CN107196347A - A kind of electric adjustment method and device - Google Patents
A kind of electric adjustment method and device Download PDFInfo
- Publication number
- CN107196347A CN107196347A CN201710461668.XA CN201710461668A CN107196347A CN 107196347 A CN107196347 A CN 107196347A CN 201710461668 A CN201710461668 A CN 201710461668A CN 107196347 A CN107196347 A CN 107196347A
- Authority
- CN
- China
- Prior art keywords
- power consumption
- current
- information
- generated energy
- power
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
Abstract
The present invention is applied to internet of things field there is provided a kind of electric adjustment method and device, and methods described includes:Obtain the current power amount of each target electric appliance;Obtain the current generated energy of target power plant;Electricity consumption regulation information corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy;Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.Pass through the embodiment of the present invention, electricity consumption situation is adjusted immediately according to power consumption and generated energy, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range, i.e. power consumption is in approximate level with generated energy as far as possible, it is ensured that the electric energy produced is fully utilized.
Description
Technical field
The invention belongs to internet of things field, more particularly to a kind of electric adjustment method and device.
Background technology
Under the overall background of current energy-saving and emission-reduction, the idea of using electricity wisely has been rooted in the hearts of the people, but people often think section
About electricity consumption is exactly simply to reduce electricity consumption, and in fact, low when high during power consumption, power consumption shakiness is also the waste to electric energy,
For example in certain period, the generated energy of power plant is larger, and power consumption is smaller, and the electricity having more will be wasted, and power plant is often
In order to meet the demand on electrical demand peak, need to improve its unit number again, improve generated energy, cause the waste of resource.
How existing power-saving technology and energy saver mostly reduces power consumption if being laid particular emphasis on, and unresolved because of power consumption and hair
The waste to electric energy that electricity is mismatched and caused.
The content of the invention
In view of this, the embodiments of the invention provide a kind of electric adjustment method and device, to solve because of power consumption and hair
Electricity mismatch and cause to the waste of electric energy the problem of.
The first aspect of the embodiment of the present invention provides a kind of electric adjustment method, including:
Obtain the current power amount of each target electric appliance;
Obtain the current generated energy of target power plant;
Determine that electricity consumption corresponding with each described target electric appliance is adjusted according to the current power amount and the current generated energy
Save information;
Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that after regulation
The difference of overall power consumption and the current generated energy be maintained in default difference range.
Preferably, it is described to be determined and each described target electric appliance pair with the current generated energy according to the current power amount
The electricity consumption regulation information answered includes:
The current state of the target power plant is judged according to the current power amount and the current generated energy;
If the current state of the target power plant is the superfluous state that generates electricity, it is determined that the electricity consumption regulation information is used to improve
First regulation information of electricity;
If the current state of the target power plant is generation deficiency state, it is determined that the electricity consumption regulation information is used for reduction
Second regulation information of electricity.
Preferably, it is described according to the current power amount and the current generated energy judges the current shape of the target power plant
State includes:
The current power amount is summed, the first power consumption is obtained;
Second power consumption is determined according to first power consumption and default statistical model;
Judge whether second power consumption is less than the current generated energy;
If second power consumption is less than the current generated energy, it is determined that the current state of the target power plant is generating
Superfluous state;
If second power consumption is more than the current generated energy, it is determined that the current state of the target power plant is generating
Not enough state.
Preferably, it is determined that the electricity consumption regulation information for improve power consumption first regulation information after, in addition to:
Improve and use according to needed for being determined the current power amount, the current generated energy and default theoretical maximum power consumption
The amplitude information of electricity;
The required amplitude information for improving power consumption is added into the first regulation information;
Or, after the second regulation information for determining the electricity consumption regulation information to reduce power consumption, in addition to:
Power consumption is reduced according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption
Amplitude information;
The amplitude information of the required reduction power consumption is added into the second regulation information.
Preferably, each described target electric appliance of control according to the corresponding electricity consumption regulation information regulation electricity consumption situation it
Afterwards, in addition to:
Obtain the feedback information of each target electric appliance;
The electrical equipment that is out of order is screened according to the feedback information, the failure electrical equipment is not fed back or the feedback information
To adjust the target electric appliance of failure information;
The corresponding electricity consumption regulation information is resend to the failure electrical equipment;
If sending times exceed default threshold value, the failure electrical equipment is removed from the target electric appliance.
The second aspect of the embodiment of the present invention provides a kind of electric power regulating mechanism, including:
Power consumption acquisition module, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module, the current generated energy for obtaining target power plant;
Adjust information determination module, for according to the current power amount and the current generated energy determine with it is described each
The corresponding electricity consumption regulation information of target electric appliance;
Control module is adjusted, for controlling each described target electric appliance to be used according to the corresponding electricity consumption regulation information regulation
Electric situation, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
Preferably, the regulation information determination module includes:
State determination unit, for judging the target power plant according to the current power amount and the current generated energy
Current state;
First regulation information determination unit, if the current state for the target power plant is the superfluous state that generates electricity, really
The fixed electricity consumption regulation information adjusts information to improve the first of power consumption;
Second regulation information determination unit, if the current state for the target power plant is generation deficiency state, really
The fixed electricity consumption regulation information adjusts information for the second of reduction power consumption.
Preferably, the state determination unit includes:
First power consumption determination subelement, for being summed to the current power amount, obtains the first power consumption;
Second power consumption determination subelement, for determining the second use according to first power consumption and default statistical model
Electricity;
Subelement is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement, if being less than the current generated energy for second power consumption, it is determined that the target
The current state of power plant is the superfluous state that generates electricity;
Second determination subelement, if being more than the current generated energy for second power consumption, it is determined that the target
The current state of power plant is generation deficiency state.
Preferably, the regulation information determination module also includes:
Increase rate determining unit, for according to the current power amount, the current generated energy and it is default it is theoretical most
Big power consumption improves the amplitude information of power consumption needed for determining;
Increase rate adding device, for the required amplitude information for improving power consumption to be added into first regulation
Information;
Reduction amplitude determining unit, for according to the current power amount, the generated energy and default theoretical minimum use
The amplitude information of reduction power consumption needed for electricity is determined;
Reduction amplitude adding device, is added into second regulation by the amplitude information of the required reduction power consumption and believes
Breath.
Preferably, described electric power regulating mechanism also includes:
Feedback information acquisition module, the feedback information for obtaining each target electric appliance;
Contingency screening module, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not carry out
Feedback or the target electric appliance that the feedback information is regulation failure information;
Module is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module, if exceeding default threshold value for sending times, by the failure electrical equipment from the target electric appliance
It is middle to remove.
The beneficial effect that the embodiment of the present invention exists compared with prior art is:The embodiment of the present invention obtains each target electricity
The current power amount of device;Obtain the current generated energy of target power plant;It is true according to the current power amount and the current generated energy
Fixed electricity consumption regulation information corresponding with each described target electric appliance;Each described target electric appliance of control is according to the corresponding electricity consumption
Information regulation electricity consumption situation is adjusted, so that the difference of the overall power consumption and the current generated energy after regulation is maintained at default
In difference range.By the embodiment of the present invention, electricity consumption situation is adjusted immediately according to power consumption and generated energy so that regulation
The difference of rear overall power consumption and the current generated energy is maintained in default difference range, i.e., power consumption as far as possible and
Generated energy is in approximate level, it is ensured that the electric energy produced is fully utilized.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art
In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only some of the present invention
Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these
Accompanying drawing obtains other accompanying drawings.
Fig. 1 is the schematic flow diagram of electric adjustment method provided in an embodiment of the present invention;
Fig. 2 is the power consumption condition schematic diagram of both of which lower water-heater;
Fig. 3 is the pattern diagram that server provided in an embodiment of the present invention is interacted with sensing and controlling device;
Fig. 4 is the message format schematic diagram that server provided in an embodiment of the present invention is interacted with sensing and controlling device;
The interaction diagrams of electric power regulating system in the case of Fig. 5 is non-relay device provided in an embodiment of the present invention;
Fig. 6 is the interaction diagrams of electric power regulating system provided in an embodiment of the present invention in the case of have repeater;
Fig. 7 according to the current power amount and described current is generated electricity in electric adjustment method provided in an embodiment of the present invention
Amount determines that electricity consumption corresponding with each described target electric appliance adjusts the schematic flow diagram of information;
Fig. 8 is the message format schematic diagram of the position of type code containing characterization information provided in an embodiment of the present invention;
Fig. 9 according to the current power amount and described current is generated electricity in electric adjustment method provided in an embodiment of the present invention
Amount judges the schematic flow diagram of the current state of the target power plant;
Figure 10 is the schematic flow diagram of determination provided in an embodiment of the present invention and addition amplitude information;
Figure 11 is the message format schematic diagram provided in an embodiment of the present invention containing amplitude information;
Figure 12 is screening provided in an embodiment of the present invention and the schematic flow diagram for removing failure electrical equipment;
Figure 13 is the schematic block diagram of electric power regulating mechanism provided in an embodiment of the present invention.
Embodiment
In describing below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc
Body details, thoroughly to understand the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific
The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity
Road and the detailed description of method, in case unnecessary details hinders description of the invention.
It should be appreciated that ought be in this specification and in the appended claims in use, term " first ", " second " etc. be stated
It is, for distinguishing different objects, and to be not intended to describe specific order.Term " comprising " indicate described feature, entirety,
Step, operation, the presence of element and/or component, but it is not precluded from one or more of the other feature, entirety, step, operation, member
The presence or addition of element, component and/or its set.
It is also understood that the term used in this description of the invention is merely for the sake of the mesh for describing specific embodiment
And be not intended to limit the present invention.As used in description of the invention and appended claims, unless on
Other situations are hereafter clearly indicated, otherwise " one " of singulative, " one " and "the" are intended to include plural form.
It will be further appreciated that, the term "and/or" used in description of the invention and appended claims is
Refer to any combinations of one or more of the associated item listed and be possible to combination, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt
Be construed to " when ... " or " once " or " in response to determining " or " in response to detecting ".Similarly, phrase " if it is determined that " or
" if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true
It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one:
As shown in figure 1, the electric adjustment method that the present embodiment is provided can include:
Step S101, obtains the current power amount of each target electric appliance.
Target electric appliance in the present embodiment can include water heater, refrigerator, charging equipment etc. non-promptness electrical equipment.
By taking water heater as an example, general user is to need have hot water can use at night, and it is white to be not relevant for water
What it which was heated period, and water heater has heat insulation function, can be maintained after heating for a long time.
It is the power consumption condition schematic diagram of both of which lower water-heater shown in Fig. 2, the pattern one shown in Fig. 2 a is to wash at night
Heated, the pattern two shown in Fig. 2 b is to be heated in the afternoon, then maintained using the heat insulation function of water heater before bath
Used to evening.
In general, the whole power consumption difference of pattern one and pattern two is little, but pattern one is to have a bath to advance at night
Row heating, and this period is the peak period of electricity consumption, pattern two is to be heated in the afternoon, relative to pattern one, this period category
In the low ebb phase of electricity consumption.
The effect that the present embodiment is wanted to reach is by by the main electricity consumption period of the target electric appliance of each non-promptness
The low power consumption phase is transferred to by peak times of power consumption, the power consumption of each period is in approximate water with generated energy as far as possible
It is flat, it is ensured that the electric energy produced is fully utilized.
The executive agent of the present embodiment is carries out the server of electric adjustment, and the server can be by specifically sensing control
Device processed obtains the various information including current power amount from target electric appliance, and the sensing and controlling device can be used for collection
The various information of target electric appliance, communication interaction etc. is carried out with server.
The sensing and controlling device can be the software unit, hardware cell or soft or hard combination being built in target electric appliance
Unit, can also be integrated into as independent suspension member in the target electric appliance.
The server can be communicated with the sensing and controlling device by wired mode, can also pass through wireless parties
Formula is communicated, it is preferable that wireless mode is used in this implementation.
As shown in Figure 3 a, it is the signal for the first pattern that the server is interacted with the sensing and controlling device
Figure, each sensor control is directly interacted with server, and this pattern is few suitable for target electric appliance number, is distributed model
Enclose small scene.In such a mode, the sensing and controlling device is gathered target terminal including current power amount in real time
Various information, and these information are directly reported into the server.
As shown in Figure 3 b, it is the signal for second of pattern that the server is interacted with the sensing and controlling device
Figure, each sensor control is interacted with server indirectly by repeater, and this pattern is applied to target electric appliance number
Mesh is more, the big scene of distribution.In such a mode, the sensing and controlling device gathers target terminal in real time includes current use
Various information including electricity, and by these information reportings to repeater, then by repeater by these information reportings to described
Server.Shown in figure, only give in the situation of one layer of relaying, practical application, can set as the case may be in multilayer
After.
As shown in fig. 4 a, the message format that to be the server interact with the sensing and controlling device, the message
Form can include various information that can be including current power amount in message body and message header, the message body, described
Message header can include device ID and message SN, and described device ID is used to identify the target electric appliance, is only in the whole network
One, not identical with any other target electric appliance, the message SN is used to identify in the message not sent in the same time.Depositing
In the case of repeater, as shown in Figure 4 b, the message header can also include repeater ID, the repeater ID for identifying
The repeater, in the whole network be it is unique, it is not identical with any other repeater.
Step S102, obtains the current generated energy of target power plant;
Usually, have in power plant special instrument and equipment to its generated energy carry out real-time statistics, by with these instruments
Equipment is communicated, you can obtain the current generated energy of power plant.
In the present embodiment, for simplicity, it is assumed that currently an only power plant is powered, i.e., described target electricity
Factory, in actual scene, may have multiple power plant's joint power supplies, at this time just tackle the generated energy of each power plant
Real-time statistics are carried out, its specific method can imitate the situation of a power plant in this implementation to carry out, and the present embodiment will not be repeated here.
Step S103, is determined corresponding with each described target electric appliance according to the current power amount and the current generated energy
Electricity consumption regulation information;
Step S104, each described target electric appliance of control adjusts electricity consumption situation according to the corresponding electricity consumption regulation information,
So that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
The server is calculated according to the current power amount and the current generated energy, it is determined that with each described mesh
The corresponding electricity consumption regulation information of electrical equipment is marked, and electricity consumption regulation information is packaged according to the message format shown in Fig. 4, is sent out
The sensing and controlling device is delivered to, the sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption to target electric appliance
Situation is adjusted, so that the difference of the overall power consumption after regulation and the current generated energy is maintained in default difference range.
As shown in figure 5, be the interaction diagrams (situation of non-relay device) of whole electric power regulating system, be specifically described as
Under:
1st, the information such as current power amount of sensing and controlling device collection target electric appliance;
2nd, sensing and controlling device carries out message encapsulation;
3rd, the message after encapsulation is sent to server by sensing and controlling device;
4th, power plant sends the message for including current generated energy to server;
5th, server is parsed and calculated to the message received, is determined electricity consumption regulation information and is carried out message envelope
Dress;
6th, the message after encapsulation is sent to sensing and controlling device by server;
7th, sensing and controlling device is parsed to the message received;
8th, sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption situation regulation to target electric appliance.
As shown in fig. 6, be the interaction diagrams (situation for having repeater) of whole electric power regulating system, be specifically described as
Under:
1st, the information such as current power amount of sensing and controlling device collection target electric appliance;
2nd, sensing and controlling device carries out message encapsulation;
3rd, the message after encapsulation is sent to repeater by sensing and controlling device;
4th, repeater transmits the message to server;
5th, power plant sends the message for including current generated energy to server;
6th, server is parsed and calculated to the message received, is determined electricity consumption regulation information and is carried out message envelope
Dress;
7th, the message after encapsulation is sent to repeater by server;
8th, repeater transmits the message to sensing and controlling device;
9th, sensing and controlling device is parsed to the message received;
10th, sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption situation regulation to target electric appliance.
It should be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment
Execution sequence should determine that the implementation process without tackling the embodiment of the present invention constitutes any limit with its function and internal logic
It is fixed.
In summary, the embodiment of the present invention obtains the current power amount of each target electric appliance;Obtain the current of target power plant
Generated energy;Electricity consumption regulation corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy
Information;Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that after regulation
The difference of overall power consumption and the current generated energy is maintained in default difference range.By the embodiment of the present invention, according to
Electricity consumption situation is adjusted immediately for power consumption and generated energy so that overall power consumption and the current generated energy after regulation
Difference is maintained in default difference range, i.e., power consumption is in approximate level with generated energy as far as possible, it is ensured that produce
Electric energy be fully utilized.
Embodiment two:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment one is provided,
In this implementation, step S103 determines corresponding with each described target electric appliance according to the current power amount and the current generated energy
Electricity consumption regulation information can include step as shown in Figure 7:
Step S701, the current shape of the target power plant is judged according to the current power amount and the current generated energy
State.
If the current state of the target power plant is the superfluous state that generates electricity, step S702 is performed, if the target power plant
Current state be generation deficiency state, then perform step S703, if the current state of the target power plant be generating equilibrium-like
State, then return to step S101 continuation obtains the current power amount of each target electric appliance.
Step S702, determines the electricity consumption regulation information to improve the first regulation information of power consumption.
Step S703, determines second regulation information of the electricity consumption regulation information for reduction power consumption.
Preferably, as shown in figure 8, the flag bit of characterization information type can be included in message body, for example, can cancel
First bit in body is ceased as the flag bit of characterization information type, and when it takes 0, represent to include in the message body is to carry
First regulation information of high power consumption, when it takes 1, it is the second regulation letter of reduction power consumption to represent what is included in the message body
Breath.
Other contents of the present embodiment are identical with embodiment one, specifically can refer to the description in embodiment one, herein not
Repeat again.
In summary, by the embodiment of the present invention, the current state of target power plant is judged according to power consumption and generated energy, when
When generating electricity superfluous, then power consumption is improved, when generation deficiency, then power consumption is reduced so that power consumption is with the fluctuation of generated energy
Trend and fluctuate, both is reached the state of balance as far as possible, it is ensured that the electric energy produced is fully utilized.
Embodiment three:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment two is provided,
In this implementation, step S701 judges the current state of the target power plant according to the current power amount and the current generated energy
Step as shown in Figure 9 can be included:
Step S901, sums to the current power amount, obtains the first power consumption.
P can be used in the present embodiment1To represent first power consumption, then have:
Wherein, N is the number of the target electric appliance, the target electric appliance is ranked up from 1 to N, pnFor serial number n's
The current power amount of target electric appliance.
Step S902, the second power consumption is determined according to first power consumption and default statistical model.
In the supply district of target power plant, in addition to the target electric appliance, other electrical equipment are also there are, equally
Electric energy is being consumed, therefore first power consumption tried to achieve according to the current power amount of the target electric appliance is only the power supply
In the range of all electrical equipments total electricity consumption a part, this total electricity consumption is second power consumption.
P can be used in the present embodiment2To represent second power consumption, then have:
P2=f (P1)
Wherein, f () is P2With P1Between functional relation, i.e., described statistical model.
According to different situations, different statistical models can be set, carried out below by way of two kinds of simple statistical models
Explanation:
The first power consumption and the second power consumption in model one, statistics preset time, the preset time can be one week,
Can be one month or a season, or 1 year.Determine the first power consumption and the second electricity consumption in this time
The proportionality coefficient of amount, can use K to represent the proportionality coefficient in the present embodiment, subsequently then can be used Proportional coefficient K and
First power consumption estimates the second power consumption, can be formulated as follows:
P2=KP1
The first power consumption and the second power consumption in model two, statistics preset time, the preset time can be one week,
Can be one month or a season, or 1 year.The preset time is divided according to certain time interval
Section, determines the proportionality coefficient of the first power consumption and the second power consumption in each period, for example can be in week age, with one
Individual hour is segmented for interval, then is divided into out 168 sections, M can be used in the present embodiment to represent the number of segmentation, often
The individual period determines a proportionality coefficient, then has 168 proportionality coefficients, k can be used in the present embodimentmTo represent
Proportionality coefficient is stated, wherein 1≤m≤M, in follow-up each week, then can be used the proportionality coefficient k of corresponding period in one weekm
The second power consumption is estimated with the first power consumption, can be formulated as follows:
P2=km P1
It these are only in two kinds of simple statistical models, practical application, other statistics can be chosen as the case may be
Model, the present embodiment is not especially limited to this.
Step S903, judges whether second power consumption is less than the current generated energy.
P can be used in the present embodiment3To represent the current generated energy.
If second power consumption is less than the current generated energy, i.e. P2<P3, then step S904 is performed, if described second uses
Electricity is more than the current generated energy, i.e. P2>P3, then step S905 is performed, if second power consumption is equal to the current generating
Amount, i.e. P2=P3, then step S906 is performed.
Preferably, following determination methods can also be used:If second power consumption be less than the current generated energy and
The absolute value of both differences is more than default threshold value, i.e. P3-P2>ε, then perform step S904, wherein, the threshold is represented using ε
Value, if second power consumption is more than the current generated energy and the absolute value of both differences is more than default threshold value, i.e. P2-P3>
ε, then perform step S905, if the absolute value of the difference of second power consumption and the current generated energy is not more than default threshold
Value, i.e., | P2-P3|<ε, then perform step S906.
Step S904, determines the current state of the target power plant for the superfluous state that generates electricity.
Step S905, the current state for determining the target power plant is generation deficiency state.
Step S906, the current state for determining the target power plant is generating poised state.
Other contents of the present embodiment are identical with embodiment two, specifically can refer to the description in embodiment two, herein not
Repeat again.
In summary, by the embodiment of the present invention, the first power consumption is tried to achieve first, then according to first power consumption and
Default statistical model determines the second power consumption, and mesh is determined by judging the relation between the second power consumption and current generated energy
Mark the current state of power plant.On the premise of statistical model is chosen appropriately, the accuracy of calculating can be improved so as to power consumption
Control it is more accurate.
Example IV:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment three is provided,
In this implementation, as shown in Figure 10, determine the electricity consumption regulation information in step S702 to improve the first regulation information of power consumption
Afterwards, it can also include:
Step S704, is determined according to the current power amount, the current generated energy and default theoretical maximum power consumption
The required amplitude information for improving power consumption.
For a certain target electric appliance, it, which runs power, a maximum limit, then its power consumption is also deposited
In a maximum limit, i.e., described theoretical maximum power consumption.Server is it is determined that, it is necessary to consider every during amplitude of accommodation information
The theoretical maximum power consumption of individual target electric appliance, otherwise, it is possible that the amplitude of accommodation is excessive so that the power consumption after regulation exceeds
The situation of the theoretical maximum power consumption of the target electric appliance, this is clearly irrational, should be evaded.
It is illustrated below:
Assuming that the sum of target electric appliance is 5, the current power amount of each target electric appliance is 10 degree, to the current power
Amount is summed, and obtains the first power consumption for 50 degree, the second power consumption is determined according to the first power consumption and default statistical model,
Assuming that the statistical model is P2=3P1, then can determine that the second power consumption is 150 degree, if current generated energy is 160 degree, then just
10 degree of generated energy has been had more, can now determine to improve the amplitude of power consumption needed for each target electric appliance for 2 degree, thus may be used
Keep the equilibrium relation between power consumption and generated energy.But, if the theoretical maximum power consumption of one of target electric appliance is
10 degree, it is impossible to continue to increase, and the theoretical maximum power consumption of other target electric appliances is 15 degree, then just can not be to theory most
Big power consumption is adjusted for 10 degree of target electric appliance, and the amplitude of raising power consumption is 2.5 needed for determining other target electric appliances
Degree, so, in rational scope, still maintains the equilibrium relation between power consumption and generated energy.
Step S705, the first regulation information is added into by the required amplitude information for improving power consumption.
As shown in fig. 11a, the required amplitude information for improving power consumption can be included in message body.
After step S703 determines the electricity consumption regulation information for the second regulation information of reduction power consumption, in addition to:
Step S706, according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption
Reduce the amplitude information of power consumption.
For a certain target electric appliance, it, which runs power, a minimum limit value, then its power consumption is also deposited
In a minimum limit value, i.e., described theoretical minimum power consumption.Server is it is determined that, it is necessary to consider every during amplitude of accommodation information
The minimum power consumption of theory of individual target electric appliance, otherwise, it is possible that the amplitude of accommodation is excessive so that the power consumption after regulation is less than
The situation of the minimum power consumption of theory of the target electric appliance, this is clearly irrational, should be evaded
Step S707, the second regulation information is added into by the amplitude information of the required reduction power consumption.
As shown in figure 11b, the amplitude information of the required reduction power consumption can be included in message body.
Other contents of the present embodiment are identical with embodiment two, specifically can refer to the description in embodiment two, herein not
Repeat again.
In summary, by the embodiment of the present invention, first according to the current power amount, the current generated energy and default
Theoretical maximum power consumption (or theoretical minimum power consumption) determine needed for improve amplitude information (or the required reduction electricity consumption of power consumption
The amplitude information of amount), the required amplitude information for improving power consumption is then added into the first regulation information (or second
Adjust information), accurate adjustment is carried out according to the actual conditions of each target electric appliance, and in this process, it is contemplated that theory is most
Big power consumption (or theoretical minimum power consumption), it is ensured that the reasonability of regulation.
Embodiment five:
The present embodiment provides further solution on the basis of the electric adjustment method that each above-mentioned embodiment is provided
Scheme, in this embodiment, as shown in figure 12, is adjusted in each described target electric appliance of step S104 controls according to the corresponding electricity consumption
After section information regulation electricity consumption situation, in addition to:
Step S1201, obtains the feedback information of each target electric appliance;
Step S1202, is out of order electrical equipment according to feedback information screening, and the failure electrical equipment is is not fed back or institute
State the target electric appliance of the feedback information for regulation failure information;
Step S1203, resends the corresponding electricity consumption to the failure electrical equipment and adjusts information;
Step S1204, if sending times exceed default threshold value, the failure electrical equipment is moved from the target electric appliance
Remove.
Other contents of the present embodiment are same as the previously described embodiments, specifically can refer to retouching in each above-mentioned embodiment
State, will not be repeated here.
By the embodiment of the present invention, failure electrical equipment can be removed from the target electric appliance in time so that final tune
Nodule fruit will not be influenceed by failure electrical equipment, so as to ensure that the accuracy of regulation.
Embodiment six:
Corresponding to the electric adjustment method described in foregoing embodiments, Figure 13 shows that electric power provided in an embodiment of the present invention is adjusted
The structured flowchart of regulating device, for convenience of description, illustrate only the part related to the embodiment of the present invention.
Reference picture 13, the electric power regulating mechanism can include:
Power consumption acquisition module 1301, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module 1302, the current generated energy for obtaining target power plant;
Adjust information determination module 1303, for according to the current power amount and the current generated energy determine with it is described
The corresponding electricity consumption regulation information of each target electric appliance;
Control module 1304 is adjusted, for controlling each described target electric appliance to be adjusted according to the corresponding electricity consumption regulation information
Electric situation is saved, so that the difference of the overall power consumption after regulation and the current generated energy is maintained at default difference range
It is interior.
Preferably, the regulation information determination module 1303 includes:
State determination unit 13031, for judging the target according to the current power amount and the current generated energy
The current state of power plant;
First regulation information determination unit 13032, if the current state for the target power plant is the superfluous state that generates electricity,
The electricity consumption regulation information is then determined to improve the first regulation information of power consumption;
Second regulation information determination unit 13033, if the current state for the target power plant is generation deficiency state,
Then determine second regulation information of the electricity consumption regulation information for reduction power consumption.
Preferably, the regulation information determination module 1303 also includes:
Increase rate determining unit 13034, for according to the current power amount, the current generated energy and default reason
The amplitude information of power consumption is improved needed for being determined by maximum power consumption;
Increase rate adding device 13035, for the required amplitude information for improving power consumption to be added into described the
One regulation information;
Reduction amplitude determining unit 13036, for according to the current power amount, the generated energy and it is default it is theoretical most
The amplitude information of reduction power consumption needed for small power consumption is determined;
Reduction amplitude adding device 13037, is added into described second by the amplitude information of the required reduction power consumption and adjusts
Save information.
Preferably, the state determination unit 13031 includes:
First power consumption determination subelement 130311, for being summed to the current power amount, obtains the first electricity consumption
Amount;
Second power consumption determination subelement 130312, for according to first power consumption and the determination of default statistical model
Second power consumption;
Subelement 130313 is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement 130314, if being less than the current generated energy for second power consumption, it is determined that institute
The current state of target power plant is stated for the superfluous state that generates electricity;
Second determination subelement 130315, if being more than the current generated energy for second power consumption, it is determined that institute
The current state for stating target power plant is generation deficiency state.
Preferably, described electric power regulating mechanism also includes:
Feedback information acquisition module 1305, the feedback information for obtaining each target electric appliance;
Contingency screening module 1306, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not
Fed back or the feedback information is the target electric appliance for adjusting failure information;
Module 1307 is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module 1308, if exceeding default threshold value for sending times, by the failure electrical equipment from the target
Removed in electrical equipment.
It is apparent to those skilled in the art that, for convenience of description and succinctly, only with above-mentioned each work(
Energy unit, the division progress of module are for example, in practical application, as needed can distribute above-mentioned functions by different
Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completion
The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used
To be that unit is individually physically present, can also two or more units it is integrated in a unit, it is above-mentioned integrated
Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.In addition, each function list
Member, the specific name of module are also only to facilitate mutually differentiation, is not limited to the protection domain of the application.Said system
The specific work process of middle unit, module, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, without detailed description or note in some embodiment
The part of load, may refer to the associated description of other embodiments.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein
Member and algorithm steps, can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually
Performed with hardware or software mode, depending on the application-specific and design constraint of technical scheme.Professional and technical personnel
Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed
The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed apparatus and method, others can be passed through
Mode is realized.For example, system embodiment described above is only schematical, for example, the division of the module or unit,
It is only a kind of division of logic function, there can be other dividing mode when actually realizing, such as multiple units or component can be with
With reference to or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown or discussed
Coupling each other or direct-coupling or communication connection can be by some interfaces, the INDIRECT COUPLING of device or unit or
Communication connection, can be electrical, machinery or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit
The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple
On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs
's.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also
That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list
Member can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized using in the form of SFU software functional unit and as independent production marketing or used
When, it can be stored in a computer read/write memory medium.Understood based on such, the technical scheme of the embodiment of the present invention
The part substantially contributed in other words to prior art or all or part of the technical scheme can be with software products
Form embody, the computer software product is stored in a storage medium, including some instructions are to cause one
Computer equipment (can be personal computer, server, or network equipment etc.) or processor (processor) perform this hair
The all or part of step of each embodiment methods described of bright embodiment.And foregoing storage medium includes:USB flash disk, mobile hard disk,
Read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic
Dish or CD etc. are various can be with the medium of store program codes.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to foregoing reality
Example is applied the present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each
Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed
Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme, all should
Within protection scope of the present invention.
Claims (10)
1. a kind of electric adjustment method, it is characterised in that including:
Obtain the current power amount of each target electric appliance;
Obtain the current generated energy of target power plant;
Electricity consumption regulation letter corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy
Breath;
Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that whole after regulation
The difference of body power consumption and the current generated energy is maintained in default difference range.
2. electric adjustment method according to claim 1, it is characterised in that described according to the current power amount and described
Current generated energy determines that electricity consumption regulation information corresponding with each described target electric appliance includes:
The current state of the target power plant is judged according to the current power amount and the current generated energy;
If the current state of the target power plant is the superfluous state that generates electricity, it is determined that the electricity consumption regulation information is to improve power consumption
First regulation information;
If the current state of the target power plant is generation deficiency state, it is determined that the electricity consumption regulation information is reduction power consumption
Second regulation information.
3. electric adjustment method according to claim 2, it is characterised in that described according to the current power amount and described
Current generated energy judges that the current state of the target power plant includes:
The current power amount is summed, the first power consumption is obtained;
Second power consumption is determined according to first power consumption and default statistical model;
Judge whether second power consumption is less than the current generated energy;
If second power consumption is less than the current generated energy, it is determined that the current state of the target power plant is superfluous to generate electricity
State;
If second power consumption is more than the current generated energy, it is determined that the current state of the target power plant is generation deficiency
State.
4. electric adjustment method according to claim 3, it is characterised in that it is determined that electricity consumption regulation information is raising
After first regulation information of power consumption, in addition to:
Power consumption is improved according to needed for being determined the current power amount, the current generated energy and default theoretical maximum power consumption
Amplitude information;
The required amplitude information for improving power consumption is added into the first regulation information;
Or, after the second regulation information for determining the electricity consumption regulation information to reduce power consumption, in addition to:
The width of power consumption is reduced according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption
Spend information;
The amplitude information of the required reduction power consumption is added into the second regulation information.
5. electric adjustment method according to any one of claim 1 to 4, it is characterised in that in each described mesh of control
After electrical equipment is marked according to the corresponding electricity consumption regulation information regulation electricity consumption situation, in addition to:
Obtain the feedback information of each target electric appliance;
It is out of order electrical equipment according to feedback information screening, the failure electrical equipment is is not fed back or the feedback information is tune
Save the target electric appliance of failure information;
The corresponding electricity consumption regulation information is resend to the failure electrical equipment;
If sending times exceed default threshold value, the failure electrical equipment is removed from the target electric appliance.
6. a kind of electric power regulating mechanism, it is characterised in that including:
Power consumption acquisition module, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module, the current generated energy for obtaining target power plant;
Information determination module is adjusted, for being determined and each described target according to the current power amount and the current generated energy
The corresponding electricity consumption regulation information of electrical equipment;
Control module is adjusted, for controlling each described target electric appliance according to the corresponding electricity consumption regulation information regulation electricity consumption feelings
Condition, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
7. electric power regulating mechanism according to claim 6, it is characterised in that the regulation information determination module includes:
State determination unit, for judging the current of the target power plant according to the current power amount and the current generated energy
State;
First regulation information determination unit, if the current state for the target power plant is the superfluous state that generates electricity, it is determined that institute
Electricity consumption regulation information is stated to improve the first regulation information of power consumption;
Second regulation information determination unit, if the current state for the target power plant is generation deficiency state, it is determined that institute
State second regulation information of the electricity consumption regulation information for reduction power consumption.
8. electric power regulating mechanism according to claim 7, it is characterised in that the state determination unit includes:
First power consumption determination subelement, for being summed to the current power amount, obtains the first power consumption;
Second power consumption determination subelement, for determining the second electricity consumption according to first power consumption and default statistical model
Amount;
Subelement is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement, if being less than the current generated energy for second power consumption, it is determined that the target power plant
Current state be the superfluous state that generates electricity;
Second determination subelement, if being more than the current generated energy for second power consumption, it is determined that the target power plant
Current state be generation deficiency state.
9. electric power regulating mechanism according to claim 8, it is characterised in that the regulation information determination module also includes:
Increase rate determining unit, for being used according to the current power amount, the current generated energy and default theoretical maximum
Electricity improves the amplitude information of power consumption needed for determining;
Increase rate adding device, believes for the required amplitude information for improving power consumption to be added into first regulation
Breath;
Reduction amplitude determining unit, for according to the current power amount, the generated energy and default theoretical minimum power consumption
It is determined that the amplitude information of required reduction power consumption;
Reduction amplitude adding device, the second regulation information is added into by the amplitude information of the required reduction power consumption.
10. the electric power regulating mechanism according to any one of claim 6 to 9, it is characterised in that also include:
Feedback information acquisition module, the feedback information for obtaining each target electric appliance;
Contingency screening module, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not fed back
Or the feedback information is the target electric appliance of regulation failure information;
Module is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module, if exceeding default threshold value for sending times, the failure electrical equipment is moved from the target electric appliance
Remove.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710461668.XA CN107196347B (en) | 2017-06-16 | 2017-06-16 | Power adjusting method and device |
PCT/CN2017/093701 WO2018227707A1 (en) | 2017-06-16 | 2017-07-20 | Power adjustment method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710461668.XA CN107196347B (en) | 2017-06-16 | 2017-06-16 | Power adjusting method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107196347A true CN107196347A (en) | 2017-09-22 |
CN107196347B CN107196347B (en) | 2020-08-04 |
Family
ID=59879777
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710461668.XA Active CN107196347B (en) | 2017-06-16 | 2017-06-16 | Power adjusting method and device |
Country Status (2)
Country | Link |
---|---|
CN (1) | CN107196347B (en) |
WO (1) | WO2018227707A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110989394A (en) * | 2019-12-31 | 2020-04-10 | 海信集团有限公司 | Power control method and device for shared household appliances |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115051416B (en) * | 2022-08-16 | 2022-11-15 | 阿里巴巴(中国)有限公司 | Data processing method, power generation method and device and cloud equipment |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102156468A (en) * | 2011-04-21 | 2011-08-17 | 东莞市瑞柯电机有限公司 | System for complementary power supply between small power station and commercial power grid |
JP2014054003A (en) * | 2012-09-05 | 2014-03-20 | Sharp Corp | Charge/discharge device and charge/discharge system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102723785B (en) * | 2012-07-03 | 2015-10-21 | 广东电网公司电力科学研究院 | The Methods of electric load forecasting gathered based on large user's intelligent terminal and system |
CN104218614A (en) * | 2013-05-29 | 2014-12-17 | 周奇迪 | Method and system for controlling photoelectricity usage in multiple buildings |
CN103676846B (en) * | 2013-11-20 | 2016-02-10 | 常州思普锐电力科技有限公司 | A kind of intelligent control algorithm of Novel household energy management system |
CN105449719B (en) * | 2014-08-26 | 2019-01-04 | 珠海格力电器股份有限公司 | Distributed energy power control method, apparatus and system |
CN106597858B (en) * | 2017-01-17 | 2019-09-06 | 深圳傲华科技有限公司 | Flexible load regulation method and its system towards new energy consumption |
-
2017
- 2017-06-16 CN CN201710461668.XA patent/CN107196347B/en active Active
- 2017-07-20 WO PCT/CN2017/093701 patent/WO2018227707A1/en active Application Filing
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102156468A (en) * | 2011-04-21 | 2011-08-17 | 东莞市瑞柯电机有限公司 | System for complementary power supply between small power station and commercial power grid |
JP2014054003A (en) * | 2012-09-05 | 2014-03-20 | Sharp Corp | Charge/discharge device and charge/discharge system |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110989394A (en) * | 2019-12-31 | 2020-04-10 | 海信集团有限公司 | Power control method and device for shared household appliances |
Also Published As
Publication number | Publication date |
---|---|
WO2018227707A1 (en) | 2018-12-20 |
CN107196347B (en) | 2020-08-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Essiet et al. | Optimized energy consumption model for smart home using improved differential evolution algorithm | |
Chai et al. | Demand response management with multiple utility companies: A two-level game approach | |
Zhou et al. | Distributionally robust co-optimization of energy and reserve for combined distribution networks of power and district heating | |
US20090228324A1 (en) | Method and System for Efficient Energy Distribution in Electrical Grids Using Sensor and Actuator Networks | |
CN109149568B (en) | Interconnected micro-grid based on distributed agent and scheduling price optimization method | |
Maulik et al. | Optimal operation of a droop‐controlled DCMG with generation and load uncertainties | |
CN110675275B (en) | Electric load regulation and control method and system for demand side response application of virtual power plant | |
Wang et al. | Chance constrained unit commitment considering comprehensive modelling of demand response resources | |
CN106992523A (en) | A kind of tidal current computing method for the power system containing photovoltaic and thermic load | |
Mehdi et al. | Electricity consumption constraints for smart-home automation: An overview of models and applications | |
CN105932683B (en) | A kind of load control method and system based on demand response | |
CN104408663A (en) | User demand response dispatching system and method of smart grid | |
CN107196347A (en) | A kind of electric adjustment method and device | |
CN111679573B (en) | Household energy consumption optimization method and device for residents | |
CN105072671B (en) | A kind of advanced self-adapting dispatching method for measuring sensor node in system network | |
Gupta et al. | Optimal placement of D-STATCOM in distribution network using new sensitivity index with probabilistic load models | |
CN109687468A (en) | A kind of micro-capacitance sensor voltage distributed control method based on electric power spring | |
CN109254211A (en) | Control method, device, computer equipment and the storage medium of electrical equipment | |
PADMA et al. | Application of fuzzy and ABC algorithm for DG placement for minimum loss in radial distribution system | |
CN104778507A (en) | Intelligent building power utilization strategy acquiring method based on self-adaptive particle swarm algorithm | |
CN107609690A (en) | A kind of method of load active management decision optimization | |
CN104009469B (en) | A kind of low-voltage distribution network platform district network topology isopleth map collecting method | |
CN110380408A (en) | A kind of power distribution network block planning method containing distributed generation resource | |
CN113224770B (en) | Power grid reactive power partitioning method integrating electrical distance and edge betweenness | |
Luan et al. | Leveraging hybrid probabilistic multi-objective evolutionary algorithm for dynamic tariff design |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Luo Cheng Inventor after: Du Guangdong Inventor before: Du Guangdong |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |