CN107153591A - A kind of detection method and device of memory construction for electricity - Google Patents
A kind of detection method and device of memory construction for electricity Download PDFInfo
- Publication number
- CN107153591A CN107153591A CN201710321465.0A CN201710321465A CN107153591A CN 107153591 A CN107153591 A CN 107153591A CN 201710321465 A CN201710321465 A CN 201710321465A CN 107153591 A CN107153591 A CN 107153591A
- Authority
- CN
- China
- Prior art keywords
- electricity
- construction
- fault simulation
- type
- detection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 184
- 238000010276 construction Methods 0.000 title claims abstract description 176
- 238000001514 detection method Methods 0.000 title claims abstract description 128
- 238000004088 simulation Methods 0.000 claims abstract description 155
- 230000002159 abnormal effect Effects 0.000 claims abstract description 23
- 238000012360 testing method Methods 0.000 claims description 55
- 238000007600 charging Methods 0.000 claims description 16
- 230000033001 locomotion Effects 0.000 claims description 9
- 238000000034 method Methods 0.000 abstract description 4
- 238000013500 data storage Methods 0.000 abstract description 3
- 230000000694 effects Effects 0.000 abstract description 3
- 230000007257 malfunction Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 17
- 101150085905 DCP2 gene Proteins 0.000 description 6
- 101100031494 Schizosaccharomyces pombe (strain 972 / ATCC 24843) psu1 gene Proteins 0.000 description 6
- 101100422754 Schizosaccharomyces pombe (strain 972 / ATCC 24843) sui1 gene Proteins 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 3
- 230000009977 dual effect Effects 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000004458 analytical method Methods 0.000 description 1
- 230000004888 barrier function Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000000750 progressive effect Effects 0.000 description 1
- 238000011084 recovery Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
- G06F11/2205—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing using arrangements specific to the hardware being tested
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/22—Detection or location of defective computer hardware by testing during standby operation or during idle time, e.g. start-up testing
- G06F11/26—Functional testing
- G06F11/261—Functional testing by simulating additional hardware, e.g. fault simulation
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Computer Hardware Design (AREA)
- Quality & Reliability (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Power Sources (AREA)
- Testing Of Short-Circuits, Discontinuities, Leakage, Or Incorrect Line Connections (AREA)
Abstract
The invention discloses a kind of detection method of memory construction for electricity, including:Determine the fault simulation type of construction for electricity;Using the fault simulation type, and the construction for electricity simulation strategy corresponding with the fault simulation type prestored, fault simulation is carried out to construction for electricity;According to the fault simulation type, corresponding detection is performed to the construction for electricity and is operated, is verified with the security to the construction for electricity;It can be seen that, in this programme, by analyze memory power framework exist power supply failure mode, by the malfunction and failure pattern for simulating construction for electricity, the validity and security of verifying memory construction for electricity, the security of storage power supply can effectively be strengthened, greatly reduced because abnormal electrical power supply causes bad influence to data storage;The invention also discloses a kind of detection means of memory construction for electricity, above-mentioned technique effect can be equally realized.
Description
Technical field
The present invention relates to construction for electricity technical field of measurement and test, more specifically to a kind of inspection of memory construction for electricity
Survey method and device.
Background technology
The construction for electricity of memory is generally dual control redundant mode.When the construction for electricity to memory is designed, typically all
It can take into account PSU (Power Distribution Unit, power supply) power supplies open circuit, standby electricity (the Battery Backup of BBU
Unit, battery back unit) and power supply redundancy the problems such as.Also, abnormal electrical power supply has certain probability to appear in equipment to use
During, once memory is powered, generation is abnormal, for example:Short circuit, open circuit, when exceedingly odious unconventional situation occurs, meeting
Bad influence can all be caused to whole storage system.
Therefore, how the construction for electricity of memory is detected, verifies the validity of construction for electricity, be art technology
The problem of personnel need to solve.
The content of the invention
It is an object of the invention to provide a kind of detection method and device of memory construction for electricity, to realize to memory
Construction for electricity detected, verify construction for electricity validity.
To achieve the above object, the embodiments of the invention provide following technical scheme:
A kind of detection method of memory construction for electricity, including:
Determine the fault simulation type of construction for electricity;
Using the fault simulation type, and construction for electricity corresponding with the fault simulation type simulation plan prestored
Slightly, fault simulation is carried out to construction for electricity;
Corresponding detection is performed to the construction for electricity according to the fault simulation type to operate, with to the construction for electricity
Security verified.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:Single power supply PSU short-circuit-types, then generate failure PSU by short circuit PSU,
And corresponding detection operation is performed to the construction for electricity, when each detection operation is satisfied by corresponding testing result, judge
The construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that failure PSU output has disconnected, judge non-
Failure PSU normal power supplies.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:Whole equal short-circuit-types of power supply PSU, then short circuit whole PSU, and to described
Construction for electricity performs corresponding detection operation, when each detection operation is satisfied by corresponding testing result, judges the power supply
Framework is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU
With BBU switching circuit error-free motion, BBU normal power supplies are judged.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:Electric network power-fail type, then break AC power supply circuits, and the construction for electricity is held
The corresponding detection operation of row, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not present
It is abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU
With BBU switching circuit error-free motion, BBU normal power supplies are judged.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:Hard disk short-circuit-type, then short-circuit hard disk power supply circuit, and to the construction for electricity
Corresponding detection operation is performed, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not deposited
In exception;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events, judge and mainboard
Corresponding PSU voltages are not interfered.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:PSU in the case where BBU powers restores electricity type, then recovers PSU and power, and right
The construction for electricity performs corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judges institute
State construction for electricity and exception is not present;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:Electric network power-fail type under BBU chargings, then break AC power supply circuits, and to institute
State construction for electricity and perform corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judge described
Construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular event, judge BBU from
Charge mode is rapidly switched to discharge mode.
Optionally, using the fault simulation type, and the power supply stand corresponding with the fault simulation type prestored
Structure simulation strategy, fault simulation is carried out to construction for electricity;Correspondence is performed to the construction for electricity according to the fault simulation type
Detection operation, verified with the security to the construction for electricity, including:
If the fault simulation type is:BBU output end short-circuit-types under charging pattern, then short circuit BBU outputs
End, and corresponding detection operation is performed to the construction for electricity, and when each detection operation is satisfied by corresponding testing result,
Judge that the construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge PSU charge closing passages.
A kind of detection means of memory construction for electricity, including:
Fault simulation determination type module, the fault simulation type for determining construction for electricity;
Fault simulation module, for utilizing the fault simulation type, and it is prestoring with the fault simulation type pair
The construction for electricity simulation strategy answered, fault simulation is carried out to construction for electricity;
Detection module, for according to the fault simulation type, corresponding detection being performed to the construction for electricity and is operated, with
Security to the construction for electricity is verified.
By above scheme, a kind of detection method of memory construction for electricity provided in an embodiment of the present invention, including:
Determine the fault simulation type of construction for electricity;Using the fault simulation type, and it is prestoring with the fault simulation type
Corresponding construction for electricity simulation strategy, fault simulation is carried out to construction for electricity;According to the fault simulation type, to the power supply
Framework performs corresponding detection operation, is verified with the security to the construction for electricity;It can be seen that, in this programme, pass through
Analysis memory is powered the power supply failure mode of framework presence, by simulating the malfunction and failure pattern of construction for electricity, checking storage
The validity and security of device construction for electricity, can effectively strengthen the security of storage power supply, greatly reduce because power supply
It is abnormal that bad influence is caused to data storage;The invention also discloses a kind of detection means of memory construction for electricity, equally
Above-mentioned technique effect can be realized.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing
There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this
Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with
Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is a kind of detection method schematic flow sheet of memory construction for electricity disclosed in the embodiment of the present invention;
Fig. 2 is system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 3 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 4 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 5 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 6 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 7 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 8 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Fig. 9 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Figure 10 is another system power supply configuration diagram disclosed in the embodiment of the present invention;
Figure 11 is handover management chip structure schematic diagram disclosed in the embodiment of the present invention;
Figure 12 is a kind of structure of the detecting device schematic diagram of memory construction for electricity disclosed in the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete
Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on
Embodiment in the present invention, it is every other that those of ordinary skill in the art are obtained under the premise of creative work is not made
Embodiment, belongs to the scope of protection of the invention.
The embodiment of the invention discloses a kind of detection method and device of memory construction for electricity, to realize to memory
Construction for electricity is detected, verifies the validity of construction for electricity.
Referring to Fig. 1, a kind of detection method of memory construction for electricity provided in an embodiment of the present invention, including:
S101, the fault simulation type for determining construction for electricity;
Specifically, the construction for electricity of memory is generally dual control redundant mode at present, if some short circuits, open circuit, pole
End is severe, unconventional situation occurs, and construction for electricity can be had undesirable effect, therefore in this programme, according to construction for electricity
The various failure modes of fault simulation type simulation, test checking construction for electricity validity, prevent the presence of this leak.
Fault simulation type in this programme, and can be preset with the construction for electricity simulation strategy corresponding to the fault simulation type
And store, when it is determined that after fault simulation type, and safety detection can be carried out according to corresponding construction for electricity simulation strategy.
S102, using the fault simulation type, and the construction for electricity corresponding with the fault simulation type prestored
Simulation strategy, fault simulation is carried out to construction for electricity;
Specifically, when this programme carries out fault simulation to construction for electricity, generally PSU and BBU short circuits, open circuit are simulated respectively
Construction for electricity occur it is various bad the problem of.For example:PSU power down is simulated by plug AC power supplies, mould is exported by short circuit PSU
Intend PSU short circuits, analog BBU short circuit is exported by short circuit BBU.Under different power supply failure modes, by testing construction for electricity
Supply voltage waveform and the control signal of upper layer software (applications) backup is notified to verify whether construction for electricity meets the standby electricity of memory
It is required that.
S103, according to the fault simulation type to the construction for electricity perform it is corresponding detection operate, with to it is described supply
The security of electric framework is verified.
Specifically, being carried out according to construction for electricity simulation strategy to construction for electricity after fault simulation, by electric power-feeding structure
The validity and security of verifying memory construction for electricity are detected, this verification method can effectively strengthen the safety of storage power supply
Property, greatly reduce because abnormal electrical power supply causes bad influence to data storage.
It should be noted that simulating different confessions by different fault simulation types in this programme
Electric framework failure mode, tests the security of construction for electricity, event here by simulating this several failure mode
Barrier analog type includes:Power supply PSU short-circuit-types, whole equal short-circuit-types of power supply PSU, electric network power-fail type, firmly
BBU under electric network power-fail type under disk short-circuit-type, PSU service restoration types, charging pattern, charging pattern is defeated
Go out terminal shortcircuit type, every kind of fault simulation type is described respectively below:
1st, power supply PSU short-circuit-types:
If the fault simulation type is:Single power supply PSU short-circuit-types, then generate failure PSU by short circuit PSU,
And corresponding detection operation is performed to the construction for electricity, when each detection operation is satisfied by corresponding testing result, judge
The construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that failure PSU output has disconnected, judge non-
Failure PSU normal power supplies.
Specifically, referring to Fig. 2, the system power supply configuration diagram provided for the present embodiment, system in the present embodiment
Construction for electricity includes two power supplies:PSU0, PSU1, two stand-by power supplies:BBU0, BBU1, also two mainboards:MB0、
MB1.In normal PSU powering modes, if in the presence of one of power supply PSU short circuits, short circuit occurs for such as PSU0 or PSU1,
At this moment the fault simulation operation performed is by short circuit PSU simulated failures PSU so that PSU can not be exported normally, so as to generate event
Hinder PSU, at this moment judge whether electric power system is safe by the detection to electric power system, the detection operation bag performed under the type
Include:Test PSU0/PSU1 Q10 gate whether normal switching-off, mainboard hot swap gate have error-free motion, P12V_PSU electricity
It is pressed with fluctuation without exception.
It should be noted that referring to Fig. 3, PSU0 Q10 gate are the control signal of a protection circuit inside PSU,
When PSU internal short-circuits or failure, switch protection is opened, and disconnects PSU outputs;If PSU0/PSU1 Q10 gate normal switching-offs,
Then representing fault PSU output has disconnected;P12V_PSU voltages are PSU output voltage, and the PSU for detecting non-faulting is not different
Ordinary wave is moved, then represents non-faulting PSU normal power supplies, if above-mentioned two condition is satisfied by, and represents electric power system without abnormal.
2nd, the whole equal short-circuit-types of power supply PSU:
If the fault simulation type is:Whole equal short-circuit-types of power supply PSU, then short circuit whole PSU, and to described
Construction for electricity performs corresponding detection operation, when each detection operation is satisfied by corresponding testing result, judges the power supply
Framework is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU
With BBU switching circuit error-free motion, BBU normal power supplies are judged.
Specifically, in the present embodiment, if simultaneously short circuit occurs for two PSU, the fault simulation strategy performed is simultaneously
Two PSU of short circuit output;At this moment judge whether electric power system is safe, is performed under the type by the detection to electric power system
Detection operation include:Test PSU0PSU1 Q10 gate whether normal switching-off, mainboard hot swap gate have error-free motion,
Mainboard output voltage P12V_AUX whether there is unusual fluctuations.
It should be noted that the output that PSU0 PSU1 Q10 gate normal switching-offs represent two PSU has disconnected, mainboard
Hot swap gate error-free motions represent that the PSU of two failures powers and are changed to two stand-by power supply BBU and power, and mainboard is defeated
Go out voltage P12V_AUX and whether there is unusual fluctuations, representative is used instead after stand-by power supply BBU powers, AUX power supplys are without exception, it is necessary to explanation
It is that either normal PSU powers, and BBU powers when being also powered off, AUX is all changed into by hot swap IC (power switching circuit)
Electricity is powered for MB (master control) below., can be by whether detecting P12V_PSU voltages in the case of the non-power down of power network referring to Fig. 4
Judged less than 11.4V, if less than 11.4V, judging that PSU0 and PSU1 is short-circuit, then sending switching BBU0 and BBU1 control
Signal processed, switching action is completed by mainboard, and at this moment PSU no longer powers, and HOT swap IC power power switching for BBU.
3rd, electric network power-fail type:
If the fault simulation type is:Electric network power-fail type, then break AC power supply circuits, and the construction for electricity is held
The corresponding detection operation of row, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not present
It is abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU
With BBU switching circuit error-free motion, BBU normal power supplies are judged.
Specifically, the simulating grid power down when normal PSU powers mould, the fault simulation operation of execution is powered electricity to break AC
Road, at this moment by the detection to electric power system judge electric power system whether the detection operation performed by safety to include all power supplies electric
All tests in the equal short-circuit-types of source PSU, will not be repeated here.
It should be noted that during electric network power-fail, PSU can not be exported normally, therefore, be cut in this programme by PSU with BBU
Change, the power supply of equipment is powered from PSU to be changed into BBU and power, and its system charge construction schematic diagram can be found in Fig. 4.
4th, hard disk short-circuit-type:
If the fault simulation type is:Hard disk short-circuit-type, then short-circuit hard disk power supply circuit, and to the construction for electricity
Corresponding detection operation is performed, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not deposited
In exception;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events, judge and mainboard
Corresponding PSU voltages are not interfered.
Specifically, when normal PSU powers, if short circuit occurs for a certain hard disk, the fault simulation strategy performed is hard for short circuit
Disk power supply circuit.At this moment judge whether electric power system is safe by the detection to electric power system, the detection performed under the type
Operation includes:Whether test MB0 GATE are operating normally, and whether test MB1 P12V_PSU are interfered.
It should be noted that referring to Fig. 5, when normal PSU powers mould, if short circuit (a certain hard disk hair occurs for a certain mainboard
Raw short circuit) when, it is operating normally by hot swap IC closing control mos, and in detection MB0 GATE, and MB1 P12V_PSU
When not being interfered, decision-making system does not occur exception.
5th, PSU service restorations type:
If the fault simulation type is:PSU in the case where BBU powers restores electricity type, then recovers PSU and power, and right
The construction for electricity performs corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judges institute
State construction for electricity and exception is not present;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events.
Specifically, when normal BBU powers, whether can normally being recovered by electricity checking electric power system on AC, being judged
Whether normal power supply when can be by detecting whether P12V_PSU voltages are higher than 11.4V, if higher than 11.4V, judging normally to supply
Electricity, at this moment judges whether electric power system is safe by the detection to electric power system, and the detection operation performed under the type includes:
Whether test MB0 GATE are operating normally.
It should be noted that being the system charge construction schematic diagram before service restoration referring to Fig. 6 and Fig. 7, Fig. 6, Fig. 7 is confession
System charge construction schematic diagram after electricity recovery;When normal BBU powers mould, if PSU service restorations, need to judge MB0
Whether GATE acts, that is, detects P12V_PSU voltages and be higher than after 11.4V, judges whether mainboard control signal is switched to PSU confessions
Electricity, if so, then decision-making system normal power supply.
6th, the electric network power-fail type under charging pattern:
If the fault simulation type is:Electric network power-fail type under BBU chargings, then break AC power supply circuits, and to institute
State construction for electricity and perform corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judge described
Construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular event, judge BBU from
Charge mode is rapidly switched to discharge mode.
Specifically, in charging pattern, if short circuit, or electric network power-fail, the failure mould at this moment performed occur for double PSU
Intend strategy to break AC power supply circuits.At this moment judge whether electric power system is safe by the detection to electric power system, in the type
The detection operation of lower execution includes:Whether test MB GATE are operating normally, and can test bbu be rapidly switched to from charge mode
Discharge mode.
It should be noted that being the system charge construction schematic diagram before power down referring to Fig. 8 and Fig. 9, Fig. 8, Fig. 9 is after power down
System charge construction schematic diagram;If double PSU occur under BBU charge modes occurs short-circuit, the necessary successful switch of BBU first,
Complete standby electricity.And in switching, if BBU is in charging, it is to need conversion time that BBU is changed into power supply state from charged state
, can if the time is oversize, standby TURP changes unsuccessful, therefore need test bbu be cut rapidly from charge mode in this programme
Discharge mode is changed to, if it can, then illustrating without abnormal.Specifically, it is less than if detecting P12V_PSU voltages after 11.4V,
BBU current supply circuits can be opened by bbu charge rate and bbu enable, while mainboard hot plug IC do and switched.
7th, the BBU output end short-circuit-types under charging pattern:
If the fault simulation type is:BBU output end short-circuit-types under charging pattern, then short circuit BBU outputs
End, and corresponding detection operation is performed to the construction for electricity, and when each detection operation is satisfied by corresponding testing result,
Judge that the construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge PSU charge closing passages.
Specifically, under charging pattern, if short circuit occurs for BBU output ends, the fault simulation strategy at this moment performed is
Short circuit BBU output ends, the detection operation performed to construction for electricity includes:Judge whether PSU closes to BBU charge tunnel.
It should be noted that referring to Figure 10, BBU charging circuit and discharge circuit are separate, and side's failure is not
Other fault must be related to;Therefore when BBU charges, if short circuit occurs for BBU output ends, the charging that PSU closes to BBU is led to
Road, illustrates construction for electricity safety, if being unable to charge closing passage, illustrates that charge construction is present abnormal.
It should be noted that referring to Figure 11, being carried out to power supply, stand-by power supply and AC power supplies in the above-described embodiments
The switching circuit of switching, handover management chip is used as using TPS2456 --- hot swap IC, in fig. 11, port INA with
P12V_PSU is corresponding, and port INB is corresponding with P12V_BBU, and port OUTA&B is corresponding with P12V_AU, for example:In AC (electricity
Net) complete in a power-on and power-off:
1st, when AC is powered off:
PSU power switchings are powered for BBU;GAT1A and GAT2A is closed, the cut-off of PSU supply accesses;GAT1B and GAT2B are beaten
Open, BBU supply accesses are opened.
2nd, when AC recovers:
BBU power switchings are powered for PSU;GAT1A and GAT2A is opened, and PSU supply accesses are opened;GAT1B and GAT2B is closed
Close, the cut-off of BBU supply accesses.
Detection means provided in an embodiment of the present invention is introduced below, detection means described below is with being described above
Detection method can be with cross-referenced.
Referring to Figure 12, a kind of detection means of memory construction for electricity provided in an embodiment of the present invention, including:
Fault simulation determination type module 100, the fault simulation type for determining construction for electricity;
Fault simulation module 200, for utilizing the fault simulation type, and it is prestoring with the fault simulation type
Corresponding construction for electricity simulation strategy, fault simulation is carried out to construction for electricity;
Detection module 300, for according to the fault simulation type, corresponding detection being performed to the construction for electricity and is grasped
Make, verified with the security to the construction for electricity.
The embodiment of each in this specification is described by the way of progressive, and what each embodiment was stressed is and other
Between the difference of embodiment, each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, enables professional and technical personnel in the field to realize or using the present invention.
A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein
General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention
The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one
The most wide scope caused.
Claims (9)
1. a kind of detection method of memory construction for electricity, it is characterised in that including:
Determine the fault simulation type of construction for electricity;
Using the fault simulation type, and the construction for electricity simulation strategy corresponding with the fault simulation type prestored,
Fault simulation is carried out to construction for electricity;
Corresponding detection is performed to the construction for electricity according to the fault simulation type to operate, with the peace to the construction for electricity
Full property is verified.
2. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:Single power supply PSU short-circuit-types, then generate failure PSU by short circuit PSU, and right
The construction for electricity performs corresponding detection operation, when each detection operation is satisfied by corresponding testing result, judges described
Construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that failure PSU output has disconnected, judge non-faulting
PSU normal power supplies.
3. detection method according to claim 2, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:Whole equal short-circuit-types of power supply PSU, then short circuit whole PSU, and to the power supply
Framework performs corresponding detection operation, when each detection operation is satisfied by corresponding testing result, judges the construction for electricity
In the absence of exception;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU and
BBU switching circuit error-free motion, judges BBU normal power supplies.
4. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:Electric network power-fail type, then break AC power supply circuits, and to construction for electricity execution pair
The detection operation answered, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge that whole PSU output has disconnected, judge PSU and
BBU switching circuit error-free motion, judges BBU normal power supplies.
5. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:Hard disk short-circuit-type, then short-circuit hard disk power supply circuit, and being performed to the construction for electricity
Corresponding detection operation, when each detection operation is satisfied by corresponding testing result, judges that the construction for electricity is not present different
Often;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events, judge corresponding with mainboard
PSU voltages be not interfered.
6. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:PSU in the case where BBU powers restores electricity type, then recovers PSU and power, and to described
Construction for electricity performs corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judges described supply
Electric framework is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events.
7. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:Electric network power-fail type under BBU chargings, then break AC power supply circuits, and supply described
Electric framework performs corresponding detection operation, and when each detection operation is satisfied by corresponding testing result, judges the power supply
Framework is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge mainboard GATE regular events, judge BBU from charging
Pattern is rapidly switched to discharge mode.
8. detection method according to claim 1, it is characterised in that using the fault simulation type, and prestore
Construction for electricity simulation strategy corresponding with the fault simulation type, fault simulation is carried out to construction for electricity;According to the failure
Analog type performs corresponding detection to the construction for electricity and operated, and is verified with the security to the construction for electricity, wraps
Include:
If the fault simulation type is:BBU output end short-circuit-types under charging pattern, then short circuit BBU output ends, and
Corresponding detection operation is performed to the construction for electricity, and when each detection operation is satisfied by corresponding testing result, is judged
The construction for electricity is not present abnormal;
Wherein, include with each detection corresponding testing result of operation:Judge PSU charge closing passages.
9. a kind of detection means of memory construction for electricity, it is characterised in that including:
Fault simulation determination type module, the fault simulation type for determining construction for electricity;
Fault simulation module, for utilize the fault simulation type, and prestore it is corresponding with the fault simulation type
Construction for electricity simulation strategy, fault simulation is carried out to construction for electricity;
Detection module, for according to the fault simulation type, corresponding detection being performed to the construction for electricity and is operated, with to institute
The security for stating construction for electricity is verified.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710321465.0A CN107153591B (en) | 2017-05-09 | 2017-05-09 | Detection method and device for power supply architecture of memory |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710321465.0A CN107153591B (en) | 2017-05-09 | 2017-05-09 | Detection method and device for power supply architecture of memory |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107153591A true CN107153591A (en) | 2017-09-12 |
CN107153591B CN107153591B (en) | 2020-06-16 |
Family
ID=59792802
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710321465.0A Active CN107153591B (en) | 2017-05-09 | 2017-05-09 | Detection method and device for power supply architecture of memory |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107153591B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107643494A (en) * | 2017-09-29 | 2018-01-30 | 郑州云海信息技术有限公司 | A kind of memory supply network is for electric battery check device and method |
CN107888448A (en) * | 2017-11-01 | 2018-04-06 | 深圳市共进电子股份有限公司 | Reverse power supply detection device and method |
CN108762456A (en) * | 2018-05-30 | 2018-11-06 | 郑州云海信息技术有限公司 | A kind of rack-mount server construction for electricity and its implementation |
CN110007173A (en) * | 2019-04-10 | 2019-07-12 | 苏州浪潮智能科技有限公司 | A kind of power supply unit fault simulation equipment and power supply unit failure simulation method |
CN111312325A (en) * | 2020-02-14 | 2020-06-19 | 苏州浪潮智能科技有限公司 | BBU fault diagnosis method and device, electronic equipment and storage medium |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0780951A2 (en) * | 1995-12-22 | 1997-06-25 | Eaton Corporation | Method and apparatus for remote testing of coordination of overcurrent protection devices in an electrical power system |
JP2003023731A (en) * | 2001-07-04 | 2003-01-24 | Mitsubishi Electric Corp | Simulator for spread of power system fault |
CN101859143A (en) * | 2010-04-27 | 2010-10-13 | 南京航空航天大学 | Method and platform for simulating faults of momentum-bias satellite |
CN103489345A (en) * | 2012-06-13 | 2014-01-01 | 上海唐盛信息科技有限公司 | Communication equipment simulated failure occurrence system |
CN104484255A (en) * | 2014-12-02 | 2015-04-01 | 北京空间飞行器总体设计部 | Fault injection device for verifying system level single particle soft error protection ability |
CN104598373A (en) * | 2013-10-30 | 2015-05-06 | 北京精密机电控制设备研究所 | Embedded software testing method capable of realizing multi-technology fusion |
CN205140330U (en) * | 2015-11-10 | 2016-04-06 | 北京铁路电气化学校 | Trouble analogue means is observed and controled in power supply |
CN106128243A (en) * | 2016-08-11 | 2016-11-16 | 国网浙江省电力公司湖州供电公司 | Power failure simulator |
CN106537351A (en) * | 2014-07-09 | 2017-03-22 | 瑞典爱立信有限公司 | Method for diagnosing power supply failure in wireless communication device |
-
2017
- 2017-05-09 CN CN201710321465.0A patent/CN107153591B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0780951A2 (en) * | 1995-12-22 | 1997-06-25 | Eaton Corporation | Method and apparatus for remote testing of coordination of overcurrent protection devices in an electrical power system |
JP2003023731A (en) * | 2001-07-04 | 2003-01-24 | Mitsubishi Electric Corp | Simulator for spread of power system fault |
CN101859143A (en) * | 2010-04-27 | 2010-10-13 | 南京航空航天大学 | Method and platform for simulating faults of momentum-bias satellite |
CN103489345A (en) * | 2012-06-13 | 2014-01-01 | 上海唐盛信息科技有限公司 | Communication equipment simulated failure occurrence system |
CN104598373A (en) * | 2013-10-30 | 2015-05-06 | 北京精密机电控制设备研究所 | Embedded software testing method capable of realizing multi-technology fusion |
CN106537351A (en) * | 2014-07-09 | 2017-03-22 | 瑞典爱立信有限公司 | Method for diagnosing power supply failure in wireless communication device |
CN104484255A (en) * | 2014-12-02 | 2015-04-01 | 北京空间飞行器总体设计部 | Fault injection device for verifying system level single particle soft error protection ability |
CN205140330U (en) * | 2015-11-10 | 2016-04-06 | 北京铁路电气化学校 | Trouble analogue means is observed and controled in power supply |
CN106128243A (en) * | 2016-08-11 | 2016-11-16 | 国网浙江省电力公司湖州供电公司 | Power failure simulator |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107643494A (en) * | 2017-09-29 | 2018-01-30 | 郑州云海信息技术有限公司 | A kind of memory supply network is for electric battery check device and method |
CN107888448A (en) * | 2017-11-01 | 2018-04-06 | 深圳市共进电子股份有限公司 | Reverse power supply detection device and method |
CN107888448B (en) * | 2017-11-01 | 2020-04-24 | 深圳市共进电子股份有限公司 | Reverse power supply detection device and method |
CN108762456A (en) * | 2018-05-30 | 2018-11-06 | 郑州云海信息技术有限公司 | A kind of rack-mount server construction for electricity and its implementation |
CN110007173A (en) * | 2019-04-10 | 2019-07-12 | 苏州浪潮智能科技有限公司 | A kind of power supply unit fault simulation equipment and power supply unit failure simulation method |
CN111312325A (en) * | 2020-02-14 | 2020-06-19 | 苏州浪潮智能科技有限公司 | BBU fault diagnosis method and device, electronic equipment and storage medium |
WO2021159710A1 (en) * | 2020-02-14 | 2021-08-19 | 苏州浪潮智能科技有限公司 | Bbu fault diagnosis method and apparatus, electronic device, and storage medium |
CN111312325B (en) * | 2020-02-14 | 2021-10-15 | 苏州浪潮智能科技有限公司 | BBU fault diagnosis method and device, electronic equipment and storage medium |
Also Published As
Publication number | Publication date |
---|---|
CN107153591B (en) | 2020-06-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107153591A (en) | A kind of detection method and device of memory construction for electricity | |
JP5059197B2 (en) | Selection switch device, power supply device using the same, and switching method thereof | |
CN101443778B (en) | Communication system, authentication method, information processing device, information processing method, and battery | |
CN104620117B (en) | Power supply apparatus | |
CN104842798B (en) | The control method and system of electrokinetic cell relay disconnection process | |
US20130241496A1 (en) | Power Supply Device | |
CN105291875B (en) | A kind of electric vehicle rapid charging method | |
EP3876333A1 (en) | Battery energy storage bms system enabling dual path-based information sampling and detection and protection control | |
CN102213735B (en) | Typical test network with power distribution automation | |
Song et al. | A new analysis method for early detection and prevention of cascading events | |
CN104716734A (en) | Energy storage system (ess) using uninterruptible power supply(ups) | |
Meeuwsen et al. | Substation reliability evaluation including switching actions with redundant components | |
CN105896490A (en) | Fault processing method and device of power distribution network | |
Wiboonrat | An empirical study on data center system failure diagnosis | |
Khan et al. | A communication-free active unit protection scheme for inverter dominated islanded microgrids | |
CN115754785A (en) | Storage battery effectiveness detection device and detection method | |
CN113533889B (en) | Backup automatic switching uninterrupted visual test method and device based on digital analog circuit breaker | |
CN104198951A (en) | Reliability validation method of 380V mobile emergency power source of nuclear power station | |
CN102904221B (en) | Backup automatic switching locking method and device for 10kV distribution room of intelligent substation | |
KR20230092115A (en) | Energy storage system and method for controlling ground configuration thereof | |
CN106786988A (en) | A kind of PACK off-line tests protect high-voltage cage and its guard method | |
CN106707194A (en) | Rechargeable battery detection method and electronic equipment | |
CN107834413B (en) | Device for live replacement of protection device and live construction method | |
CN213262033U (en) | Bipolar grounding device | |
CN102759712B (en) | Battery testing device and testing method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200520 Address after: 215100 No. 1 Guanpu Road, Guoxiang Street, Wuzhong Economic Development Zone, Suzhou City, Jiangsu Province Applicant after: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd. Address before: 450018 Henan province Zheng Dong New District of Zhengzhou City Xinyi Road No. 278 16 floor room 1601 Applicant before: ZHENGZHOU YUNHAI INFORMATION TECHNOLOGY Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |