Prior art keywords
business
quick response
response code
stage
code
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710453431.7A
Other languages
Chinese (zh)
Inventor
杨建康
梁博浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201710453431.7A priority Critical patent/CN107169676A/en
Publication of CN107169676A publication Critical patent/CN107169676A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides the system and method that a kind of engineering material of utilization planar bar code technology is managed, method includes:A, acquisition handling of goods and materials information simultaneously generate corresponding business form;B, corresponding business Quick Response Code generated according to business form;C, by the business Quick Response Code communication transfer of generation to SmartClient;D, in response to receiving come from retracting for SmartClient and reform instruction, return to step a;E, the examination & approval for coming from response to receiving SmartClient pass through instruction, the more content of new business Quick Response Code;F, updated business Quick Response Code and corresponding business form be uploaded to database;The content of business form in g, the request instruction in response to getting making business summary sheet, searching database, makes business summary sheet;H, export business summary sheet.Characteristic of the invention based on Quick Response Code, is carried out when list is transmitted by instant messaging module, the paper form transmission spent time is reduced, so as to improve the transfer rate of list.

Description

A kind of system and method for the engineering material management of utilization planar bar code technology
Technical field
Managed the present invention relates to the engineering material of engineering material management domain, more particularly to a kind of utilization planar bar code technology System and method.
Background technology
The resources area of construction general contract unit includes in the action of daily project handling of goods and materials:With reference to production requirement Goods and materials plan carry report to a higher authorities for approval approve the right to use of foreign exchange it is total;Contact numerous suppliers and carry out assigning for planned order, Joint Production portion builder, subpackage Troop material director and logistics company or the multi-party quantity of driver are checked;Cooperation project quality testing department and management are marched into the arena thing The examination of goods, materials and equipments material;Material issuing quantity for subpackage troop material director is checked;The reconciliation inventory and invoice of monthly supplier Management;It is finally moon sheet of docking company etc..Material department will dock that personnel are numerous and diverse, and task is heavy, particularly written List, no matter hand filling or PC aid in treatment, efficiency and accuracy rate all allow of no optimist.
Quick Response Code has the spies such as storage capacity is big, confidentiality is high, traceability is high, damage resistance is strong, redundant is big, cost is cheap Property, these characteristics are particularly suitable for use in sheet disposal.With the two-dimensional code scanning software on mobile device, it can directly scan Quick Response Code and enter Enter correspondence website, and carry out checking, editing and the operation such as storage again for data.
The content of the invention
The problem of existing in the prior art for solution is above-mentioned or be potential, the invention provides a kind of utilization planar bar code technology Engineering material management system and method, can through whole projects handling of goods and materials, its data statistics efficiency high, pass Pass that speed is fast, time saving environmental protection.
To achieve the above object, the first aspect of the present invention provides a kind of engineering material management of utilization planar bar code technology Method, it includes step:
A, acquisition handling of goods and materials information simultaneously generate corresponding business form;
B, corresponding business Quick Response Code generated according to the business form;
C, by the business Quick Response Code communication transfer of generation to SmartClient;
D, in response to receiving come from retracting for the SmartClient and reform instruction, return to step a;
E, the examination & approval for coming from response to receiving the SmartClient update the business Quick Response Code by instruction Content;
F, the updated business Quick Response Code and the corresponding business form be uploaded to database and stored;
G, the request instruction in response to getting making business summary sheet, retrieve the business form in the database Content, make business summary sheet;And
H, the export business summary sheet.
In certain embodiments, the content of the business Quick Response Code is numbered including the stage;
Also, the step of generation corresponding business Quick Response Code according to the business form, includes:
Formulate the stage corresponding specification between Service Period and stage numbering;
Judge the Service Period of the business form, and corresponding stage numbering is assigned according to the stage rule of correspondence.
In certain embodiments, the Service Period include programming phase, the rewinding stage, acceptance phase, neck the material stage, move back One or more in the goods stage.
In certain embodiments, the content of the business Quick Response Code also includes serial number;
Also, after the operation of the return to step a is carried out each time, in the business Quick Response Code that generates again The serial number carries out numeric order and is incremented by.
In certain embodiments, the content of the business Quick Response Code also includes status number;
Also, the step of content of the renewal business Quick Response Code, includes:
Change the status number of the business Quick Response Code.
In certain embodiments, the status number includes the numbering of copending state and examines the numbering of completion status.
The second aspect of the present invention provides a kind of engineering material management system of utilization planar bar code technology, and it includes:
First receiving module, for obtaining handling of goods and materials information and generating corresponding business form;
Two-dimensional code generation module, for generating corresponding business Quick Response Code according to the business form;
Instant messaging module, for by the business Quick Response Code communication transfer of generation to SmartClient;
Second receiving module, the feedback command of the SmartClient is come from for receiving;
Quick Response Code update module, for updating the business two dimension by instruction in response to the feedback command for examination & approval The content of code;
Jump module, orders first receiving module to be mended for retracting to reform to instruct in response to the feedback command Fill acquisition handling of goods and materials information, update business form;
Database module, the business Quick Response Code and the corresponding business form updated for gathering, is deposited Accumulating is calculated;
3rd receiving module, the request instruction for receiving making business summary sheet, and accessed according to the request instruction The database module, generates business summary sheet;And
Output module, for exporting the business summary sheet.
In certain embodiments, the content of the business Quick Response Code includes stage numbering, serial number and status number.
In certain embodiments, stage numbering includes programming phase, rewinding stage, acceptance phase, leads the material stage, moves back One or more numberings in the goods stage.
In certain embodiments, the status number includes the numbering of copending state and examines the numbering of completion status.
The present invention is due to using above-mentioned technical proposal, and the technique effect for obtaining it is as follows:
1st, the transfer rate of list is improved;
Characteristic based on Quick Response Code, is carried out when list is transmitted by MSN, reduces paper form transmission The spent time, so as to improve the transfer rate of list.
2nd, the storage and retrospective of data are improved;
Have benefited from the effect of database server, a large amount of lists can carry out properly storage keeping, reduce list and lose, damage The generation of bad situations such as, and when reviewing a certain list, the efficiency searched in database is substantially higher seeking in paper form Look for efficiency.
3rd, data statistics efficiency is improved, error is reduced;
Have benefited from the operand of computer, the list of some aggregate types can be automatically generated.Reduce and be manually entered, instead Calculation, repeatedly modification etc. are reviewed, so as to improve operating efficiency, the generation of error is reduced.
4th, energy-conserving and environment-protective;
When list cancels, the usage amount of paper is reduced, the effect of energy-conserving and environment-protective has been reached.
Brief description of the drawings
Technical scheme in order to illustrate the embodiments of the present invention more clearly, makes required in being described below to embodiment Accompanying drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the present invention, for For those of ordinary skill in the art, on the premise of not paying creative work, other can also be obtained according to these accompanying drawings Accompanying drawing.
Fig. 1 be embodiments of the invention in utilization planar bar code technology engineering material management system schematic diagram.
Fig. 2 be embodiments of the invention in utilization planar bar code technology engineering material management method main protocol procedures Figure.
Fig. 3 be embodiments of the invention in utilization planar bar code technology engineering material management method programming phase flow Figure.
Fig. 4 be embodiments of the invention in utilization planar bar code technology engineering material management method phase flow of receiving Figure.
Fig. 5 be embodiments of the invention in utilization planar bar code technology engineering material management method acceptance phase stream Cheng Tu.
Fig. 6 be embodiments of the invention in utilization planar bar code technology engineering material management method neck the material stage stream Cheng Tu.
Fig. 7 be embodiments of the invention in utilization planar bar code technology engineering material management method the return of goods stage stream Cheng Tu.
Embodiment
The present invention is described in further detail with reference to the accompanying drawings and examples.It is understood that this place is retouched The specific embodiment stated is used only for explaining the present invention, rather than limitation of the invention.It also should be noted that, in order to just Part related to the present invention rather than full content are illustrate only in description, accompanying drawing.
The operation flow that the live handling of goods and materials of current construction project is used for:Compiled by PC ends word document Plan list processed → plan singles print production manager and project manager's signature examination & verification examination & approval → plan are singly taken pictures by bitcom (hand Generator terminal, PC ends) pass to supplier → supplier stock one or more material receipt of establishment and deliver to project → project material with goods Department, production division, subpackage troop director etc. combine progress quantity of receiving and check and photograph to record → project quality testing department etc. Combine and receipt is carried out an acceptance inspection and worked out to the batch material report after project manager's examination & approval → acceptance(check) material to be put in storage, in storehouse The batch material is one or many in data renewal → storehouse issues to subpackage troop material director and works out material requistion → project Material department monthly decides monthly statement → project material department with the supplier monthly reconciliation both sides of progress and monthly binds data And work out moon sheet.
We can understand from above-mentioned flow, and existing to receive and dispatch the management deposited to project goods and materials, being related to list has:Plan List, material receipt, receipt, material requistion and monthly statement, wherein two, image photo when further relating to receive.Moreover, at one Material data once deliver once neck material in the case of, at least to transmit establishment 6 times, and not once delivery or storehouse in material The establishment transmission of material book data is then more in the case of not gone out by once neck.Hand weaving list and simple PC ends EXCEL Data statistics, not only workload is heavy, situations such as quantity mistake, leakage item also easily occur, and the property related of data is not also strong.
Therefore, the present invention is intended to provide the live goods and material handling method and a kind of new engineering of a kind of new engineering construction The live material Management System of construction, its be based on planar bar code technology, can through whole projects handling of goods and materials, endeavour In efficient, the energy-conservation of realizing the live handling of goods and materials of projects.
First, as shown in fig.1, the first aspect of the present invention provides a kind of engineering material pipe of utilization planar bar code technology Reason system, specifically includes following module:
First receiving module 11, for obtaining handling of goods and materials information and generating corresponding business form;
Two-dimensional code generation module 12, for generating corresponding business Quick Response Code according to business form;
Instant messaging module 13, for by the business Quick Response Code communication transfer of generation to SmartClient;
Second receiving module 14, the feedback command of SmartClient is come from for receiving;
Quick Response Code update module 15, for being examined in response to feedback command by instruction in more new business Quick Response Code Hold;
Jump module 16, the supplement acquisition of the first receiving module is ordered for retracting to reform to instruct in response to feedback command Handling of goods and materials information, renewal business form;
Database module 17, the business Quick Response Code and corresponding business form updated for gathering carry out storage computing;
3rd receiving module 18, the request instruction for receiving making business summary sheet, and visited according to the request instruction The database module is asked, business summary sheet is generated;And
Output module 19, for exporting business summary sheet.
Coordinate again shown in Fig. 2, the engineering material that the second aspect of the present invention provides a kind of utilization planar bar code technology is managed Method, is comprised the following steps that:
Step a, acquisition handling of goods and materials information simultaneously generate corresponding business form;
Step b, corresponding business Quick Response Code generated according to the business form;
Step c, by the business Quick Response Code communication transfer of generation to SmartClient;
Step d, in response to receiving come from retracting for the SmartClient and reform instruction, return to step a, supplement is obtained Take handling of goods and materials information and update business form;
Step e, the examination & approval for coming from response to receiving the SmartClient update the business two dimension by instruction The content of code;
Step f, the updated business Quick Response Code and the corresponding business form be uploaded to database and deposited Storage;
Step g, the request instruction in response to getting making business summary sheet, retrieve the business in the database The content of list, makes business summary sheet;And
Step h, the export business summary sheet.
It is preferred that the content of business Quick Response Code is numbered including the stage;Also, corresponding business two is generated according to business form The step of dimension code, includes:
Formulate the stage corresponding specification between Service Period and stage numbering;And
Judge the Service Period of business form, and corresponding stage numbering is assigned according to the stage rule of correspondence.
Wherein, Service Period includes one kind in programming phase, rewinding stage, acceptance phase, neck material stage, return of goods stage Or it is a variety of.
It is preferred that the content of business Quick Response Code also includes serial number;Also, in the behaviour for carrying out return to step a each time After work, numeric order is carried out to the serial number in the business Quick Response Code that generates again and is incremented by.
It is preferred that the content of business Quick Response Code also includes status number;Also, the step of more content of new business Quick Response Code Including:The status number of modification business Quick Response Code.
Wherein, status number includes the numbering of copending state and examines the numbering of completion status.
Characteristic of the invention based on Quick Response Code, is carried out by instant messaging module when list is transmitted, reduces papery table Time spent by uniport, so as to improve the transfer rate of list;Have benefited from the effect of database module, a large amount of list energy Properly storage keeping is carried out, the generation for situations such as list is lost, damaged is reduced, and when reviewing a certain list, in database The efficiency of interior search is substantially higher the searching efficiency in paper form.
With reference to shown in Fig. 3~7, using the engineering material management system and engineering of the utilization planar bar code technology of the present invention Goods and material handling method, to each Service Period (programming phase, rewinding stage, acceptance phase, neck material rank of whole engineering project Section, return goods the stage) make being specifically described respectively, and the form data between each stage is realized shared, organically combines, constitutes Circulate traceability mechanism.
Before this, following explanation of nouns is first provided herein, to be hereinafter described:
1. user
User is concrete operations person in this patent, and wherein user's first is project material departmental staff;User's second is production Departmental staff;User third is production manager;User's fourth is project manager;User penta is project quality testing department personnel;User oneself be Subpackage head of the unit;User is supplier heptan, is determined by bid result;Pungent user is material department person in charge;User's nonyl For purchasing department personnel, user's last of the ten Heavenly stems is project data departmental staff.
2. Quick Response Code
The numbering of the bit code of business two is in this patent:N-n-1(2).
Wherein N represents stage numbering, 1- plan Quick Response Codes;2- rewinding Quick Response Codes;3- checks and accepts Quick Response Code;4- neck material two dimensions Code;5- return of goods Quick Response Codes.
Wherein n represents serial number, 001- first, 002- second, by that analogy.
Wherein 1 (2) represent status number, the copending states of 1-, 2- examination & approval completion statuses
Retrieve storage system in 3.PC ends
PC ends retrieval storage system working method is that setting is retrieved in specific flow, picked up and stored, and is reached To automatically forming each summary sheet.
4. database and prompt database
State will upload database automatically for the business Quick Response Code that examination & approval are completed, and the database does not possess calculation function, single As storage service 2 D code information function, data volume is larger, and database update backup cycle is selected according to server capacity.
Prompt database then after the regulation bit code of business two scanning, cumulative fortune of successively decreasing will be carried out to the relevant parameter of setting Calculate, access convenient, data volume is smaller, and calculation process vestige is periodically carried out according to server capacity and is cleared up.
5. electronic signature
When the live confirmation of each user progress, examination & verification and examination & approval etc. judge behavior, it is prior that signature agreement opinion then inserts its The electronic signature of storage, forms processing vestige.
6. the explanation of value in table
List is various in this patent, now does explained below:
Value A is material equipment title, and it has multiple parameters, including model specification a, measurement unit b, planned quantity c, unit price D, remarks e, plan into field time.Wherein A1 represents Section 1 material, and its parameter is respectively a1, b1, c1 ... number parameter c11 The first time planned quantity of A1 materials is represented, cmn represents the n-th planned quantity of Am materials.
Other values are generally fixed value, and modification is configured in system initial setting up.
(1) programming phase
The content of business Quick Response Code is shown in Table 1 plan list signal table in this stage, and operation flow refers to Fig. 3 plan Phase flow figure.
User's second is according to construction speed, produce reality situation and onsite inventory in PC ends software project workout system (this hair Bright system) in, the content to table 1 is filled in, and is generated by two-dimension code generator (i.e. the two-dimensional code generation module of system) Numbering is:1-n-1 Quick Response Code, generation Quick Response Code after by MSN (i.e. the instant messaging module of system) or its His approach carries out the transmission of Quick Response Code, and Yong Hubing, user's fourth retract use using the corresponding judgement of basis after mobile device scanning, selection Updated at the second of family or agree to carry out next step operation, two bit code code identifications are after this workflow examination and approval terminates:1-n-2, and It is automatic to upload database.PC ends retrieval storage system (present system) is then started working, and the value A of table 1 parameter a-e is picked up Take, access and computing, be finally shown in Table 2 in the end of month export monthly plan summary sheet (i.e. business summary sheet).
(2) receives the stage
Two-dimentional digital content is shown in Table 3 receiving note signal tables in this stage, and operation flow, which refers to Fig. 4, receives phase flow figure.
User's first will number the Quick Response Code for being 1-n-2 and be transferred to user's heptan by MSN or other means, use Family heptan is delivered by mobile terminal software after programmed function scanning, understands the content of this plan, and starts stock.After the completion of stock Start to edit receiving note information, it can be seen from the content of table 3, its value has part identical in table 1, then mobile terminal delivery making software will Value A and its parameter (remove parameter c), value B, value C etc. to insert in table 3, the intermediate value A of table 3 parameter c in automatic crawl Quick Response Code 1-n-2 Need to be manually filling according to stock situation, this is not got ready the goods, fills out 0, be manually filling completion and then generate Quick Response Code 2-n-1, Quick Response Code 1-n-2 can Multiple-Scan carry out delivery editor, until by Quick Response Code 1-n-2 contents all delivery complete.
Two bit code 2-n-1 are together delivered to agreed address by user's heptan by MSN and other approach with goods, are used Family first, Yong Huyi, user while receiving by mobile device scan Quick Response Code 2-n-1, control two bit code contents to Every material quantity of goods is checked, and makes corresponding judgement, and selection is retracted and updates or agrees under progress at user heptan Single stepping, two bit code code identifications are after this workflow examination and approval terminates:2-n-2, and database is uploaded automatically.The retrieval storage of PC ends System is then started working, and the value A of table 3 parameter a-e is picked up, accessed and computing, finally the end of month export it is monthly enter script holder Record table (being shown in Table 4).
(3) acceptance phase
Two-dimentional digital content is shown in Table 5 receipt signal tables in this stage, and operation flow refers to Fig. 5 acceptance phase flow charts.
User's first scans Quick Response Code 2-n-2 using mobile terminal software acceptance list programmed function, it can be seen from the content of table 5, its Value has part identical with table 3, then delivery making software in mobile terminal will capture value A and its part in Quick Response Code 2-n-2 automatically and join Number, value B, value C etc. are inserted in table 5, and user's nail root carries out manual editing, generation two according to firm price to value A parameter d Code 3-n-1 is tieed up,.The temporary value A without contract price, parameter d first can temporarily fill out 0, Quick Response Code 2-n-2 can Multiple-Scan carry out an acceptance inspection volume Volume, until all filling in completion by value A parameters d in Quick Response Code 2n-2.
User's first is transferred to two bit code 3-n-1 at user penta by MSN and other approach.User penta makes After special equipment Quick Response Code 3-n-1, according to concerned countries and industry standard, the quality to material carries out an acceptance inspection, and makes phase It should judge, selection is retracted to be updated or agree to carry out next step operation at user's first, and user's first is then entered to underproof material Line number amount mark 0, then reports and carries out subsequent return flow, user's fourth is examined according to the examination opinion of user penta again, And corresponding judgement is made, selection is retracted to be updated or agrees to carry out next step operation at user's first.After this workflow examination and approval terminates Two bit code code identifications are:3-n-2, and database is uploaded automatically.PC ends retrieval storage system is then started working, to the value A's of table 5 Parameter is picked up, accessed and computing, is finally updated in instant inventory database and (is shown in Table 12), and exports the moon at the end of month Spend goods and materials statement of account (being shown in Table 6).
(4) neck material, cancelling stocks stage
Two-dimentional digital content is shown in Table 7 material requistion signal tables in this stage, and the material returning slip of table 8 signal table, operation flow refers to Fig. 6 Neck material, material returned phase flow figure.
User's second according to user's production requirement in mobile phone terminal software neck material, material returned workout system, by table 7, table 8 Hold into edlin, and numbering is generated by two-dimension code generator and be:By instant after 4-n-1 Quick Response Code, generation Quick Response Code Bitcom or other approach carry out the transmission of Quick Response Code, and basis is accordingly sentenced after Yong Hubing, user's first are scanned using mobile device Disconnected, selection is retracted to be updated or agrees to carry out next step operation at user's second, two bit codes coding mark after this workflow examination and approval terminates Know and be:4-n-2, and database is uploaded automatically.PC ends retrieval storage system is then started working, and is carried out in instant inventory database Update (being shown in Table 12) and the parameter to table 7, the value H of table 8, value A is picked up, accessed and computing, it is finally monthly in the end of month export Subcontractor receives summary sheet (being shown in Table 9).
(5) return process
Two-dimentional digital content is shown in Table 10 returning note signal tables in this flow, and operation flow refers to Fig. 5 return of goods phase flow figures.
When finding that material is off quality in acceptance phase, the scanning of user's first is passed over by user penta or user's fourth Quick Response Code 3-n-1, enters edlin, it can be seen from the content of table 10, its value has in table 5 in mobile phone terminal software return of goods workout system Part is identical, then mobile terminal delivery making software inserts value A and its parameter, value B, value C etc. in automatic crawl Quick Response Code 3-n-1 In table 10, the intermediate value A of table 10 parameter j needs actual conditions to be manually filling, and this is not returned goods, fills out 0, is manually filling completion and then gives birth to Into Quick Response Code 5-n-1.
User's first is transferred to two bit code 5-n-1 at user's second by MSN and other approach.User's second root Corresponding judgement is made according to actual conditions, selection is retracted to be updated or agree to carry out next step operation at user's first, and user passes through heptan Corresponding judgement is made at scene after confirming, selection is retracted to be updated or agree to carry out next step operation at user's first.This flow is examined Criticizing two bit code code identifications after terminating is:
5-n-2, and database is uploaded automatically.PC ends retrieval storage system is then started working, and the parameter to the value A of table 10 is carried out Pickup, access and computing, monthly return of goods record sheet (being shown in Table 11) is exported at the end of month.
Table 1 plans single signal table
The monthly plan of table 2 collects signal table
The material receipt of table 3 illustrates table
The receipt of table 5 illustrates table
The monthly goods and materials advice of settlement signal table of table 6
The material requistion of table 7 illustrates table
The material returning slip of table 8 illustrates table
Table September degree subcontractor, which receives, collects signal table
The returning note of table 10 illustrates table
The just in time inventory summary sheet of table 12 illustrates table
It should be noted that structure, ratio, size depicted in this specification institute accompanying drawings etc., only to coordinate Content disclosed in bright book, so that those skilled in the art understands and reads, is not limited to the enforceable limit of the present invention Fixed condition, therefore do not have technical essential meaning, the modification of any structure, the change of proportionate relationship or the adjustment of size, not Under influence effect of the invention that can be generated and the purpose that can reach, it all should still fall and be obtained in disclosed technology contents In the range of covering.Meanwhile, it is cited such as " on ", " under ", "left", "right", " centre " and " one " etc. in this specification Term, is merely convenient to understanding for narration, and is not used to limit enforceable scope of the invention, the change of its relativeness or tune It is whole, under without essence change technology contents, when being also considered as enforceable category of the invention.
Described above is only presently preferred embodiments of the present invention, not does any formal limitation to the present invention, though So the present invention is disclosed above with preferred embodiment, but is not limited to the present invention, any to be familiar with this professional technology people Member, in the range of technical solution of the present invention is not departed from, when the technology contents using the disclosure above make a little change or repair The equivalent embodiment for equivalent variations is adornd, as long as being the content without departing from technical solution of the present invention, the technology according to the present invention is real Any simple modification, equivalent variations and modification that confrontation above example is made, still fall within the scope of technical solution of the present invention It is interior.

Claims (10)

1. a kind of engineering material management method of utilization planar bar code technology, it is characterised in that including step:
A, acquisition handling of goods and materials information simultaneously generate corresponding business form;
B, corresponding business Quick Response Code generated according to the business form;
C, by the business Quick Response Code communication transfer of generation to SmartClient;
D, in response to receiving come from retracting for the SmartClient and reform instruction, return to step a;
E, the examination & approval for coming from response to receiving the SmartClient update the interior of the business Quick Response Code by instruction Hold;
F, the updated business Quick Response Code and the corresponding business form be uploaded to database and stored;
G, the request instruction in response to getting making business summary sheet, retrieve the interior of the business form in the database Hold, make business summary sheet;And
H, the export business summary sheet.
2. the engineering material management method of planar bar code technology is utilized as claimed in claim 1, it is characterised in that:The business two The content for tieing up code is numbered including the stage;
Also, the step of generation corresponding business Quick Response Code according to the business form, includes:
Formulate the stage corresponding specification between Service Period and stage numbering;
Judge the Service Period of the business form, and corresponding stage numbering is assigned according to the stage rule of correspondence.
3. the engineering material management method of planar bar code technology is utilized as claimed in claim 2, it is characterised in that:The business rank Section includes the one or more in programming phase, rewinding stage, acceptance phase, neck material stage, return of goods stage.
4. the engineering material management method of planar bar code technology is utilized as claimed in claim 1, it is characterised in that:The business two Tieing up the content of code also includes serial number;
Also, after the operation of the return to step a is carried out each time, described in the business Quick Response Code that generates again Serial number carries out numeric order and is incremented by.
5. the engineering material management method of planar bar code technology is utilized as claimed in claim 1, it is characterised in that:The business two Tieing up the content of code also includes status number;
Also, the step of content of the renewal business Quick Response Code, includes:
Change the status number of the business Quick Response Code.
6. the engineering material management method of planar bar code technology is utilized as claimed in claim 5, it is characterised in that:The state is compiled Number include copending state numbering and examine completion status numbering.
7. a kind of engineering material management system of utilization planar bar code technology, it is characterised in that including:
First receiving module, for obtaining handling of goods and materials information and generating corresponding business form;
Two-dimensional code generation module, for generating corresponding business Quick Response Code according to the business form;
Instant messaging module, for by the business Quick Response Code communication transfer of generation to SmartClient;
Second receiving module, the feedback command of the SmartClient is come from for receiving;
Quick Response Code update module, for updating the business Quick Response Code by instruction in response to the feedback command for examination & approval Content;
Jump module, orders the first receiving module supplement to obtain for retracting to reform to instruct in response to the feedback command Take handling of goods and materials information, update business form;
Database module, the business Quick Response Code and the corresponding business form updated for gathering carry out storage fortune Calculate;
3rd receiving module, the request instruction for receiving making business summary sheet, and according to being accessed the request instruction Database module, generates business summary sheet;And
Output module, for exporting the business summary sheet.
8. the engineering material management system of planar bar code technology is utilized as claimed in claim 7, it is characterised in that:The business two Tieing up the content of code includes stage numbering, serial number and status number.
9. the engineering material management system of planar bar code technology is utilized as claimed in claim 8, it is characterised in that:The stage compiles Number include programming phase, rewinding stage, acceptance phase, neck material stage, one or more numberings in the return of goods stage.
10. the engineering material management system of planar bar code technology is utilized as claimed in claim 8, it is characterised in that:The state Numbering includes the numbering of copending state and examines the numbering of completion status.
CN201710453431.7A 2017-06-15 2017-06-15 A kind of system and method for the engineering material management of utilization planar bar code technology Pending CN107169676A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710453431.7A CN107169676A (en) 2017-06-15 2017-06-15 A kind of system and method for the engineering material management of utilization planar bar code technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710453431.7A CN107169676A (en) 2017-06-15 2017-06-15 A kind of system and method for the engineering material management of utilization planar bar code technology

Publications (1)

Publication Number Publication Date
CN107169676A true CN107169676A (en) 2017-09-15

Family

ID=59818998

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710453431.7A Pending CN107169676A (en) 2017-06-15 2017-06-15 A kind of system and method for the engineering material management of utilization planar bar code technology

Country Status (1)

Country Link
CN (1) CN107169676A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108460008A (en) * 2018-03-20 2018-08-28 深圳中兴网信科技有限公司 Document generation method, system, computer equipment and readable storage medium storing program for executing
CN108596569A (en) * 2018-04-19 2018-09-28 重庆市筑云科技有限责任公司 A kind of list measures and procedures for the examination and approval based on pattern recognition technique
CN108877874A (en) * 2018-05-29 2018-11-23 北京大学 A kind of clinical data acquisition method based on two dimensional code
CN109784738A (en) * 2019-01-22 2019-05-21 绍兴大明电力建设有限公司 The measures and procedures for the examination and approval and examination & approval device
CN111222966A (en) * 2018-11-26 2020-06-02 上海阿米特数据系统有限公司 Automatic account checking system and implementation method
CN111626675A (en) * 2020-05-26 2020-09-04 北京金山云网络技术有限公司 Information processing method, information processing device, electronic equipment and computer readable storage medium
CN111915322A (en) * 2019-05-09 2020-11-10 美光科技公司 Scanning encoded images on physical objects to determine parameters for a manufacturing process

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049837A (en) * 2012-12-24 2013-04-17 浙江中呼科技有限公司 Mobile storage information management system with multiple terminals for updating and storing information in real time
US20140229337A1 (en) * 2013-02-08 2014-08-14 Interface Optoelectronics Corporation Order management system and order management method thereof
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103049837A (en) * 2012-12-24 2013-04-17 浙江中呼科技有限公司 Mobile storage information management system with multiple terminals for updating and storing information in real time
US20140229337A1 (en) * 2013-02-08 2014-08-14 Interface Optoelectronics Corporation Order management system and order management method thereof
CN105225040A (en) * 2015-09-25 2016-01-06 中铁建电气化局集团南方工程有限公司 Based on the preparation of construction material overall process method for tracing of Internet of Things

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108460008A (en) * 2018-03-20 2018-08-28 深圳中兴网信科技有限公司 Document generation method, system, computer equipment and readable storage medium storing program for executing
CN108460008B (en) * 2018-03-20 2022-05-06 深圳中兴网信科技有限公司 Bill generation method, system, computer equipment and readable storage medium
CN108596569A (en) * 2018-04-19 2018-09-28 重庆市筑云科技有限责任公司 A kind of list measures and procedures for the examination and approval based on pattern recognition technique
CN108877874A (en) * 2018-05-29 2018-11-23 北京大学 A kind of clinical data acquisition method based on two dimensional code
CN111222966A (en) * 2018-11-26 2020-06-02 上海阿米特数据系统有限公司 Automatic account checking system and implementation method
CN111222966B (en) * 2018-11-26 2023-09-26 上海阿米特数据系统有限公司 Automatic account checking system and implementation method
CN109784738A (en) * 2019-01-22 2019-05-21 绍兴大明电力建设有限公司 The measures and procedures for the examination and approval and examination & approval device
CN111915322A (en) * 2019-05-09 2020-11-10 美光科技公司 Scanning encoded images on physical objects to determine parameters for a manufacturing process
CN111626675A (en) * 2020-05-26 2020-09-04 北京金山云网络技术有限公司 Information processing method, information processing device, electronic equipment and computer readable storage medium

Similar Documents

Publication Publication Date Title
CN107169676A (en) A kind of system and method for the engineering material management of utilization planar bar code technology
CN107958328A (en) Green assembled architecture digitlization construct platform and its method of work
CN110880097B (en) Project progress simulation display method and device
CN108346029A (en) A kind of customization credit system of support credit factory mode
CN110362936B (en) Power station small pipeline secondary design construction method based on BIM technology
Kumar et al. A CBR-based decision support system framework for construction supply chain risk management
CN109359842A (en) A kind of single multivariate data examines processing method, apparatus and terminal device
CN112990829B (en) Asset management system based on block chain
CN111507686B (en) Automatic budget system and method for engineering design change
CN107958331A (en) A kind of electricity power engineering of GPU multithreadings marks clearly method automatically
Kang et al. Information-integration maturity model for the capital projects industry
CN101976399A (en) Integrated reviewing method based on reviewing work system
CN111597265B (en) Block chain-based electronic commerce commodity anti-counterfeiting traceability management system
CN101706915A (en) System and method for adjusting outbound cost
Tsoi et al. Knowledge-based customization of enterprise applications
CN114926232B (en) Material purchasing system, method, controller and storage medium
CN108197158A (en) A kind of information acquisition method and its equipment
Bertolini et al. A scrumban board-based approach to improve material flow in engineering to order (ETO) companies: an industrial application based on action research
Ng et al. Liability factors and conceptual framework for contracts to manage design for digital fabrication in construction projects
CN114418527A (en) Project flow management system and method based on software componentization
Akinsola et al. Construction planning process improvement using information technology tools
Kaverin et al. Lessons Learnt from the use of the Manufacturing Database for the ITER Magnet System
CN110570160A (en) Railway four-electricity construction material management method
CN110070276A (en) A kind of prison prisoner reform through labour total management system and method
Sherman et al. Identifying and Categorizing Risks Incumbent in US Nuclear Power Plant Construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication