CN107194553A - A kind of software and hardware appraisal procedure for being applied to bid - Google Patents

A kind of software and hardware appraisal procedure for being applied to bid Download PDF

Info

Publication number
CN107194553A
CN107194553A CN201710328994.3A CN201710328994A CN107194553A CN 107194553 A CN107194553 A CN 107194553A CN 201710328994 A CN201710328994 A CN 201710328994A CN 107194553 A CN107194553 A CN 107194553A
Authority
CN
China
Prior art keywords
bid
final election
project
hardware
software
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710328994.3A
Other languages
Chinese (zh)
Inventor
荣浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Jianbo Information Technology Co Ltd
Original Assignee
Anhui Jianbo Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Jianbo Information Technology Co Ltd filed Critical Anhui Jianbo Information Technology Co Ltd
Priority to CN201710328994.3A priority Critical patent/CN107194553A/en
Publication of CN107194553A publication Critical patent/CN107194553A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of software and hardware appraisal procedure for being applied to bid, selected by the progressive formula to the object that calls for bid, bid object is selected from strength, innovation and development speed, qualification etc. are many-sided, the development in all directions of the professional virtue and vocational skills of final contractor can be ensured, so as to be laid the foundation for the completion project for bidding of high-effect high-quality.Also ensure that the contractor selected, to the familiarity of project for bidding, so as to improve construction quality, saves engineering time.

Description

A kind of software and hardware appraisal procedure for being applied to bid
Technical field
The present invention relates to bid technical field, more particularly to a kind of software and hardware appraisal procedure for being applied to bid.
Background technology
Bid is condition and the requirement for disclosing goods, engineering or services procurement within the specific limits, invites numerous bidders Bid is participated in, and therefrom selects according to regulation program a kind of marketing behavior of trading object.
At present, in bidding process, assessment object is bid prospectus, and assessment object is single, and evidence is insufficient, is unfavorable for recruiting Correct judgement is made to tenderer in mark side.
The content of the invention
The technical problem existed based on background technology, the present invention proposes a kind of software and hardware assessment side for being applied to bid Method.
A kind of software and hardware appraisal procedure for being applied to bid proposed by the present invention, comprises the following steps:
S1, reception bid prospectus, and according to bid prospectus preliminary screening preparation object;
The history construction plan book of projects since S2, each prepared object foundation of acquisition, and obtain each prepared object trick The target construction plan book of mark project;
S3, the history construction plan book of each prepared object arranged according to Production Time, with the order drawn near With reference to history construction plan book analysis preparation object technology progress speed and renewal of the equipment speed;
S4, according to technological progress speed and renewal of the equipment speed assign preparation object one progressive rate value, according to target Construction plan book degree of perfection assigns preparation one engineering project score value of object;
S5, final election object screened from preparation object according to progressive rate value and engineering project point;
S6, for each final election object, choose in its history engineering with the immediate engineering project of project for bidding as a comparison Project;
S7, according to each contrast project final election object similarity score corresponding with the similarity degree imparting of project for bidding, and Contractor is chosen from final election object according to similarity score.
Preferably, in step S4, progressive rate value=(technological progress speed × 2+ renewal of the equipment speed)/3.
Preferably, in step S4, construction plan book degree of perfection can regard scoring average as work by assessing participant's scoring Journey meter divide value.
Preferably, in step S5, progressive rate value and engineering project point is substituted into default final election model and calculate final election point, Then final election object is taken according to final election sorting.
Preferably, in step S5, final election model is:Final election point=(progressive rate value+engineering project point × 2)/3.
Preferably, in step S5, final election object is chosen according to final election point score value or ranking.
In the present invention, the primary election by step S1 to bid prospectus, it is ensured that preparation object possesses basic quality, reduces Follow-up screening operation amount;By step S2-S5, the test and appraisal of the creative quality and development potentiality to preparation object can be achieved, and can Ensure contractor to the perfect of the preparation of highway bids;Pass through step S6 and S7, it is ensured that the contractor selected is to bid The familiarity of project, so as to improve construction quality, saves engineering time.
In the present invention, selected by the progressive formula to the object that calls for bid, from strength, innovation and development speed, qualification Bid object is selected Deng many-sided, it is ensured that the professional virtue of final contractor and the hair in all directions of vocational skills Exhibition, so as to be laid the foundation for the completion project for bidding of high-effect high-quality.Also ensure the contractor selected to the ripe of project for bidding Degree is known, so as to improve construction quality, engineering time is saved.
Brief description of the drawings
Fig. 1 is a kind of software and hardware appraisal procedure flow chart for being applied to bid proposed by the present invention.
Embodiment
A kind of reference picture 1, software and hardware appraisal procedure for being applied to bid proposed by the present invention, comprises the following steps.
S1, reception bid prospectus, and according to bid prospectus preliminary screening preparation object.
In this step, preferred the underproof bid prospectus of form can be deleted, then obtain bid evaluator to remaining Each bid prospectus of specification is scored, and then chooses prepared object automatically according to score.Specifically, it is forward to choose score value Bid prospectus correspondence unit be used as preparation object.
The history construction plan book of projects since S2, each prepared object foundation of acquisition, and obtain each prepared object trick The target construction plan book of mark project.
S3, the history construction plan book of each prepared object arranged according to Production Time, with the order drawn near With reference to history construction plan book analysis preparation object technology progress speed and renewal of the equipment speed.
In this step, the interval time computing technique progress between the two parts of construction plan books that can be had made marked progress according to tool Speed and renewal of the equipment speed, specifically, the interval time technically having between two parts of construction plan books having made marked progress get over Long, then technological progress speed is lower;Has the interval time between two parts of construction plan books having made marked progress in construction equipment Longer, then equipment advance speed is lower.
S4, according to technological progress speed and renewal of the equipment speed assign preparation object one progressive rate value, according to target Construction plan book degree of perfection assigns preparation one engineering project score value of object.In this step, carried out based on technological progress single The progressive rate value evaluation in position, specifically, progressive rate value=(technological progress speed × 2+ renewal of the equipment speed)/3.
In this step, construction plan book degree of perfection can regard scoring average as engineering project by assessing participant's scoring Score value, will pass through artificial scoring, improves the flexibility evaluated and validity.
S5、
Progressive rate value and engineering project point are substituted into default final election model calculating final election to divide, then sorted according to final election Take final election object
, final election model is:Final election point=(progressive rate value+engineering project point × 2)/3.Specifically, in this step, according to Final election point score value or ranking choose final election object.In this way, final election point is calculated automatically with reference to final election model, and it is automatic to preparation pair As being ranked up, be conducive to improving operating efficiency.
S6, for each final election object, choose in its history engineering with the immediate engineering project of project for bidding as a comparison Project.
S7, according to each contrast project final election object similarity score corresponding with the similarity degree imparting of project for bidding, and Contractor is chosen from final election object according to similarity score.
With reference to step S6 and S7, it can be scored by manually for comparative run purpose similarity, and the average conduct that will score Similarity score, then chooses similarity score highest final election object and is used as contractor.So, it is ensured that the contractor selected To the familiarity of project for bidding, so as to improve construction quality, engineering time is saved.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (6)

1. a kind of software and hardware appraisal procedure for being applied to bid, it is characterised in that comprise the following steps:
S1, reception bid prospectus, and according to bid prospectus preliminary screening preparation object;
The history construction plan book of projects since S2, each prepared object foundation of acquisition, and obtain each prepared object bid item Purpose target construction plan book;
S3, the history construction plan book of each prepared object arranged according to Production Time, combined with the order drawn near History construction plan book analysis preparation object technology progress speed and renewal of the equipment speed;
S4, according to technological progress speed and renewal of the equipment speed assign preparation object one progressive rate value, constructed according to target Prospectus degree of perfection assigns preparation one engineering project score value of object;
S5, final election object screened from preparation object according to progressive rate value and engineering project point;
S6, for each final election object, choose in its history engineering with the immediate engineering project of project for bidding project as a comparison;
S7, according to each contrast project final election object similarity score corresponding with the similarity degree imparting of project for bidding, and according to Similarity score chooses contractor from final election object.
2. the software and hardware appraisal procedure as claimed in claim 1 for being applied to bid, it is characterised in that in step S4, enter leg speed Rate value=(technological progress speed × 2+ renewal of the equipment speed)/3.
3. the software and hardware appraisal procedure as claimed in claim 1 for being applied to bid, it is characterised in that in step S4, construction meter Scoring average can be regard as engineering project score value by assessing participant's scoring by drawing book degree of perfection.
4. the software and hardware appraisal procedure for being applied to bid as described in claim 1 or 2 or 3, it is characterised in that in step S5, Progressive rate value and engineering project point are substituted into default final election model calculating final election to divide, final election pair is then taken according to final election sorting As.
5. the software and hardware appraisal procedure as claimed in claim 4 for being applied to bid, it is characterised in that in step S5, final election mould Type is:Final election point=(progressive rate value+engineering project point × 2)/3.
6. the software and hardware appraisal procedure as claimed in claim 5 for being applied to bid, it is characterised in that in step S5, according to multiple Choosing point score value or ranking choose final election object.
CN201710328994.3A 2017-05-11 2017-05-11 A kind of software and hardware appraisal procedure for being applied to bid Pending CN107194553A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710328994.3A CN107194553A (en) 2017-05-11 2017-05-11 A kind of software and hardware appraisal procedure for being applied to bid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710328994.3A CN107194553A (en) 2017-05-11 2017-05-11 A kind of software and hardware appraisal procedure for being applied to bid

Publications (1)

Publication Number Publication Date
CN107194553A true CN107194553A (en) 2017-09-22

Family

ID=59873804

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710328994.3A Pending CN107194553A (en) 2017-05-11 2017-05-11 A kind of software and hardware appraisal procedure for being applied to bid

Country Status (1)

Country Link
CN (1) CN107194553A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108182116A (en) * 2018-01-23 2018-06-19 江苏国泰新点软件有限公司 A kind of bidding documents analysis method, device, equipment and storage medium

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324080A (en) * 2011-09-06 2012-01-18 上海互联网软件有限公司 Bidding system and method
CN103235983A (en) * 2013-04-23 2013-08-07 浪潮集团山东通用软件有限公司 Multi-dimensional automatic supplier evaluation method
CN106294532A (en) * 2016-05-18 2017-01-04 广东电网有限责任公司信息中心 The image appraisal algorithm analyzed based on microblog emotional

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102324080A (en) * 2011-09-06 2012-01-18 上海互联网软件有限公司 Bidding system and method
CN103235983A (en) * 2013-04-23 2013-08-07 浪潮集团山东通用软件有限公司 Multi-dimensional automatic supplier evaluation method
CN106294532A (en) * 2016-05-18 2017-01-04 广东电网有限责任公司信息中心 The image appraisal algorithm analyzed based on microblog emotional

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
董云芬: "工程量清单模式下的招投标研究", 《中国优秀硕士学位论文全文数据库 经济与管理科技辑》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108182116A (en) * 2018-01-23 2018-06-19 江苏国泰新点软件有限公司 A kind of bidding documents analysis method, device, equipment and storage medium

Similar Documents

Publication Publication Date Title
Lall et al. Latin American industrial competitiveness and the challenge of globalization
CN107169650A (en) It is a kind of to be applied to the sincere toolization methods of marking that bid is assessed
Chan et al. A balanced scorecard approach to measuring industry performance
CN107194552A (en) A kind of intelligence bid platform
CN108711097A (en) Online bidding method and its system
Park et al. Rough diamonds: The four traits of successful breakout firms in BRIC countries
Marsden A phoenix from the ashes of apprenticeship? Vocational training in Britain
CN109255691A (en) Acquisition methods, device and the computer readable storage medium of acceptance of the bid supplier
CN107194553A (en) A kind of software and hardware appraisal procedure for being applied to bid
Krasnokutskaya et al. Trading across borders in online auctions
Omran et al. Determining the critical factors in ensuring the accuracy of cost estimate in obtaining a tender
US20070130045A1 (en) Method and apparatus for tracking the progress of an auction
CN111985808B (en) Method and device for matching movable row tables
CN107169651A (en) A kind of contractor's professional skill assessment system analyzed based on big data
CN107578324A (en) The expression and device of large petroleum chemicals e-commerce platform quantity purchase
CN107016474A (en) A kind of manufacturing service appraisal procedure screened based on multi-party participation and dynamic combined
Zainal et al. Success Factor for Project Management on High Rise Building Project
CN107194555A (en) A kind of invitation system that credit and faith degree is analyzed based on big data
CN107180357A (en) A kind of way of invitation for bid of comprehensive assessment
Bell The prospects for industrialisation in the new South Africa
Adnan et al. Partnering for small medium contractors in Malaysia
Sadeghpour et al. A Comparative Study of Owner, Contractor, and Consultant Perspective on the Selection Criteria for Subcontractors.
Pryor et al. Lean selling: slash your sales cycle and drive profitable, predictable revenue growth by giving buyers what they really want
Gupta Studying the reverse auction bidding game for the role variants of guardians in the facilities management industry
Buertey et al. Procurement of Developmental Projects in Ghana: A Literature Review of the Designer-Led System Verses the Producer-Led Systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922

RJ01 Rejection of invention patent application after publication