the present embodiment is not to except light Other all kinds of sensing devices that can be realized beyond electric switch are repeated one by one.
Below using sensor as optoelectronic switch, examination target is photographic plate, raw bamboo clamp system for installed in spoke disk end Hook exemplified by, the course of work to the raw bamboo shear in the application is illustrated:
220V general supplies voltage conversion is delivered to PLC by transformer into 24V voltages by the current-collector being installed on axle, PLC inputs are connected with optoelectronic switch, and PLC output ends are connected with magnetic valve;
Expect in raw bamboo after the hook on spoke disk, being spiraled with spoke and going to photographic plate, optoelectronic switch senses photoelectric reflection After plate, testing result signal is sent to PLC by optoelectronic switch, and PLC is handled testing result signal, by handle obtain the One level signal is sent to magnetic valve, and magnetic valve opens gas circuit, and cylinder piston rod is released, and clamps original with hook collective effect Bamboo;
Spoke disk carries raw bamboo and rotated to circular sawing machine, and raw bamboo is truncated the bamboo section for corresponding size, and spoke disk carries bamboo section extremely Behind position without photographic plate, optoelectronic switch sends a signal to PLC, and PLC is handled testing result signal, processing is obtained Second electrical level signal be sent to magnetic valve, closed electromagnetic valve gas circuit, cylinder piston rod retracts original state, unclamps bamboo section, spoke Disk continues to rotate to discharging Board position, and bamboo section departs from hook, by diversion spoke disk, now completes the cross cut saw of a raw bamboo.
In the present embodiment, preferably, also including gas source triplet, gas source triplet includes point water air filtration being sequentially connected Device, pressure-reducing valve, three parts of oil sprayer, the gas outlet of the air compressor are connected with the air inlet of the gas source triplet, Now, the pneumatic schematic diagram of raw bamboo shear control system is as shown in figure 5, the gas outlet of the gas source triplet passes through pipeline point Each magnetic valve is not connected.
Here gas source triplet is used to provide specified pressure and extends the service life of whole system.
Based on same inventive concept, the embodiment of the present application additionally provides a kind of controlling party for being used to control raw bamboo shear Method, the raw bamboo shear that this method is controlled is identical with the raw bamboo shear that above-mentioned control system is controlled, including driving motor, Rotating shaft, air compressor, examination target, at least two spoke disks and magnetic valve, cylinder and the original being installed on the spoke of spoke disk Bamboo clamp system, wherein, driving motor drives each spoke disk by same rotating shaft, and magnetic valve passes through pipeline and the air compressor It is connected;Cylinder is connected by pipeline with the magnetic valve, for driving a raw bamboo clamp system;
The control method is as shown in fig. 6, comprise the following steps:
Step 601:Sensor non-contact formula detects examination target, and by testing result signal output to PLC.
Step 602:PLC receives the testing result signal, and the testing result signal is converted into the first level signal Or exported after second electrical level signal to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, will Testing result signal is converted to the first level signal, when the testing result signal represents to be not detected by the examination target, Testing result signal is converted into second electrical level signal.
Step 603:Magnetic valve receives the first level signal or second electrical level signal, and opening is performed based on the signal received Or shutoff operation, wherein, when receiving the first level signal, the path between air compressor and cylinder is opened, is being received The path closed during second electrical level signal between air compressor and cylinder.
In view of after raw bamboo is blocked, if simultaneously closing off after each magnetic valve, the bamboo intercepted section is imported simultaneously and conveyed Band, may occur situation about mutually disturbing, preferably, the raw bamboo shear includes because of effect of inertia between each bamboo section The even number spoke disk being arranged side by side successively from front to back, wherein being provided with sensor on the spoke of a spoke disk;
The testing result signal is converted to export after second electrical level signal and specifically included to magnetic valve by the PLC:
The PLC by second electrical level signal lag in setting duration installed in the previous magnetic valve on spoke disk, export to With the previous latter magnetic valve to spoke disk on adjacent to spoke disk.
By relative to the previous magnetic valve on spoke disk, delay export second electrical level signal to adjacent latter to spoke disk On magnetic valve so that each closed electromagnetic valve cylinder is different with the time of the path between air compressor, so to raw bamboo carry out Each bamboo time for being released of section after blocking is different, when avoiding bamboo section and importing conveyer belt at the same time, because of effect of inertia, bamboo section Situation about mutually disturbing appearance.
In summary, controlled, controlled same on each spoke disk by circuit and gas circuit in the control system of the embodiment of the present application Clamping and release of the cylinder of position to raw bamboo, without artificial operation, realize the clamping and release of raw bamboo, improve raw bamboo automatically The automaticity of automatic cutter, improves the automatic of raw bamboo and blocks efficiency, improve production efficiency, reduce labour.
Through the above description of the embodiments, those skilled in the art can be understood that the embodiment of the present application It can be realized by hardware, the mode of necessary general hardware platform can also be added to realize by software.Understood based on such, The technical scheme of the embodiment of the present application can be embodied in the form of software product, the software product can be stored in one it is non- Volatile storage medium (can be CD-ROM, USB flash disk, mobile hard disk etc.) in, including some instructions are to cause a computer Method described in each embodiment of equipment (can be personal computer, server, or network equipment etc.) execution the application.
It will be appreciated by those skilled in the art that accompanying drawing is the schematic diagram of a preferred embodiment, module or stream in accompanying drawing Journey is not necessarily implemented necessary to the application.
It will be appreciated by those skilled in the art that the module in embodiment in terminal can describe to be distributed according to embodiment In the terminal of embodiment, respective change can also be carried out and be disposed other than in one or more terminals of the present embodiment.It is above-mentioned The module of embodiment can be merged into a module, can also be further split into multiple submodule.
Above-mentioned the embodiment of the present application sequence number is for illustration only, and the quality of embodiment is not represented.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the application to the application God and scope.So, if these modifications and variations of the application belong to the scope of the application claim and its equivalent technologies Within, then the application is also intended to comprising including these changes and modification.

Claims (10)

1. a kind of be used to control the control system of raw bamboo shear, it is characterised in that the raw bamboo shear include driving motor, Rotating shaft, air compressor, at least two spoke disks, and magnetic valve, cylinder and the raw bamboo clamping machine being installed on the spoke of spoke disk Structure, wherein, driving motor drives each spoke disk by same rotating shaft, and magnetic valve is connected by pipeline with the air compressor;Gas Cylinder is connected by pipeline with magnetic valve, for driving a raw bamboo clamp system;
The control system includes:PLC programmable logic controller (PLC)s, examination target and the sensor being installed on spoke;
The sensor, is electrically connected with the PLC, for examination target described in non-contact detection, testing result signal is defeated Go out to the PLC;
The PLC, its input wires terminal electrically connects the output end of sensor, and its output wiring terminal electrical connection magnetic valve is used In receiving the testing result signal, the testing result signal is converted to defeated after the first level signal or second electrical level signal Go out to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, testing result signal is converted to First level signal;When the testing result signal represents to be not detected by the examination target, testing result signal is changed For second electrical level signal;
The magnetic valve, for receiving the first level signal or second electrical level signal, performed based on the signal received open or Shutoff operation, wherein, when receiving the first level signal, the path between air compressor and cylinder is opened, the is being received The path closed during two level signals between air compressor and cylinder.
2. control system as claimed in claim 1, it is characterised in that the raw bamboo shear is included from front to back successively side by side The even number spoke disk of arrangement, wherein being provided with sensor on the spoke of a spoke disk;
The PLC, specifically for by second electrical level signal lag in setting duration installed in the previous magnetic valve on spoke disk, it is defeated Go out to give the previous latter magnetic valve to spoke disk on adjacent to spoke disk.
3. control system as claimed in claim 2, it is characterised in that the setting duration is more than 0 second and is less than or equal to 5 seconds.
4. control system as claimed in claim 1, it is characterised in that the PLC is installed in the rotating shaft, the control system System also includes:Transformer and the current-collector being installed in the rotating shaft;
The transformer, its input is connected with power supply, and its output end is connected with the input of current-collector;
The current-collector, its output end is connected with the energization input of the PLC.
5. control system as claimed in claim 1, it is characterised in that the raw bamboo shear also includes gas source triplet, institute The gas outlet for stating air compressor is connected with the air inlet of the gas source triplet, and the gas outlet of the gas source triplet passes through pipe Road is connected and installed in the magnetic valve on the spoke of spoke disk respectively.
6. control system as claimed in claim 1, it is characterised in that the cylinder on each spoke of same spoke disk is in a ring Arrangement, the examination target is the arc of relative ground static, and the arc and the part sensor are positioned opposite.
7. control system as claimed in claim 1, it is characterised in that the examination target has two, is placed in spoke disk activity row Different detection positions in journey.
8. the control system as described in claim 1 to 7 is any, it is characterised in that the sensor is optoelectronic switch.
9. a kind of be used to control the control method of raw bamboo shear, it is characterised in that the raw bamboo shear include driving motor, Rotating shaft, air compressor, at least two spoke disks and the magnetic valve being installed on the spoke of spoke disk, cylinder and raw bamboo clamping machine Structure, wherein, driving motor drives each spoke disk by same rotating shaft, and magnetic valve is connected by pipeline with the air compressor;Gas Cylinder, is connected by pipeline with the magnetic valve, for driving a raw bamboo clamp system;
The control method includes:
Sensor non-contact formula detects examination target, and
PLC programmable logic controller (PLC)s are given by testing result signal output;
PLC receives the testing result signal, and the testing result signal is converted into the first level signal or second electrical level is believed Exported after number to magnetic valve, wherein, represent to detect the detection timestamp in the testing result signal, by testing result signal The first level signal is converted to, when the testing result signal represents to be not detected by the examination target, testing result is believed Number be converted to second electrical level signal;
Magnetic valve receives the first level signal or second electrical level signal, is performed based on the signal received and opens or closes operation, Wherein, when receiving the first level signal, the path between air compressor and cylinder is opened, second electrical level signal is being received When the path closed between air compressor and cylinder.
10. control method as claimed in claim 9, it is characterised in that the raw bamboo shear is included from front to back successively simultaneously More than or equal to 2 spoke disks of row's arrangement, wherein being provided with sensor on the spoke of a spoke disk;
The testing result signal is converted to export after second electrical level signal and specifically included to magnetic valve by the PLC:
The PLC installed in the previous magnetic valve on spoke disk by second electrical level signal lag in setting duration, and output gives institute State the previous latter magnetic valve to spoke disk on adjacent to spoke disk.
CN201710505616.8A 2017-06-28 2017-06-28 Control system and control method for controlling raw bamboo cutting machine Active CN107199609B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710505616.8A CN107199609B (en) 2017-06-28 2017-06-28 Control system and control method for controlling raw bamboo cutting machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710505616.8A CN107199609B (en) 2017-06-28 2017-06-28 Control system and control method for controlling raw bamboo cutting machine

Publications (2)

Publication Number Publication Date
CN107199609A true CN107199609A (en) 2017-09-26
CN107199609B CN107199609B (en) 2020-02-14

Family

ID=59908060

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710505616.8A Active CN107199609B (en) 2017-06-28 2017-06-28 Control system and control method for controlling raw bamboo cutting machine

Country Status (1)

Country Link
CN (1) CN107199609B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117340508A (en) * 2023-10-23 2024-01-05 株洲日望精工有限公司 Automatic welding device for scissors

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104149132A (en) * 2014-08-14 2014-11-19 湖北省林业科学研究院 Continuous automatic cut-off machine for raw bamboo
CN105409608A (en) * 2015-11-27 2016-03-23 安徽清保竹业有限公司 Moso bamboo cut-off control system
CN105599075A (en) * 2016-01-05 2016-05-25 湖南长笛龙吟竹业有限公司 Automatic bamboo pole sawing device
CN205415851U (en) * 2015-10-15 2016-08-03 关桂长 Automatic slicer of bamboo timber
CN207077541U (en) * 2017-06-27 2018-03-09 湖北省林业科学研究院 Raw bamboo clamps Power Component and raw bamboo processing unit (plant)

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104149132A (en) * 2014-08-14 2014-11-19 湖北省林业科学研究院 Continuous automatic cut-off machine for raw bamboo
CN205415851U (en) * 2015-10-15 2016-08-03 关桂长 Automatic slicer of bamboo timber
CN105409608A (en) * 2015-11-27 2016-03-23 安徽清保竹业有限公司 Moso bamboo cut-off control system
CN105599075A (en) * 2016-01-05 2016-05-25 湖南长笛龙吟竹业有限公司 Automatic bamboo pole sawing device
CN207077541U (en) * 2017-06-27 2018-03-09 湖北省林业科学研究院 Raw bamboo clamps Power Component and raw bamboo processing unit (plant)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN117340508A (en) * 2023-10-23 2024-01-05 株洲日望精工有限公司 Automatic welding device for scissors

Also Published As

Publication number Publication date
CN107199609B (en) 2020-02-14

Similar Documents

Publication Publication Date Title
CN106271647B (en) A kind of automatic drilling tapping equipment and technique
CN205104319U (en) Online automatic detection device that magnetizes
CN201351984Y (en) Energy-saving and cost-reducing environment dust removing system
CN101733265B (en) Ambient dust removing method
CN203371254U (en) Automatic oilless air compressor cylinder cover and valve plate assembling mechanism
CN102368673B (en) Power balance control method of frequency converter multi-motor dragging system and test device
CN106115300B (en) A kind of bamboo section processing equipment automatic charging equipment
CN107639418A (en) A kind of magnetic valve terminal box automatic assembling machine
CN207873440U (en) Laser pipe cutter automatic feeding
CN105355359A (en) Method and device for online automatic magnetizing detection
CN107199609A (en) A kind of control system and control method for being used to control raw bamboo shear
DE50303267D1 (en) Method for controlling a plurality of turbomachines in parallel or series operation
CN106966121A (en) Stereo rotating feeding device
CN108994602A (en) Automatic assembly system and method
CN103950583B (en) A kind of automatic cigarette packet transparent paper hot-connecting cuts off, stores paper, offset detection deviation correcting device
CN102729212A (en) Pneumatic cylinder valve loading and unloading machine
CN102343494A (en) Multi-working position automatic spot welding device
CN104246631A (en) Method and device for pneumatically driving a turbocharger rotor in a balancing machine
CN107617671A (en) The automatic positioning equipment and localization method of a kind of annular work piece
CN102689427A (en) Energy-saving control system of injection molding machine and operating mode of energy-saving control system
CN104235109A (en) Servo closed-loop electro-hydraulic proportional control device for axial flow compressor
CN208759335U (en) The lower wall transmission mechanism of grinder or polishing machine
CN204604559U (en) A kind of Intelligent automatic-control type type concrete steam curing means
CN208819680U (en) Shunting patches resistance repairs resistance machine automatically
CN208780479U (en) Air feed experimental rig

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant