CN107196347B - Power adjusting method and device - Google Patents

Power adjusting method and device Download PDF

Info

Publication number
CN107196347B
CN107196347B CN201710461668.XA CN201710461668A CN107196347B CN 107196347 B CN107196347 B CN 107196347B CN 201710461668 A CN201710461668 A CN 201710461668A CN 107196347 B CN107196347 B CN 107196347B
Authority
CN
China
Prior art keywords
power
information
current
target
consumption
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710461668.XA
Other languages
Chinese (zh)
Other versions
CN107196347A (en
Inventor
罗成
杜光东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenglu IoT Communication Technology Co Ltd
Original Assignee
Shenzhen Shenglu IoT Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenglu IoT Communication Technology Co Ltd filed Critical Shenzhen Shenglu IoT Communication Technology Co Ltd
Priority to CN201710461668.XA priority Critical patent/CN107196347B/en
Priority to PCT/CN2017/093701 priority patent/WO2018227707A1/en
Publication of CN107196347A publication Critical patent/CN107196347A/en
Application granted granted Critical
Publication of CN107196347B publication Critical patent/CN107196347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention is suitable for the technical field of Internet of things, and provides a power adjusting method and a power adjusting device, wherein the method comprises the following steps: acquiring the current power consumption of each target electrical appliance; acquiring the current generating capacity of a target power plant; determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount; and controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range. According to the embodiment of the invention, the electricity utilization condition is adjusted in real time according to the electricity consumption and the generated energy, so that the difference value between the adjusted integral electricity consumption and the current generated energy is kept in a preset difference value range, namely the electricity consumption is at an approximate level as much as possible and the generated energy is at an approximate level, and the produced electric energy is fully utilized.

Description

Power adjusting method and device
Technical Field
The invention belongs to the technical field of Internet of things, and particularly relates to a power adjusting method and device.
Background
Under the current large background of energy conservation and emission reduction, the concept of electricity conservation is in depth, but people generally consider that electricity conservation is simply to reduce electricity consumption, and actually, electricity consumption is high and low, and unstable electricity consumption is also waste of electric energy.
Most of the existing energy-saving technologies and energy-saving devices focus on how to reduce the power consumption, but do not solve the problem of electric energy waste caused by mismatching of the power consumption and the generated energy.
Disclosure of Invention
In view of this, embodiments of the present invention provide an electric power adjusting method and apparatus to solve the problem of electric energy waste caused by mismatch between power consumption and power generation.
A first aspect of an embodiment of the present invention provides a power adjustment method, including:
acquiring the current power consumption of each target electrical appliance;
acquiring the current generating capacity of a target power plant;
determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount;
and controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range.
Preferably, the determining of the power consumption adjustment information corresponding to the respective target electrical appliances according to the current power consumption and the current power generation amount includes:
judging the current state of the target power plant according to the current power consumption and the current power generation amount;
if the current state of the target power plant is a power generation excess state, determining the power utilization regulation information as first regulation information for improving power consumption;
and if the current state of the target power plant is the insufficient power generation state, determining the power utilization adjusting information to be second adjusting information for reducing the power consumption.
Preferably, the determining the current state of the target power plant according to the current power consumption and the current power generation amount includes:
summing the current electricity consumption to obtain a first electricity consumption;
determining a second electric quantity according to the first electric quantity and a preset statistical model;
judging whether the second electric quantity is smaller than the current generating capacity;
if the second electric quantity is smaller than the current generating capacity, determining that the current state of the target power plant is an excessive power generation state;
and if the second electric quantity is larger than the current generating capacity, determining that the current state of the target power plant is an insufficient power generation state.
Preferably, after determining that the electricity consumption adjustment information is first adjustment information for increasing an amount of electricity used, the method further includes:
determining amplitude information of the power consumption required to be increased according to the current power consumption, the current generating capacity and a preset theoretical maximum power consumption;
adding the amplitude information of the electricity consumption required to be increased into the first adjusting information;
or after the determining that the electricity consumption adjustment information is second adjustment information for reducing electricity consumption, the method further includes:
determining amplitude information of the required power consumption reduction according to the current power consumption, the generated energy and a preset theoretical minimum power consumption;
and adding the amplitude information of the required electricity consumption reduction into the second adjustment information.
Preferably, after controlling each target electrical appliance to adjust the power consumption according to the corresponding power consumption adjustment information, the method further includes:
acquiring feedback information of each target electrical appliance;
screening out a fault electric appliance according to the feedback information, wherein the fault electric appliance is the target electric appliance which is not fed back or the feedback information is regulation failure information;
the corresponding power utilization regulation information is sent to the fault electric appliance again;
and if the number of times of retransmission exceeds a preset threshold value, removing the fault electric appliance from the target electric appliance.
A second aspect of an embodiment of the present invention provides a power conditioning device, including:
the power consumption obtaining module is used for obtaining the current power consumption of each target electrical appliance;
the generating capacity acquisition module is used for acquiring the current generating capacity of the target power plant;
the adjustment information determining module is used for determining power utilization adjustment information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount;
and the adjusting control module is used for controlling each target electric appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range.
Preferably, the adjustment information determination module includes:
the state judgment unit is used for judging the current state of the target power plant according to the current power consumption and the current power generation amount;
the first adjustment information determining unit is used for determining that the power utilization adjustment information is first adjustment information for increasing power consumption if the current state of the target power plant is a power generation excess state;
and the second adjusting information determining unit is used for determining that the electricity utilization adjusting information is the second adjusting information for reducing the electricity consumption if the current state of the target power plant is the insufficient electricity generation state.
Preferably, the state determination unit includes:
the first electricity consumption determining subunit is used for summing the current electricity consumption to obtain first electricity consumption;
the second electric quantity determining subunit is used for determining second electric quantity according to the first electric quantity and a preset statistical model;
the judging subunit is used for judging whether the second electric quantity is smaller than the current electric quantity;
the first determining subunit is configured to determine that the current state of the target power plant is an excessive power generation state if the second electric quantity is smaller than the current power generation amount;
and the second determining subunit is used for determining that the current state of the target power plant is an insufficient power generation state if the second electric quantity is larger than the current power generation amount.
Preferably, the adjustment information determination module further includes:
the improvement range determining unit is used for determining range information of the electricity consumption to be improved according to the current electricity consumption, the current electricity generation amount and a preset theoretical maximum electricity consumption;
the increase amplitude adding unit is used for adding the amplitude information of the electricity consumption required to be increased into the first adjusting information;
the reduction amplitude determining unit is used for determining amplitude information of required reduction electricity consumption according to the current electricity consumption, the generated energy and a preset theoretical minimum electricity consumption;
and the reduction amplitude adding unit is used for adding the amplitude information of the required reduction electricity consumption into the second adjusting information.
Preferably, the power conditioning device further includes:
the feedback information acquisition module is used for acquiring feedback information of each target electric appliance;
the fault screening module is used for screening out a fault electric appliance according to the feedback information, wherein the fault electric appliance is the target electric appliance which does not perform feedback or the feedback information is regulation failure information;
the retransmission module is used for retransmitting the corresponding power utilization regulation information to the fault electric appliance;
and the removing module is used for removing the fault electric appliance from the target electric appliance if the number of times of retransmission exceeds a preset threshold value.
Compared with the prior art, the embodiment of the invention has the following beneficial effects: the embodiment of the invention obtains the current power consumption of each target electrical appliance; acquiring the current generating capacity of a target power plant; determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount; and controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range. According to the embodiment of the invention, the electricity utilization condition is adjusted in real time according to the electricity consumption and the generated energy, so that the difference value between the adjusted integral electricity consumption and the current generated energy is kept in a preset difference value range, namely the electricity consumption is at an approximate level as much as possible and the generated energy is at an approximate level, and the produced electric energy is fully utilized.
Drawings
In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the drawings needed to be used in the embodiments or the prior art descriptions will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings based on these drawings without inventive exercise.
FIG. 1 is a schematic flow diagram of a power conditioning method provided by an embodiment of the invention;
FIG. 2 is a schematic diagram of the power consumption of the water heater in two modes;
fig. 3 is a schematic diagram illustrating a mode of interaction between a server and a sensing control device according to an embodiment of the present invention;
fig. 4 is a schematic diagram of a message format of a server interacting with a sensing control device according to an embodiment of the present invention;
FIG. 5 is a flow chart of the interaction of the power conditioning system without repeaters provided by an embodiment of the present invention;
FIG. 6 is a flow chart illustrating interaction of the power conditioning system with repeaters in accordance with an embodiment of the present invention;
fig. 7 is a schematic flow chart of determining power consumption adjustment information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount in the power adjustment method according to the embodiment of the present invention;
fig. 8 is a schematic diagram of a message format including a flag bit of a token information type according to an embodiment of the present invention;
FIG. 9 is a schematic flow chart diagram of determining a current state of the target power plant according to the current power consumption and the current power generation amount in the power regulation method according to the embodiment of the present invention;
FIG. 10 is a schematic flow chart diagram of determining and adding amplitude information provided by an embodiment of the present invention;
fig. 11 is a schematic diagram of a message format containing amplitude information according to an embodiment of the present invention;
FIG. 12 is a schematic flow chart diagram of screening and removing faulty appliances provided by an embodiment of the present invention;
fig. 13 is a schematic block diagram of a power conditioning device provided by an embodiment of the present invention.
Detailed Description
In the following description, for purposes of explanation and not limitation, specific details are set forth, such as particular system structures, techniques, etc. in order to provide a thorough understanding of the embodiments of the invention. It will be apparent, however, to one skilled in the art that the present invention may be practiced in other embodiments that depart from these specific details. In other instances, detailed descriptions of well-known systems, devices, circuits, and methods are omitted so as not to obscure the description of the present invention with unnecessary detail.
It should be understood that the terms "first," "second," and the like, when used in this specification and the appended claims, are used for distinguishing between different objects and not for describing a particular order. The terms "comprises" and/or "comprising" indicate the presence of stated features, integers, steps, operations, elements, and/or components, but do not preclude the presence or addition of one or more other features, integers, steps, operations, elements, components, and/or groups thereof.
It is also to be understood that the terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used in the specification of the present invention and the appended claims, the singular forms "a," "an," and "the" are intended to include the plural forms as well, unless the context clearly indicates otherwise.
It should be further understood that the term "and/or" as used in this specification and the appended claims refers to and includes any and all possible combinations of one or more of the associated listed items.
As used in this specification and the appended claims, the term "if" may be interpreted contextually as "when", "upon" or "in response to a determination" or "in response to a detection". Similarly, the phrase "if it is determined" or "if a [ described condition or event ] is detected" may be interpreted contextually to mean "upon determining" or "in response to determining" or "upon detecting [ described condition or event ]" or "in response to detecting [ described condition or event ]".
In order to explain the technical means of the present invention, the following description will be given by way of specific examples.
The first embodiment is as follows:
as shown in fig. 1, the power adjusting method provided by the present embodiment may include:
and step S101, acquiring the current electricity consumption of each target electric appliance.
The target electrical appliance in the embodiment may include non-timely electrical appliances such as a water heater, a refrigerator, a charging device, and the like.
Taking the water heater as an example, a common user only needs to have hot water available at night, and does not need to be concerned about which time period of the day the water is heated, and the water heater has the heat preservation function and can be maintained for a long time after being heated.
Fig. 2 is a schematic diagram showing the power consumption of the water heater in two modes, wherein the mode shown in fig. 2a is heating before bathing at night, and the mode shown in fig. 2b is heating in the afternoon, and then the water heater is maintained to be used at night by utilizing the heat preservation function of the water heater.
Generally speaking, the overall power consumption of the mode one and the mode two is not much different, but the mode one is heating before bathing at night, and the period is the peak period of power utilization, and the mode two is heating in the afternoon, and relative to the mode one, the period belongs to the valley period of power utilization.
The effect that this embodiment wants to reach is through shifting the main power consumption period of each non-timely target electrical apparatus from peak period of power consumption to valley period of power consumption, makes the power consumption of each period as far as possible and generated energy be at approximate level, guarantees that the electric energy of producing obtains abundant utilization.
The execution subject of the embodiment is a server for power adjustment, the server can acquire various information including current power consumption from a target electrical appliance through a specific sensing control device, and the sensing control device can be used for acquiring various information of the target electrical appliance, performing communication interaction with the server, and the like.
The sensing control device can be a software unit, a hardware unit or a unit combining software and hardware which is built in a target electric appliance, and can also be integrated into the target electric appliance as an independent pendant.
The server and the sensing control device may communicate by a wired method or a wireless method, and preferably, a wireless method is used in this embodiment.
As shown in fig. 3a, the first mode of interaction between the server and the sensor control devices is illustrated, and each sensor control device directly interacts with the server, which is suitable for a scenario with a small number of target electrical appliances and a small distribution range. In this mode, the sensing control device acquires various information of the target terminal including the current power consumption in real time and directly reports the information to the server.
As shown in fig. 3b, the second mode is a schematic diagram of the interaction between the server and the sensor control devices, and each sensor control device interacts with the server indirectly through a relay, which is suitable for a scenario with a large number of target electrical appliances and a large distribution range. In this mode, the sensing control device collects various information of the target terminal including the current power consumption in real time, reports the information to the repeater, and reports the information to the server through the repeater. In the figure, only one layer of relay is shown, and in practical application, multiple layers of relays can be set according to specific situations.
As shown in fig. 4a, the message format for the server to interact with the sensing control device may include a message body and a message header, the message body may include various information including current power consumption, the message header may include a device ID and a message serial number, the device ID is used to identify the target appliance, is unique in the whole network and is not the same as any other target appliance, and the message serial number is used to identify messages sent at different times. In the case of a repeater, as shown in fig. 4b, the message header may also include a repeater ID, which is used to identify the repeater, is unique throughout the network, and is not identical to any other repeater.
Step S102, acquiring the current power generation amount of a target power plant;
generally, a power plant has special instruments and equipment to count the power generation in real time, and the current power generation of the power plant can be obtained by communicating with the instruments and equipment.
In this embodiment, for the sake of simplicity, it is assumed that only one power plant supplies power at present, that is, the target power plant may have a situation of joint power supply of multiple power plants in an actual scene, and at this time, the generated energy of each power plant is counted in real time.
Step S103, determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount;
and step S104, controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range.
The server calculates according to the current power consumption and the current power generation amount, determines power utilization adjusting information corresponding to each target electrical appliance, packages the power utilization adjusting information according to a message format shown in fig. 4, and sends the packaged information to the sensing control device, and the sensing control device adjusts the power utilization condition of the target electrical appliance according to the received power utilization adjusting information, so that the difference value between the adjusted overall power consumption and the current power generation amount is kept within a preset difference value range.
As shown in fig. 5, it is an interaction flow chart of the whole power conditioning system (without repeater), specifically explaining as follows:
1. the sensing control device acquires information such as current power consumption of a target electric appliance;
2. the sensing control device packages the information;
3. the sensing control device sends the encapsulated message to a server;
4. the power plant sends a message containing the current power generation amount to a server;
5. the server analyzes and calculates the received message, determines the electricity utilization regulation information and packages the information;
6. the server sends the encapsulated message to the sensing control device;
7. the sensing control device analyzes the received message;
8. and the sensing control device adjusts the power utilization condition of the target electrical appliance according to the received power utilization adjusting information.
As shown in fig. 6, it is an interaction flow chart of the whole power conditioning system (with repeater), specifically set forth as follows:
1. the sensing control device acquires information such as current power consumption of a target electric appliance;
2. the sensing control device packages the information;
3. the sensing control device sends the encapsulated message to the repeater;
4. the repeater sends the message to the server;
5. the power plant sends a message containing the current power generation amount to a server;
6. the server analyzes and calculates the received message, determines the electricity utilization regulation information and packages the information;
7. the server sends the encapsulated message to the repeater;
8. the relay sends the message to the sensing control device;
9. the sensing control device analyzes the received message;
10. and the sensing control device adjusts the power utilization condition of the target electrical appliance according to the received power utilization adjusting information.
It should be understood that, the sequence numbers of the steps in the foregoing embodiments do not imply an execution sequence, and the execution sequence of each process should be determined by its function and inherent logic, and should not constitute any limitation to the implementation process of the embodiments of the present invention.
In summary, the embodiment of the present invention obtains the current power consumption of each target electrical appliance; acquiring the current generating capacity of a target power plant; determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount; and controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information so as to keep the difference value between the adjusted overall electricity utilization and the current electricity generation amount within a preset difference value range. According to the embodiment of the invention, the electricity utilization condition is adjusted in real time according to the electricity consumption and the generated energy, so that the difference value between the adjusted integral electricity consumption and the current generated energy is kept in a preset difference value range, namely the electricity consumption is at an approximate level as much as possible and the generated energy is at an approximate level, and the produced electric energy is fully utilized.
Example two:
the present embodiment provides a further solution on the basis of the power adjustment method provided in the first embodiment, in which the step S103 of determining the power utilization adjustment information corresponding to the respective target electrical appliances according to the current power consumption and the current power generation amount may include the steps as shown in fig. 7:
and S701, judging the current state of the target power plant according to the current power consumption and the current power generation amount.
And if the current state of the target power plant is an excessive power generation state, executing a step S702, if the current state of the target power plant is an insufficient power generation state, executing a step S703, and if the current state of the target power plant is a balanced power generation state, returning to the step S101 to continuously acquire the current power consumption of each target electrical appliance.
And step S702, determining the electricity utilization regulation information as first regulation information for increasing electricity utilization.
In step S703, it is determined that the electricity consumption adjustment information is second adjustment information for reducing an amount of electricity consumption.
Preferably, as shown in fig. 8, a flag bit for indicating the type of the information may be included in the message body, for example, the first bit in the message body may be taken as the flag bit for indicating the type of the information, when it takes 0, it indicates that the message body includes the first adjustment information for increasing the power consumption, and when it takes 1, it indicates that the message body includes the second adjustment information for decreasing the power consumption.
Other contents of this embodiment are the same as those of the first embodiment, and specific reference may be made to the description of the first embodiment, which is not repeated herein.
In summary, according to the embodiments of the present invention, the current state of the target power plant is determined according to the power consumption and the power generation amount, when the power generation is excessive, the power consumption is increased, and when the power generation is insufficient, the power consumption is decreased, so that the power consumption fluctuates along with the fluctuation trend of the power generation amount, and the power consumption and the power generation amount reach a balanced state as much as possible, thereby ensuring that the generated power is fully utilized.
Example three:
this embodiment provides a further solution on the basis of the power regulating method provided in the second embodiment, in this embodiment, the step S701 of determining the current state of the target power plant according to the current power consumption and the current power generation amount may include the steps as shown in fig. 9:
step S901, summing the current power consumption to obtain a first power consumption.
P may be used in this embodiment1To represent the first amount of power, then:
Figure GDA0002421189420000101
wherein N is the number of the target electrical appliances, the target electrical appliances are sorted from 1 to N, pnThe current electricity consumption of the target electrical appliance with the serial number n.
And step S902, determining a second electric quantity according to the first electric quantity and a preset statistical model.
In the power supply range of the target power plant, besides the target electrical appliance, other electrical appliances exist, and the electrical energy is consumed, so that the first electricity consumption obtained according to the current electricity consumption of the target electrical appliance is only a part of the total electricity consumption of all the electrical appliances in the power supply range, and the total electricity consumption is the second electricity consumption.
P may be used in this embodiment2To represent the second amount of power, then:
P2=f(P1)
wherein f () is P2And P1The functional relationship between them, i.e. the statistical model.
According to different situations, different statistical models can be set, and the following description is given by two simple statistical models:
the first model is used for counting the first electric quantity and the second electric quantity within a preset time, wherein the preset time can be a week, a month, a quarter or a year. Determining a proportionality coefficient between the first electric quantity and the second electric quantity in the period of time, in this embodiment, K may be used to represent the proportionality coefficient, and then K and the first electric quantity may be used to estimate the second electric quantity, which may be expressed as follows:
P2=KP1
and a second model, counting the first electric quantity and the second electric quantity within a preset time, wherein the preset time can be a week, a month, a quarter or a year. Segmenting the preset time according to a certain time interval, and determining a proportionality coefficient of the first electric quantity and the second electric quantity in each time segment, for example, segmenting at one hour interval in one week time, and then segmenting into 168 segments in total, in this embodiment, M may be used to represent the number of segments, in each time segment, one proportionality coefficient is determined, then 168 proportionality coefficients in total are determined, in this embodiment, k may be usedmTo represent the proportionality coefficient, wherein M is more than or equal to 1 and less than or equal to M, in each subsequent week, the proportionality coefficient k of the corresponding time period in one week can be usedmAnd the first amount of power to estimate the second amount of power, which may be formulated as follows:
P2=kmP1
in practical applications, other statistical models may be selected according to specific situations, which is not specifically limited in this embodiment.
And step S903, judging whether the second electric quantity is smaller than the current generated energy.
P may be used in this embodiment3To represent the current power generation amount.
If the second electric quantity is smaller than the current electric quantity, namely P2<P3Then step S904 is executed, if the second electric quantity is larger than the current electric quantity, i.e. P2>P3Then step S905 is executed, if the second electric quantity is equal to the current electric quantity, i.e. P2=P3Then step S906 is performed.
Preferably, the following determination method may also be adopted: if the second electric quantity is smaller than the current electric quantity and the absolute value of the difference value of the second electric quantity and the current electric quantity is larger than a preset threshold value, namely P3-P2>Then step S904 is executed, wherein the threshold is represented by using the second electric quantity, and if the second electric quantity is larger than the current electric quantity and the absolute value of the difference between the two is larger than a preset threshold, that is, P is greater than the preset threshold2-P3>Then, step S905 is executed, if the absolute value of the difference between the second electric quantity and the current electric quantity is not greater than the preset threshold, that is, | P2-P3|<Then step S906 is performed.
And step S904, determining the current state of the target power plant as a power generation surplus state.
And step S905, determining the current state of the target power plant as an insufficient power generation state.
And step S906, determining the current state of the target power plant as a power generation balance state.
Other contents of this embodiment are the same as those of the embodiment two, and specific reference may be made to the description of the embodiment two, which is not repeated herein.
In summary, according to the embodiment of the present invention, first electric quantity is obtained, then second electric quantity is determined according to the first electric quantity and a preset statistical model, and the current state of the target power plant is determined by determining the relationship between the second electric quantity and the current power generation amount. On the premise that the statistical model is properly selected, the calculation accuracy can be improved, and the control on the power consumption is more accurate.
Example four:
in this embodiment, as shown in fig. 10, after determining that the power consumption adjustment information is the first adjustment information for increasing the power consumption in step S702, the method may further include:
and step S704, determining the amplitude information of the electricity consumption required to be increased according to the current electricity consumption, the current electricity generation and a preset theoretical maximum electricity consumption.
For a target electrical appliance, the operating power has a maximum limit, and the power consumption also has a maximum limit, i.e. the theoretical maximum power consumption. When determining the adjustment amplitude information, the server needs to consider the theoretical maximum power consumption of each target electrical appliance, otherwise, the adjustment amplitude may be too large, so that the adjusted power consumption exceeds the theoretical maximum power consumption of the target electrical appliance, which is obviously unreasonable and should be avoided.
Examples are as follows:
assuming that the total number of the target electrical appliances is 5, the current electricity consumption of each target electrical appliance is 10 degrees, summing the current electricity consumption to obtain a first electricity consumption of 50 degrees, determining a second electricity consumption according to the first electricity consumption and a preset statistical model, assuming that the statistical model is P2=3P1Then, it is determined that the second electric quantity is 150 degrees, and if the current electric quantity is 160 degrees, then 10 degrees of electric quantity is added, at this time, it is determined that the magnitude of the increase of the electric quantity required by each target electric appliance is 2 degrees, so that the balance relationship between the electric quantity and the electric quantity can be maintained. However, if the theoretical maximum power consumption of one of the target electrical appliances is 10 degrees, the theoretical maximum power consumption cannot be increased continuously, and the theoretical maximum power consumption of the other target electrical appliances is 15 degrees, the target electrical appliance with the theoretical maximum power consumption of 10 degrees can be determined to have the range of increasing the power consumption of 2.5 degrees, so that the balance relation between the power consumption and the power generation amount is still maintained within a reasonable range.
Step S705, adding the amplitude information of the required increased power consumption into the first adjustment information.
As shown in fig. 11a, the magnitude information of the required increase power usage may be included in the message body.
After determining that the electricity consumption adjustment information is the second adjustment information for reducing the electricity consumption amount in step S703, the method further includes:
and step S706, determining the amplitude information of the required electricity consumption reduction according to the current electricity consumption, the electricity generation amount and the preset theoretical minimum electricity consumption.
For a target appliance, the operating power has a minimum limit, and the power consumption also has a minimum limit, i.e., the theoretical minimum power consumption. When determining the adjustment amplitude information, the server needs to consider the theoretical minimum power consumption of each target electrical appliance, otherwise, the adjustment amplitude may be too large, so that the adjusted power consumption is smaller than the theoretical minimum power consumption of the target electrical appliance, which is obviously unreasonable and should be avoided.
In step S707, the information of the magnitude of the required reduction in the used amount of electricity is added to the second adjustment information.
As shown in fig. 11b, the magnitude information of the required reduction power usage may be included in the message body.
Other contents of this embodiment are the same as those of the embodiment two, and specific reference may be made to the description of the embodiment two, which is not repeated herein.
In summary, according to the embodiments of the present invention, firstly, the amplitude information of the required increase power consumption (or the amplitude information of the required decrease power consumption) is determined according to the current power consumption, the current power generation amount, and the preset theoretical maximum power consumption (or the theoretical minimum power consumption), then the amplitude information of the required increase power consumption is added to the first adjustment information (or the second adjustment information), and the adjustment is accurately performed according to the actual conditions of each target electrical appliance, and in this process, the theoretical maximum power consumption (or the theoretical minimum power consumption) is considered, so that the adjustment rationality is ensured.
Example five:
the present embodiment provides a further solution on the basis of the power adjusting method provided by each of the above embodiments, in this embodiment, as shown in fig. 12, after controlling each target electrical appliance to adjust the power consumption according to the corresponding power consumption adjusting information in step S104, the method further includes:
step S1201, obtaining feedback information of each target electrical appliance;
step S1202, a fault electric appliance is screened out according to the feedback information, and the fault electric appliance is the target electric appliance which is not fed back or the feedback information is regulation failure information;
step S1203, resending the corresponding power utilization adjusting information to the failed electric appliance;
step S1204, if the number of times of retransmission exceeds a preset threshold, removing the faulty electrical appliance from the target electrical appliance.
Other contents of this embodiment are the same as those of the above embodiment, and specific reference may be made to the description of the above embodiments, which are not repeated herein.
According to the embodiment of the invention, the fault electric appliance can be removed from the target electric appliance in time, so that the final adjusting result is not influenced by the fault electric appliance, and the adjusting accuracy is ensured.
Example six:
fig. 13 shows a block diagram of a power conditioning apparatus according to an embodiment of the present invention, which corresponds to the power conditioning method described in the above embodiment, and only shows a part related to the embodiment of the present invention for convenience of description.
Referring to fig. 13, the power conditioning device may include:
a power consumption obtaining module 1301, configured to obtain current power consumption of each target electrical appliance;
the power generation amount obtaining module 1302 is configured to obtain a current power generation amount of the target power plant;
an adjustment information determining module 1303, configured to determine, according to the current power consumption and the current power generation amount, power consumption adjustment information corresponding to each target electrical appliance;
and the adjusting control module 1304 is configured to control each target electrical appliance to adjust the power consumption according to the corresponding power consumption adjusting information, so that a difference between the adjusted overall power consumption and the current power generation amount is kept within a preset difference range.
Preferably, the adjustment information determining module 1303 includes:
a state determination unit 13031, configured to determine a current state of the target power plant according to the current power consumption and the current power generation amount;
a first adjustment information determining unit 13032, configured to determine, if the current state of the target power plant is an excessive power generation state, that the power utilization adjustment information is first adjustment information for increasing power consumption;
a second adjustment information determining unit 13033, configured to determine, if the current state of the target power plant is an insufficient power generation state, that the power utilization adjustment information is second adjustment information for reducing power consumption.
Preferably, the adjustment information determining module 1303 further includes:
the improvement amplitude determining unit 13034 is configured to determine amplitude information of the required improvement power consumption according to the current power consumption, the current power generation amount, and a preset theoretical maximum power consumption;
an increase amplitude adding unit 13035, configured to add the amplitude information of the required increase in power consumption into the first adjustment information;
a reduction amplitude determining unit 13036, configured to determine amplitude information of the required reduction power consumption according to the current power consumption, the power generation amount, and a preset theoretical minimum power consumption;
a reduction amount adding unit 13037 adds the amount information of the required reduction power consumption amount to the second adjustment information.
Preferably, the state determination unit 13031 includes:
the first electricity consumption determining subunit is used for summing the current electricity consumption to obtain first electricity consumption;
the second electric quantity determining subunit is used for determining second electric quantity according to the first electric quantity and a preset statistical model;
the judging subunit is used for judging whether the second electric quantity is smaller than the current electric quantity;
the first determining subunit is configured to determine that the current state of the target power plant is an excessive power generation state if the second electric quantity is smaller than the current power generation amount;
and the second determining subunit is used for determining that the current state of the target power plant is an insufficient power generation state if the second electric quantity is larger than the current power generation amount.
Preferably, the power conditioning device further includes:
a feedback information obtaining module 1305, configured to obtain feedback information of each target electrical appliance;
a fault screening module 1306, configured to screen out a faulty electrical appliance according to the feedback information, where the faulty electrical appliance is the target electrical appliance that has not been fed back or the feedback information is adjustment failure information;
a retransmission module 1307, configured to retransmit the corresponding power utilization adjustment information to the faulty electrical appliance;
a removing module 1308, configured to remove the faulty electrical appliance from the target electrical appliance if the number of retransmissions exceeds a preset threshold.
It will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-mentioned division of the functional units and modules is illustrated, and in practical applications, the above-mentioned function distribution may be performed by different functional units and modules according to needs, that is, the internal structure of the apparatus is divided into different functional units or modules to perform all or part of the above-mentioned functions. Each functional unit and module in the embodiments may be integrated in one processing unit, or each unit may exist alone physically, or two or more units are integrated in one unit, and the integrated unit may be implemented in a form of hardware, or in a form of software functional unit. In addition, specific names of the functional units and modules are only for convenience of distinguishing from each other, and are not used for limiting the protection scope of the present application. The specific working processes of the units and modules in the system may refer to the corresponding processes in the foregoing method embodiments, and are not described herein again.
In the above embodiments, the descriptions of the respective embodiments have respective emphasis, and reference may be made to the related descriptions of other embodiments for parts that are not described or illustrated in a certain embodiment.
Those of ordinary skill in the art will appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as electronic hardware or combinations of computer software and electronic hardware. Whether such functionality is implemented as hardware or software depends upon the particular application and design constraints imposed on the implementation. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
In the embodiments provided in the present invention, it should be understood that the disclosed apparatus and method may be implemented in other ways. For example, the above-described system embodiments are merely illustrative, and for example, the division of the modules or units is only one logical division, and there may be other divisions when actually implemented, for example, a plurality of units or components may be combined or may be integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, devices or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit. The integrated unit can be realized in a form of hardware, and can also be realized in a form of a software functional unit.
The integrated unit, if implemented in the form of a software functional unit and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solutions of the embodiments of the present invention may be implemented in the form of a software product, which is stored in a storage medium and includes several instructions for causing a computer device (which may be a personal computer, a server, a network device, or the like) or a processor (processor) to execute all or part of the steps of the methods described in the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes.
The above-mentioned embodiments are only used for illustrating the technical solutions of the present invention, and not for limiting the same; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; such modifications and substitutions do not substantially depart from the spirit and scope of the embodiments of the present invention, and are intended to be included within the scope of the present invention.

Claims (8)

1. A method of power conditioning, comprising:
acquiring the current power consumption of each target electrical appliance;
acquiring the current generating capacity of a target power plant;
determining power utilization adjusting information corresponding to each target electrical appliance according to the current power consumption and the current power generation amount, wherein the power utilization adjusting information comprises first adjusting information or second adjusting information, and specifically comprises the following steps: judging the current state of the target power plant according to the current power consumption and the current power generation amount; if the current state of the target power plant is a power generation excess state, determining the power utilization regulation information as the first regulation information for increasing the power consumption; if the current state of the target power plant is an insufficient power generation state, determining the power utilization regulation information as the second regulation information for reducing the power consumption;
controlling each target electrical appliance to adjust the power utilization condition according to the corresponding power utilization adjusting information, which specifically comprises the following steps: and packaging the power utilization adjusting information corresponding to each target electrical appliance, sending the packaged information to the repeater, and sending the packaged information to the target sensing control device corresponding to each target electrical appliance through the repeater, so that the sensing control device adjusts the power utilization condition of the target electrical appliance according to the received power utilization adjusting information, so that the difference value between the adjusted overall power consumption and the current power generation amount is kept in a preset difference value range, and the problem that the power consumption amount is not matched in the situations of large number of target electrical appliances and large distribution range is solved.
2. The power conditioning method of claim 1, wherein the determining the current state of the target plant based on the current power usage and the current power generation comprises:
summing the current electricity consumption to obtain a first electricity consumption;
determining a second electric quantity according to the first electric quantity and a preset statistical model;
judging whether the second electric quantity is smaller than the current generating capacity;
if the second electric quantity is smaller than the current generating capacity, determining that the current state of the target power plant is an excessive power generation state;
and if the second electric quantity is larger than the current generating capacity, determining that the current state of the target power plant is an insufficient power generation state.
3. The power adjustment method according to claim 2, further comprising, after determining that the power usage adjustment information is first adjustment information that increases a power usage amount:
determining amplitude information of the power consumption required to be increased according to the current power consumption, the current generating capacity and a preset theoretical maximum power consumption;
adding the amplitude information of the electricity consumption required to be increased into the first adjusting information;
or after the determining that the electricity consumption adjustment information is second adjustment information for reducing electricity consumption, the method further includes:
determining amplitude information of the required power consumption reduction according to the current power consumption, the generated energy and a preset theoretical minimum power consumption;
and adding the amplitude information of the required electricity consumption reduction into the second adjustment information.
4. The power conditioning method according to any one of claims 1 to 3, further comprising, after controlling the target electrical appliances to condition power consumption in accordance with the corresponding power consumption conditioning information:
acquiring feedback information of each target electrical appliance;
screening out a fault electric appliance according to the feedback information, wherein the fault electric appliance is the target electric appliance which is not fed back or the feedback information is regulation failure information;
the corresponding power utilization regulation information is sent to the fault electric appliance again;
and if the number of times of retransmission exceeds a preset threshold value, removing the fault electric appliance from the target electric appliance.
5. An electric power conditioning device, characterized by comprising:
the power consumption obtaining module is used for obtaining the current power consumption of each target electrical appliance;
the generating capacity acquisition module is used for acquiring the current generating capacity of the target power plant;
an adjustment information determining module, configured to determine, according to the current power consumption and the current power generation amount, power consumption adjustment information corresponding to each target electrical appliance, where the power consumption adjustment information includes first adjustment information or second adjustment information, and the adjustment information determining module includes:
the state judgment unit is used for judging the current state of the target power plant according to the current power consumption and the current power generation amount;
a first adjustment information determination unit, configured to determine that the power consumption adjustment information is the first adjustment information for increasing power consumption if the current state of the target power plant is an excess power generation state;
a second adjustment information determination unit, configured to determine that the power consumption adjustment information is the second adjustment information for reducing power consumption if the current state of the target power plant is an insufficient power generation state;
and the adjusting control module is used for controlling each target electrical appliance to adjust the electricity utilization condition according to the corresponding electricity utilization adjusting information, and is specifically used for: and packaging the power utilization adjusting information corresponding to each target electrical appliance, sending the packaged information to the repeater, and sending the packaged information to the target sensing control device corresponding to each target electrical appliance through the repeater, so that the sensing control device adjusts the power utilization condition of the target electrical appliance according to the received power utilization adjusting information, so that the difference value between the adjusted overall power consumption and the current power generation amount is kept in a preset difference value range, and the problem that the power consumption amount is not matched in the situations of large number of target electrical appliances and large distribution range is solved.
6. The power conditioning device according to claim 5, characterized in that the state determination unit includes:
the first electricity consumption determining subunit is used for summing the current electricity consumption to obtain first electricity consumption;
the second electric quantity determining subunit is used for determining second electric quantity according to the first electric quantity and a preset statistical model;
the judging subunit is used for judging whether the second electric quantity is smaller than the current electric quantity;
the first determining subunit is configured to determine that the current state of the target power plant is an excessive power generation state if the second electric quantity is smaller than the current power generation amount;
and the second determining subunit is used for determining that the current state of the target power plant is an insufficient power generation state if the second electric quantity is larger than the current power generation amount.
7. The power conditioning device of claim 6, wherein the conditioning information determination module further comprises:
the improvement range determining unit is used for determining range information of the electricity consumption to be improved according to the current electricity consumption, the current electricity generation amount and a preset theoretical maximum electricity consumption;
the increase amplitude adding unit is used for adding the amplitude information of the electricity consumption required to be increased into the first adjusting information;
the reduction amplitude determining unit is used for determining amplitude information of required reduction electricity consumption according to the current electricity consumption, the generated energy and a preset theoretical minimum electricity consumption;
and the reduction amplitude adding unit is used for adding the amplitude information of the required reduction electricity consumption into the second adjusting information.
8. The power conditioning device according to any one of claims 5 to 7, characterized by further comprising:
the feedback information acquisition module is used for acquiring feedback information of each target electric appliance;
the fault screening module is used for screening out a fault electric appliance according to the feedback information, wherein the fault electric appliance is the target electric appliance which does not perform feedback or the feedback information is regulation failure information;
the retransmission module is used for retransmitting the corresponding power utilization regulation information to the fault electric appliance;
and the removing module is used for removing the fault electric appliance from the target electric appliance if the number of times of retransmission exceeds a preset threshold value.
CN201710461668.XA 2017-06-16 2017-06-16 Power adjusting method and device Active CN107196347B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710461668.XA CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device
PCT/CN2017/093701 WO2018227707A1 (en) 2017-06-16 2017-07-20 Power adjustment method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710461668.XA CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device

Publications (2)

Publication Number Publication Date
CN107196347A CN107196347A (en) 2017-09-22
CN107196347B true CN107196347B (en) 2020-08-04

Family

ID=59879777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710461668.XA Active CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device

Country Status (2)

Country Link
CN (1) CN107196347B (en)
WO (1) WO2018227707A1 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110989394B (en) * 2019-12-31 2021-07-20 海信集团有限公司 Power control method and device for shared household appliances
CN115051416B (en) * 2022-08-16 2022-11-15 阿里巴巴(中国)有限公司 Data processing method, power generation method and device and cloud equipment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156468B (en) * 2011-04-21 2013-06-05 东莞瑞柯电子科技股份有限公司 System for complementary power supply between small power station and commercial power grid
CN102723785B (en) * 2012-07-03 2015-10-21 广东电网公司电力科学研究院 The Methods of electric load forecasting gathered based on large user's intelligent terminal and system
JP2014054003A (en) * 2012-09-05 2014-03-20 Sharp Corp Charge/discharge device and charge/discharge system
CN104218614A (en) * 2013-05-29 2014-12-17 周奇迪 Method and system for controlling photoelectricity usage in multiple buildings
CN103676846B (en) * 2013-11-20 2016-02-10 常州思普锐电力科技有限公司 A kind of intelligent control algorithm of Novel household energy management system
CN105449719B (en) * 2014-08-26 2019-01-04 珠海格力电器股份有限公司 Distributed energy power control method, apparatus and system
CN106597858B (en) * 2017-01-17 2019-09-06 深圳傲华科技有限公司 Flexible load regulation method and its system towards new energy consumption

Also Published As

Publication number Publication date
CN107196347A (en) 2017-09-22
WO2018227707A1 (en) 2018-12-20

Similar Documents

Publication Publication Date Title
Wang et al. A game theory-based energy management system using price elasticity for smart grids
WO2018031798A1 (en) Power sharing in a mesh energy system
Tham et al. Sensing-driven energy purchasing in smart grid cyber-physical system
Crisostomi et al. Plug-and-play distributed algorithms for optimized power generation in a microgrid
Chan et al. Load/price forecasting and managing demand response for smart grids: Methodologies and challenges
CN105068513B (en) Wired home energy management method based on social networks behavior perception
Chen et al. A simple asymptotically optimal joint energy allocation and routing scheme in rechargeable sensor networks
CN105207247B (en) Control method of electric power system and device
Aksanli et al. Human behavior aware energy management in residential cyber-physical systems
Nguyen et al. Further optimized scheduling of micro grids via dispatching virtual electricity storage offered by deferrable power-driven demands
EP3082096A1 (en) Demand prediction device and program
CN104008432A (en) Micro-grid short-term load forecasting method based on EMD-KELM-EKF
EP3026773B1 (en) System and method for modelling load in an electrical power network
CN107196347B (en) Power adjusting method and device
CN104408663A (en) User demand response dispatching system and method of smart grid
Xu et al. Supply demand coordination for building energy saving: Explore the soft comfort
Batra et al. Data driven energy efficiency in buildings
Huang et al. Real-time data and energy management in microgrids
Ghorbani et al. Multi-agent autonomous decision making in smart micro-grids’ energy management: a decentralized approach
Zhang et al. Stochastic unit commitment with air conditioning loads participating in reserve service
CN103117569A (en) Power storage control apparatus and power storage control method
Essayeh et al. Cost‐Effective Energy Usage in a Microgrid Using a Learning Algorithm
CN106532782B (en) Operation optimization method and device for cogeneration unit for improving wind power utilization rate
CN106169756B (en) A kind of isolated island microgrid frequency cooperative control method of meter and economic performance
Javaid et al. Controlling energy consumption with the world-wide adaptive thermostat using fuzzy inference system in smart grid

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Luo Cheng

Inventor after: Du Guangdong

Inventor before: Du Guangdong

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant