CN107143692A - A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method - Google Patents

A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method Download PDF

Info

Publication number
CN107143692A
CN107143692A CN201710439014.7A CN201710439014A CN107143692A CN 107143692 A CN107143692 A CN 107143692A CN 201710439014 A CN201710439014 A CN 201710439014A CN 107143692 A CN107143692 A CN 107143692A
Authority
CN
China
Prior art keywords
pipeline
pipe
carried out
coast
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710439014.7A
Other languages
Chinese (zh)
Inventor
朱家直
张明磊
王从颜
田伟
李仁抢
彭飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Original Assignee
Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ceec Anhui Electric Power Construction First Engineering Co Ltd filed Critical Ceec Anhui Electric Power Construction First Engineering Co Ltd
Priority to CN201710439014.7A priority Critical patent/CN107143692A/en
Publication of CN107143692A publication Critical patent/CN107143692A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/024Laying or reclaiming pipes on land, e.g. above the ground
    • F16L1/028Laying or reclaiming pipes on land, e.g. above the ground in the ground
    • F16L1/036Laying or reclaiming pipes on land, e.g. above the ground in the ground the pipes being composed of sections of short length

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Prevention Of Electric Corrosion (AREA)

Abstract

The invention discloses a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method, it the described method comprises the following steps:Make-up system pipeline is positioned and excavated;PCCP Pipe installings are carried out by the way of excavation section by section and cross construction:Basement process is carried out using CFG;The thick graded sand and stone mattress layers of layering laying 500mm;GSZ, compaction in layers are overlayed in the middle of mattress layer;Pepe standard section is using double cushion rubber closure;Cathodic protection is carried out to pipeline using bar-shaped zinc anode.The present invention can effectively solve uneven settlement of foundation and seawater corrosion problem, economical, environmentally friendly, simple and easy to apply, safe and reliable, be worthy of popularization, and have fine facilitation to the development of Dewatering technology.

Description

A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method
Technical field
Pacify the invention belongs to pipeline construction field, more particularly to a kind of soft soil along the coast Prestressed concrete cylinder pipe road Fill construction method.
Background technology
Prestressed concrete cylinder pipe (abbreviation PCCP) is by four kinds of steel plate, compressor wire, concrete and cement mortar After the manufacturing process such as basic raw material is being molded by steel cylinder, concreting, prestress application and protective layer injection, composition A kind of novel composite pipe, has given full play to resistance to compression, the decay resistance of tension, easy sealing and the concrete of steel, with height Sealing, high intensity and high impervious characteristic.In soft soil along the coast sea water conveying pipelines engineering, traditional Pipe installing side Method can not effectively solve uneven settlement of foundation and seawater corrosion problem.
The content of the invention
It is an object of the invention to the problem above for overcoming prior art presence, there is provided a kind of soft soil along the coast prestressing force Steel production route construction method of installation, can effectively solve uneven settlement of foundation and seawater corrosion problem.
To realize above-mentioned technical purpose and the technique effect, the present invention is achieved through the following technical solutions:
A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method, methods described includes following step Suddenly:
S1:Make-up system pipeline is positioned and excavated;
S2:PCCP Pipe installings are carried out by the way of excavation section by section and cross construction:
Step 201:Basement process is carried out using CFG;
Step 202:The thick graded sand and stone mattress layers of layering laying 500mm;
Step 203:GSZ, compaction in layers are overlayed in the middle of mattress layer;
S3:Pepe standard section is using double cushion rubber closure;
S4:Cathodic protection is carried out to pipeline using bar-shaped zinc anode.
Further, pepe standard section is comprised the following steps using double cushion rubber closure in the step S3:
Step 301:Pipe joint is connected:Sealing rubber ring is arranged on to the previous length of tubing bellmouth of installation In two pass groove, and uniformly brush nontoxic natural oil;
Step 302:Pipe socket is slowly slid horizontally into previous by pipeline and previous length of tubing to drawing using chain block In root pipe socket, after Pipe installing is finished, check whether sealing rubber ring is at the groove circle correct position of socket ring, such as Cushion rubber position is improper, then removes and reinstall;
Step 303:Pipeline center, absolute altitude are checked, qualified rear progress next length of tubing construction, should before installment work starts Repetition measurement is carried out to the pipeline of installation before this, displacement is such as found, then resets again;
Step 304:Check and ensure the gap between bell and spigot and apart from uniformity, pipe joint is blocked by double cushion rubbers And the secondary single port water pressure test is carried out to each interface.
Further, checked in the step 304 and ensure that pipe internal clearance is 10-35mm, while ensureing that Pipe installing is permitted Perhaps deviation is:Misalignment of axe is 30mm, and height variation is 30mm.
Further, carrying out cathodic protection to pipeline using bar-shaped high-purity zinc anode in the step S4 includes following step Suddenly:
Step 401:Anti-corrosion protection is carried out to pipeline inner steel piece using cathode protection method:PCCP is managed using bar-shaped zinc anode Internal steel part and steel pipe are protected;
Step 402:Protection location is divided, and electric continuity connection is carried out to the often section PCCP in each protection location, respectively Electric continuity bridging is no longer carried out between protection location;
Step 403:Anode cable is drawn from PCCP pipes, weld carries out anti-corrosion insulation again.
Further, protection location is divided in the step 402 to comprise the following steps:DN1000 pipeline is with 3 section 18m pipes Section is divided into a protection location, and DN1200 pipeline is divided into a protection location with 2 section 12m pipeline sections.
Further, the step 403 Anodic cable is connected using crimping mode with bar-shaped zinc anode cable and uses heat Colloidal sol band and thermal shrinkable sleeve anti-corrosion.
The beneficial effects of the invention are as follows:
1st, compared with steel pipe or common prestressed reinforced concrete pipe road, speed of application is fast, cost bottom, service life are long;
2nd, it is suitable with common prestressed reinforced concrete pipe road price, lower than steel pipe price by 30%, pre-stress steel cylinder coagulation Native pipeline has tension, impervious and concrete resistance to compression, the advantage of corrosion resistance of steel concurrently, can bear higher internal pressure and outer lotus Carry;
3rd, Prestressed concrete cylinder pipe road uses finished product standard knot, bell socket, two pass seal with elastometic washer, in chain calabash A section socket ring is slipped under the traction of reed, compared with steel pipe, PCCP pipes counterpart is simple, be not required to welding, interface is easy;
4th, effective protection due to Prestressed concrete cylinder pipe road inside and outside wall concrete to internal steel part, PCCP pipelines are cloudy The bar-shaped zinc anode of pole protection reduces 1/3 than steel pipeline, but its service life is really longer than steel pipe more than 10 years;
5th, equipment purchase is convenient, peace tears that simple, efficiency high, cost are low open, and pipeline is using PCCP pipes, with high leakproofness, height Intensity and high impervious characteristic.
6th, the present invention is economical, environmentally friendly, simple and easy to apply, safe and reliable, is worthy of popularization, and has to the development of Dewatering technology Fine facilitation.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, constitutes the part of the application, this hair Bright schematic description and description is used to explain the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the schematic flow sheet of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete Site preparation is described, it is clear that described embodiment is only a part of embodiment of the invention, rather than whole embodiments.It is based on Embodiment in the present invention, it is all other that those of ordinary skill in the art are obtained under the premise of creative work is not made Embodiment, belongs to the scope of protection of the invention.
A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method as shown in Figure 1, methods described Comprise the following steps:
S1:Make-up system pipeline is positioned and excavated;
S2:PCCP Pipe installings are carried out by the way of excavation section by section and cross construction:
Step 201:Basement process is carried out using CFG;
Step 202:The thick graded sand and stone mattress layers of layering laying 500mm;
Step 203:GSZ is overlayed in the middle of mattress layer, compaction in layers effectively controls pipeline soft soil foundation uneven Even sedimentation;
S3:Pepe standard section effectively increases joint sealing quality using double cushion rubber closure, it is ensured that the tight nothing of interface is oozed Water:
Step 301:Pipe joint is connected:Sealing rubber ring is arranged on to the previous length of tubing bellmouth of installation In two pass groove, and uniformly brush nontoxic natural oil;
Step 302:Using 5t chain blocks by pipeline and previous length of tubing to drawing, before pipe socket is slowly slid horizontally into In a piece pipe socket, after Pipe installing is finished, check whether sealing rubber ring is at the groove circle correct position of socket ring, Such as cushion rubber position is improper, then removes and reinstall;
Step 303:Pipeline center, absolute altitude are checked, qualified rear progress next length of tubing construction, should before installment work starts Repetition measurement is carried out to the pipeline of installation before this, displacement is such as found, then resets again;
Step 304:Check and ensure the gap between bell and spigot and apart from uniformity, pipe internal clearance is generally 15mm, but 10mm is cannot be less than, 35mm is cannot be greater than, while ensureing that Pipe installing tolerance is:Misalignment of axe is 30mm, height variation For 30mm, pipe joint is blocked by double cushion rubbers and carries out the secondary single port water pressure test to each interface.
S4:Cathodic protection is carried out to pipeline using bar-shaped zinc anode, deformed bar and steel pipe fittings in pipeline are slow down Corrosion failure, add pipeline durability:
Step 401:Anti-corrosion protection is carried out to pipeline inner steel piece using cathode protection method:PCCP is managed using bar-shaped zinc anode Internal steel part and steel pipe are protected;
Step 402:Protection location is divided, DN1000 pipeline is divided into a protection location with 3 section 18m pipeline sections, DN1200 pipeline is divided into a protection location with 2 section 12m pipeline sections, and carries out electricity to the often section PCCP in each protection location Continuity is connected, and electric continuity bridging is no longer carried out between each protection location;
Step 403:Anode cable is drawn from PCCP pipes, weld carries out anti-corrosion insulation again, anode cable and bar-shaped zinc Anode cable is connected using crimping mode and uses thermosol tape and thermal shrinkable sleeve anti-corrosion.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, without departing from the spirit and scope of the present invention, various changes and modifications of the present invention are possible, these changes Change and improvement all fall within the protetion scope of the claimed invention.

Claims (6)

1. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method, it is characterised in that:Methods described bag Include following steps:
S1:Make-up system pipeline is positioned and excavated;
S2:PCCP Pipe installings are carried out by the way of excavation section by section and cross construction:
Step 201:Basement process is carried out using CFG;
Step 202:The thick graded sand and stone mattress layers of layering laying 500mm;
Step 203:GSZ, compaction in layers are overlayed in the middle of mattress layer;
S3:Pepe standard section is using double cushion rubber closure;
S4:Cathodic protection is carried out to pipeline using bar-shaped zinc anode.
2. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method according to claim 1, its It is characterised by:Pepe standard section is comprised the following steps using double cushion rubber closure in the step S3:
Step 301:Pipe joint is connected:Sealing rubber ring is arranged on to the two pass of the previous length of tubing bellmouth of installation In groove, and uniformly brush nontoxic natural oil;
Step 302:Pipe socket is slowly slid horizontally into previous pipe by pipeline and previous length of tubing to drawing using chain block In road bellmouth, after Pipe installing is finished, check whether sealing rubber ring is at the groove circle correct position of socket ring, such as cushion rubber Position is improper, then removes and reinstall;
Step 303:Pipeline center, absolute altitude are checked, qualified rear progress next length of tubing construction before installment work starts, tackles this The pipeline of preceding installation carries out repetition measurement, such as finds displacement, then resets again;
Step 304:Check and ensure the gap between bell and spigot and apart from uniformity, pipe joint is blocked and right by double cushion rubbers Each interface carries out the secondary single port water pressure test.
3. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method according to claim 2, its It is characterised by:Checked in the step 304 and ensure that pipe internal clearance is 10-35mm, while ensureing that Pipe installing tolerance is: Misalignment of axe is 30mm, and height variation is 30mm.
4. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method according to claim 1, its It is characterised by:Cathodic protection is carried out in the step S4 to pipeline using bar-shaped high-purity zinc anode to comprise the following steps:
Step 401:Anti-corrosion protection is carried out to pipeline inner steel piece using cathode protection method:Using bar-shaped zinc anode to PCCP pipes inside Steel part and steel pipe are protected;
Step 402:Protection location is divided, and electric continuity connection, each protection are carried out to the often section PCCP in each protection location Electric continuity bridging is no longer carried out between unit;
Step 403:Anode cable is drawn from PCCP pipes, weld carries out anti-corrosion insulation again.
5. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method according to claim 4, its It is characterised by:Protection location is divided in the step 402 to comprise the following steps:DN1000 pipeline is divided into 3 section 18m pipeline sections One protection location, DN1200 pipeline is divided into a protection location with 2 section 12m pipeline sections.
6. a kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method according to claim 4, its It is characterised by:The step 403 Anodic cable be connected with bar-shaped zinc anode cable using crimping mode and use thermosol tape and Thermal shrinkable sleeve anti-corrosion.
CN201710439014.7A 2017-06-12 2017-06-12 A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method Pending CN107143692A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710439014.7A CN107143692A (en) 2017-06-12 2017-06-12 A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710439014.7A CN107143692A (en) 2017-06-12 2017-06-12 A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method

Publications (1)

Publication Number Publication Date
CN107143692A true CN107143692A (en) 2017-09-08

Family

ID=59782408

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710439014.7A Pending CN107143692A (en) 2017-06-12 2017-06-12 A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method

Country Status (1)

Country Link
CN (1) CN107143692A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011043116A (en) * 2009-08-21 2011-03-03 Toyota Motor Corp Radial sound reducing structure
CN101994878A (en) * 2010-10-25 2011-03-30 天津市泽宝水泥制品有限公司 Double-rubber gasket prestressed concrete cylinder pipe
CN102155009A (en) * 2011-05-23 2011-08-17 中铁二院工程集团有限责任公司 Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof
CN202629361U (en) * 2012-06-28 2012-12-26 邢士波 Embedded type prestress steel cylinder concrete pipe with built-in zinc bar sacrificial anode
CN103590390A (en) * 2013-11-26 2014-02-19 郑州中核岩土工程有限公司 Plastic flow soft foundation reinforced structure and reinforcing method thereof
CN204645075U (en) * 2015-05-07 2015-09-16 沈阳建筑大学 A kind of urban road soft foundation underground pipeline bracing means

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011043116A (en) * 2009-08-21 2011-03-03 Toyota Motor Corp Radial sound reducing structure
CN101994878A (en) * 2010-10-25 2011-03-30 天津市泽宝水泥制品有限公司 Double-rubber gasket prestressed concrete cylinder pipe
CN102155009A (en) * 2011-05-23 2011-08-17 中铁二院工程集团有限责任公司 Crushed rock pile used for strengthening extremely soft soil foundation and construction method thereof
CN202629361U (en) * 2012-06-28 2012-12-26 邢士波 Embedded type prestress steel cylinder concrete pipe with built-in zinc bar sacrificial anode
CN103590390A (en) * 2013-11-26 2014-02-19 郑州中核岩土工程有限公司 Plastic flow soft foundation reinforced structure and reinforcing method thereof
CN204645075U (en) * 2015-05-07 2015-09-16 沈阳建筑大学 A kind of urban road soft foundation underground pipeline bracing means

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张迪士等: "《大口径PCCP管在软土地基中的应用》", 《中国给水排水》 *
雷宇蓉等: "《预应力钢筒混凝土管道的施工安装与质量控制》", 《西部探矿工程》 *

Similar Documents

Publication Publication Date Title
CN202936484U (en) Cathode protection system for underground pipeline system
CN101775826A (en) Construction method for laying water pipes
CN106149764A (en) A kind of precast assembly pipe gallery bell and spigot waterproof construction
CN205297583U (en) Slurry shield shield tail sealing system
CN110645418B (en) Connecting method for mounting large-diameter pipeline
CN101619779B (en) Sealing device for buried pipe connected with protective well
CN106049551B (en) Pipe gallery boss sealing structure
CN201731178U (en) Rigid waterproof sleeve
CN107761911A (en) A kind of construction method for the blowdown pipe network for improving installation quality
CN104482298A (en) HDPE (high-density polyethylene) steel-plastic composite spiral winding drainage pipe installation construction method
CN103591377B (en) Directly-buried thermal insulation pipes is by the method for construction of marsh district
CN202937918U (en) Reinforced concrete drainage pipe connecting structure
CN202927358U (en) A steel liner repair structure of a large-diameter concrete non-bearing pipeline fissure
CN103629474B (en) For repairing the restorative procedure connecting aqueduct of impaired cast iron fire protection pipeline
CN107143692A (en) A kind of soft soil along the coast Prestressed concrete cylinder pipe pipeline installation construction method
CN217579825U (en) Prefabricated pin-connected panel rainwater box culvert suitable for integrative machine of strutting
CN204717161U (en) With the PCCP culvert pipe of pre-buried weldment
CN203809954U (en) Bilateral interactive cathode protected PCCP (prestressed concrete cylinder pipe)
CN203927102U (en) Polyester concrete Pressure pipe and assembly thereof
CN202992424U (en) Reinforced concrete pipe with sealing rod for jacking construction method
CN210033475U (en) Waterproof connecting structure for connecting pipe joint joints of channel by mechanical method
CN201259025Y (en) Sealing device for buried pipe protection well
CN213361381U (en) Corrosion-resistant high-pressure glass fiber reinforced plastic jacking pipe
CN201803021U (en) Combustion gas underground inlet pipe
CN217030382U (en) Anti-stress-damage heat supply direct-buried elbow structure with double fixing ring plates

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908