CN107186426A - A kind of pipeline tests clamping tooling - Google Patents

A kind of pipeline tests clamping tooling Download PDF

Info

Publication number
CN107186426A
CN107186426A CN201710369698.8A CN201710369698A CN107186426A CN 107186426 A CN107186426 A CN 107186426A CN 201710369698 A CN201710369698 A CN 201710369698A CN 107186426 A CN107186426 A CN 107186426A
Authority
CN
China
Prior art keywords
pipeline
swollen mouth
inflation port
clamping
mouth claw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710369698.8A
Other languages
Chinese (zh)
Inventor
马果
傅爱军
杨迪新
李飞翔
曾宪民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liuzhou Wuling Automobile Industry Co Ltd
Liuzhou Wuling Motors Co Ltd
Guangxi Automobile Group Co Ltd
Original Assignee
Liuzhou Wuling Automobile Industry Co Ltd
Guangxi Automobile Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liuzhou Wuling Automobile Industry Co Ltd, Guangxi Automobile Group Co Ltd filed Critical Liuzhou Wuling Automobile Industry Co Ltd
Priority to CN201710369698.8A priority Critical patent/CN107186426A/en
Publication of CN107186426A publication Critical patent/CN107186426A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0536Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor for maintaining flanges on tubes

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

A kind of pipeline experiment clamping tooling disclosed in the embodiment of the present invention, including:Swollen mouth claw, the swollen mouth claw is formed with inflation port;For the spacing ring being sheathed on the outside of the swollen mouth claw, the space for being embedded line ports is formed between swollen the mouth claw and the spacing ring;The expansion pin coordinated with the inflation port, the expansion pin has screwed hole, as the expansion pin and the inflation port coordinate the increase of depth, the swollen mouth claw radial direction distending;For the clamping plate through fixture, and the screw rod coordinated with the screwed hole, one end of the screw rod is keeper, and the space of the clamping clamping plate is formed between the keeper and the swollen mouth claw.The present invention can also realize the clamping to pipeline without the welding flange at line ports, it is to avoid due to various problems caused by welding.

Description

A kind of pipeline tests clamping tooling
Technical field
The present invention relates to clamping tooling technical field, clamping tooling is tested more specifically to a kind of pipeline.
Background technology
In order to verify whether bellows meets the requirements, it is necessary to which to bellows progress experimental bench experiment, entrucking is then carried out again Experiment.In the prior art, the clamping method that experimental bench experiment is used is in one flange of each welding in the port at bellows two ends Disk, is connected by ring flange with test fixture.
The welding flange at bellows two-port, it is not only cumbersome, and easily because welding flange has angle official post Free state can not be in after bellows clamping, so as to influence experimental result.And the bellows after experiment is because of the reason of welding, The original installation dimension of part has been destroyed, the flexibility of experiment is limited, it is impossible to (sound) rigidity actual measurement zero will have been carried out Part carries out vehicle loading stress.
Therefore, how can be effectively spacing to bellows progress in the case of without soldering, to avoid due to weldering Various problems caused by connecing, as those skilled in the art's technical problem urgently to be resolved hurrily.
The content of the invention
In view of this, clamping tooling is tested it is an object of the invention to provide a kind of pipeline, with without soldering In the case of can to pipeline carry out effectively it is spacing, with avoid due to welding caused by various problems.
To achieve the above object, the present invention provides following technical scheme:
A kind of pipeline tests clamping tooling, including:
Swollen mouth claw, the swollen mouth claw is formed with inflation port;
For the spacing ring being sheathed on the outside of the swollen mouth claw, form embedding between swollen the mouth claw and the spacing ring If the space of line ports;
The expansion pin coordinated with the inflation port, the expansion pin has screwed hole, with the expansion pin with it is described swollen Swollen hole coordinates the increase of depth, the swollen mouth claw radial direction distending;
For the clamping plate through fixture, and the screw rod coordinated with the screwed hole, one end of the screw rod is keeper, institute State the space that the clamping clamping plate is formed between keeper and the swollen mouth claw.
Preferably, in above-mentioned pipeline experiment clamping tooling, the swollen mouth claw is made up of circumferential multiple jaw components.
Preferably, in above-mentioned pipeline experiment clamping tooling, the jaw components are by the circumferential decile of the swollen mouth claw Four.
Preferably, in above-mentioned pipeline experiment clamping tooling, the swollen mouth claw is flange plate structure, and miner diameter end is used for Coordinate with line ports, bigger diameter end is used for the space that the clamping clamping plate is formed between the keeper.
Preferably, in above-mentioned pipeline experiment clamping tooling, in the miner diameter end insertion line ports of the swollen mouth claw Length is 10mm-14mm.
Preferably, in above-mentioned pipeline experiment clamping tooling, the width of the spacing ring is less than the small of the swollen mouth claw The width at footpath end.
Preferably, in above-mentioned pipeline experiment clamping tooling, the width of the spacing ring is 8mm-9mm.
Preferably, above-mentioned pipeline experiment clamping tooling in, the inflation port be round platform hole, the expansion pin be with it is described The round platform that round platform hole coordinates, and maximum inner diameter of the minimum outer diameter less than the inflation port of the expansion pin, more than the expansion The minimum diameter in hole;The maximum outside diameter of the expansion pin is more than the maximum inner diameter of the inflation port.
Preferably, in above-mentioned pipeline experiment clamping tooling, the bus angle of the inflation port and the expansion pin for 5 °- 9°。
Preferably, in above-mentioned pipeline experiment clamping tooling, the screw rod is bolt, and the keeper is the bolt Head.
It can be seen from above-mentioned technical scheme that, the pipeline experiment clamping tooling that the present invention is provided is needing to enter pipeline During row experiment, it is necessary first to pipeline is clamped on fixture, then tested accordingly again.Due to the special construction of pipeline, So that can not be clamped on fixture, based on this, line ports can be embedded between swollen mouth claw and spacing ring by the present invention, then Screw rod is passed through to the clamping plate of fixture, and coordinated with the inflation port screw thread of expansion pin, so that clamping plate is located at the keeper of screw rod Between swollen mouth claw.By rotary screw, because the keeper of screw rod is limited by clamping plate, it is impossible to realize and move, therefore During rotary screw, expansion pin can produce axial displacement, and as expansion pin and inflation port coordinate the increase of depth, swollen mouth claw is radially Distending, then clamps the line ports being embedded between swollen mouth claw and spacing ring.The present invention at line ports without welding Ring flange, can also realize the clamping to pipeline, it is to avoid due to various problems caused by welding.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the front view that pipeline provided in an embodiment of the present invention tests clamping tooling;
Fig. 2 is sectional views of the Fig. 1 along line D-D;
Fig. 3 is the side view that pipeline provided in an embodiment of the present invention tests clamping tooling.
Wherein, 101 be screw rod, and 102 be swollen mouth claw, and 103 be spacing ring, and 104 be expansion pin.
Embodiment
The core of the present invention is to provide a kind of pipeline experiment clamping tooling, with the energy in the case of without soldering It is effectively spacing to pipeline progress, to avoid due to various problems caused by welding.
Hereinafter, embodiment is illustrated referring to the drawings.In addition, embodiments illustrated below is not to described in claim The content of the invention rise any restriction effect.In addition, the full content of the composition represented by example below is not limited to as right It is required that necessary to the solution of described invention.
Fig. 1-Fig. 3 is referred to, Fig. 1 is the front view that pipeline provided in an embodiment of the present invention tests clamping tooling;Fig. 2 is figure 1 along line D-D sectional view;Fig. 3 is the side view that pipeline provided in an embodiment of the present invention tests clamping tooling.
Clamping tooling is tested the embodiment of the invention discloses a kind of pipeline, by the clamping tooling, welding can be substituted Ring flange realizes that bellows is easy to the purpose by fixture clamping, it is necessary to which explanation, the present invention is not limited to enter bellows Row clamping, other pipelines can also be clamped, below be introduced by taking bellows as an example.The pipeline tests clamping tooling bag Include swollen mouth claw 102, spacing ring 103, expansion pin 104 and screw rod 101.
Wherein, swollen mouth claw 102 is formed with inflation port, and spacing ring 103 is used for the outside for being sheathed on swollen mouth claw 102, swollen The space for being embedded corrugated tube port is formed between mouth claw 102 and spacing ring 103.Before swollen mouth claw 102 is unexpanded, swollen mouth The distance between claw 102 and spacing ring 103 should be greater than the thickness of corrugated tube port, can conveniently be embedded corrugated tube port.
Expansion pin 104 coordinates with inflation port, and expansion pin 104 has screwed hole, as expansion pin 104 and inflation port coordinate deep The increase of degree, the swollen radial direction distending of mouth claw 102.Inserted in inflation port, swollen mouth claw 102 can be entered by expansion pin 104 Row expansion, expands its Outside Dimensions, then reduces the distance between swollen mouth claw 102 and spacing ring 103, it is ensured that to bellows The clamping of port.
Screw rod 101 is used for the clamping plate (hole that the end of thread for screw rod 101 is passed through is offered on clamping plate) through fixture, and with Screwed hole screw thread coordinates, and one end of screw rod 101 is keeper, and the sky of clamping clamping plate is formed between keeper and swollen mouth claw 102 Between.After Kong Bingyu screwed holes screw thread on the end of thread insertion clamping plate of screw rod 101 coordinates, keeper and swollen 102 points of mouth claw Not Wei Yu clamping plate both sides.
The pipeline experiment clamping tooling that the present invention is provided, when needing to test bellows, it is necessary first to ripple Pipe is clamped on fixture, is then tested accordingly again.Due to the special construction of bellows so that can not be pressed from both sides on fixture Hold, based on this, corrugated tube port can be embedded between swollen mouth claw 102 and spacing ring 103 by the present invention, then by screw rod 101 Coordinate through the clamping plate of fixture, and with the inflation port screw thread of expansion pin 104, so that clamping plate is located at the keeper of screw rod 101 Between swollen mouth claw 102.By rotary screw 101, because the keeper of screw rod 101 is limited by clamping plate, it is impossible to realize and move It is dynamic, therefore in rotary screw 101, expansion pin can produce axial displacement, as expansion pin 104 and inflation port coordinate the increasing of depth Plus, swollen mouth claw 102 then clamps the corrugated tube port being embedded between swollen mouth claw 102 and spacing ring 103.Nothing of the present invention Need at corrugated tube port welding flange, can also realize the clamping to bellows, it is to avoid ask due to various caused by welding Topic.
It should be noted that installation of the above only to the port of bellows one end is described, the end of the other end Mouth is similar, is no longer repeated.Based on the above, the two ends of bellows have been fixed on two clamping plates of fixture respectively, It is achieved thereby that the clamping of bellows, to facilitate follow-up experiment.
In a specific embodiment of the invention, swollen mouth claw 102 is made up of circumferential multiple jaw components, i.e., swollen mouth claw 102 not integral structures, but be made up of multiple jaw components, so that in the presence of the axial movement of expansion pin 104, it is multiple Jaw components can be separated from each other, so as to realize the effect of distending.Specifically, jaw components are by the circumferential decile of swollen mouth claw 102 Four, or three, two or more.It should be noted that swollen mouth claw 102 or integral structure, but will Ask swollen mouth claw 102 to need to be made of elastomeric material, to ensure in the presence of expansion pin 104 is moved axially, reach distending Effect.Quality of rubber materials, silica gel material elastomeric material can for example be used.
As shown in Fig. 2 swollen mouth claw 102 is flange plate structure, and miner diameter end is used to coordinate with corrugated tube port, bigger diameter end Space for forming clamping clamping plate between keeper.Using flange plate structure, it ensure that bigger diameter end to spacing ring 103 Position-limiting action, prevents spacing ring 103 from departing from swollen mouth claw 102.
In a specific embodiment of the invention, the length that the miner diameter end insertion bellows end of swollen mouth claw 102 is intraoral is 10mm-14mm, preferably 12mm.It should be noted that embedded length should match with the size of bellows, can be according to ripple The size of line pipe is adjusted, to reach that stable holding is advisable.
In a specific embodiment of the invention, the width of spacing ring 103 is less than the width of the miner diameter end of swollen mouth claw 102. The width of spacing ring 103 is 8mm-9mm, preferably 8.5mm.It should be noted that the width of spacing ring 103 should be with bellows Size match, can be adjusted according to the size of bellows, to reach that stable holding is advisable.
In a specific embodiment of the invention, inflation port is round platform hole, and expansion pin 104 is the round platform coordinated with round platform hole, And the minimum outer diameter of expansion pin 104 is less than the maximum inner diameter of inflation port, more than the minimum diameter of inflation port;Expansion pin 104 is most Big external diameter is more than the maximum inner diameter of inflation port.Inflation port and expansion pin 104 are both designed as truncated conical shape by the present invention, are enabled to With the increase of the insertion depth of expansion pin 104, the distending of the swollen homogenous linear of mouth claw 102 is realized.It should be noted that of the invention Also one in inflation port and expansion pin 104 can be designed as truncated conical shape, another is cylinder or circle hole shape, equally can be real The effect of existing distending.
In a specific embodiment of the invention, the bus angle of inflation port and expansion pin 104 (the i.e. folder of bus and axis Angle) it is 5 ° -9 °, preferably 7 °.Screw rod 101 is preferably bolt, and keeper is the head of bolt.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (10)

1. a kind of pipeline tests clamping tooling, it is characterised in that including:
Swollen mouth claw (102), the swollen mouth claw (102) is formed with inflation port;
For the spacing ring (103) being sheathed on the outside of the swollen mouth claw (102), the swollen mouth claw (102) with it is described spacing The space for being embedded line ports is formed between ring (103);
The expansion pin (104) coordinated with the inflation port, the expansion pin (104) has screwed hole, with the expansion pin (104) increase of depth, swollen mouth claw (102) the radial direction distending are coordinated with the inflation port;
For the clamping plate through fixture, and the screw rod (101) coordinated with the screwed hole, one end of the screw rod (101) is fixed Position part, forms the space of the clamping clamping plate between the keeper and the swollen mouth claw (102).
2. pipeline as claimed in claim 1 tests clamping tooling, it is characterised in that the swollen mouth claw (102) is by circumferential more Individual jaw components composition.
3. pipeline as claimed in claim 2 tests clamping tooling, it is characterised in that the jaw components are by the swollen mouth card Four of pawl (102) circumference decile.
4. pipeline as claimed in claim 1 tests clamping tooling, it is characterised in that the swollen mouth claw (102) is ring flange Structure, and miner diameter end, for coordinating with line ports, bigger diameter end is used to form the clamping clamping plate between the keeper Space.
5. pipeline as claimed in claim 4 tests clamping tooling, it is characterised in that the miner diameter end of the swollen mouth claw (102) Length in embedded line ports is 10mm-14mm.
6. pipeline as claimed in claim 4 tests clamping tooling, it is characterised in that the width of the spacing ring (103) is less than The width of the miner diameter end of the swollen mouth claw (102).
7. pipeline as claimed in claim 6 tests clamping tooling, it is characterised in that the width of the spacing ring (103) is 8mm-9mm。
8. the pipeline experiment clamping tooling as described in claim any one of 1-7, it is characterised in that the inflation port is round platform Hole, the expansion pin (104) is the round platform coordinated with the round platform hole, and the minimum outer diameter of the expansion pin (104) is less than institute The maximum inner diameter of inflation port is stated, more than the minimum diameter of the inflation port;The maximum outside diameter of the expansion pin (104) is more than described The maximum inner diameter of inflation port.
9. pipeline as claimed in claim 8 tests clamping tooling, it is characterised in that the inflation port and the expansion pin (104) bus angle is 5 ° -9 °.
10. the pipeline experiment clamping tooling as described in claim any one of 1-7, it is characterised in that the screw rod (101) is spiral shell Bolt, the keeper is the head of the bolt.
CN201710369698.8A 2017-05-23 2017-05-23 A kind of pipeline tests clamping tooling Pending CN107186426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710369698.8A CN107186426A (en) 2017-05-23 2017-05-23 A kind of pipeline tests clamping tooling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710369698.8A CN107186426A (en) 2017-05-23 2017-05-23 A kind of pipeline tests clamping tooling

Publications (1)

Publication Number Publication Date
CN107186426A true CN107186426A (en) 2017-09-22

Family

ID=59875422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710369698.8A Pending CN107186426A (en) 2017-05-23 2017-05-23 A kind of pipeline tests clamping tooling

Country Status (1)

Country Link
CN (1) CN107186426A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108759605A (en) * 2018-05-16 2018-11-06 中车眉山车辆有限公司 A kind of slotted hole and elliptical aperture look for the device and method of geometric center
CN109015451A (en) * 2018-07-16 2018-12-18 佛山市远阳五金制品有限公司 A kind of fluid pressure type expanding arbor
CN111421214A (en) * 2020-03-25 2020-07-17 宁波市鄞州特尔斐电子有限公司 Pipeline tool device of pencil threading pipeline welding usefulness
CN112170672A (en) * 2020-09-30 2021-01-05 上海威克迈龙川汽车发动机零件有限公司 Distribution pipe copper ring expansion opening mounting clamp and distribution pipe copper ring mounting method
CN112847209A (en) * 2019-11-12 2021-05-28 中国航发商用航空发动机有限责任公司 Axis lead pipe centering tool and clamping device thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29821499U1 (en) * 1998-09-23 1999-04-08 Kalberg, Friedel Paul, 22885 Barsbüttel Device for closing a pipe end or shaped part for the purpose of forming a weld seam in the production of a welded connection with this pipe end or shaped part and arrangement using the device
AU2003271328A1 (en) * 1998-05-15 2004-01-29 Sabre International, Inc. Internal pipe clamp
CN203380388U (en) * 2013-07-01 2014-01-08 成都飞机工业(集团)有限责任公司 Adjustable expanding mandrel outer circle machining fixture
CN104439363A (en) * 2014-12-05 2015-03-25 重庆耀勇减震器有限公司 Expansion clamping device
CN204413189U (en) * 2015-01-08 2015-06-24 江苏新岛机械有限公司 A kind of conical pipe special purpose machine tool clamp for machining
CN205834286U (en) * 2016-07-22 2016-12-28 江苏建筑职业技术学院 Cast workpiece internal expansion type turning tool
CN106424801A (en) * 2016-11-30 2017-02-22 武汉泛洲中越合金有限公司 Bearing bush partition tool fixture
CN207026857U (en) * 2017-05-23 2018-02-23 广西汽车集团有限公司 A kind of pipeline tests clamping tooling

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU2003271328A1 (en) * 1998-05-15 2004-01-29 Sabre International, Inc. Internal pipe clamp
DE29821499U1 (en) * 1998-09-23 1999-04-08 Kalberg, Friedel Paul, 22885 Barsbüttel Device for closing a pipe end or shaped part for the purpose of forming a weld seam in the production of a welded connection with this pipe end or shaped part and arrangement using the device
CN203380388U (en) * 2013-07-01 2014-01-08 成都飞机工业(集团)有限责任公司 Adjustable expanding mandrel outer circle machining fixture
CN104439363A (en) * 2014-12-05 2015-03-25 重庆耀勇减震器有限公司 Expansion clamping device
CN204413189U (en) * 2015-01-08 2015-06-24 江苏新岛机械有限公司 A kind of conical pipe special purpose machine tool clamp for machining
CN205834286U (en) * 2016-07-22 2016-12-28 江苏建筑职业技术学院 Cast workpiece internal expansion type turning tool
CN106424801A (en) * 2016-11-30 2017-02-22 武汉泛洲中越合金有限公司 Bearing bush partition tool fixture
CN207026857U (en) * 2017-05-23 2018-02-23 广西汽车集团有限公司 A kind of pipeline tests clamping tooling

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108759605A (en) * 2018-05-16 2018-11-06 中车眉山车辆有限公司 A kind of slotted hole and elliptical aperture look for the device and method of geometric center
CN108759605B (en) * 2018-05-16 2023-06-13 中车眉山车辆有限公司 Device and method for finding geometric centers of oblong holes and elliptical holes
CN109015451A (en) * 2018-07-16 2018-12-18 佛山市远阳五金制品有限公司 A kind of fluid pressure type expanding arbor
CN112847209A (en) * 2019-11-12 2021-05-28 中国航发商用航空发动机有限责任公司 Axis lead pipe centering tool and clamping device thereof
CN112847209B (en) * 2019-11-12 2022-07-08 中国航发商用航空发动机有限责任公司 Centering tool for axis lead tube
CN111421214A (en) * 2020-03-25 2020-07-17 宁波市鄞州特尔斐电子有限公司 Pipeline tool device of pencil threading pipeline welding usefulness
CN112170672A (en) * 2020-09-30 2021-01-05 上海威克迈龙川汽车发动机零件有限公司 Distribution pipe copper ring expansion opening mounting clamp and distribution pipe copper ring mounting method

Similar Documents

Publication Publication Date Title
CN107186426A (en) A kind of pipeline tests clamping tooling
CN107626941A (en) A kind of inner supporting device of tubing external screw thread processing
CN104439363A (en) Expansion clamping device
CN107520576B (en) Slip-on welding flange internal clamp
CN112122870B (en) Steel pipe welding positioning tool
CN207026857U (en) A kind of pipeline tests clamping tooling
JPS5913200A (en) Pipe-scraper
CN105750577A (en) Inward clamping floating clamp for bearing ring turning
CN108994184A (en) Tube bundling device
CN104339120A (en) Self-tightened type aligner for aligning shock-cooling heat exchanger tube
CN207386613U (en) A kind of inner supporting device of tubing external screw thread processing
CN204294974U (en) expansion clamping device
CN106475932B (en) A kind of handle universal adjustment type elbow folder
JP6525057B2 (en) Method of connecting pressure piping and method of creating pressure piping with flange
CN207569337U (en) A kind of adjustable type pipe clamp
CN205716171U (en) A kind of reducingreduce tee
CN205733961U (en) Ready-package part processing clamp
CN209408011U (en) Clamp and lathe with same
CN211387516U (en) Butt joint device for high-altitude pipelines
CN205856530U (en) The test tool of guide rail heat treatment
CN207907377U (en) A kind of clamping device of copper pipe
CN103726576B (en) By interfacing part and the method thereof of axial star plate docking steel pipe
CN206972676U (en) A kind of pipe connecting device
CN103330994A (en) Connecting structure of medical hose and medical copper pipe
CN204450428U (en) Disc type male-pipe dismantling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170922