CN107196347A - A kind of electric adjustment method and device - Google Patents

A kind of electric adjustment method and device Download PDF

Info

Publication number
CN107196347A
CN107196347A CN201710461668.XA CN201710461668A CN107196347A CN 107196347 A CN107196347 A CN 107196347A CN 201710461668 A CN201710461668 A CN 201710461668A CN 107196347 A CN107196347 A CN 107196347A
Authority
CN
China
Prior art keywords
power consumption
current
information
generated energy
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710461668.XA
Other languages
Chinese (zh)
Other versions
CN107196347B (en
Inventor
杜光东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Shenglu IoT Communication Technology Co Ltd
Original Assignee
Shenzhen Shenglu IoT Communication Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Shenglu IoT Communication Technology Co Ltd filed Critical Shenzhen Shenglu IoT Communication Technology Co Ltd
Priority to CN201710461668.XA priority Critical patent/CN107196347B/en
Priority to PCT/CN2017/093701 priority patent/WO2018227707A1/en
Publication of CN107196347A publication Critical patent/CN107196347A/en
Application granted granted Critical
Publication of CN107196347B publication Critical patent/CN107196347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers

Abstract

The present invention is applied to internet of things field there is provided a kind of electric adjustment method and device, and methods described includes:Obtain the current power amount of each target electric appliance;Obtain the current generated energy of target power plant;Electricity consumption regulation information corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy;Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.Pass through the embodiment of the present invention, electricity consumption situation is adjusted immediately according to power consumption and generated energy, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range, i.e. power consumption is in approximate level with generated energy as far as possible, it is ensured that the electric energy produced is fully utilized.

Description

A kind of electric adjustment method and device
Technical field
The invention belongs to internet of things field, more particularly to a kind of electric adjustment method and device.
Background technology
Under the overall background of current energy-saving and emission-reduction, the idea of using electricity wisely has been rooted in the hearts of the people, but people often think section About electricity consumption is exactly simply to reduce electricity consumption, and in fact, low when high during power consumption, power consumption shakiness is also the waste to electric energy, For example in certain period, the generated energy of power plant is larger, and power consumption is smaller, and the electricity having more will be wasted, and power plant is often In order to meet the demand on electrical demand peak, need to improve its unit number again, improve generated energy, cause the waste of resource.
How existing power-saving technology and energy saver mostly reduces power consumption if being laid particular emphasis on, and unresolved because of power consumption and hair The waste to electric energy that electricity is mismatched and caused.
The content of the invention
In view of this, the embodiments of the invention provide a kind of electric adjustment method and device, to solve because of power consumption and hair Electricity mismatch and cause to the waste of electric energy the problem of.
The first aspect of the embodiment of the present invention provides a kind of electric adjustment method, including:
Obtain the current power amount of each target electric appliance;
Obtain the current generated energy of target power plant;
Determine that electricity consumption corresponding with each described target electric appliance is adjusted according to the current power amount and the current generated energy Save information;
Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that after regulation The difference of overall power consumption and the current generated energy be maintained in default difference range.
Preferably, it is described to be determined and each described target electric appliance pair with the current generated energy according to the current power amount The electricity consumption regulation information answered includes:
The current state of the target power plant is judged according to the current power amount and the current generated energy;
If the current state of the target power plant is the superfluous state that generates electricity, it is determined that the electricity consumption regulation information is used to improve First regulation information of electricity;
If the current state of the target power plant is generation deficiency state, it is determined that the electricity consumption regulation information is used for reduction Second regulation information of electricity.
Preferably, it is described according to the current power amount and the current generated energy judges the current shape of the target power plant State includes:
The current power amount is summed, the first power consumption is obtained;
Second power consumption is determined according to first power consumption and default statistical model;
Judge whether second power consumption is less than the current generated energy;
If second power consumption is less than the current generated energy, it is determined that the current state of the target power plant is generating Superfluous state;
If second power consumption is more than the current generated energy, it is determined that the current state of the target power plant is generating Not enough state.
Preferably, it is determined that the electricity consumption regulation information for improve power consumption first regulation information after, in addition to:
Improve and use according to needed for being determined the current power amount, the current generated energy and default theoretical maximum power consumption The amplitude information of electricity;
The required amplitude information for improving power consumption is added into the first regulation information;
Or, after the second regulation information for determining the electricity consumption regulation information to reduce power consumption, in addition to:
Power consumption is reduced according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption Amplitude information;
The amplitude information of the required reduction power consumption is added into the second regulation information.
Preferably, each described target electric appliance of control according to the corresponding electricity consumption regulation information regulation electricity consumption situation it Afterwards, in addition to:
Obtain the feedback information of each target electric appliance;
The electrical equipment that is out of order is screened according to the feedback information, the failure electrical equipment is not fed back or the feedback information To adjust the target electric appliance of failure information;
The corresponding electricity consumption regulation information is resend to the failure electrical equipment;
If sending times exceed default threshold value, the failure electrical equipment is removed from the target electric appliance.
The second aspect of the embodiment of the present invention provides a kind of electric power regulating mechanism, including:
Power consumption acquisition module, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module, the current generated energy for obtaining target power plant;
Adjust information determination module, for according to the current power amount and the current generated energy determine with it is described each The corresponding electricity consumption regulation information of target electric appliance;
Control module is adjusted, for controlling each described target electric appliance to be used according to the corresponding electricity consumption regulation information regulation Electric situation, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
Preferably, the regulation information determination module includes:
State determination unit, for judging the target power plant according to the current power amount and the current generated energy Current state;
First regulation information determination unit, if the current state for the target power plant is the superfluous state that generates electricity, really The fixed electricity consumption regulation information adjusts information to improve the first of power consumption;
Second regulation information determination unit, if the current state for the target power plant is generation deficiency state, really The fixed electricity consumption regulation information adjusts information for the second of reduction power consumption.
Preferably, the state determination unit includes:
First power consumption determination subelement, for being summed to the current power amount, obtains the first power consumption;
Second power consumption determination subelement, for determining the second use according to first power consumption and default statistical model Electricity;
Subelement is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement, if being less than the current generated energy for second power consumption, it is determined that the target The current state of power plant is the superfluous state that generates electricity;
Second determination subelement, if being more than the current generated energy for second power consumption, it is determined that the target The current state of power plant is generation deficiency state.
Preferably, the regulation information determination module also includes:
Increase rate determining unit, for according to the current power amount, the current generated energy and it is default it is theoretical most Big power consumption improves the amplitude information of power consumption needed for determining;
Increase rate adding device, for the required amplitude information for improving power consumption to be added into first regulation Information;
Reduction amplitude determining unit, for according to the current power amount, the generated energy and default theoretical minimum use The amplitude information of reduction power consumption needed for electricity is determined;
Reduction amplitude adding device, is added into second regulation by the amplitude information of the required reduction power consumption and believes Breath.
Preferably, described electric power regulating mechanism also includes:
Feedback information acquisition module, the feedback information for obtaining each target electric appliance;
Contingency screening module, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not carry out Feedback or the target electric appliance that the feedback information is regulation failure information;
Module is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module, if exceeding default threshold value for sending times, by the failure electrical equipment from the target electric appliance It is middle to remove.
The beneficial effect that the embodiment of the present invention exists compared with prior art is:The embodiment of the present invention obtains each target electricity The current power amount of device;Obtain the current generated energy of target power plant;It is true according to the current power amount and the current generated energy Fixed electricity consumption regulation information corresponding with each described target electric appliance;Each described target electric appliance of control is according to the corresponding electricity consumption Information regulation electricity consumption situation is adjusted, so that the difference of the overall power consumption and the current generated energy after regulation is maintained at default In difference range.By the embodiment of the present invention, electricity consumption situation is adjusted immediately according to power consumption and generated energy so that regulation The difference of rear overall power consumption and the current generated energy is maintained in default difference range, i.e., power consumption as far as possible and Generated energy is in approximate level, it is ensured that the electric energy produced is fully utilized.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, below will be to embodiment or description of the prior art In required for the accompanying drawing that uses be briefly described, it should be apparent that, drawings in the following description are only some of the present invention Embodiment, for those of ordinary skill in the art, without having to pay creative labor, can also be according to these Accompanying drawing obtains other accompanying drawings.
Fig. 1 is the schematic flow diagram of electric adjustment method provided in an embodiment of the present invention;
Fig. 2 is the power consumption condition schematic diagram of both of which lower water-heater;
Fig. 3 is the pattern diagram that server provided in an embodiment of the present invention is interacted with sensing and controlling device;
Fig. 4 is the message format schematic diagram that server provided in an embodiment of the present invention is interacted with sensing and controlling device;
The interaction diagrams of electric power regulating system in the case of Fig. 5 is non-relay device provided in an embodiment of the present invention;
Fig. 6 is the interaction diagrams of electric power regulating system provided in an embodiment of the present invention in the case of have repeater;
Fig. 7 according to the current power amount and described current is generated electricity in electric adjustment method provided in an embodiment of the present invention Amount determines that electricity consumption corresponding with each described target electric appliance adjusts the schematic flow diagram of information;
Fig. 8 is the message format schematic diagram of the position of type code containing characterization information provided in an embodiment of the present invention;
Fig. 9 according to the current power amount and described current is generated electricity in electric adjustment method provided in an embodiment of the present invention Amount judges the schematic flow diagram of the current state of the target power plant;
Figure 10 is the schematic flow diagram of determination provided in an embodiment of the present invention and addition amplitude information;
Figure 11 is the message format schematic diagram provided in an embodiment of the present invention containing amplitude information;
Figure 12 is screening provided in an embodiment of the present invention and the schematic flow diagram for removing failure electrical equipment;
Figure 13 is the schematic block diagram of electric power regulating mechanism provided in an embodiment of the present invention.
Embodiment
In describing below, in order to illustrate rather than in order to limit, it is proposed that such as tool of particular system structure, technology etc Body details, thoroughly to understand the embodiment of the present invention.However, it will be clear to one skilled in the art that there is no these specific The present invention can also be realized in the other embodiments of details.In other situations, omit to well-known system, device, electricity Road and the detailed description of method, in case unnecessary details hinders description of the invention.
It should be appreciated that ought be in this specification and in the appended claims in use, term " first ", " second " etc. be stated It is, for distinguishing different objects, and to be not intended to describe specific order.Term " comprising " indicate described feature, entirety, Step, operation, the presence of element and/or component, but it is not precluded from one or more of the other feature, entirety, step, operation, member The presence or addition of element, component and/or its set.
It is also understood that the term used in this description of the invention is merely for the sake of the mesh for describing specific embodiment And be not intended to limit the present invention.As used in description of the invention and appended claims, unless on Other situations are hereafter clearly indicated, otherwise " one " of singulative, " one " and "the" are intended to include plural form.
It will be further appreciated that, the term "and/or" used in description of the invention and appended claims is Refer to any combinations of one or more of the associated item listed and be possible to combination, and including these combinations.
As used in this specification and in the appended claims, term " if " can be according to context quilt Be construed to " when ... " or " once " or " in response to determining " or " in response to detecting ".Similarly, phrase " if it is determined that " or " if detecting [described condition or event] " can be interpreted to mean according to context " once it is determined that " or " in response to true It is fixed " or " once detecting [described condition or event] " or " in response to detecting [described condition or event] ".
In order to illustrate technical solutions according to the invention, illustrated below by specific embodiment.
Embodiment one:
As shown in figure 1, the electric adjustment method that the present embodiment is provided can include:
Step S101, obtains the current power amount of each target electric appliance.
Target electric appliance in the present embodiment can include water heater, refrigerator, charging equipment etc. non-promptness electrical equipment.
By taking water heater as an example, general user is to need have hot water can use at night, and it is white to be not relevant for water What it which was heated period, and water heater has heat insulation function, can be maintained after heating for a long time.
It is the power consumption condition schematic diagram of both of which lower water-heater shown in Fig. 2, the pattern one shown in Fig. 2 a is to wash at night Heated, the pattern two shown in Fig. 2 b is to be heated in the afternoon, then maintained using the heat insulation function of water heater before bath Used to evening.
In general, the whole power consumption difference of pattern one and pattern two is little, but pattern one is to have a bath to advance at night Row heating, and this period is the peak period of electricity consumption, pattern two is to be heated in the afternoon, relative to pattern one, this period category In the low ebb phase of electricity consumption.
The effect that the present embodiment is wanted to reach is by by the main electricity consumption period of the target electric appliance of each non-promptness The low power consumption phase is transferred to by peak times of power consumption, the power consumption of each period is in approximate water with generated energy as far as possible It is flat, it is ensured that the electric energy produced is fully utilized.
The executive agent of the present embodiment is carries out the server of electric adjustment, and the server can be by specifically sensing control Device processed obtains the various information including current power amount from target electric appliance, and the sensing and controlling device can be used for collection The various information of target electric appliance, communication interaction etc. is carried out with server.
The sensing and controlling device can be the software unit, hardware cell or soft or hard combination being built in target electric appliance Unit, can also be integrated into as independent suspension member in the target electric appliance.
The server can be communicated with the sensing and controlling device by wired mode, can also pass through wireless parties Formula is communicated, it is preferable that wireless mode is used in this implementation.
As shown in Figure 3 a, it is the signal for the first pattern that the server is interacted with the sensing and controlling device Figure, each sensor control is directly interacted with server, and this pattern is few suitable for target electric appliance number, is distributed model Enclose small scene.In such a mode, the sensing and controlling device is gathered target terminal including current power amount in real time Various information, and these information are directly reported into the server.
As shown in Figure 3 b, it is the signal for second of pattern that the server is interacted with the sensing and controlling device Figure, each sensor control is interacted with server indirectly by repeater, and this pattern is applied to target electric appliance number Mesh is more, the big scene of distribution.In such a mode, the sensing and controlling device gathers target terminal in real time includes current use Various information including electricity, and by these information reportings to repeater, then by repeater by these information reportings to described Server.Shown in figure, only give in the situation of one layer of relaying, practical application, can set as the case may be in multilayer After.
As shown in fig. 4 a, the message format that to be the server interact with the sensing and controlling device, the message Form can include various information that can be including current power amount in message body and message header, the message body, described Message header can include device ID and message SN, and described device ID is used to identify the target electric appliance, is only in the whole network One, not identical with any other target electric appliance, the message SN is used to identify in the message not sent in the same time.Depositing In the case of repeater, as shown in Figure 4 b, the message header can also include repeater ID, the repeater ID for identifying The repeater, in the whole network be it is unique, it is not identical with any other repeater.
Step S102, obtains the current generated energy of target power plant;
Usually, have in power plant special instrument and equipment to its generated energy carry out real-time statistics, by with these instruments Equipment is communicated, you can obtain the current generated energy of power plant.
In the present embodiment, for simplicity, it is assumed that currently an only power plant is powered, i.e., described target electricity Factory, in actual scene, may have multiple power plant's joint power supplies, at this time just tackle the generated energy of each power plant Real-time statistics are carried out, its specific method can imitate the situation of a power plant in this implementation to carry out, and the present embodiment will not be repeated here.
Step S103, is determined corresponding with each described target electric appliance according to the current power amount and the current generated energy Electricity consumption regulation information;
Step S104, each described target electric appliance of control adjusts electricity consumption situation according to the corresponding electricity consumption regulation information, So that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
The server is calculated according to the current power amount and the current generated energy, it is determined that with each described mesh The corresponding electricity consumption regulation information of electrical equipment is marked, and electricity consumption regulation information is packaged according to the message format shown in Fig. 4, is sent out The sensing and controlling device is delivered to, the sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption to target electric appliance Situation is adjusted, so that the difference of the overall power consumption after regulation and the current generated energy is maintained in default difference range.
As shown in figure 5, be the interaction diagrams (situation of non-relay device) of whole electric power regulating system, be specifically described as Under:
1st, the information such as current power amount of sensing and controlling device collection target electric appliance;
2nd, sensing and controlling device carries out message encapsulation;
3rd, the message after encapsulation is sent to server by sensing and controlling device;
4th, power plant sends the message for including current generated energy to server;
5th, server is parsed and calculated to the message received, is determined electricity consumption regulation information and is carried out message envelope Dress;
6th, the message after encapsulation is sent to sensing and controlling device by server;
7th, sensing and controlling device is parsed to the message received;
8th, sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption situation regulation to target electric appliance.
As shown in fig. 6, be the interaction diagrams (situation for having repeater) of whole electric power regulating system, be specifically described as Under:
1st, the information such as current power amount of sensing and controlling device collection target electric appliance;
2nd, sensing and controlling device carries out message encapsulation;
3rd, the message after encapsulation is sent to repeater by sensing and controlling device;
4th, repeater transmits the message to server;
5th, power plant sends the message for including current generated energy to server;
6th, server is parsed and calculated to the message received, is determined electricity consumption regulation information and is carried out message envelope Dress;
7th, the message after encapsulation is sent to repeater by server;
8th, repeater transmits the message to sensing and controlling device;
9th, sensing and controlling device is parsed to the message received;
10th, sensing and controlling device adjusts information according to the electricity consumption received and carries out electricity consumption situation regulation to target electric appliance.
It should be understood that the size of the sequence number of each step is not meant to the priority of execution sequence, each process in above-described embodiment Execution sequence should determine that the implementation process without tackling the embodiment of the present invention constitutes any limit with its function and internal logic It is fixed.
In summary, the embodiment of the present invention obtains the current power amount of each target electric appliance;Obtain the current of target power plant Generated energy;Electricity consumption regulation corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy Information;Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that after regulation The difference of overall power consumption and the current generated energy is maintained in default difference range.By the embodiment of the present invention, according to Electricity consumption situation is adjusted immediately for power consumption and generated energy so that overall power consumption and the current generated energy after regulation Difference is maintained in default difference range, i.e., power consumption is in approximate level with generated energy as far as possible, it is ensured that produce Electric energy be fully utilized.
Embodiment two:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment one is provided, In this implementation, step S103 determines corresponding with each described target electric appliance according to the current power amount and the current generated energy Electricity consumption regulation information can include step as shown in Figure 7:
Step S701, the current shape of the target power plant is judged according to the current power amount and the current generated energy State.
If the current state of the target power plant is the superfluous state that generates electricity, step S702 is performed, if the target power plant Current state be generation deficiency state, then perform step S703, if the current state of the target power plant be generating equilibrium-like State, then return to step S101 continuation obtains the current power amount of each target electric appliance.
Step S702, determines the electricity consumption regulation information to improve the first regulation information of power consumption.
Step S703, determines second regulation information of the electricity consumption regulation information for reduction power consumption.
Preferably, as shown in figure 8, the flag bit of characterization information type can be included in message body, for example, can cancel First bit in body is ceased as the flag bit of characterization information type, and when it takes 0, represent to include in the message body is to carry First regulation information of high power consumption, when it takes 1, it is the second regulation letter of reduction power consumption to represent what is included in the message body Breath.
Other contents of the present embodiment are identical with embodiment one, specifically can refer to the description in embodiment one, herein not Repeat again.
In summary, by the embodiment of the present invention, the current state of target power plant is judged according to power consumption and generated energy, when When generating electricity superfluous, then power consumption is improved, when generation deficiency, then power consumption is reduced so that power consumption is with the fluctuation of generated energy Trend and fluctuate, both is reached the state of balance as far as possible, it is ensured that the electric energy produced is fully utilized.
Embodiment three:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment two is provided, In this implementation, step S701 judges the current state of the target power plant according to the current power amount and the current generated energy Step as shown in Figure 9 can be included:
Step S901, sums to the current power amount, obtains the first power consumption.
P can be used in the present embodiment1To represent first power consumption, then have:
Wherein, N is the number of the target electric appliance, the target electric appliance is ranked up from 1 to N, pnFor serial number n's The current power amount of target electric appliance.
Step S902, the second power consumption is determined according to first power consumption and default statistical model.
In the supply district of target power plant, in addition to the target electric appliance, other electrical equipment are also there are, equally Electric energy is being consumed, therefore first power consumption tried to achieve according to the current power amount of the target electric appliance is only the power supply In the range of all electrical equipments total electricity consumption a part, this total electricity consumption is second power consumption.
P can be used in the present embodiment2To represent second power consumption, then have:
P2=f (P1)
Wherein, f () is P2With P1Between functional relation, i.e., described statistical model.
According to different situations, different statistical models can be set, carried out below by way of two kinds of simple statistical models Explanation:
The first power consumption and the second power consumption in model one, statistics preset time, the preset time can be one week, Can be one month or a season, or 1 year.Determine the first power consumption and the second electricity consumption in this time The proportionality coefficient of amount, can use K to represent the proportionality coefficient in the present embodiment, subsequently then can be used Proportional coefficient K and First power consumption estimates the second power consumption, can be formulated as follows:
P2=KP1
The first power consumption and the second power consumption in model two, statistics preset time, the preset time can be one week, Can be one month or a season, or 1 year.The preset time is divided according to certain time interval Section, determines the proportionality coefficient of the first power consumption and the second power consumption in each period, for example can be in week age, with one Individual hour is segmented for interval, then is divided into out 168 sections, M can be used in the present embodiment to represent the number of segmentation, often The individual period determines a proportionality coefficient, then has 168 proportionality coefficients, k can be used in the present embodimentmTo represent Proportionality coefficient is stated, wherein 1≤m≤M, in follow-up each week, then can be used the proportionality coefficient k of corresponding period in one weekm The second power consumption is estimated with the first power consumption, can be formulated as follows:
P2=km P1
It these are only in two kinds of simple statistical models, practical application, other statistics can be chosen as the case may be Model, the present embodiment is not especially limited to this.
Step S903, judges whether second power consumption is less than the current generated energy.
P can be used in the present embodiment3To represent the current generated energy.
If second power consumption is less than the current generated energy, i.e. P2<P3, then step S904 is performed, if described second uses Electricity is more than the current generated energy, i.e. P2>P3, then step S905 is performed, if second power consumption is equal to the current generating Amount, i.e. P2=P3, then step S906 is performed.
Preferably, following determination methods can also be used:If second power consumption be less than the current generated energy and The absolute value of both differences is more than default threshold value, i.e. P3-P2>ε, then perform step S904, wherein, the threshold is represented using ε Value, if second power consumption is more than the current generated energy and the absolute value of both differences is more than default threshold value, i.e. P2-P3> ε, then perform step S905, if the absolute value of the difference of second power consumption and the current generated energy is not more than default threshold Value, i.e., | P2-P3|<ε, then perform step S906.
Step S904, determines the current state of the target power plant for the superfluous state that generates electricity.
Step S905, the current state for determining the target power plant is generation deficiency state.
Step S906, the current state for determining the target power plant is generating poised state.
Other contents of the present embodiment are identical with embodiment two, specifically can refer to the description in embodiment two, herein not Repeat again.
In summary, by the embodiment of the present invention, the first power consumption is tried to achieve first, then according to first power consumption and Default statistical model determines the second power consumption, and mesh is determined by judging the relation between the second power consumption and current generated energy Mark the current state of power plant.On the premise of statistical model is chosen appropriately, the accuracy of calculating can be improved so as to power consumption Control it is more accurate.
Example IV:
The present embodiment provides further solution on the basis of the electric adjustment method that embodiment three is provided, In this implementation, as shown in Figure 10, determine the electricity consumption regulation information in step S702 to improve the first regulation information of power consumption Afterwards, it can also include:
Step S704, is determined according to the current power amount, the current generated energy and default theoretical maximum power consumption The required amplitude information for improving power consumption.
For a certain target electric appliance, it, which runs power, a maximum limit, then its power consumption is also deposited In a maximum limit, i.e., described theoretical maximum power consumption.Server is it is determined that, it is necessary to consider every during amplitude of accommodation information The theoretical maximum power consumption of individual target electric appliance, otherwise, it is possible that the amplitude of accommodation is excessive so that the power consumption after regulation exceeds The situation of the theoretical maximum power consumption of the target electric appliance, this is clearly irrational, should be evaded.
It is illustrated below:
Assuming that the sum of target electric appliance is 5, the current power amount of each target electric appliance is 10 degree, to the current power Amount is summed, and obtains the first power consumption for 50 degree, the second power consumption is determined according to the first power consumption and default statistical model, Assuming that the statistical model is P2=3P1, then can determine that the second power consumption is 150 degree, if current generated energy is 160 degree, then just 10 degree of generated energy has been had more, can now determine to improve the amplitude of power consumption needed for each target electric appliance for 2 degree, thus may be used Keep the equilibrium relation between power consumption and generated energy.But, if the theoretical maximum power consumption of one of target electric appliance is 10 degree, it is impossible to continue to increase, and the theoretical maximum power consumption of other target electric appliances is 15 degree, then just can not be to theory most Big power consumption is adjusted for 10 degree of target electric appliance, and the amplitude of raising power consumption is 2.5 needed for determining other target electric appliances Degree, so, in rational scope, still maintains the equilibrium relation between power consumption and generated energy.
Step S705, the first regulation information is added into by the required amplitude information for improving power consumption.
As shown in fig. 11a, the required amplitude information for improving power consumption can be included in message body.
After step S703 determines the electricity consumption regulation information for the second regulation information of reduction power consumption, in addition to:
Step S706, according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption Reduce the amplitude information of power consumption.
For a certain target electric appliance, it, which runs power, a minimum limit value, then its power consumption is also deposited In a minimum limit value, i.e., described theoretical minimum power consumption.Server is it is determined that, it is necessary to consider every during amplitude of accommodation information The minimum power consumption of theory of individual target electric appliance, otherwise, it is possible that the amplitude of accommodation is excessive so that the power consumption after regulation is less than The situation of the minimum power consumption of theory of the target electric appliance, this is clearly irrational, should be evaded
Step S707, the second regulation information is added into by the amplitude information of the required reduction power consumption.
As shown in figure 11b, the amplitude information of the required reduction power consumption can be included in message body.
Other contents of the present embodiment are identical with embodiment two, specifically can refer to the description in embodiment two, herein not Repeat again.
In summary, by the embodiment of the present invention, first according to the current power amount, the current generated energy and default Theoretical maximum power consumption (or theoretical minimum power consumption) determine needed for improve amplitude information (or the required reduction electricity consumption of power consumption The amplitude information of amount), the required amplitude information for improving power consumption is then added into the first regulation information (or second Adjust information), accurate adjustment is carried out according to the actual conditions of each target electric appliance, and in this process, it is contemplated that theory is most Big power consumption (or theoretical minimum power consumption), it is ensured that the reasonability of regulation.
Embodiment five:
The present embodiment provides further solution on the basis of the electric adjustment method that each above-mentioned embodiment is provided Scheme, in this embodiment, as shown in figure 12, is adjusted in each described target electric appliance of step S104 controls according to the corresponding electricity consumption After section information regulation electricity consumption situation, in addition to:
Step S1201, obtains the feedback information of each target electric appliance;
Step S1202, is out of order electrical equipment according to feedback information screening, and the failure electrical equipment is is not fed back or institute State the target electric appliance of the feedback information for regulation failure information;
Step S1203, resends the corresponding electricity consumption to the failure electrical equipment and adjusts information;
Step S1204, if sending times exceed default threshold value, the failure electrical equipment is moved from the target electric appliance Remove.
Other contents of the present embodiment are same as the previously described embodiments, specifically can refer to retouching in each above-mentioned embodiment State, will not be repeated here.
By the embodiment of the present invention, failure electrical equipment can be removed from the target electric appliance in time so that final tune Nodule fruit will not be influenceed by failure electrical equipment, so as to ensure that the accuracy of regulation.
Embodiment six:
Corresponding to the electric adjustment method described in foregoing embodiments, Figure 13 shows that electric power provided in an embodiment of the present invention is adjusted The structured flowchart of regulating device, for convenience of description, illustrate only the part related to the embodiment of the present invention.
Reference picture 13, the electric power regulating mechanism can include:
Power consumption acquisition module 1301, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module 1302, the current generated energy for obtaining target power plant;
Adjust information determination module 1303, for according to the current power amount and the current generated energy determine with it is described The corresponding electricity consumption regulation information of each target electric appliance;
Control module 1304 is adjusted, for controlling each described target electric appliance to be adjusted according to the corresponding electricity consumption regulation information Electric situation is saved, so that the difference of the overall power consumption after regulation and the current generated energy is maintained at default difference range It is interior.
Preferably, the regulation information determination module 1303 includes:
State determination unit 13031, for judging the target according to the current power amount and the current generated energy The current state of power plant;
First regulation information determination unit 13032, if the current state for the target power plant is the superfluous state that generates electricity, The electricity consumption regulation information is then determined to improve the first regulation information of power consumption;
Second regulation information determination unit 13033, if the current state for the target power plant is generation deficiency state, Then determine second regulation information of the electricity consumption regulation information for reduction power consumption.
Preferably, the regulation information determination module 1303 also includes:
Increase rate determining unit 13034, for according to the current power amount, the current generated energy and default reason The amplitude information of power consumption is improved needed for being determined by maximum power consumption;
Increase rate adding device 13035, for the required amplitude information for improving power consumption to be added into described the One regulation information;
Reduction amplitude determining unit 13036, for according to the current power amount, the generated energy and it is default it is theoretical most The amplitude information of reduction power consumption needed for small power consumption is determined;
Reduction amplitude adding device 13037, is added into described second by the amplitude information of the required reduction power consumption and adjusts Save information.
Preferably, the state determination unit 13031 includes:
First power consumption determination subelement 130311, for being summed to the current power amount, obtains the first electricity consumption Amount;
Second power consumption determination subelement 130312, for according to first power consumption and the determination of default statistical model Second power consumption;
Subelement 130313 is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement 130314, if being less than the current generated energy for second power consumption, it is determined that institute The current state of target power plant is stated for the superfluous state that generates electricity;
Second determination subelement 130315, if being more than the current generated energy for second power consumption, it is determined that institute The current state for stating target power plant is generation deficiency state.
Preferably, described electric power regulating mechanism also includes:
Feedback information acquisition module 1305, the feedback information for obtaining each target electric appliance;
Contingency screening module 1306, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not Fed back or the feedback information is the target electric appliance for adjusting failure information;
Module 1307 is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module 1308, if exceeding default threshold value for sending times, by the failure electrical equipment from the target Removed in electrical equipment.
It is apparent to those skilled in the art that, for convenience of description and succinctly, only with above-mentioned each work( Energy unit, the division progress of module are for example, in practical application, as needed can distribute above-mentioned functions by different Functional unit, module are completed, i.e., the internal structure of described device is divided into different functional unit or module, more than completion The all or part of function of description.Each functional unit, module in embodiment can be integrated in a processing unit, also may be used To be that unit is individually physically present, can also two or more units it is integrated in a unit, it is above-mentioned integrated Unit can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.In addition, each function list Member, the specific name of module are also only to facilitate mutually differentiation, is not limited to the protection domain of the application.Said system The specific work process of middle unit, module, may be referred to the corresponding process in preceding method embodiment, will not be repeated here.
In the above-described embodiments, the description to each embodiment all emphasizes particularly on different fields, without detailed description or note in some embodiment The part of load, may refer to the associated description of other embodiments.
Those of ordinary skill in the art are it is to be appreciated that the list of each example described with reference to the embodiments described herein Member and algorithm steps, can be realized with the combination of electronic hardware or computer software and electronic hardware.These functions are actually Performed with hardware or software mode, depending on the application-specific and design constraint of technical scheme.Professional and technical personnel Described function can be realized using distinct methods to each specific application, but this realization is it is not considered that exceed The scope of the present invention.
In embodiment provided by the present invention, it should be understood that disclosed apparatus and method, others can be passed through Mode is realized.For example, system embodiment described above is only schematical, for example, the division of the module or unit, It is only a kind of division of logic function, there can be other dividing mode when actually realizing, such as multiple units or component can be with With reference to or be desirably integrated into another system, or some features can be ignored, or not perform.It is another, it is shown or discussed Coupling each other or direct-coupling or communication connection can be by some interfaces, the INDIRECT COUPLING of device or unit or Communication connection, can be electrical, machinery or other forms.
The unit illustrated as separating component can be or may not be it is physically separate, it is aobvious as unit The part shown can be or may not be physical location, you can with positioned at a place, or can also be distributed to multiple On NE.Some or all of unit therein can be selected to realize the mesh of this embodiment scheme according to the actual needs 's.
In addition, each functional unit in each embodiment of the invention can be integrated in a processing unit, can also That unit is individually physically present, can also two or more units it is integrated in a unit.Above-mentioned integrated list Member can both be realized in the form of hardware, it would however also be possible to employ the form of SFU software functional unit is realized.
If the integrated unit is realized using in the form of SFU software functional unit and as independent production marketing or used When, it can be stored in a computer read/write memory medium.Understood based on such, the technical scheme of the embodiment of the present invention The part substantially contributed in other words to prior art or all or part of the technical scheme can be with software products Form embody, the computer software product is stored in a storage medium, including some instructions are to cause one Computer equipment (can be personal computer, server, or network equipment etc.) or processor (processor) perform this hair The all or part of step of each embodiment methods described of bright embodiment.And foregoing storage medium includes:USB flash disk, mobile hard disk, Read-only storage (ROM, Read-Only Memory), random access memory (RAM, Random Access Memory), magnetic Dish or CD etc. are various can be with the medium of store program codes.
Embodiment described above is merely illustrative of the technical solution of the present invention, rather than its limitations;Although with reference to foregoing reality Example is applied the present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each Technical scheme described in embodiment is modified, or carries out equivalent substitution to which part technical characteristic;And these are changed Or replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme, all should Within protection scope of the present invention.

Claims (10)

1. a kind of electric adjustment method, it is characterised in that including:
Obtain the current power amount of each target electric appliance;
Obtain the current generated energy of target power plant;
Electricity consumption regulation letter corresponding with each described target electric appliance is determined according to the current power amount and the current generated energy Breath;
Each described target electric appliance of control is according to the corresponding electricity consumption regulation information regulation electricity consumption situation, so that whole after regulation The difference of body power consumption and the current generated energy is maintained in default difference range.
2. electric adjustment method according to claim 1, it is characterised in that described according to the current power amount and described Current generated energy determines that electricity consumption regulation information corresponding with each described target electric appliance includes:
The current state of the target power plant is judged according to the current power amount and the current generated energy;
If the current state of the target power plant is the superfluous state that generates electricity, it is determined that the electricity consumption regulation information is to improve power consumption First regulation information;
If the current state of the target power plant is generation deficiency state, it is determined that the electricity consumption regulation information is reduction power consumption Second regulation information.
3. electric adjustment method according to claim 2, it is characterised in that described according to the current power amount and described Current generated energy judges that the current state of the target power plant includes:
The current power amount is summed, the first power consumption is obtained;
Second power consumption is determined according to first power consumption and default statistical model;
Judge whether second power consumption is less than the current generated energy;
If second power consumption is less than the current generated energy, it is determined that the current state of the target power plant is superfluous to generate electricity State;
If second power consumption is more than the current generated energy, it is determined that the current state of the target power plant is generation deficiency State.
4. electric adjustment method according to claim 3, it is characterised in that it is determined that electricity consumption regulation information is raising After first regulation information of power consumption, in addition to:
Power consumption is improved according to needed for being determined the current power amount, the current generated energy and default theoretical maximum power consumption Amplitude information;
The required amplitude information for improving power consumption is added into the first regulation information;
Or, after the second regulation information for determining the electricity consumption regulation information to reduce power consumption, in addition to:
The width of power consumption is reduced according to needed for being determined the current power amount, the generated energy and default theoretical minimum power consumption Spend information;
The amplitude information of the required reduction power consumption is added into the second regulation information.
5. electric adjustment method according to any one of claim 1 to 4, it is characterised in that in each described mesh of control After electrical equipment is marked according to the corresponding electricity consumption regulation information regulation electricity consumption situation, in addition to:
Obtain the feedback information of each target electric appliance;
It is out of order electrical equipment according to feedback information screening, the failure electrical equipment is is not fed back or the feedback information is tune Save the target electric appliance of failure information;
The corresponding electricity consumption regulation information is resend to the failure electrical equipment;
If sending times exceed default threshold value, the failure electrical equipment is removed from the target electric appliance.
6. a kind of electric power regulating mechanism, it is characterised in that including:
Power consumption acquisition module, the current power amount for obtaining each target electric appliance;
Generated energy acquisition module, the current generated energy for obtaining target power plant;
Information determination module is adjusted, for being determined and each described target according to the current power amount and the current generated energy The corresponding electricity consumption regulation information of electrical equipment;
Control module is adjusted, for controlling each described target electric appliance according to the corresponding electricity consumption regulation information regulation electricity consumption feelings Condition, so that the difference of the overall power consumption and the current generated energy after regulation is maintained in default difference range.
7. electric power regulating mechanism according to claim 6, it is characterised in that the regulation information determination module includes:
State determination unit, for judging the current of the target power plant according to the current power amount and the current generated energy State;
First regulation information determination unit, if the current state for the target power plant is the superfluous state that generates electricity, it is determined that institute Electricity consumption regulation information is stated to improve the first regulation information of power consumption;
Second regulation information determination unit, if the current state for the target power plant is generation deficiency state, it is determined that institute State second regulation information of the electricity consumption regulation information for reduction power consumption.
8. electric power regulating mechanism according to claim 7, it is characterised in that the state determination unit includes:
First power consumption determination subelement, for being summed to the current power amount, obtains the first power consumption;
Second power consumption determination subelement, for determining the second electricity consumption according to first power consumption and default statistical model Amount;
Subelement is judged, for judging whether second power consumption is less than the current generated energy;
First determination subelement, if being less than the current generated energy for second power consumption, it is determined that the target power plant Current state be the superfluous state that generates electricity;
Second determination subelement, if being more than the current generated energy for second power consumption, it is determined that the target power plant Current state be generation deficiency state.
9. electric power regulating mechanism according to claim 8, it is characterised in that the regulation information determination module also includes:
Increase rate determining unit, for being used according to the current power amount, the current generated energy and default theoretical maximum Electricity improves the amplitude information of power consumption needed for determining;
Increase rate adding device, believes for the required amplitude information for improving power consumption to be added into first regulation Breath;
Reduction amplitude determining unit, for according to the current power amount, the generated energy and default theoretical minimum power consumption It is determined that the amplitude information of required reduction power consumption;
Reduction amplitude adding device, the second regulation information is added into by the amplitude information of the required reduction power consumption.
10. the electric power regulating mechanism according to any one of claim 6 to 9, it is characterised in that also include:
Feedback information acquisition module, the feedback information for obtaining each target electric appliance;
Contingency screening module, for screening the electrical equipment that is out of order according to the feedback information, the failure electrical equipment is not fed back Or the feedback information is the target electric appliance of regulation failure information;
Module is retransmitted, information is adjusted for resending the corresponding electricity consumption to the failure electrical equipment;
Remove module, if exceeding default threshold value for sending times, the failure electrical equipment is moved from the target electric appliance Remove.
CN201710461668.XA 2017-06-16 2017-06-16 Power adjusting method and device Active CN107196347B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201710461668.XA CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device
PCT/CN2017/093701 WO2018227707A1 (en) 2017-06-16 2017-07-20 Power adjustment method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710461668.XA CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device

Publications (2)

Publication Number Publication Date
CN107196347A true CN107196347A (en) 2017-09-22
CN107196347B CN107196347B (en) 2020-08-04

Family

ID=59879777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710461668.XA Active CN107196347B (en) 2017-06-16 2017-06-16 Power adjusting method and device

Country Status (2)

Country Link
CN (1) CN107196347B (en)
WO (1) WO2018227707A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110989394A (en) * 2019-12-31 2020-04-10 海信集团有限公司 Power control method and device for shared household appliances

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115051416B (en) * 2022-08-16 2022-11-15 阿里巴巴(中国)有限公司 Data processing method, power generation method and device and cloud equipment

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156468A (en) * 2011-04-21 2011-08-17 东莞市瑞柯电机有限公司 System for complementary power supply between small power station and commercial power grid
JP2014054003A (en) * 2012-09-05 2014-03-20 Sharp Corp Charge/discharge device and charge/discharge system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102723785B (en) * 2012-07-03 2015-10-21 广东电网公司电力科学研究院 The Methods of electric load forecasting gathered based on large user's intelligent terminal and system
CN104218614A (en) * 2013-05-29 2014-12-17 周奇迪 Method and system for controlling photoelectricity usage in multiple buildings
CN103676846B (en) * 2013-11-20 2016-02-10 常州思普锐电力科技有限公司 A kind of intelligent control algorithm of Novel household energy management system
CN105449719B (en) * 2014-08-26 2019-01-04 珠海格力电器股份有限公司 Distributed energy power control method, apparatus and system
CN106597858B (en) * 2017-01-17 2019-09-06 深圳傲华科技有限公司 Flexible load regulation method and its system towards new energy consumption

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102156468A (en) * 2011-04-21 2011-08-17 东莞市瑞柯电机有限公司 System for complementary power supply between small power station and commercial power grid
JP2014054003A (en) * 2012-09-05 2014-03-20 Sharp Corp Charge/discharge device and charge/discharge system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110989394A (en) * 2019-12-31 2020-04-10 海信集团有限公司 Power control method and device for shared household appliances

Also Published As

Publication number Publication date
WO2018227707A1 (en) 2018-12-20
CN107196347B (en) 2020-08-04

Similar Documents

Publication Publication Date Title
Essiet et al. Optimized energy consumption model for smart home using improved differential evolution algorithm
Chai et al. Demand response management with multiple utility companies: A two-level game approach
Zhou et al. Distributionally robust co-optimization of energy and reserve for combined distribution networks of power and district heating
US20090228324A1 (en) Method and System for Efficient Energy Distribution in Electrical Grids Using Sensor and Actuator Networks
CN109149568B (en) Interconnected micro-grid based on distributed agent and scheduling price optimization method
Maulik et al. Optimal operation of a droop‐controlled DCMG with generation and load uncertainties
CN110675275B (en) Electric load regulation and control method and system for demand side response application of virtual power plant
Wang et al. Chance constrained unit commitment considering comprehensive modelling of demand response resources
CN106992523A (en) A kind of tidal current computing method for the power system containing photovoltaic and thermic load
Mehdi et al. Electricity consumption constraints for smart-home automation: An overview of models and applications
CN105932683B (en) A kind of load control method and system based on demand response
CN104408663A (en) User demand response dispatching system and method of smart grid
CN107196347A (en) A kind of electric adjustment method and device
CN111679573B (en) Household energy consumption optimization method and device for residents
CN105072671B (en) A kind of advanced self-adapting dispatching method for measuring sensor node in system network
Gupta et al. Optimal placement of D-STATCOM in distribution network using new sensitivity index with probabilistic load models
CN109687468A (en) A kind of micro-capacitance sensor voltage distributed control method based on electric power spring
CN109254211A (en) Control method, device, computer equipment and the storage medium of electrical equipment
PADMA et al. Application of fuzzy and ABC algorithm for DG placement for minimum loss in radial distribution system
CN104778507A (en) Intelligent building power utilization strategy acquiring method based on self-adaptive particle swarm algorithm
CN107609690A (en) A kind of method of load active management decision optimization
CN104009469B (en) A kind of low-voltage distribution network platform district network topology isopleth map collecting method
CN110380408A (en) A kind of power distribution network block planning method containing distributed generation resource
CN113224770B (en) Power grid reactive power partitioning method integrating electrical distance and edge betweenness
Luan et al. Leveraging hybrid probabilistic multi-objective evolutionary algorithm for dynamic tariff design

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Luo Cheng

Inventor after: Du Guangdong

Inventor before: Du Guangdong

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant