CN107180298A - A kind of recommendation method of investment project - Google Patents

A kind of recommendation method of investment project Download PDF

Info

Publication number
CN107180298A
CN107180298A CN201710283653.9A CN201710283653A CN107180298A CN 107180298 A CN107180298 A CN 107180298A CN 201710283653 A CN201710283653 A CN 201710283653A CN 107180298 A CN107180298 A CN 107180298A
Authority
CN
China
Prior art keywords
project
investment
investor
items
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710283653.9A
Other languages
Chinese (zh)
Inventor
曾顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Telescopic Jie Jie Technology Co Ltd
Original Assignee
Beijing Telescopic Jie Jie Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Telescopic Jie Jie Technology Co Ltd filed Critical Beijing Telescopic Jie Jie Technology Co Ltd
Priority to CN201710283653.9A priority Critical patent/CN107180298A/en
Publication of CN107180298A publication Critical patent/CN107180298A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q40/00Finance; Insurance; Tax strategies; Processing of corporate or income taxes
    • G06Q40/06Asset management; Financial planning or analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Development Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Game Theory and Decision Science (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • Educational Administration (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Technology Law (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)

Abstract

The invention discloses a kind of recommendation method of investment project, to reduce the time energy to be spent when investor finds investment project, investor is assisted to be quickly found out eligible investment project.Methods described includes:Obtain the Investment Choice of investor;Investor is classified according to the Investment Choice of investor;Obtain the project information of investment project;Investment project is subjected to classification of the items;According to the project information of investment project, investment project is matched with the investor of different classifications, investment project and the matching degree of investor is obtained;Project information according to the information of investment project and with the sundry item of same classification of the items, be at war with force estimation to the investment project, obtains the competitiveness of investment project;The recommendation factor of the investment project to investor is obtained according to the competitiveness of the matching degree and the investment project of the investment project and investor;The investment project that the recommendation factor is more than predetermined threshold value is recommended into investor.

Description

A kind of recommendation method of investment project
Technical field
The present invention relates to investment field, the recommendation method of more particularly to a kind of investment project.
Background technology
Due to the call of " masses are started an undertaking, millions of people are innovated ", various regions government is all increasing the support dynamics to foundation, occurred in that Large quantities of entrepreneurs, the substantial amounts of enterprise invested is occurred in that in investment field.Meanwhile, it is emerging with internet and big data Rise, occur in that many throwings, financing platform.These are thrown, financing platform is often simply carried out simply to investment project by industry Classification, or only consider that investment project is carried out classification arrangement by prospective earnings, investor is generally required in substantial amounts of investment item The substantial amounts of time is wasted on mesh can just find suitable project.
Accordingly, it would be desirable to which a kind of recommendation method of investment project, can exclude to the inappropriate investment project of investor, reduce The time energy to be spent when investor finds investment project, so as to assist investor to be quickly found out eligible investment project.
The content of the invention
The present invention provides a kind of recommendation method of investment project, to exclude to the inappropriate investment project of investor, subtracts The time energy to be spent when few investor finds investment project, assists investor to be quickly found out eligible investment project.
A kind of recommendation method for investment project that the present invention is provided, including:
The Investment Choice of investor is obtained, the Investment Choice includes investment amount, expected returns, can bear risk, throwing The one or more in preference are provided, the investment preference includes the industry to be invested, the team to be invested;
Investor is classified according to the Investment Choice of investor;
The project information of investment project is obtained, the project information includes:The existing fund of project team, project, project institute One or more in industry, investor and investment amount where needing fund, project;
Investment project is subjected to classification of the items;
According to the project information of investment project, investment project is matched with the investor of different classifications, invested Project and the matching degree of investor;
Project information according to the information of investment project and with the sundry item of same classification of the items, is carried out to the investment project Competitiveness Assessment, obtains the competitiveness of investment project;
Investment project pair is obtained according to the competitiveness of the matching degree and the investment project of the investment project and investor The recommendation factor of investor;
The investment project that the recommendation factor is more than predetermined threshold value is recommended into investor.
It is preferred that, the Investment Choice according to investor is classified investor, including:
Investor is divided into major class by investment preference, when an investor there are a variety of investment preferences, in each preference The investor is divided into major class;
In each investment preference major class, the Investment Choice of investor is arranged in certain sequence, is considered as a multidimensional Array;
In each investment preference major class, using SVMs to it is described by the Investment Choice of investor determine it is many Dimension group is classified, and obtains the classification of investor.
It is preferred that, the project information for obtaining investment project, including:
The project information that project team is provided is used as project information;
When the project information that project team is provided is imperfect, using disclosed information as supplement, supplemented Project information;
When the project information supplemented is still imperfect, the statistical result using the data of the project information of similar projects is entered Row supplement, and be low authentic data by the data markers, the statistical result is average value, or the letter provided according to project team Breath data and similar projects project information data ratio average value is modified after data.
It is preferred that, it is described that investment project is subjected to classification of the items, including:
Clustering is carried out to the project without low authentic data, classification of the items is obtained;
The project containing low authentic data and the distance of the cluster centre point of each classification of the items are calculated, the distance is found Minimum classification of the items, the project containing low authentic data is divided into the classification of the items.
It is preferred that, the project information according to investment project, by investor's progress of investment project and different classifications Match somebody with somebody, obtain investment project and the matching degree of investor, including:
By the data of cluster centre point of the classification of the items of investment project and being averaged for the Investment Choice of each class investor Data are matched, and matching process used is:By the average data of the Investment Choice of investor according to cluster centre point data Order is ranked up, and calculates both adjustment cosine similarity, as matching for classification of the items and each class investor Degree;
When the matching degree of classification of the items and such investor are more than default threshold value, each in the classification of the items is calculated Investment project and the matching degree of each investor in such investor, obtain investment project and the matching degree of investor.
It is preferred that, it is described according to the information of investment project and the project information with the sundry item of same classification of the items, to this Investment project is at war with force estimation, obtains the competitiveness of investment project, including:
According to the existing fund of the project of investment project, investor and investment amount, with the sundry item of classification of the items The existing fund of the number of entry, project, investor and investment amount obtain the competitiveness of the investment project, and the competitiveness is with being somebody's turn to do The existing fund of project of investment project, investor and investment amount are into positive correlation, the sundry item with same classification of the items The number of entry, the existing fund of project, investor and investment amount be into negative correlativing relation, wherein, according to investor all The total amount invested in project sets the weight coefficient of the investor, and the weight coefficient is proportional to the investor in all items The total amount of upper investment, to correct the influence of the investors of the different fund scale of constructions to the competitiveness of investment project.
It is preferred that, the competitiveness of the matching degree and the investment project according to the investment project and investor is obtained Investment project to the recommendation factor of investor, including:
The competitiveness of investment project is normalized, the competition after the normalized of the investment project is obtained Power;
Investment project is multiplied with the matching degree of investor with the competitiveness after the normalized, the investment is obtained Mesh and the recommendation factor of investor.
Some beneficial effects of the present invention can include:
A kind of recommendation method for investment project that the present invention is provided, can be excluded to the inappropriate investment project of investor, So as to reduce the time energy to be spent when investor finds investment project, investor is assisted to be quickly found out eligible investment Mesh.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification Obtain it is clear that or being understood by implementing the present invention.The purpose of the present invention and other advantages can be by the explanations write Specifically noted structure is realized and obtained in book, claims and accompanying drawing.
Below by drawings and examples, technical scheme is described in further detail.
Brief description of the drawings
Accompanying drawing is used for providing a further understanding of the present invention, and constitutes a part for specification, the reality with the present invention Applying example is used to explain the present invention together, is not construed as limiting the invention.In the accompanying drawings:
Fig. 1 is a kind of flow chart of the recommendation method of investment project in the embodiment of the present invention;
Embodiment
The preferred embodiments of the present invention are illustrated below in conjunction with accompanying drawing, it will be appreciated that preferred reality described herein Apply example to be merely to illustrate and explain the present invention, be not intended to limit the present invention.
Fig. 1 is a kind of flow chart of the recommendation method of investment project in the embodiment of the present invention.As shown in figure 1, this method bag Include following steps S101-S108:
S101, the Investment Choice for obtaining investor, the Investment Choice include investment amount, expected returns, can bear wind One or more in danger, investment preference, the investment preference includes the industry to be invested, the team to be invested;
S102, according to the Investment Choice of investor investor is classified;
S103, the project information for obtaining investment project, the project information include:The existing fund of project team, project, item One or more in industry, investor and investment amount where fund, project needed for mesh;
S104, investment project is subjected to classification of the items;
S105, the project information according to investment project, investment project is matched with the investor of different classifications, obtained Investment project and the matching degree of investor;
S106, the information according to investment project and the project information with the sundry item of same classification of the items, to the investment Mesh is at war with force estimation, obtains the competitiveness of investment project;
S107, according to the competitiveness of the matching degree and the investment project of the investment project and investor obtain invest item The recommendation factor of the mesh to investor;
S108, by it is described recommendation the factor be more than predetermined threshold value investment project recommend investor.
The method provided according to the present invention, it is possible to achieve will be suitable according to different project information and the Investment Choice of investor The investment project for closing investor recommends investor, so that reducing investor finds the time to be spent essence during investment project Power, assists investor to be quickly found out eligible investment project.
In one embodiment of the invention, the Investment Choice according to investor is classified investor, including:
Investor is divided into major class by investment preference, when an investor there are a variety of investment preferences, in each preference The investor is divided into major class;
In each investment preference major class, the Investment Choice of investor is arranged in certain sequence, is considered as a multidimensional Array;
In each investment preference major class, using SVMs to it is described by the Investment Choice of investor determine it is many Dimension group is classified, and obtains the classification of investor.
The method provided according to the present invention, can carry out finer classification to investor, so that for accurately to investment People recommends investment project to lay the first stone.
In one embodiment of the invention, the project information for obtaining investment project, including:
The project information that project team is provided is used as project information;
When the project information that project team is provided is imperfect, using disclosed information as supplement, supplemented Project information;
When the project information supplemented is still imperfect, the statistical result using the data of the project information of similar projects is entered Row supplement, and be low authentic data by the data markers, the statistical result is average value, or the letter provided according to project team Breath data and similar projects project information data ratio average value is modified after data.
The method provided according to the present invention, can obtain more complete investment project information, so that for accurately to investment People recommends investment project to lay the first stone.
In one embodiment of the invention, it is described that investment project is subjected to classification of the items, including:
Clustering is carried out to the project without low authentic data, classification of the items is obtained;
The project containing low authentic data and the distance of the cluster centre point of each classification of the items are calculated, the distance is found Minimum classification of the items, the project containing low authentic data is divided into the classification of the items.
The method provided according to the present invention, is classified by the project higher to reliability, can obtained more accurately Classification of the items mode, then the relatively low project of reliability is assigned in already present classification of the items, reliability can be excluded relatively low Influence of the project to classification of the items, obtains more accurately classification of the items, so that accurately to recommend investment project to beat to investor Lower basis.
In one embodiment of the invention, the project information according to investment project, by investment project and different points The investor of class is matched, and obtains investment project and the matching degree of investor, including:
By the data of cluster centre point of the classification of the items of investment project and being averaged for the Investment Choice of each class investor Data are matched, and matching process used is:By the average data of the Investment Choice of investor according to cluster centre point data Order is ranked up, and calculates both adjustment cosine similarity, as matching for classification of the items and each class investor Degree;
When the matching degree of classification of the items and such investor are more than default threshold value, each in the classification of the items is calculated Investment project and the matching degree of each investor in such investor, obtain investment project and the matching degree of investor.
The method provided according to the present invention, is accurately to investment by calculating the matching degree of investment project and investor People recommends investment project to lay the first stone.
In one embodiment of the invention, it is described according to the information of investment project and the sundry item with same classification of the items Project information, be at war with force estimation to the investment project, obtains the competitiveness of investment project, including:
According to the existing fund of the project of investment project, investor and investment amount, with the sundry item of classification of the items The existing fund of the number of entry, project, investor and investment amount obtain the competitiveness of the investment project, and the competitiveness is with being somebody's turn to do The existing fund of project of investment project, investor and investment amount are into positive correlation, the sundry item with same classification of the items The number of entry, the existing fund of project, investor and investment amount be into negative correlativing relation, wherein, according to investor all The total amount invested in project sets the weight coefficient of the investor, and the weight coefficient is proportional to the investor in all items The total amount of upper investment, to correct the influence of the investors of the different fund scale of constructions to the competitiveness of investment project.
The method provided according to the present invention, by the information of different investment projects, can compare the competition between investment project Power, while considering the selection of other investors, further increases the reliability of investment project, reduces the risk of investment project, Investment project is recommended to lay the first stone to investor for safety and reliability.
In one embodiment of the invention, the matching degree and the investment according to the investment project and investor The competitiveness of project obtains the recommendation factor of the investment project to investor, including:
The competitiveness of investment project is normalized, the competition after the normalized of the investment project is obtained Power;
Investment project is multiplied with the matching degree of investor with the competitiveness after the normalized, the investment is obtained Mesh and the recommendation factor of investor.
The method provided according to the present invention, while considering the competition of investment project and the matching degree and investment project of investor Power, can by with the matching degree of investor is higher and the lower competitiveness of risk is higher project recommendation to investor, reduction investment The time and efforts to be spent when people finds investment project, assists investor to be quickly found out eligible investment project.
A kind of recommendation method for investment project that the present invention is provided, can be excluded to the inappropriate investment project of investor, So as to reduce the time energy to be spent when investor finds investment project, investor is assisted to be quickly found out eligible investment Mesh.
It should be understood by those skilled in the art that, embodiments of the invention can be provided as method, system or computer program Product.Therefore, the present invention can be using the reality in terms of complete hardware embodiment, complete software embodiment or combination software and hardware Apply the form of example.Moreover, the present invention can be used in one or more computers for wherein including computer usable program code The shape for the computer program product that usable storage medium is implemented on (including but is not limited to magnetic disk storage and optical memory etc.) Formula.
The present invention is the flow with reference to method according to embodiments of the present invention, equipment (system) and computer program product Figure and/or block diagram are described.It should be understood that can be by every first-class in computer program instructions implementation process figure and/or block diagram Journey and/or the flow in square frame and flow chart and/or block diagram and/or the combination of square frame.These computer programs can be provided The processor of all-purpose computer, special-purpose computer, Embedded Processor or other programmable data processing devices is instructed to produce A raw machine so that produced by the instruction of computer or the computing device of other programmable data processing devices for real The device for the function of being specified in present one flow of flow chart or one square frame of multiple flows and/or block diagram or multiple square frames.
These computer program instructions, which may be alternatively stored in, can guide computer or other programmable data processing devices with spy Determine in the computer-readable memory that mode works so that the instruction being stored in the computer-readable memory, which is produced, to be included referring to Make the manufacture of device, the command device realize in one flow of flow chart or multiple flows and/or one square frame of block diagram or The function of being specified in multiple square frames.
These computer program instructions can be also loaded into computer or other programmable data processing devices so that in meter Series of operation steps is performed on calculation machine or other programmable devices to produce computer implemented processing, thus in computer or The instruction performed on other programmable devices is provided for realizing in one flow of flow chart or multiple flows and/or block diagram one The step of function of being specified in individual square frame or multiple square frames.
Obviously, those skilled in the art can carry out the essence of various changes and modification without departing from the present invention to the present invention God and scope.So, if these modifications and variations of the present invention belong to the scope of the claims in the present invention and its equivalent technologies Within, then the present invention is also intended to comprising including these changes and modification.

Claims (7)

1. a kind of recommendation method of investment project, it is characterised in that including:
The Investment Choice of investor is obtained, the Investment Choice includes investment amount, expected returns, can bear risk, investment partially One or more in good, the investment preference includes the industry to be invested, the team to be invested;
Investor is classified according to the Investment Choice of investor;
The project information of investment project is obtained, the project information includes:Provided needed for the existing fund of project team, project, project One or more in industry, investor and investment amount where gold, project;
Investment project is subjected to classification of the items;
According to the project information of investment project, investment project is matched with the investor of different classifications, investment project is obtained With the matching degree of investor;
Project information according to the information of investment project and with the sundry item of same classification of the items, is at war with to the investment project Force estimation, obtains the competitiveness of investment project;
Investment project is obtained to investment according to the competitiveness of the matching degree and the investment project of the investment project and investor The recommendation factor of people;
The investment project that the recommendation factor is more than predetermined threshold value is recommended into investor.
2. the method as described in claim 1, it is characterised in that the Investment Choice according to investor is divided investor Class, including:
Investor is divided into major class by investment preference, when an investor there are a variety of investment preferences, in each preference major class In be divided into the investor;
In each investment preference major class, the Investment Choice of investor is arranged in certain sequence, is considered as a Multidimensional numerical;
In each investment preference major class, using SVMs to many dimensions determined by the Investment Choice of investor Group is classified, and obtains the classification of investor.
3. the method as described in claim 1, it is characterised in that the project information of the acquisition investment project, including:
The project information that project team is provided is used as project information;
When the project information that project team is provided is imperfect, using disclosed information as supplement, the project supplemented Information;
When the project information supplemented is still imperfect, mended using the statistical result of the data of the project information of similar projects Fill, and be low authentic data by the data markers, the statistical result is average value, or the Information Number provided according to project team Data after being modified according to the ratio with the project information data of similar projects to average value.
4. the method as described in claim 1, it is characterised in that described that investment project is subjected to classification of the items, including:
Clustering is carried out to the project without low authentic data, classification of the items is obtained;
The project containing low authentic data and the distance of the cluster centre point of each classification of the items are calculated, the distance is found minimum Classification of the items, the project containing low authentic data is divided into the classification of the items.
5. the method as described in claim 1, it is characterised in that the project information according to investment project, by investment project Matched with the investor of different classifications, obtain investment project and the matching degree of investor, including:
By the data of the cluster centre point of the classification of the items of investment project and the average data of the Investment Choice of each class investor Matched, matching process used is:By order of the average data of the Investment Choice of investor according to cluster centre point data It is ranked up, and calculates both adjustment cosine similarities, as classification of the items and the matching degree of each class investor;
When the matching degree of classification of the items and such investor are more than default threshold value, calculate each in the classification of the items and invest Project and the matching degree of each investor in such investor, obtain investment project and the matching degree of investor.
6. the method as described in claim 1, it is characterised in that the information according to investment project and with same classification of the items The project information of sundry item, be at war with force estimation to the investment project, obtains the competitiveness of investment project, including:
According to the existing fund of the project of investment project, investor and investment amount, with classification of the items sundry item project The existing fund of quantity, project, investor and investment amount obtain the competitiveness of the investment project, the competitiveness and the investment The existing fund of project of project, investor and investment amount are into positive correlation, the item with the sundry item of same classification of the items The existing fund of mesh number amount, project, investor and investment amount into negative correlativing relation, wherein, according to investor in all items The total amount of upper investment sets the weight coefficient of the investor, and the weight coefficient is proportional to the investor in all items upslide The total amount of money, to correct the influence of the investors of the different fund scale of constructions to the competitiveness of investment project.
7. the method as described in claim 1, it is characterised in that the matching degree according to the investment project and investor and The competitiveness of the investment project obtains the recommendation factor of the investment project to investor, including:
The competitiveness of investment project is normalized, the competitiveness after the normalized of the investment project is obtained;
Investment project is multiplied with the matching degree of investor with the competitiveness after the normalized, obtain the investment project with The recommendation factor of investor.
CN201710283653.9A 2017-04-26 2017-04-26 A kind of recommendation method of investment project Pending CN107180298A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710283653.9A CN107180298A (en) 2017-04-26 2017-04-26 A kind of recommendation method of investment project

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710283653.9A CN107180298A (en) 2017-04-26 2017-04-26 A kind of recommendation method of investment project

Publications (1)

Publication Number Publication Date
CN107180298A true CN107180298A (en) 2017-09-19

Family

ID=59832419

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710283653.9A Pending CN107180298A (en) 2017-04-26 2017-04-26 A kind of recommendation method of investment project

Country Status (1)

Country Link
CN (1) CN107180298A (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909481A (en) * 2017-12-28 2018-04-13 中科钢研节能科技有限公司 One kind invests build together displaying and allotment of shares information analysis system and method
CN107909479A (en) * 2017-12-06 2018-04-13 上海裕乾金融信息服务有限公司 Financial asset quickly matches somebody with somebody mark system
CN108470032A (en) * 2018-01-30 2018-08-31 天津中科智能识别产业技术研究院有限公司 Overseas garden trade and investment promotion service system based on digital earth frame
CN109064339A (en) * 2018-09-12 2018-12-21 张连祥 A kind of method and system of intelligence inquiry merchant vector environmental information
CN109118362A (en) * 2018-07-26 2019-01-01 北京洪泰同创信息技术有限公司 The method and apparatus of commerciality investment and financing transaction
CN109214772A (en) * 2018-08-07 2019-01-15 平安科技(深圳)有限公司 Item recommendation method, device, computer equipment and storage medium
CN109299905A (en) * 2018-05-09 2019-02-01 北京京润恒远科技有限公司 A kind of project appraisal method and system
CN109740914A (en) * 2018-12-28 2019-05-10 武汉金融资产交易所有限公司 A kind of method, storage medium, equipment and system that financial business is assessed, recommended
CN111402063A (en) * 2020-04-07 2020-07-10 上海应用技术大学 Enterprise fund management system based on internet platform
CN112434216A (en) * 2020-11-13 2021-03-02 北京创业光荣信息科技有限责任公司 Intelligent investment project recommendation method and device, storage medium and computer equipment
CN112445973A (en) * 2020-11-13 2021-03-05 北京创业光荣信息科技有限责任公司 Method and device for searching project, storage medium and computer equipment
CN117688249A (en) * 2024-02-02 2024-03-12 上海银行股份有限公司 Intelligent line throwing matching platform based on data analysis

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1580953A (en) * 2003-08-15 2005-02-16 富士胶片株式会社 Light-sensitive transfer sheet, light-sensitive layers, picture pattern forming method and layout pattern forming method
CN101419697A (en) * 2008-12-04 2009-04-29 中国工商银行股份有限公司 Method, device and system for processing customer information of bank
CN101647037A (en) * 2006-10-24 2010-02-10 塞纳克·阿图莱利亚 Guarantee joint system for one
CN102236870A (en) * 2010-04-26 2011-11-09 上海无花果信息科技有限公司 Control method of quantified multiple-factor investment portfolio for obtaining stable payback
CN103218744A (en) * 2012-07-20 2013-07-24 上海大智慧股份有限公司 Industry investment information and data processing system based on strength, weakness, opportunity, and threat (SWOT) model
CN105205719A (en) * 2014-05-30 2015-12-30 武汉元宝创意科技有限公司 Financing method and system based on project relevancy

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1580953A (en) * 2003-08-15 2005-02-16 富士胶片株式会社 Light-sensitive transfer sheet, light-sensitive layers, picture pattern forming method and layout pattern forming method
CN101647037A (en) * 2006-10-24 2010-02-10 塞纳克·阿图莱利亚 Guarantee joint system for one
CN101419697A (en) * 2008-12-04 2009-04-29 中国工商银行股份有限公司 Method, device and system for processing customer information of bank
CN102236870A (en) * 2010-04-26 2011-11-09 上海无花果信息科技有限公司 Control method of quantified multiple-factor investment portfolio for obtaining stable payback
CN103218744A (en) * 2012-07-20 2013-07-24 上海大智慧股份有限公司 Industry investment information and data processing system based on strength, weakness, opportunity, and threat (SWOT) model
CN105205719A (en) * 2014-05-30 2015-12-30 武汉元宝创意科技有限公司 Financing method and system based on project relevancy

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107909479A (en) * 2017-12-06 2018-04-13 上海裕乾金融信息服务有限公司 Financial asset quickly matches somebody with somebody mark system
CN107909481A (en) * 2017-12-28 2018-04-13 中科钢研节能科技有限公司 One kind invests build together displaying and allotment of shares information analysis system and method
CN108470032A (en) * 2018-01-30 2018-08-31 天津中科智能识别产业技术研究院有限公司 Overseas garden trade and investment promotion service system based on digital earth frame
CN109299905A (en) * 2018-05-09 2019-02-01 北京京润恒远科技有限公司 A kind of project appraisal method and system
CN109118362A (en) * 2018-07-26 2019-01-01 北京洪泰同创信息技术有限公司 The method and apparatus of commerciality investment and financing transaction
WO2020029400A1 (en) * 2018-08-07 2020-02-13 平安科技(深圳)有限公司 Project recommendation method and apparatus, and computer device and storage medium
CN109214772A (en) * 2018-08-07 2019-01-15 平安科技(深圳)有限公司 Item recommendation method, device, computer equipment and storage medium
CN109214772B (en) * 2018-08-07 2024-01-16 平安科技(深圳)有限公司 Project recommendation method, device, computer equipment and storage medium
CN109064339A (en) * 2018-09-12 2018-12-21 张连祥 A kind of method and system of intelligence inquiry merchant vector environmental information
CN109740914A (en) * 2018-12-28 2019-05-10 武汉金融资产交易所有限公司 A kind of method, storage medium, equipment and system that financial business is assessed, recommended
CN111402063A (en) * 2020-04-07 2020-07-10 上海应用技术大学 Enterprise fund management system based on internet platform
CN112434216A (en) * 2020-11-13 2021-03-02 北京创业光荣信息科技有限责任公司 Intelligent investment project recommendation method and device, storage medium and computer equipment
CN112445973A (en) * 2020-11-13 2021-03-05 北京创业光荣信息科技有限责任公司 Method and device for searching project, storage medium and computer equipment
CN112434216B (en) * 2020-11-13 2024-04-26 海创汇科技创业发展股份有限公司 Intelligent recommendation method and device for investment projects, storage medium and computer equipment
CN112445973B (en) * 2020-11-13 2024-05-24 海创汇科技创业发展股份有限公司 Method, device, storage medium and computer equipment for searching items
CN117688249A (en) * 2024-02-02 2024-03-12 上海银行股份有限公司 Intelligent line throwing matching platform based on data analysis
CN117688249B (en) * 2024-02-02 2024-04-19 上海银行股份有限公司 Intelligent line throwing matching platform based on data analysis

Similar Documents

Publication Publication Date Title
CN107180298A (en) A kind of recommendation method of investment project
US11205129B2 (en) GBDT model feature interpretation method and apparatus
US8676740B2 (en) Attribute estimation system, age estimation system, gender estimation system, age and gender estimation system and attribute estimation method
CN115618941A (en) Training refined machine learning models
JP7409513B2 (en) Machine learning data generation program, machine learning data generation method, and machine learning data generation device
US20220066744A1 (en) Automatic Derivation Of Software Engineering Artifact Attributes From Product Or Service Development Concepts
CN107784519A (en) A kind of advertising results appraisal procedure and server
JP6365032B2 (en) Data classification method, data classification program, and data classification apparatus
CN111199186A (en) Image quality scoring model training method, device, equipment and storage medium
CN108805388A (en) A kind of determination method and apparatus of non-coming year Load Time Series scene
US20130311231A1 (en) Risk management device
US7716145B2 (en) System for supporting user's behavior
CN111723206B (en) Text classification method, apparatus, computer device and storage medium
CN113516185A (en) Model training method and device, electronic equipment and storage medium
EP4287083A1 (en) Determination program, determination apparatus, and method of determining
Ergashev Should risk managers rely on maximum likelihood estimation method while quantifying operational risk?
Pawlicki et al. Prediction of price increase for magic: The gathering cards
Chiang et al. Rank aggregation and prediction with item features
CN112950225A (en) Customer category determination method, device and storage medium
JP6831221B2 (en) Learning device and learning method
CN111539830A (en) Tracking and optimizing method for FOF investment strategy combination
Tian et al. PL-FSCIL: Harnessing the Power of Prompts for Few-Shot Class-Incremental Learning
US20240087028A1 (en) Indicator selection apparatus, indicator selection method, and non-transitory computer-readable medium
CN113409025B (en) Service data extraction method, device and storage medium
CN111080046A (en) Transmission technology maturity assessment method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170919