CN107191171A - 基于顶板裂隙缝网水力压裂煤层增透方法 - Google Patents

基于顶板裂隙缝网水力压裂煤层增透方法 Download PDF

Info

Publication number
CN107191171A
CN107191171A CN201710635027.1A CN201710635027A CN107191171A CN 107191171 A CN107191171 A CN 107191171A CN 201710635027 A CN201710635027 A CN 201710635027A CN 107191171 A CN107191171 A CN 107191171A
Authority
CN
China
Prior art keywords
pressure
balkstone
hole
coal seam
roof
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710635027.1A
Other languages
English (en)
Inventor
王海东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Institute of Science and Technology
Original Assignee
North China Institute of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Institute of Science and Technology filed Critical North China Institute of Science and Technology
Priority to CN201710635027.1A priority Critical patent/CN107191171A/zh
Publication of CN107191171A publication Critical patent/CN107191171A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明涉及一种基于顶板裂隙缝网水力压裂煤层增透方法,其包括以下步骤:在回采工作面向煤层顶板钻一个顶板岩石孔,水力封隔器对顶板岩石孔进行封孔,将高压脉动水注入顶板岩石孔内,使顶板岩石孔周围的裂隙连通,最后均匀压入煤层裂隙中;打开高压脉动注水泵开始脉动压裂,当出现压力骤减或压力稳定时停止脉动压裂,开始乳化液泵注水,如此反复,直至达到需要的压裂压力及脉动压裂时间停止压裂。本发明增加煤层透气性,脉动水压可控。

Description

基于顶板裂隙缝网水力压裂煤层增透方法
技术领域
本发明涉及煤矿安全技术领域,特别是涉及一种基于顶板岩石钻孔裂隙缝网脉动水力压裂煤层增透方法。
背景技术
常规的煤层水力压裂技术及煤层脉动水力压裂技术主要是在煤层内施工顺层钻孔然后采用压裂泵进行注水压裂。实验研究和工程实践表明,水力压裂作用下煤层裂纹扩展具有显著的地应力敏感性,往往只生成平行于最大主应力方向的两条对称裂纹,有的煤层还具有显著的水敏感性,煤体吸水引起基质膨胀,使得注入煤层内的高压水不易从煤体内排出,影响水力压裂增透的效果。同时在煤层内进行水力压裂还存在封孔困难、制约生产等问题,虽然采用了分段水力压裂等技术但一直存在问题;因此,要使水力压裂技术在煤层增透上获得理想效果及大面积推广,在理论上和工艺上还存在一些重要问题值得进一步研究。
发明内容
为了克服上述现有技术的不足,本发明提供了一种操作简单、压裂效果好的基于顶板岩石钻孔裂隙缝网脉动水力压裂煤层增透方法。
本发明基于顶板岩石钻孔裂隙缝网脉动水力压裂煤层增透方法,包括以下步骤:
1)在回采工作面的进风顺槽内采用定向钻机向煤层顶板钻一个顶板岩石孔,钻孔经一段煤层孔后进入顶板岩石,顶板岩石孔距煤层顶部1-2m;
2)将与高压脉动注水系统相连的高压胶管与水力封隔器相连,水力封隔器对顶板岩石孔进行封孔,封孔长度20m;
3)启动高压脉动注水泵,将高压脉动水通过启动阀门注入顶板岩石孔内,高压脉动注水泵脉冲强度:0~25MPa;脉冲频率:0~1460 次/min;输出流量:0~120L/min;使顶板岩石孔周围的裂隙连通,最后均匀压入煤层裂隙中;
4) 打开高压脉动注水泵开始脉动压裂,当出现压力骤减或压力稳定时停止脉动压裂,开始乳化液泵注水,如此反复,直至达到需要的压裂压力及脉动压裂时间停止压裂。
在步骤1)中,顶板岩石孔采用定向钻机以仰角β从煤层巷道开口先施工一段煤层孔后进入煤层顶板岩石内,钻进至煤层顶板1.5米位置时,以于煤层平行的倾角α沿煤层顶板继续钻进。
在步骤1)中,顶板岩石孔平行于回采工作面。
在步骤1)中,顶板岩石孔中心与煤层顶部距离1.5m。
在步骤1)中,顶板岩石孔的直径为Ø89mm。
在步骤2)中,顶板岩石孔端部封孔长度为20m。
在步骤3)中,高压脉动水源选择井下静压水。
在步骤4)中,顶板岩石孔内先用乳化液泵充满水后再采用高压脉动注水泵压裂。
与现有煤层水力压裂技术相比,本发明的有益效果是:1) 通过岩层钻孔注入脉动高压水压裂下方煤体增加煤层透气性是利用了顶板岩石裂隙通道将脉动高压水垂直均匀作用煤体层理弱面形成缝网裂纹达到增透的目的;2) 煤层顶板施工岩石钻孔向煤层进行脉动水力压裂,顶板钻孔距煤层垂直间距1~2m,脉动水压可控,可避免因煤层构造复杂、地应力大,常导致压裂方向不易控制、常常沿主应力平行方向压裂两个大的裂隙不利于煤层瓦斯释放且压裂液浸入煤体后不易排除,可周期性地注入高压液重复冲击驱裂;3)压裂的过程实现的是脉动水应力波或应力波动态冲击震裂效应和煤岩体界面以及在高压水在节理面产生拉伸破坏后在节理裂纹中形成网缝裂隙。
附图说明
图1为本发明基于顶板裂隙缝网水力压裂煤层增透方法中煤层顶板岩石钻孔的水平投影示意图;
图2为本发明基于顶板裂隙缝网水力压裂煤层增透方法中煤层顶板岩石钻孔的水平投影示意图,竖向投影示意图;
图3为本发明基于顶板裂隙缝网水力压裂煤层增透方法中高压脉冲水力系统、压裂管道和钻孔示意图。
图中标记为:1.回风顺槽;2.进风顺槽;3. 顶板岩石孔;20.回采工作面;21.煤层顶板岩石;22.开采煤层;23. 高压脉动注水泵;24.脉冲加压装置;25.电控阀门;26.高压胶管;27.水力封隔器。
具体实施方式
实施例1
下面结合一个长240m工作面的实施例(附图)对本发明进一步说明。
基于顶板裂隙缝网水力压裂煤层增透方法的实施依次包括以下步骤:
1)在回采工作面进风顺槽向煤层顶板岩石内施工Ø89mm直径的顶板岩石孔3,钻孔采用定向钻机施工,定向钻机先以仰角β钻进经一段煤层孔后进入顶板岩石钻进至距煤层1.5m位置后,以于煤层平行的倾角α的岩石孔继续钻进,,顶板岩石孔长度为280m左右,顶板岩石孔中心距煤层顶板1.5m;顶板岩石孔平行于回采工作面。
2)将通过高压胶管26与密封顶板岩石孔的水力封隔器28相连,水力封隔器封孔长度为20m;
3)启动高压脉动注水泵23,当高压脉动注水泵23压力达到设定值后,电控阀门25自动打开,高压水经高压胶管26通过水力封隔器28进入顶板岩石孔3内对煤层进行压裂,使顶板岩石孔周围的裂隙连通,最后均匀压入煤层裂隙中,当压力值迅速下降后停止压裂;高压脉动注水泵脉冲强度:0~25MPa;脉冲频率:0~1460 次/min;输出流量:0~120L/min;高压脉动水源选择井下静压水;
4)关闭阀门20后关闭高压脉动注水泵23,将高压胶管26撤掉,完成煤层顶板的超前预裂。
实施例2
所述的步骤4为, 打开高压脉动注水泵开始脉动压裂,当出现压力骤减或压力稳定时停止脉动压裂,开始乳化液泵注水,如此反复,直至达到需要的压裂压力及脉动压裂时间停止压裂;顶板岩石孔内先用乳化液泵充满水后再采用高压脉动注水泵压裂。其它步骤同实施例1。

Claims (8)

1.一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于包括以下步骤:
1)在回采工作面的进风顺槽内采用定向钻机向煤层顶板钻一个顶板岩石孔,钻孔经一段煤层孔后进入顶板岩石,顶板岩石孔距煤层顶部1-2m;
2)将与高压脉动注水系统相连的高压胶管与水力封隔器相连,水力封隔器对顶板岩石孔进行封孔,封孔长度20m;
3)启动高压脉动注水泵,将高压脉动水通过启动阀门注入顶板岩石孔内,高压脉动注水泵脉冲强度:0~25MPa;脉冲频率:0~1460 次/min;输出流量:0~120L/min;使顶板岩石孔周围的裂隙连通,最后均匀压入煤层裂隙中;
4) 打开高压脉动注水泵开始脉动压裂,当出现压力骤减或压力稳定时停止脉动压裂,开始乳化液泵注水,如此反复,直至达到需要的压裂压力及脉动压裂时间停止压裂。
2.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤1)中,顶板岩石孔采用定向钻机以仰角β从煤层巷道开口先施工一段煤层孔后进入煤层顶板岩石内,钻进至煤层顶板1.5米位置时,以于煤层平行的倾角α沿煤层顶板继续钻进。
3.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤1)中,顶板岩石孔平行于回采工作面。
4.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤1)中,顶板岩石孔中心与煤层顶部距离1.5m。
5.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤1)中,顶板岩石孔的直径为Ø89mm。
6.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤2)中,顶板岩石孔端部封孔长度为20m。
7.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤3)中,高压脉动水源选择井下静压水。
8.根据权利要求1所述的一种基于顶板裂隙缝网水力压裂煤层增透方法,其特征在于在步骤4)中,顶板岩石孔内先用乳化液泵充满水后再采用高压脉动注水泵压裂。
CN201710635027.1A 2017-07-30 2017-07-30 基于顶板裂隙缝网水力压裂煤层增透方法 Pending CN107191171A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710635027.1A CN107191171A (zh) 2017-07-30 2017-07-30 基于顶板裂隙缝网水力压裂煤层增透方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710635027.1A CN107191171A (zh) 2017-07-30 2017-07-30 基于顶板裂隙缝网水力压裂煤层增透方法

Publications (1)

Publication Number Publication Date
CN107191171A true CN107191171A (zh) 2017-09-22

Family

ID=59884385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710635027.1A Pending CN107191171A (zh) 2017-07-30 2017-07-30 基于顶板裂隙缝网水力压裂煤层增透方法

Country Status (1)

Country Link
CN (1) CN107191171A (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476807A (zh) * 2017-10-10 2017-12-15 中国平煤神马能源化工集团有限责任公司 一种煤层坚硬顶板致裂弱化方法
CN108843320A (zh) * 2018-06-12 2018-11-20 王帆 煤矿坚硬顶板全工作面巷道内提前消突方法
CN109138961A (zh) * 2018-08-22 2019-01-04 中国石油大学(北京) 分级循环水力压裂方法及压裂装置
CN112253114A (zh) * 2020-09-10 2021-01-22 中煤科工集团西安研究院有限公司 煤矿井下深孔水力预裂弱化煤层中坚硬夹矸层的方法
CN113445981A (zh) * 2021-07-22 2021-09-28 中国矿业大学(北京) 一种松软煤层顶板定向钻孔水力压裂增透装置及应用方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102337919A (zh) * 2011-09-01 2012-02-01 河南理工大学 “四期五用”钻孔高效抽采瓦斯工艺方法
CN103147734A (zh) * 2013-03-08 2013-06-12 中煤科工集团重庆研究院 煤矿井下顺煤层多段水力压裂方法
RU2540709C1 (ru) * 2013-12-10 2015-02-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Способ ударно-волнового разрушения угольного пласта через скважины пробуренные из горных выработок
CN104879159A (zh) * 2015-06-11 2015-09-02 河南理工大学 一种松软煤层回采工作面增透抽采瓦斯的装置及其方法
CN106761740A (zh) * 2016-11-11 2017-05-31 中国矿业大学 一种坚硬煤层顶板耦合致裂方法

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102155254A (zh) * 2011-02-28 2011-08-17 中国矿业大学 一种低透气性煤层脉冲压裂增透抽采瓦斯方法
CN102337919A (zh) * 2011-09-01 2012-02-01 河南理工大学 “四期五用”钻孔高效抽采瓦斯工艺方法
CN103147734A (zh) * 2013-03-08 2013-06-12 中煤科工集团重庆研究院 煤矿井下顺煤层多段水力压裂方法
RU2540709C1 (ru) * 2013-12-10 2015-02-10 Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Национальный минерально-сырьевой университет "Горный" Способ ударно-волнового разрушения угольного пласта через скважины пробуренные из горных выработок
CN104879159A (zh) * 2015-06-11 2015-09-02 河南理工大学 一种松软煤层回采工作面增透抽采瓦斯的装置及其方法
CN106761740A (zh) * 2016-11-11 2017-05-31 中国矿业大学 一种坚硬煤层顶板耦合致裂方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107476807A (zh) * 2017-10-10 2017-12-15 中国平煤神马能源化工集团有限责任公司 一种煤层坚硬顶板致裂弱化方法
CN108843320A (zh) * 2018-06-12 2018-11-20 王帆 煤矿坚硬顶板全工作面巷道内提前消突方法
CN109138961A (zh) * 2018-08-22 2019-01-04 中国石油大学(北京) 分级循环水力压裂方法及压裂装置
CN109138961B (zh) * 2018-08-22 2019-11-19 中国石油大学(北京) 分级循环水力压裂方法及压裂装置
CN112253114A (zh) * 2020-09-10 2021-01-22 中煤科工集团西安研究院有限公司 煤矿井下深孔水力预裂弱化煤层中坚硬夹矸层的方法
CN113445981A (zh) * 2021-07-22 2021-09-28 中国矿业大学(北京) 一种松软煤层顶板定向钻孔水力压裂增透装置及应用方法

Similar Documents

Publication Publication Date Title
CN107191171A (zh) 基于顶板裂隙缝网水力压裂煤层增透方法
WO2022252591A1 (zh) 一种水力压裂与甲烷原位燃爆协同致裂增透方法
CN101575983B (zh) 煤矿井下定向压裂增透消突方法及压裂增透消突装置
US7748458B2 (en) Initiation and propagation control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments
US6991037B2 (en) Multiple azimuth control of vertical hydraulic fractures in unconsolidated and weakly cemented sediments
CN102383828B (zh) 深孔水力致裂驱赶瓦斯浅孔抽采的增透与消突方法
AU2014336858B2 (en) Method for enhanced fuel gas extraction by coal mine underground gas-liquid dual-phase alternating phase-driven fracturing of coal body
CN106988719B (zh) 向煤层循环注入热水和液氮的增透系统和增透方法
CN106761740A (zh) 一种坚硬煤层顶板耦合致裂方法
RU2373398C1 (ru) Способ дегазации и разупрочнения горных пород
CN104564001B (zh) 水平井多簇压裂的方法及实施该方法的多簇射孔压裂管柱
CN105422164B (zh) 水压致裂增透辅助煤层高效注水方法及设备
CN105239984B (zh) 一种煤矿井下压裂裂缝扩展控制方法
CN106285681A (zh) 一种坚硬煤层顶板致裂装置及方法
CN104405358B (zh) 一种高压气体压裂煤层的方法
CN105804786B (zh) 一种松软煤层底板穿层钻孔压冲增透方法
CN111520184A (zh) 一种煤矿冲击地压和有害气体综合防治系统及方法
CN112696182A (zh) 一种钻孔封堵致裂注水一体化结构及其使用方法
CN109025940B (zh) 一种针对致密油藏的co2压裂驱油一体化采油方法
CN105041344A (zh) 一种微裂隙围岩预切槽高压气体扩缝注浆堵水方法
CN103233768A (zh) 一种井下煤层水平钻孔分段压裂卸压方法
CN105351001A (zh) 一种基于沿空留巷区域加固瓦斯抽采的方法
WO2020151207A1 (zh) 一种高承压水高瓦斯煤层群协调抽采卸压方法
CN115749713A (zh) 岩层变频脉冲缝网压裂方法与装备
CN104963674B (zh) 低渗煤层液氮冻融裂化增透方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922