CN107164622A - Press quenching equipment and product production line - Google Patents

Press quenching equipment and product production line Download PDF

Info

Publication number
CN107164622A
CN107164622A CN201710418199.3A CN201710418199A CN107164622A CN 107164622 A CN107164622 A CN 107164622A CN 201710418199 A CN201710418199 A CN 201710418199A CN 107164622 A CN107164622 A CN 107164622A
Authority
CN
China
Prior art keywords
quenching
spout
tank
press
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710418199.3A
Other languages
Chinese (zh)
Other versions
CN107164622B (en
Inventor
刘煌萍
梁金飞
梁泽森
张世集
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong galuminium Aluminium Co. Ltd.
Original Assignee
GALUMINIUM TECHNOLOGY Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GALUMINIUM TECHNOLOGY Co filed Critical GALUMINIUM TECHNOLOGY Co
Priority to CN201710418199.3A priority Critical patent/CN107164622B/en
Publication of CN107164622A publication Critical patent/CN107164622A/en
Application granted granted Critical
Publication of CN107164622B publication Critical patent/CN107164622B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/63Quenching devices for bath quenching
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21DMODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
    • C21D1/00General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
    • C21D1/62Quenching devices
    • C21D1/63Quenching devices for bath quenching
    • C21D1/64Quenching devices for bath quenching with circulating liquids

Abstract

The invention provides a kind of press quenching equipment and product production line, belong to quenching technology field.The press quenching equipment includes quenching unit, quenching unit has quenching tank, the support member transported for section bar is provided with quenching unit, the side of the bottom land of the remote quenching tank of support member forms the transport channel transported for section bar, quenching unit is provided with the first spout, first spout is located at one end of quenching unit, and the opening of the first spout is set towards the center of quenching tank and tilting towards transport channel.When quenching liquid in quenching tank will overflow, the quenching liquid that the first spout being obliquely installed is ejected has the trend for hindering it to overflow, when profile carrying is transported in quenching tank, in the presence of quenching liquid flows and mutually impacted repeatedly in quenching tank, quenching operation is carried out to section bar, preferably, overall using effect is preferable for quenching effect.The product production line includes online quenching apparatus, and it has the repertoire of the press quenching equipment.

Description

Press quenching equipment and product production line
Technical field
The present invention relates to quenching technology field, in particular to a kind of press quenching equipment and product production line.
Background technology
Aluminium and its alloy have a series of excellent performances, in the application of metal material, and the application of aluminium is only second to steel The application of material, occupies second.Particularly after World War II, the war industry of aluminium turns to civilian industry, enters And enter the every aspect of people's lives, as developing national economy and the weight for improving people's material life and the level of cultural life Want basic material.Social required quantity is increased rapidly, and application field is constantly widened.
In the hot extrusion process of aluminium alloy extrusions, the aluminum alloy materials of fritting state are in extrusion die, aluminium alloy type The temperature of material can reach 500-600 DEG C, at this moment, and the hardness and intensity of section bar are relatively low, in order to improve aluminium alloy extrusions hardness and Intensity, need to carry out Quenching Treatment to the aluminium alloy extrusions of high temperature.
Inventor has found that traditional quenching apparatus at least has the following disadvantages under study for action:
Quenching effect is poor;
Overall using effect is poor.
The content of the invention
Object of the present invention is to provide a kind of press quenching equipment, improve the deficiencies in the prior art, it can pass through When quenching liquid in quenching liquid of first spout into quenching tank needed for flash quenching, quenching tank will overflow, it is obliquely installed The quenching liquid that first spout is ejected has the trend for hindering it to overflow, when profile carrying is transported in quenching tank, and quenching liquid is in quenching In the presence of flowing and mutually being impacted repeatedly in groove, quenching operation is carried out to section bar.In actual quenching process, it can adjust The hydraulic pressure of the whole quenching liquid ejected, the quenching liquid that the first spout is ejected enters in quenching tank, and water level rises in quenching tank, water Potential energy enough exceeds the upper surface of section bar, so as to submerge section bar, it is not necessary to by baffle plate water level raising.Its quenching effect is preferably, whole Body using effect is preferable.Its is reasonable in design, can greatly improve quenching efficiency, reduces section bar production cost.
Another object of the present invention is to there is provided a kind of product production line, it includes press quenching mentioned above and set Standby, it has the repertoire of the press quenching equipment, and the cooling tower can endlessly supply water for the first spout, integrally make It is preferable with effect.
What embodiments of the invention were realized in:
The embodiment provides a kind of press quenching equipment, it includes quenching unit, and quenching unit has quenching The support member transported for section bar is provided with groove, quenching unit, the side of the bottom land of the remote quenching tank of support member, which is formed, to be used The transport channel transported in section bar, quenching unit is provided with the first spout, and the first spout is located at one end of quenching unit, the first spray The opening of mouth is towards the center of quenching tank and tilts towards transport channel setting.
Specifically, the press quenching equipment can be by the first spout into quenching tank needed for flash quenching quenching liquid, When quenching liquid in quenching tank will overflow, the quenching liquid that the first spout being obliquely installed is ejected has that hinders it to overflow to become Gesture, when profile carrying is transported in quenching tank, in the presence of quenching liquid flows and mutually impacted repeatedly in quenching tank, enters to section bar Row quenching operation, preferably, overall using effect is preferable for quenching effect.Its is reasonable in design, can greatly improve quenching efficiency, reduction Section bar production cost.
Optionally, the quantity of the first spout is two, and two the first spouts are located at the two ends of quenching unit respectively.
Optionally, quenching unit is provided with least two water jet guided parts, and two water jet guided parts being oppositely arranged are with quenching The inner surface connection of fiery device, forms liquid storage cavity between two water jet guided parts and quenching unit, two water jet guided parts it Between have gap, gap be located at water jet guided part close quenching tank center one end, gap formation the first spout.
Optionally, there is gap between support member and the bottom land of quenching tank, formed between support member and the bottom land of quenching tank The flow channel flowed for quenching liquid.
Optionally, quenching unit is additionally provided with the second spout, and the opening of the second spout is positioned at the bottom land of quenching tank and close The center of quenching tank.
Optionally, quenching unit is additionally provided with the quenching pipe with the first spout and the second spout connection, and quenching pipe is provided with Control the valve of the first spout and the second spout.
Optionally, quenching unit is additionally provided with least two locating parts, and locating part is located at the two ends of quenching tank, relative two The limit channels transported for section bar are formed between individual locating part, limit channels correspond to transport channel.
Optionally, the two ends of quenching unit are additionally provided with drainage element, and drainage element has drainage channel, and drainage channel includes row The mouth of a river and the water inlet connected with quenching tank, discharge outlet are located at one end of the remote quenching tank of drainage element.
Optionally, press quenching equipment also includes captation, and captation has water leg, the opening direction of water leg Discharge outlet.
Embodiments of the invention additionally provide a kind of product production line, and it includes cooling tower and press quenching mentioned above Equipment, it is used for cooling tower to be supplied water in the first spout.
Compared with prior art, the beneficial effect of the embodiment of the present invention is:
In summary, the quenching that the press quenching equipment can be by the first spout into quenching tank needed for flash quenching When quenching liquid in liquid, quenching tank will overflow, the quenching liquid that the first spout being obliquely installed is ejected, which has, hinders its spilling Trend, when profile carrying is transported in quenching tank, quenching liquid in quenching tank repeatedly flow and mutually impact in the presence of, to type Material carries out quenching operation.In actual quenching process, the hydraulic pressure of the quenching liquid ejected can be adjusted, the first spout is ejected Quenching liquid enter in quenching tank, water level rises in quenching tank, and water level can exceed the upper surface of section bar, so as to submerge section bar, Need not be by baffle plate water level raising.Preferably, overall using effect is preferable for its quenching effect.Its is reasonable in design, can carry significantly High quenching efficiency, reduces section bar production cost.
Brief description of the drawings
In order to illustrate the technical solution of the embodiments of the present invention more clearly, below will be attached to what is used required in embodiment Figure is briefly described, it will be appreciated that the following drawings illustrate only certain embodiments of the present invention, therefore is not construed as pair The restriction of scope, for those of ordinary skill in the art, on the premise of not paying creative work, can also be according to this A little accompanying drawings obtain other related accompanying drawings.
Fig. 1 is the schematic diagram under the first visual angle for the press quenching equipment that the embodiment of the present invention 1 is provided;
Fig. 2 is the schematic diagram under second of visual angle of the press quenching equipment shown in Fig. 1;
Fig. 3 is the schematic diagram under the third visual angle of the press quenching equipment shown in Fig. 1;
Fig. 4 is the schematic diagram under the 4th kind of visual angle of the press quenching equipment shown in Fig. 1.
Icon:100- press quenching equipment;200- section bars;10- quenching units;101- quenching tanks;102- transport channels; The spouts of 103- first;104- flow channels;The spouts of 105- second;106- limit channels;11- support members;12- water jet guided parts; 120- liquid storage cavities;121- water inlet pipe mouths;13- quenching pipes;The valves of 131- first;The valves of 132- second;14- locating parts;15- is arranged Water part;151- drainage channels;1511- water inlets;1512- discharge outlet;20- captations;201- water legs;202- water legs are opened Mouthful.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention In accompanying drawing, the technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is A part of embodiment of the present invention, rather than whole embodiments.The present invention implementation being generally described and illustrated herein in the accompanying drawings The component of example can be arranged and designed with a variety of configurations.
Therefore, the detailed description of embodiments of the invention below to providing in the accompanying drawings is not intended to limit claimed The scope of the present invention, but be merely representative of the present invention selected embodiment.Based on the embodiment in the present invention, this area is common The every other embodiment that technical staff is obtained under the premise of creative work is not made, belongs to the model that the present invention is protected Enclose.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi It is defined in individual accompanying drawing, then it further need not be defined and explained in subsequent accompanying drawing.
In the description of the invention, it is necessary to explanation, term " " center ", " on ", " under ", "left", "right", " level ", The orientation or position relationship of the instructions such as " interior ", " outer " be based on orientation shown in the drawings or position relationship, or the invention production The orientation or position relationship usually put when product are used, are for only for ease of the description present invention and simplify description, rather than indicate Or imply that the device or element of meaning must have specific orientation, with specific azimuth configuration and operation, therefore be not understood that For limitation of the present invention.In addition, term " first ", " second " etc. are only used for distinguishing description, and it is not intended that indicating or dark Show relative importance.
In addition, term " level " is not offered as requiring part abswolute level or pendency, but it can be slightly tilted.Such as " water It is flat " only refer to its direction with respect to more level for " vertical ", it is not that the expression structure must be fully horizontal, but can To be slightly tilted.
In the description of the invention, in addition it is also necessary to explanation, unless otherwise clearly defined and limited, term " setting ", " installation ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly be connected Connect;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected to by intermediary, can To be the connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition Concrete meaning in the present invention.
Embodiment 1
Fig. 1-Fig. 4 is refer to, a kind of press quenching equipment 100 is present embodiments provided, it includes quenching unit 10, is quenched Device 10 has quenching tank 101, is provided with the support member 11 transported for section bar 200 in quenching unit 10, support member 11 it is remote Side from the bottom land of quenching tank 101 forms the transport channel 102 that is transported for section bar 200, and quenching unit 10 is provided with first Spout 103, the first spout 103 is located at one end of quenching unit 10, and the opening of the first spout 103 is towards the center of quenching tank 101 And inclination is set towards transport channel 102.
Explanation is needed exist for, is not had to preferably embody in the structure of online quenching apparatus 100, Fig. 1, Fig. 2 and Fig. 3 There is the position that section bar 200 is embodied in the position for embodying section bar 200, Fig. 4.
The support member 11 can be made of graphite cake.
Graphite cake belongs to preferably fire resisting, wear-resisting and resistant material, in smelting process, can play protection raw material Effect;It can quite be slided in the range of -200 DEG C to 2000 DEG C with 100m/s speed, use no or little lubricating oil;Its Can be with resistance to various corrosive gases or liquid.The abrasion during section bar 200 is transported can be reduced using graphite cake, raising is quenched online The service life of fiery equipment 100.
Referred to herein as center, it can be understood as the middle part of the quenching tank 101.
The opening of first spout 103 is to tilt towards transport channel 102, that is to say, that the quenching in quenching tank 101 When liquid will overflow, the quenching liquid that the first spout 103 persistently sprays can play a part of impact to the quenching liquid that will be overflowed, Make it have the function of hindering quenching liquid to overflow.
Specifically, the press quenching equipment 100 can be by the first spout 103 into quenching tank 101 needed for flash quenching Quenching liquid, when the quenching liquid in quenching tank 101 will overflow, the quenching liquid tool that the first spout 103 being obliquely installed is ejected Have hinder its overflow trend, when section bar 200 is transported to quenching tank 101, quenching liquid in quenching tank 101 repeatedly flowing and Mutually in the presence of impact, quenching operation is carried out to section bar 200.In actual quenching process, quenching of ejecting can be adjusted The hydraulic pressure of fiery liquid, the quenching liquid that the first spout 103 is ejected enters in quenching tank 101, and water level rises in quenching tank 101, water level The upper surface of section bar 200 can be exceeded, so as to submerge section bar 200, it is not necessary to by baffle plate water level raising.Its quenching effect compared with Good, overall using effect is preferable.Its is reasonable in design, can greatly improve quenching efficiency, reduces the production cost of section bar 200.
Optionally, the quantity of the first spout 103 is two, and two the first spouts 103 are located at the two of quenching unit 10 respectively End.
Explanation is needed exist for, the structure of the quenching unit 10 can be that relative symmetry is set, that is to say, that quenching The two ends of device 10 are provided with the first spout 103, and two the first spouts 103 are quenched to the central-injection of quenching tank 101 simultaneously Liquid, impact effect is more obvious.
With reference to Fig. 3 and Fig. 4, optionally, quenching unit 10 is provided with least two water jet guided parts 12, two be oppositely arranged Individual water jet guided part 12 is connected with the inner surface of quenching unit 10, and storage is formed between two water jet guided parts 12 and quenching unit 10 There is gap, gap is located at the close quenching tank 101 of water jet guided part 12 between liquid air chamber 120, two water jet guided parts 12 The one end at center, gap forms the first spout 103.
It can be seen that each 103 pairs of first spout should have two water jet guided parts 12, it shows divides up and down There is liquid storage cavity 120, the quenching liquid of outside input to pass through after first making of short duration storage herein between cloth, two water jet guided parts 12 Gap sprays, and the gap can be 10mm rectangular aperture.
Quenching liquid is when liquid storage cavity 120 is sprayed from inside to outside, due to the narrower width in the gap, the flow velocity moment of quenching liquid Accelerate, in the state gushed.
Explanation is needed exist for, the water jet guided part 12 can be made of steel plate, it can be solid with quenching unit 10 Fixed connection, can also removably be connected, it can also be integrally formed with quenching unit 10.
Water inlet pipe mouth 121 is provided with the liquid storage cavity 120, the relatively low quenching liquid of outside temperature can pass through water inlet pipe Mouth 121 is inputted into liquid storage cavity 120.Water inlet pipe mouth 121 shown in figure is located at the bottom land of quenching tank 101, and it can also position In the cell wall of quenching tank 101.
With reference to Fig. 3, optionally, quenching unit 10 is additionally provided with the second spout 105, and the opening of the second spout 105, which is located at, quenches The center of the bottom land of fiery groove 101 and close quenching tank 101.
Be described with the relative position in Fig. 3, the second spout 105 spray quenching liquid can straight line up spray, The ejection of other directions can also be tilted towards, the effect of the equal flash quenching liquid in two ends and middle part can be integrally realized.
With reference to Fig. 1, optionally, quenching unit 10 is additionally provided with the quenching connected with the first spout 103 and the second spout 105 Pipe 13, quenching pipe 13 is provided with the valve of the first spout 103 of control and the second spout 105.
By quenching pipe 13, the function that quenching liquid is provided the first spout 103 and the second spout 105 simultaneously is realized, with Fig. 1 In relative position be described, the valve in left side is the first valve 131, for the first spout 103 on the left of control;The valve on right side Door is the second valve 132, for the first spout 103 on the right side of control.
It can also set other valves, for controlling the second spout 105.
By the effect of valve, the quenching liquid injection flow of the spout on regulation left side, middle part and right side is realized, is realized real-time Control.
In specific implement, the two ends of the quenching pipe 13 are connected with the water inlet pipe mouth 121 at the two ends of quenching unit 10.
Optionally, quenching unit 10 is additionally provided with least two locating parts 14, and locating part 14 is located at the two of quenching tank 101 The limit channels 106 transported for section bar 200 are formed between end, two relative locating parts 14, limit channels 106 correspond to fortune Defeated passage 102.
After section bar 200 is extruded, enter transport channel 102 by limit channels 106, quenching is realized in transport channel 102.
The locating part 14 can also be made of graphite cake.
Optionally, the two ends of quenching unit 10 are additionally provided with drainage element 15, and drainage element 15 has drainage channel 151, draining Passage 151 includes discharge outlet 1512 and the water inlet 1511 connected with quenching tank 101, and discharge outlet 1512 is located at the remote of drainage element 15 From one end of quenching tank 101.
The quenching liquid overflowed in quenching tank 101, is realized by drainage element 15 and discharged.
With reference to Fig. 2, optionally, press quenching equipment 100 also includes captation 20, and captation 20 has water leg 201, the opening of water leg 201 is towards discharge outlet 1512.
The quenching liquid that drainage element 15 is discharged is entered in water leg 201 by discharge outlet 1512, and the water leg 201, which has, to catchment Channel opening 202, quenching liquid is made after brief stay to be exported by the channel opening 202 that catchments in water leg 201.
With reference to Fig. 4, optionally, there is gap, support member 11 and quenching tank between the bottom land of support member 11 and quenching tank 101 The flow channel 104 flowed for quenching liquid is formed between 101 bottom land.
First spout 103 is to after the central-injection quenching liquid of quenching tank 101, and quenching liquid under gravity, is finally leaned on The flows of nearly quenching tank 101, the flow channel 104 can help quenching liquid realization to circulate.Whole structure is preferable.
Explanation is needed exist for, the quenching unit 10 is that relative level is installed after mounting, the quenching unit 10 Structure can be that relative symmetry is set, when the quenching liquid in quenching tank 101 overflows, and can be overflowed simultaneously from two ends.
It is described with the relative position in Fig. 1, section bar 200 enters quenching tank 101, and it can be from the left side of quenching unit 10 Input, right side output;It can also be inputted from right side, left side output.
A kind of press quenching equipment 100 provided according to embodiments of the present invention, the operation principle of press quenching equipment 100 It is:
The relatively low quenching liquid of temperature is inputted by quenching pipe 13, is sprayed by the first spout 103 and the second spout 105 Go out.
When being sprayed from the first spout 103, quenching liquid is introduced into quenching pipe 13, then enters liquid storage by water inlet pipe mouth 121 In cavity 120, quenching liquid accommodates accumulation in liquid storage cavity 120, is gushed by less first spout 103 in gap.
In the presence of water jet guided part 12, the quenching liquid that the first spout 103 sprays is that relative tilt sprays, and is ejected Quenching liquid enter in quenching tank 101, the first spout 103 and the sustained firing quenching liquid of the second spout 105, in quenching tank 101 Water level rises, until the section bar 200 in transport channel 102 can be submerged, and carries out Quenching Treatment to it.
The quenching liquid at the middle part of quenching tank 101 under the impact force action for the quenching liquid that gravity and the first spout 103 are ejected, Quenching liquid circulating in quenching tank 101 can be realized by flow channel 104 to flowing at the first spout 103, and Mutually impact.
When quenching liquid in first spout 103 and the sustained firing quenching liquid of the second spout 105, quenching tank 101 will overflow, First spout 103, which tilts the quenching liquid sprayed, has the trend for hindering it to overflow, and quenching liquid is realized in quenching tank 101 and followed repeatedly Ring, after mutual impact, the quenching liquid finally overflowed is discharged by drainage element 15.
Quenching liquid temperature after quenching is of a relatively high, and it enters makees after short stay in water leg 201, is opened by water leg The outwards output of mouth 202, it can be entered by quenching pipe 13 again after cooling treatment.Realize recycling for quenching liquid.
Need exist for explanation, can by control valve, adjust the first spout 103 and the second spout 105 injection Flow, makes it keep certain hydraulic pressure output, reaches preferably impact effect.
In specific implementation, second spout 105 can decide whether flash quenching liquid according to the actual requirements.
Embodiment 2
The present embodiment also provides a kind of production line of section bar 200, and it includes cooling tower and press quenching mentioned above is set Standby 100, it is used for cooling tower to be supplied water in the first spout 103.
The structure of press quenching equipment 100 may be referred to embodiment 1, and the production line of section bar 200 has press quenching equipment 100 institute is functional.
Cooling tower (The cooling tower) is, as circulating coolant, heat dissipation to be absorbed from a system with water Into air, to reduce the device of water temperature.It is carried out cold and hot exchange and produces steam after being contacted using water with air flow, steam is waved Hair band walks heat to ensure the normal operation of system, and device is generally tubbiness, and therefore named is cooling tower.
The higher quenching liquid of temperature that the channel opening 202 that catchments outwards is exported realizes that cooling down is handled by cooling tower, cold But the quenching liquid after handling can export by the effect of pump, achieve the injection into quenching tank 101 into quenching pipe 13 Effect.
In summary, the invention provides a kind of press quenching equipment 100, the press quenching equipment 100 can pass through When quenching liquid in quenching liquid of one spout 103 into quenching tank 101 needed for flash quenching, quenching tank 101 will overflow, tilt The quenching liquid that the first spout 103 set is ejected has the trend for hindering it to overflow, and section bar 200 is transported to quenching tank 101 When, in the presence of quenching liquid flows and mutually impacted repeatedly in quenching tank 101, quenching operation is carried out to section bar 200.In reality In the quenching process on border, the hydraulic pressure of the quenching liquid ejected can be adjusted, the quenching liquid that the first spout 103 is ejected enters quenching In groove 101, water level rises in quenching tank 101, and water level can exceed the upper surface of section bar 200, so as to submerge section bar 200, be not required to Will be by baffle plate water level raising.Preferably, overall using effect is preferable for its quenching effect.Its is reasonable in design, can greatly improve and quench Fiery efficiency, reduces the production cost of section bar 200.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (10)

1. a kind of press quenching equipment, it is characterised in that including quenching unit, the quenching unit has quenching tank, described to quench The support member transported for section bar is provided with fiery device, the side of the bottom land of the remote quenching tank of the support member is formed The transport channel transported for section bar, the quenching unit is provided with the first spout, and first spout is located at the quenching dress The one end put, the opening of first spout is set towards the center of the quenching tank and tilting towards the transport channel.
2. press quenching equipment according to claim 1, it is characterised in that the quantity of first spout is two, two Individual first spout is located at the two ends of the quenching unit respectively.
3. press quenching equipment according to claim 1, it is characterised in that the quenching unit is provided with least two sprays Water guide, two water jet guided parts being oppositely arranged are connected with the inner surface of the quenching unit, two water sprays Being formed between guide and the quenching unit has gap, the gap between liquid storage cavity, two water jet guided parts One end positioned at the center of the close quenching tank of the water jet guided part, the gap forms first spout.
4. press quenching equipment according to claim 1, it is characterised in that the bottom land of the support member and the quenching tank Between have gap, formed between the support member and the bottom land of the quenching tank for quenching liquid flow flow channel.
5. press quenching equipment according to claim 1 or 2, it is characterised in that the quenching unit is additionally provided with second Spout, bottom land of the opening positioned at the quenching tank of second spout and the center close to the quenching tank.
6. press quenching equipment according to claim 5, it is characterised in that the quenching unit is additionally provided with and described The quenching pipe of one spout and second spout connection, the quenching pipe is provided with control first spout and second spray The valve of mouth.
7. press quenching equipment according to claim 1 or 2, it is characterised in that the quenching unit is additionally provided with least Two locating parts, the locating part, which is located between the two ends of the quenching tank, two relative locating parts, to be formed for type The limit channels of material transport, the limit channels correspond to the transport channel.
8. the press quenching equipment according to claim any one of 1-4, it is characterised in that the two ends of the quenching unit are also Drainage element is provided with, the drainage element has drainage channel, and the drainage channel includes discharge outlet and connected with the quenching tank Water inlet, the discharge outlet be located at the drainage element the remote quenching tank one end.
9. press quenching equipment according to claim 8, it is characterised in that the press quenching equipment also includes the dress that catchments Put, the captation has a water leg, the opening of the water leg is towards the discharge outlet.
10. a kind of product production line, it is characterised in that including the press quenching described in cooling tower and claim any one of 1-9 Equipment, it is described used for cooling tower in first spout water supply.
CN201710418199.3A 2017-06-06 2017-06-06 Press quenching equipment and product production line Active CN107164622B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710418199.3A CN107164622B (en) 2017-06-06 2017-06-06 Press quenching equipment and product production line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710418199.3A CN107164622B (en) 2017-06-06 2017-06-06 Press quenching equipment and product production line

Publications (2)

Publication Number Publication Date
CN107164622A true CN107164622A (en) 2017-09-15
CN107164622B CN107164622B (en) 2019-08-16

Family

ID=59825610

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710418199.3A Active CN107164622B (en) 2017-06-06 2017-06-06 Press quenching equipment and product production line

Country Status (1)

Country Link
CN (1) CN107164622B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109439876A (en) * 2018-12-26 2019-03-08 丽水青蓝环保科技有限公司 A kind of mating equipment water jetting cooler for plate tempering product line equipment

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201087206Y (en) * 2007-09-11 2008-07-16 上海华钢不锈钢有限公司 Uniform cooling device for metal tube thermal treatment
CN101851700A (en) * 2009-10-13 2010-10-06 上海泽奇炉业有限公司 Online water cooling method and equipment
CN101984091A (en) * 2010-11-26 2011-03-09 上海交通大学 Online time-control temperature-control water quenching device
CN202030793U (en) * 2011-04-01 2011-11-09 上海鑫益瑞杰有色合金有限公司 Online water-cooling quenching device for hot extrusion
CN102433419A (en) * 2011-12-29 2012-05-02 上海交通大学 Water-through quenching cooling device and method capable of realizing rapid cooling through slit water injection
CN203080018U (en) * 2012-12-28 2013-07-24 佛山金兰铝厂有限公司 Online water-cooling quenching equipment
CN204550666U (en) * 2015-03-24 2015-08-12 天津市精成伟业机器制造有限公司 A kind of weldless steel tube process furnace quenching cooler
CN204690057U (en) * 2015-06-08 2015-10-07 中冶赛迪工程技术股份有限公司 A kind of continuous-cast blank press quenching equipment
CN205710847U (en) * 2016-06-20 2016-11-23 天津市万得福工贸有限公司 A kind of finer wire heat treatment lead bath

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201087206Y (en) * 2007-09-11 2008-07-16 上海华钢不锈钢有限公司 Uniform cooling device for metal tube thermal treatment
CN101851700A (en) * 2009-10-13 2010-10-06 上海泽奇炉业有限公司 Online water cooling method and equipment
CN101984091A (en) * 2010-11-26 2011-03-09 上海交通大学 Online time-control temperature-control water quenching device
CN202030793U (en) * 2011-04-01 2011-11-09 上海鑫益瑞杰有色合金有限公司 Online water-cooling quenching device for hot extrusion
CN102433419A (en) * 2011-12-29 2012-05-02 上海交通大学 Water-through quenching cooling device and method capable of realizing rapid cooling through slit water injection
CN203080018U (en) * 2012-12-28 2013-07-24 佛山金兰铝厂有限公司 Online water-cooling quenching equipment
CN204550666U (en) * 2015-03-24 2015-08-12 天津市精成伟业机器制造有限公司 A kind of weldless steel tube process furnace quenching cooler
CN204690057U (en) * 2015-06-08 2015-10-07 中冶赛迪工程技术股份有限公司 A kind of continuous-cast blank press quenching equipment
CN205710847U (en) * 2016-06-20 2016-11-23 天津市万得福工贸有限公司 A kind of finer wire heat treatment lead bath

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109439876A (en) * 2018-12-26 2019-03-08 丽水青蓝环保科技有限公司 A kind of mating equipment water jetting cooler for plate tempering product line equipment

Also Published As

Publication number Publication date
CN107164622B (en) 2019-08-16

Similar Documents

Publication Publication Date Title
CN207483849U (en) A kind of laser melting coating cooling and protective device
CN202329331U (en) Closed cooling tower specially used for hardening liquid
CN107164622A (en) Press quenching equipment and product production line
CN103436670A (en) Water cooling system for steel plate quenching apparatus
CN208341385U (en) A kind of multistage cooling device of steel wire drawing
CN203320064U (en) Water cooling system of steel plate quenching device
CN208230812U (en) Crystallizer copper pipe with nozzle
CN206645999U (en) A kind of clarification structure for 3D glass furnace ears pond
CN205635825U (en) Aluminum alloy welded joint's micro -arc oxidation corrosion resistant protector
CN211420234U (en) Adjustable circulation quenching oil pool
CN103882199B (en) The method and system of speciality Quenching apparatus of rod parts cooling
CN209960983U (en) Smelting top-blowing immersed spray gun nozzle
CN207760045U (en) A kind of cooling device prepared for insoluble sulfur
CN207365745U (en) One kind is used for neodymium iron boron magnetic body production cooling tower
CN107056024B (en) Optical glass forming die
CN206936339U (en) A kind of Rotating caster mold cooling system
CN205020785U (en) Cooling water circulation system is used in aluminum casting production
CN206456802U (en) A kind of heating endless tube and the crude oil storage tank with the heating endless tube
CN209349471U (en) A kind of continuous casting and rolling device of Novel copper alloy tubing
CN209512487U (en) Steel production palletizing shaft furnace ontology cooling water circulation utilization apparatus
CN218811960U (en) Cooling device is used in production of high chromium alloy ball
CN210420066U (en) Round-link chain heat treatment water tank
CN209597891U (en) A kind of cooling system for extrudate
CN209260136U (en) A kind of RH furnace thermometric cooling device
CN214023377U (en) Cooling device and continuous casting machine with same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190703

Address after: 510000 Building No. 55 Qingyun Road, Jianggao Town, Baiyun District, Guangzhou City, Guangdong Province

Applicant after: Guangdong galuminium Aluminium Co. Ltd.

Address before: 510450 No. 55 Qingyun Road, Jianggao Town, Baiyun District, Guangzhou City, Guangdong Province

Applicant before: GAluminium Technology Company

GR01 Patent grant
GR01 Patent grant