CN107142962A - A kind of pipe gallery and its construction method - Google Patents

A kind of pipe gallery and its construction method Download PDF

Info

Publication number
CN107142962A
CN107142962A CN201710423279.8A CN201710423279A CN107142962A CN 107142962 A CN107142962 A CN 107142962A CN 201710423279 A CN201710423279 A CN 201710423279A CN 107142962 A CN107142962 A CN 107142962A
Authority
CN
China
Prior art keywords
cavity
prefabricated
projection
side plate
top plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710423279.8A
Other languages
Chinese (zh)
Inventor
左春丽
周恬恬
周臻
岳金方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangzhou Polytechnic Institute
Original Assignee
Yangzhou Polytechnic Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangzhou Polytechnic Institute filed Critical Yangzhou Polytechnic Institute
Priority to CN201710423279.8A priority Critical patent/CN107142962A/en
Publication of CN107142962A publication Critical patent/CN107142962A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/10Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2300/00Materials
    • E02D2300/0004Synthetics
    • E02D2300/0018Cement used as binder
    • E02D2300/002Concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a kind of pipe gallery, including the bottom wall being made up of prefabricated panel, the side wall being made up of prefabricated side plate, the crown wall being made up of prefabricated top plate, in the water impervious layer of bottom of foundation ditch first, the prefabricated panel is set on first water impervious layer, the prefabricated side plate is set close to the both sides of foundation pit walls on the prefabricated panel, the prefabricated top plate is set on the prefabricated side plate, each prefabricated component different-thickness into set hollow cavity, steel reinforcement cage is plugged wherein and concrete constitutes reinforcement structure, and set connecting pipe to connect each hollow cavity, each prefabricated component is caused to constitute an entirety by armored concrete reinforcement structure, using prefabricated board with the basis of accelerating construction period, it has been obviously improved the globality structural strength of pipe gallery.

Description

A kind of pipe gallery and its construction method
Technical field
The invention belongs to Urban Underground facility technology field, particularly specifically related to a kind of pipe gallery and its construction party Method.
Background technology
The pipe gallery underground common trench in the field of business that is otherwise known as, mainly in infrastructure economizing type pipeline, by a variety of cities Political affairs pipeline, the pipeline such as electric power, communication, combustion gas, rainwater and sewage is integrated into a piping lane, it is to avoid city management all departments Done things in his own way in terms of infrastructure, repeated construction even influences each other, and embodies the level of city comprehensive planning and management.
At present, pipe gallery mainly has complete cast-in-place method, full prefabrication and prefabrication cast-in-place combined techniques.
Cast-in-place method is carried out as follows entirely, first excavation pit, and assembling reinforcement and fixed form, are then progressively poured at the scene It is overall that concrete constitutes piping lane.The advantage of complete cast-in-place method is that the structural integrity and water proofing property of piping lane are relatively good;Shortcoming is being applied Work complex process, causes long construction period, is not suitable for using this construction technology in the larger region of traffic pressure.
Full prefabrication is that, using mould one-piece casting piping lane section, on the one hand the method that then scene carries out lifting splicing manages The overall structure of corridor is larger, and the preparation for the piping lane for being and the equal difficulty of site operation are larger, on the other hand, and treating between piping lane section is spelled The girth for connecing section is longer, and high requirement is proposed for water-impervious operation, and the splicing process of piping lane it is also proposed bigger Challenge, causes difficulty of construction to increase.
Prefabrication cast-in-place combined techniques is to use more technique at present, and a part of part is batch production in whole work progress Prefabricated, a part of part is cast-in-place.For example, publication No. discloses a kind of underground for CN106555408A Chinese invention application The structure and construction method of pipe gallery, using the prefabricated panel with cavity, the top plate of the bottom plate of combined cast-in-situ encloses to form ground Lower pipe gallery.It is prefabricated that Chinese invention application after announcement for CN106013228A discloses a kind of overlapping monoblock type pipe gallery Assembling structure and its construction method, using cast-in-place bottom plate, use for side wall and top plate and first lift individual layer prefabricated component, so The cast-in-place prefabricated portion of side wall and the prefabricated portion of top plate on prefabricated component respectively afterwards.Chinese invention application CN105839667A is disclosed A kind of construction manufacture craft of complete prefabricated overlapping assembled underground pipe gallery, sets prefabricated panel, is setting pre- thereon first Hollow overlapping side wall is made, in the in-situ layer that the reinforcing bar in side wall is anchored into prefabricated overlapping bottom plate, then installs prefabricated on side wall The preformed layer of top plate is overlapped, and the reinforcing bar bending revolution on side wall is anchored into the in-situ layer in top plate.What is shown above is each In technical scheme, in order to keep piping lane that there is preferable globality structure, it is in bottom plate and/or is that top plate sets full wafer to show Layer is poured, during construction operation, is required to wait these in-situ layers to obtain after certain intensity, follow-up apply could be carried out Work.Accordingly, it is difficult to the desired purpose for saving the duration of prefabrication is obtained, or the time saved is fairly limited, it is difficult to Meet the expectation of people.In addition, for prefabricated side wall, although it can be designed to hollow-core construction to strengthen itself and bottom plate And/or the bonding strength of bottom plate, but can not to meet people high-strength to pipe gallery globality for the bonding strength between side wall The need for spending structure.For example, Granted publication discloses a kind of prefabricated integrated pipe for CN206052779U Chinese utility model well Joint face between corridor splicing structure, its prefabricated side wall sets boss and groove to be attached respectively, and in convex-concave and groove The reserved concreting cavity in centre.Publication No. discloses a kind of empty stomach wallboard for CN106088147A Chinese invention application and mixed Prefabricated assembled pipe gallery and its application method are closed, the connection of wherein side wall is constituted using vertical reinforcement and with closed stirrups Reinforcing bar body, then cast-in-place connection.In above-mentioned two scheme, due to lacking horizontal bar construction between side wall so that side wall Bonding strength is difficult to meet the technical requirements that piping lane side wall should have enough bearing capacities.
It can be seen that, the pipe gallery prepared in the prior art using prefabrication cast-in-place combined techniques is shortening construction period and reinforced pipe The technical problem for being badly in need of solving is still suffered from corridor structural integrity on this two big important Construction index.On the other hand, in order to obtain Preferable globality structure, some prefabricated pipe galleries cause the assembling of precast wall body to be constructed using complicated assembling structure Technique is sufficiently complex, loses and uses the contracting of prefabricated pipe gallery with the technique effect of short construction period.
The content of the invention
It is an object of the invention to overcome technological deficiency present in prior art there is provided a kind of pipe gallery and its apply Work method, solves prefabricated pipe gallery long construction period in the prior art, complex process and pipe gallery globality structure The technical problem of difference.
To achieve these goals, the present invention provides following technical scheme.
A kind of pipe gallery, including the bottom wall being made up of prefabricated panel, the side wall being made up of prefabricated side plate, by prefabricated top plate The crown wall of composition;In the water impervious layer of bottom of foundation ditch first, the prefabricated panel is set on first water impervious layer, in institute The both sides setting prefabricated side plate close to foundation pit walls on prefabricated panel is stated, the prefabricated top is set on the prefabricated side plate Plate;
The prefabricated panel includes the floor body of rectangular parallelepiped structure, the floor body include a top surface A, bottom surface B, Two sides, a front end face C and a rear end face D;There is length along what top surface A extended on one side of floor body First projection of cube structure;The with rectangular parallelepiped structure extended along bottom surface B on the another side of floor body Two projections;The thickness of first projection and the second projection is a quarter of the thickness of floor body;First on prefabricated panel Projection stacks the direction extension that prefabricated panel is extended along foundation ditch with the second projection on contiguous prefabricated bottom plate and constitutes bottom wall, And first form the first connection cavity between projection and the second projection;
Two rows the first cavity arranged side by side, first are vertically opened up separately down close to the both sides of foundation pit walls on floor body top surface A The depth of cavity is less than or equal to 1/2nd of floor body thickness;One, which is opened up, on the front end face C of floor body ranked second chamber Body, the second cavity is passed through the first cavity and from rear end face D, and the bottom of the cavity of bottom first of the second cavity is flushed;The bottom of at The 3rd cavity is opened up on two/one side of the close bottom of foundation ditch of plate main body, the 3rd cavity is from another side along bottom surface The side of the second projection extended is passed;The first connecting pipe is set between second cavity and the 3rd cavity;In floor body Top surface A on multiple the first injected holes connected with the second cavity and the first connection cavity are set;
The prefabricated side plate includes the side plate main of rectangular parallelepiped structure, the side plate main include a top surface E, bottom surface F, Two sides, a front end face G and a rear end face H;Along having that front end face G extends sideways out at one of side plate main 3rd projection of rectangular parallelepiped structure;There is rectangular parallelepiped structure along what rear end face H extended in the another side of floor body 4th projection;3rd projection and the 4th projection thickness are a quarter of the thickness of side plate main;The 3rd on prefabricated side plate Projection stacks the direction extension that prefabricated side plate is extended along foundation ditch with the 4th projection on contiguous prefabricated side plate and constitutes side wall, And the 3rd form the second connection cavity between projection and the 4th projection;
One is opened up downward vertically on 1/2nd top surface E of foundation pit walls side in side plate main ranked fourth cavity, the Four cavitys are passed from the bottom surface F of side plate main through side plate main and docked with the first cavity on floor body, in side plate master One is opened up on body on two/one side away from foundation pit walls side and ranked fifth cavity, the 5th cavity passes through side plate main from side plate The side of upper 4th projection of main body is passed;The second connecting pipe is set between 4th cavity and the 5th cavity;
The prefabricated top plate includes the top plate main body of rectangular parallelepiped structure, and top plate main body is by a top surface I, bottom surface G, two sides Face, a front end face K and a rear end face L composition;It is rectangular along having of being extended sideways out at one of top plate main body of top surface I 5th projection of body structure;The 6th with rectangular parallelepiped structure extended along bottom surface G in the another side of top plate main body is convex Block;The thickness of 5th projection and the 6th projection is a quarter of the thickness of top plate main body;The 5th projection on prefabricated top plate The direction extension that prefabricated top plate is extended along foundation ditch is stacked with the 6th projection on contiguous prefabricated top plate and constitutes crown wall;And the The 3rd connection cavity is formed between five cavitys and the 6th cavity;
Two rows the 6th cavity arranged side by side, the 6th cavity are opened up downward vertically close to the both sides of foundation pit walls on top plate body top face I It is passed down through top plate main body to pass and dock with the 4th cavity of prefabricated side plate from bottom surface G, in top plate main body away from prefabricated side plate 1/2nd front end face K on open up one and ranked seventh cavity, the 7th cavity is passed through the 6th cavity and from rear end face L, Top plate main body opens up the 8th cavity close to two/one side of prefabricated side plate and passed from the side of the 6th projection;7th cavity And the 8th set third connecting pipeline between cavity;Multiple and the 7th cavity and the 3rd company are set on the top surface I of top plate main body Connect the second injected hole of cavity connection;
First steel reinforcement cage is plugged in second cavity, and the second steel reinforcement cage is plugged in the 3rd cavity, and the 3rd steel reinforcement cage is plugged In first cavity, the 4th cavity and the 6th cavity, the 4th steel reinforcement cage is plugged in the 5th cavity, and the 5th steel reinforcement cage is plugged In the 7th cavity, the 6th steel reinforcement cage is plugged in the 8th cavity;
From the first injected hole on the top surface A of prefabricated panel, the 4th cavity on the top surface E of prefabricated side plate and the first connection cavity Upper port, the second injected hole on the top surface I of prefabricated top plate and the 6th cavity upper port concrete perfusion cause the first cavity, Second cavity, the 3rd cavity, the 4th cavity, the 5th cavity, the 6th cavity, the 7th cavity, the 8th cavity, the first connecting pipe, Second connecting pipe, third connecting pipeline, the first connection cavity, the second connection cavity and the 3rd connection cavity are each filled with coagulation Soil.
The present invention further improvement is that, anti-second permeable layer is filled between side wall and foundation pit walls, is filled on crown wall 3rd water impervious layer.By setting these water impervious layers so that whole pipe gallery has preferable infiltration.
The present invention further improvement is that, referring to shown in accompanying drawing 1, prefabricated side plate is arranged on prefabricated panel, contiguous prefabricated The 3rd projection and the 4th projection of side plate are stacked in the centre position of prefabricated panel;Prefabricated mounting of roof plate is on prefabricated side plate, phase The 5th projection and the 6th projection of adjacent prefabricated top plate are stacked positioned at the centre position of prefabricated side plate top surface.Pass through this stacking side Formula, disperses the stacked position of prefabricated component, can effectively improve the globality structural strength of pipe gallery.
The present invention further improvement is that, the mid-board parallel with bottom wall is set between crown wall and bottom wall, and mid-board is with pushing up The first cabin is formed between wall, for underground parking garage;The second cabin is formed between mid-board and bottom wall, for arranging pipeline.
The present invention further improvement is that, some cross walls and several mediastinum walls are set in the second cabin, by second Cabin is divided into multiple subdivision rooms., can be separated to the progress of a variety of pipelines by the subdivision room that these are split, subtract Influence between small pipeline.
The present invention further improvement is that, the second connecting pipe between the 4th cavity and the 5th cavity is pressed from both sides with horizontal direction Angle is 30-80 °.Second connecting pipe oblique by setting, is conducive to the concrete subsequently poured into a mould to rapidly enter the 5th cavity In, it is to avoid there is the 4th cavity and have been filled with concrete, and underfill concrete in the 5th cavity so that the connection between side plate is strong Degree is inadequate, causes side wall not possess enough bearing capacities.The second connecting pipe and water between 4th cavity and the 5th cavity Flat angular separation is preferably 30 °, 45 °, 60 °, 70 ° or 80 °.
Present invention also offers a kind of construction method of pipe gallery, comprise the following steps:
Step one:Excavation pit, permeable layer of being set up defences on foundation ditch bottom surface upper berth inserts the first steel reinforcement cage in the second chamber of prefabricated panel In body, on hoisting prefabricated bottom plate to water impervious layer, by the first projection on prefabricated panel with it is second convex on contiguous prefabricated bottom plate Block, which is stacked, causes prefabricated panel to extend along the direction that foundation ditch extends, and second is plugged in the 3rd cavity of adjacent prefabricated panel Steel reinforcement cage;
Step 2:Close to the hoisting prefabricated side plate of two side positions of foundation pit walls on the top surface A of prefabricated panel, by prefabricated side plate 3rd projection is stacked with the 4th projection on contiguous prefabricated side plate causes prefabricated side plate to extend along the direction that foundation ditch extends, and makes The 4th cavity obtained on prefabricated side plate is docked with the first cavity on prefabricated panel;In the 5th cavity of adjacent prefabricated side plate Plug the 4th steel reinforcement cage, from the top surface E of prefabricated side plate plug downwards the 3rd steel reinforcement cage to the bottom of the first cavity and with prefabricated bottom The first steel reinforcement cage in plate is crossed, and the 3rd steel reinforcement cage is passed above prefabricated side plate top surface E for follow-up prefabricated top plate In the 6th cavity pass through;Detachable ribs is installed in the intersection of prefabricated panel and prefabricated side plate, from the of prefabricated panel The upper port of one injected hole and the 4th cavity on prefabricated side plate top surface E irrigates coagulation simultaneously to prefabricated side plate and prefabricated panel Soil;So that the first cavity, the second cavity, the 3rd cavity, the first connection cavity and the first connecting pipe in prefabricated panel are filled up Concrete;So that the 4th cavity, the 5th cavity, the second connection cavity and the second connecting pipe in prefabricated side plate fill up coagulation Soil;
Step 3:In the 7th cavity that 5th steel reinforcement cage is inserted to prefabricated top plate, on the prefabricated side plate top close to foundation pit walls both sides Hoisting prefabricated top plate on the E of face so that pass prefabricated side plate the 3rd steel reinforcement cage insert into the 6th cavity of prefabricated top plate and with 3rd steel reinforcement cage crosses;The 6th projection on the 5th projection on prefabricated top plate and contiguous prefabricated top plate is stacked and causes prefabricated bottom Plate extends along the direction that foundation ditch extends, and the 6th steel reinforcement cage is plugged in the 8th cavity of adjacent prefabricated top plate;In prefabricated side The intersection of plate and prefabricated top plate disposes detachable ribs, from the second injected hole and the top surface I of prefabricated top plate of prefabricated top plate On the 6th cavity upper port simultaneously concrete perfusion so that the 6th cavity, the 7th cavity, the 8th chamber in prefabricated top plate Body, the 3rd connection cavity and third connecting pipeline fill up concrete.
The present invention further improvement is that, including step 4:Laying second is prevented on the outside of the side wall being made up of prefabricated side plate Permeable layer, lays the 3rd water impervious layer above the crown wall being made up of prefabricated top plate.
The present invention further improvement is that, in addition to step 5:During setting is parallel with bottom wall between crown wall and bottom wall Partition wall, forms the first cabin, for underground parking garage between mid-board and crown wall;The second cabin is formed between mid-board and bottom wall Room, for arranging pipeline.
The present invention further improvement is that, in addition to step 6:Some cross walls are set in the second cabin and some vertical Partition wall, multiple subdivision rooms are divided into by the second cabin.
The present invention further improvement is that, in step 2, the second connecting pipe between the 4th cavity and the 5th cavity It it is 30-80 ° with horizontal direction angle.
The advantageous effects of the present invention embody the following aspects:
1. it is both needed to cause to apply using the in-situ layer of full wafer in bottom wall and/or crown wall for prefabricated pipe gallery of the prior art The problem of work cycle is long, bottom wall, side wall and the crown wall of the prefabricated pipe gallery that the present invention is provided use prefabricated board structure, contracting The short construction period of pipe gallery.
2. the present invention is entirely prefabricated using agent structure, is constructed, without setting the large space scope of operation, subtracted using lifting Small excavation of earthwork amount, saves cost.
3. by the way that the first projection and the thickness of the second projection on prefabricated panel are being set into the four of prefabricated panel thickness / mono-, cause to form the first connecting cavity between the first projection and the second projection by the stacking of the first projection and the second projection Body, the concrete perfusion in cavity so that be seamlessly connected between prefabricated panel.The phase used in prefabricated side plate and prefabricated top plate As method to form the second connection cavity and the 3rd connection cavity to realize the seamless company between prefabricated side plate and prefabricated top plate Connect, considerably enhance the antiseepage outlet capacity of pipe gallery.
4. cause pipe gallery pressure-bearing energy for the bonding strength deficiency between same prefabricated board member in the prior art Hypodynamic problem, on the one hand, the present invention is by setting transverse direction between prefabricated component of the same race adjacent in the horizontal direction Cavity, then plugs steel reinforcement cage and fill concrete so that the bonding strength between adjacent prefabricated component has wherein It is obviously improved.For example, in the present invention, by opening up the 3rd on two/one side of bottom of foundation ditch in prefabricated panel Cavity, then plugs steel reinforcement cage and fill concrete.On the other hand, the present invention is in different pre- of two kinds in orthogonal connection Also the cavity being mutually butted is offered on making sheet component so that the intensity of whole pipe gallery is obviously improved.In the present invention, lead to X-axis, Y-axis and the Z-direction crossed on prefabricated panel and prefabricated top plate set hollow cavity respectively, X-axis and Z on prefabricated side plate Hollow cavity is set respectively on axle, and connecting pipe is set so that being mutually connected between comprehensive cavity staggeredly in same prefabricated component It is logical, and then realize between identical prefabricated component and run through steel reinforcement cage and concrete between different prefabricated components.Tool For body, in the present invention, on the direction that foundation ditch extends, by the 3rd cavity between prefabricated panel, between prefabricated side plate The 5th cavity and prefabricated top plate between the 8th cavity and steel reinforcement cage and concrete in each cavity cause it is each similar It is stably connected between prefabricated component;Cause the first cavity of prefabricated panel, the of prefabricated side plate on the section of pipe gallery The 6th cavity docking of four cavitys and prefabricated top plate, and the second cavity of prefabricated panel runs through on the firstth cavity, prefabricated top plate The 7th cavity run through the 6th cavity, therefore so that the first cavity of prefabricated panel both sides and the 7th chamber through the first cavity Body, the 4th cavity in the prefabricated side plate of prefabricated panel both sides, the 6th cavity of prefabricated top plate both sides and through the 6th chamber The 7th cavity and steel reinforcement cage and concrete in cavity of body constitute an armored concrete loop, improve integrated pipe The globality structural strength of corridor;And the connecting pipe in each prefabricated board causes the armored concrete loop with prolonging along foundation ditch direction Each cavity connection stretched, the globality structure of the whole pipe gallery further improved so that the overall knot of the pipe gallery Structure intensity is suitable with the globality structural strength of full cast-type pipe gallery.
In general, the present invention makes full use of the thickness face of each prefabricated board, and being set respectively in its different thick layer can The cavity plugged for steel reinforcement cage so that prefabricated board is equal on the bearing of trend of foundation ditch and between the prefabricated board of neighboring vertical connection The reinforcement structure of steel reinforcement cage and concrete is set, while setting connecting pipe to cause the reinforcement structure on different-thickness layer to connect Get up, by these cavitys, steel reinforcement cage and concrete constitute one it is horizontal and vertical connect overall reinforcement structure, carry significantly Rise the globality structural strength of pipe gallery.
Calculated by practice of construction, the present invention will save for 80% time on construction period than full cast-type pipe gallery, And the globality structural strength of piping lane can reach the 95% of full cast-type pipe gallery, the construction technique of pipe gallery disclosure satisfy that It is required that.
Brief description of the drawings
Accompanying drawing 1 is the structural representation of pipe gallery.
Accompanying drawing 2 is the structural representation of prefabricated panel.
Accompanying drawing 3 is the top view of prefabricated panel.
Accompanying drawing 4 is the front view of prefabricated panel.
Accompanying drawing 5 is the right view of prefabricated panel.
Accompanying drawing 6 is the sectional schematic diagram of A-B tangent planes in prefabricated panel top view.
Accompanying drawing 7 is the stacking schematic diagram of prefabricated panel.
Accompanying drawing 8 is the structural representation of prefabricated side plate.
Accompanying drawing 9 is the top view of prefabricated side plate.
Accompanying drawing 10 is the right view of prefabricated side plate.
Accompanying drawing 11 is the sectional schematic diagram of A-B tangent planes in prefabricated side plate top view.
Accompanying drawing 12 is the stacking schematic diagram of prefabricated side plate.
Accompanying drawing 13 is the structural representation of prefabricated top plate.
Accompanying drawing 14 is the front view of prefabricated top plate.
Accompanying drawing 15 is the top view of prefabricated top plate.
Accompanying drawing 16 is the right view of prefabricated top plate.
Accompanying drawing 17 is the sectional schematic diagram of A-B tangent planes in prefabricated top plate top view.
Accompanying drawing 18 is the stacking schematic diagram of prefabricated top plate.
Embodiment
Technical scheme described below in conjunction with the accompanying drawings.
Referring to shown in accompanying drawing 1, a kind of pipe gallery, including the bottom wall being made up of prefabricated panel 1, it is made up of prefabricated side plate 2 Side wall, the crown wall being made up of prefabricated top plate 3;In the water impervious layer of bottom of foundation ditch first, set on first water impervious layer The prefabricated panel 1 is put, the prefabricated side plate 2 is set close to the both sides of foundation pit walls on the prefabricated panel 1, described prefabricated The prefabricated top plate 3 is set on side plate 2;
Referring to shown in accompanying drawing 2 and 7, the prefabricated panel 1 includes the floor body of rectangular parallelepiped structure, and the floor body includes one Individual top surface A4, a bottom surface B, two sides, a front end face C5 and a rear end face D;Along top surface A4 in floor body one The first projection 6 with rectangular parallelepiped structure extended on individual side;Extend along bottom surface B on the another side of floor body The second projection 7 with rectangular parallelepiped structure gone out;The thickness of first projection 6 and the second projection 7 is the thickness of floor body A quarter;The first projection 6 on prefabricated panel 1 is stacked with the second projection 7 on contiguous prefabricated bottom plate 1 causes prefabricated panel 1 The direction extension extended along foundation ditch is constituted forms the first connection cavity 8 between bottom wall, and the first projection 6 and the second projection 7.
Referring to shown in accompanying drawing 2-7, the both sides close to foundation pit walls on floor body top surface A4 vertically open up two separately down Row's the first cavity 9 arranged side by side, the depth of the first cavity 9 is less than or equal to 1/2nd of floor body thickness;In floor body One is opened up on front end face C5 and ranked second cavity 10, the second cavity 10 is through the first cavity 9 and is passed from rear end face D, the second cavity The bottom of 10 the first cavity of bottom 9 is flushed;The 3rd is opened up on two/one side of the close bottom of foundation ditch of floor body Cavity 11, the side for the second projection 7 that the 3rd cavity 11 extends from another side along bottom surface is passed;The He of second cavity 10 First connecting pipe 12 is set between the 3rd cavity 11;Set multiple with the second cavity 10 and the on the top surface A4 of floor body First injected hole 13 of one connection cavity 8 connection;
Referring to shown in accompanying drawing 8 and 12, the prefabricated side plate 2 includes the side plate main of rectangular parallelepiped structure, and the side plate main includes One top surface E14, a bottom surface F, two sides, a front end face G15 and a rear end face H;Along front end face G15 in side plate The 3rd projection 16 with rectangular parallelepiped structure that one of main body extends sideways out;Along rear end face H in the another of floor body The 4th projection 17 with rectangular parallelepiped structure extended sideways out;3rd projection 16 and the thickness of the 4th projection 17 are side plate main Thickness a quarter;The 3rd projection 16 on prefabricated side plate 2 is stacked with the 4th projection 17 on contiguous prefabricated side plate 2 to be caused The direction extension that prefabricated side plate 2 extends along foundation ditch is constituted forms second between side wall, and the 3rd projection 16 and the 4th projection 17 Connection cavity 18.
It is downward on 1/2nd top surface E14 of foundation pit walls side in side plate main referring to shown in accompanying drawing 8-12 It is vertical to open up one and ranked fourth cavity 19, the 4th cavity 19 passed through side plate main from the bottom surface F of side plate main and with bottom plate master The first cavity 9 on body is docked, and opening up one on two/one side away from foundation pit walls side in side plate main ranked fifth chamber Body 20, the 5th cavity 20 is passed through side plate main from the side of upper 4th projection 17 of side plate main;4th cavity 19 and Second connecting pipe 21 is set between five cavitys 20.
Referring to shown in accompanying drawing 13 and 18, the prefabricated top plate 3 includes the top plate main body of rectangular parallelepiped structure, and top plate main body is by one Individual top surface I22, a bottom surface G, two sides, a front end face K23 and a rear end face L composition;Along top surface I22 in top plate The 5th projection 24 with rectangular parallelepiped structure that one of main body extends sideways out;Along bottom surface G top plate main body opposite side The 6th projection 25 with rectangular parallelepiped structure that face is extended;The thickness of 5th projection 24 and the 6th projection 25 is top plate main body Thickness a quarter;The 5th projection 24 on prefabricated top plate 3 is stacked with the 6th projection 25 on contiguous prefabricated top plate 3 to be caused The direction extension that prefabricated top plate 2 extends along foundation ditch constitutes crown wall;And the 5th form the 3rd between cavity 20 and the 6th cavity 27 Connection cavity 26.
Referring to accompanying drawing 13-18, it is arranged side by side on top plate body top face I22 close to the both sides of foundation pit walls to open up two rows downward vertically The 6th cavity 27, the 6th cavity 27 be passed down through top plate main body passed from bottom surface G and with 19 pairs of the 4th cavity of prefabricated top plate 3 Connect, opening up one on 1/2nd front end face K23s of the top plate main body away from prefabricated side plate 2 ranked seventh cavity 28, the 7th cavity 28 Pass through the 6th cavity 27 and from rear end face L, the 8th is opened up close to two/one side of prefabricated side plate 2 in top plate main body Cavity 29 is simultaneously passed from the side of the 6th projection 25;Third connecting pipeline 30 is set between the 7th cavity 28 and the 8th cavity 29; Multiple the second injected holes 31 connected with the 7th cavity 28 and the 3rd connection cavity 26 are set on the top surface I22 of top plate main body;
First steel reinforcement cage is plugged in second cavity 10, and the second steel reinforcement cage is plugged in the 3rd cavity 11, the 3rd steel reinforcement cage It is plugged in first cavity 9, the 4th cavity 19 and the 6th cavity 27, the 4th steel reinforcement cage is plugged in the 5th cavity 20, the Five steel reinforcement cages are plugged in the 7th cavity 28, and the 6th steel reinforcement cage is plugged in the 8th cavity 29;
From the first injected hole 13 on the top surface A4 of prefabricated panel 1, the 4th cavity 19 on the top surface E14 of prefabricated side plate 2 and The second injected hole 31 and the perfusion of the upper port of the 6th cavity 27 in the upper port of one connection cavity 8, the top surface I22 of prefabricated top plate 3 Concrete causes the first cavity 9, the second cavity 10, the 3rd cavity 11, the 4th cavity 19, the 5th cavity 20, the 6th cavity 27, Seven cavitys 28, the 8th cavity 29, the first connecting pipe 12, the second connecting pipe 21, third connecting pipeline 30, the first connection cavity 8th, the second connection cavity 18 and the 3rd connection cavity 26 are each filled with concrete.
In an embodiment of the invention, anti-second permeable layer is filled between side wall and foundation pit walls, on crown wall Fill the 3rd water impervious layer.By setting these water impervious layers so that whole pipe gallery has preferable infiltration.
In an embodiment of the invention, the mid-board parallel with bottom wall, mid-board are set between crown wall and bottom wall The first cabin is formed between crown wall, for underground parking garage;The second cabin is formed between mid-board and bottom wall, for deployment tube Line.
In an embodiment of the invention, some cross walls and several mediastinum walls are set in the second cabin, will Second cabin is divided into multiple subdivision rooms.By the subdivision room that these are split, a variety of pipelines can separately be put Put, reduce the influence between pipeline.
In an embodiment of the invention, the second connecting pipe 21 between the 4th cavity 19 and the 5th cavity 20 with Horizontal direction angle is 30-80 °.Second connecting pipe 21 oblique by setting, is conducive to the concrete subsequently poured into a mould quick Into in the 5th cavity 20, it is to avoid the 4th cavity 19 occur and have been filled with concrete, and underfill concrete in the 5th cavity 20, make The bonding strength obtained between side plate is inadequate, causes side wall not possess enough bearing capacities.4th cavity 19 and the 5th cavity 20 Between the second connecting pipe 21 and horizontal direction angle be preferably 30 °, 45 °, 60 °, 70 ° or 80 °.
For above-mentioned pipe gallery, present invention also offers a kind of construction method of above-mentioned pipe gallery, including following step Suddenly:
Step one:First steel reinforcement cage is inserted the second of prefabricated panel 1 by excavation pit, permeable layer of being set up defences on foundation ditch bottom surface upper berth In cavity 10, on hoisting prefabricated bottom plate 1 to water impervious layer, by the first projection 6 and contiguous prefabricated bottom plate 1 on prefabricated panel 1 The second projection 7 stack the direction that prefabricated panel 1 is extended along foundation ditch and extend, in the 3rd chamber of adjacent prefabricated panel 1 The second steel reinforcement cage is plugged in body 11;
Step 2:Close to the hoisting prefabricated side plate 2 of two side positions of foundation pit walls on the top surface A4 of prefabricated panel 1, by prefabricated side plate 2 On the 3rd projection 16 stack the side for make it that prefabricated side plate 2 extends along foundation ditch with the 4th projection 17 on contiguous prefabricated side plate 2 To extension, and the 4th cavity 19 on prefabricated side plate 2 is docked with the first cavity 9 on prefabricated panel 1;Adjacent prefabricated The 4th steel reinforcement cage is plugged in 5th cavity 20 of side plate 2, the 3rd steel reinforcement cage is plugged downwards to from the top surface E14 of prefabricated side plate 2 The bottom of one cavity 9 simultaneously crosses with the first steel reinforcement cage in prefabricated panel 1, and causes the 3rd steel reinforcement cage from the prefabricated top surface of side plate 2 Pass and passed through for the 6th cavity 27 in follow-up prefabricated top plate 3 above E14;In the intersection of prefabricated panel 1 and prefabricated side plate 2 Detachable ribs is installed, the 4th cavity 19 from the first injected hole 13 and the top surface E14 of prefabricated side plate 2 of prefabricated panel 1 Upper port to prefabricated side plate 2 and prefabricated panel 1 concrete perfusion simultaneously;So that the first cavity 9, second in prefabricated panel 1 Cavity 10, the 3rd cavity 11, the first connection cavity 8 and the first connecting pipe 12 fill up concrete;So that in prefabricated side plate 2 Four cavitys 19, the 5th cavity 20, the second connection cavity 18 and the second connecting pipe 21 fill up concrete;
Step 3:In the 7th cavity 28 that 5th steel reinforcement cage is inserted to prefabricated top plate 3, in the prefabricated side plate close to foundation pit walls both sides Hoisting prefabricated top plate 3 on 2 top surface E14 so that the 3rd steel reinforcement cage for passing prefabricated side plate 2 inserts the 6th chamber into prefabricated top plate 3 Crossed in body 27 and with the 3rd steel reinforcement cage;By the 5th projection 24 on prefabricated top plate 3 and the 6th projection on contiguous prefabricated top plate 3 25 stack the direction extension for make it that prefabricated panel 1 extends along foundation ditch, are plugged in the 8th cavity 29 of adjacent prefabricated top plate 3 6th steel reinforcement cage;Detachable ribs is disposed in the intersection of prefabricated side plate 2 and prefabricated top plate 3, from the second note of prefabricated top plate 3 The upper port of the 6th cavity 27 on the top surface I22 of slurry hole 31 and prefabricated top plate 3 is while concrete perfusion so that prefabricated top plate 3 In the 6th cavity 27, the 7th cavity 28, the 8th cavity 29, the 3rd connection cavity 26 and third connecting pipeline 30 fill up coagulation Soil.
In an embodiment of the invention, including step 4:Is laid on the outside of the side wall being made up of prefabricated side plate 2 Two water impervious layers, lay the 3rd water impervious layer above the crown wall being made up of prefabricated top plate 3.
In an embodiment of the invention, in addition to step 5:Set between crown wall and bottom wall parallel with bottom wall Mid-board, the first cabin is formed between mid-board and crown wall, for underground parking garage;Second is formed between mid-board and bottom wall Cabin, for arranging pipeline.
In an embodiment of the invention, in addition to step 6:If set in the second cabin some cross walls and Dry mediastinum wall, multiple subdivision rooms are divided into by the second cabin.
In an embodiment of the invention, in step 2, second between the 4th cavity 19 and the 5th cavity 20 Connecting pipe 21 and horizontal direction angle are 30-80 °.
The present invention between prefabricated component of the same race adjacent in the horizontal direction by setting horizontal cavity, then at it In plug steel reinforcement cage and fill concrete so that the bonding strength between adjacent prefabricated component, which has, to be obviously improved.Tool For body, in the present invention, by opening up the 3rd cavity on two/one side of bottom of foundation ditch in prefabricated panel, then Plug steel reinforcement cage and fill concrete;Prefabricated side plate, which is opened up, opens up the 8th similar chamber in the 5th similar cavity, prefabricated top plate Body, then plugs steel reinforcement cage and fill concrete.On the other hand, the present invention is in different prefabricated of two kinds in orthogonal connection Also the cavity being mutually butted is offered on board member so that the intensity of whole pipe gallery is obviously improved.In the present invention, pass through X-axis, Y-axis and Z-direction on prefabricated panel and prefabricated top plate set hollow cavity respectively, X-axis and Z axis on prefabricated side plate It is upper that hollow cavity is set respectively, and connecting pipe is set so that being interconnected in same prefabricated component between comprehensive cavity staggeredly, And then realize between identical prefabricated component and run through steel reinforcement cage and concrete between different prefabricated components.It is specific and Speech, in the present invention, on the direction that foundation ditch extends, by the 3rd cavity between prefabricated panel, the between prefabricated side plate The 8th cavity between five cavitys and prefabricated top plate and the steel reinforcement cage and concrete in each cavity cause each similar prefabricated It is stably connected between board member;Cause the first cavity, the 4th chamber of prefabricated side plate of prefabricated panel on the section of pipe gallery The 6th cavity docking of body and prefabricated top plate, and the second cavity of prefabricated panel runs through the firstth cavity, the on prefabricated top plate Seven cavitys run through the 6th cavity, therefore so that the first cavity of prefabricated panel both sides and the 7th cavity through the first cavity, position 6th cavity of the 4th cavity, prefabricated top plate both sides in the prefabricated side plate of prefabricated panel both sides and through the 6th cavity Steel reinforcement cage and concrete in seven cavitys and cavity constitute an armored concrete loop, improve the whole of pipe gallery Body structural strength;And the connecting pipe in each prefabricated board cause the armored concrete loop with along foundation ditch direction extend it is each Cavity is connected, the globality structure of the whole pipe gallery further improved so that the overall construction intensity of the pipe gallery It is suitable with the globality structural strength of full cast-type pipe gallery.
In general, the present invention makes full use of the thickness face of each prefabricated board, and being set respectively in its different thick layer can The cavity plugged for steel reinforcement cage so that prefabricated board is equal on the bearing of trend of foundation ditch and between the prefabricated board of neighboring vertical connection The reinforcement structure of steel reinforcement cage and concrete is set, while setting connecting pipe to cause the reinforcement structure on different-thickness layer to connect Get up, constitute an entirety, greatly promote the globality structural strength of pipe gallery.
The general principle and principal character and advantages of the present invention of the present invention has been shown and described above.Belonging to this area Technical staff it should be appreciated that merely illustrating the principles of the invention described in description above, do not depart from spirit of the invention and On the premise of scope, various changes and modifications of the present invention are possible, and these changes and improvements both fall within claimed invention In the range of.The scope of the present invention is defined by the appended claims and its equivalents.

Claims (10)

1. a kind of pipe gallery, it is characterized in that:Including the bottom wall being made up of prefabricated panel, the side wall being made up of prefabricated side plate, by The crown wall of prefabricated top plate composition;In the water impervious layer of bottom of foundation ditch first, set described prefabricated on first water impervious layer Bottom plate, sets the prefabricated side plate close to the both sides of foundation pit walls on the prefabricated panel, institute is set on the prefabricated side plate State prefabricated top plate;
The prefabricated panel includes the floor body of rectangular parallelepiped structure, the floor body include a top surface A, bottom surface B, Two sides, a front end face C and a rear end face D;There is length along what top surface A extended on one side of floor body First projection of cube structure;The with rectangular parallelepiped structure extended along bottom surface B on the another side of floor body Two projections;The thickness of first projection and the second projection is a quarter of the thickness of floor body;First on prefabricated panel Projection stacks the direction extension that prefabricated panel is extended along foundation ditch with the second projection on contiguous prefabricated bottom plate and constitutes bottom wall, And first form the first connection cavity between projection and the second projection;
Two rows the first cavity arranged side by side, first are vertically opened up separately down close to the both sides of foundation pit walls on floor body top surface A The depth of cavity is less than or equal to 1/2nd of floor body thickness;One, which is opened up, on the front end face C of floor body ranked second chamber Body, the second cavity is passed through the first cavity and from rear end face D, and the bottom of the cavity of bottom first of the second cavity is flushed;The bottom of at The 3rd cavity is opened up on two/one side of the close bottom of foundation ditch of plate main body, the 3rd cavity is from another side along bottom surface The side of the second projection extended is passed;The first connecting pipe is set between second cavity and the 3rd cavity;In floor body Top surface A on multiple the first injected holes connected with the second cavity and the first connection cavity are set;
The prefabricated side plate includes the side plate main of rectangular parallelepiped structure, the side plate main include a top surface E, bottom surface F, Two sides, a front end face G and a rear end face H;Along having that front end face G extends sideways out at one of side plate main 3rd projection of rectangular parallelepiped structure;There is rectangular parallelepiped structure along what rear end face H extended in the another side of floor body 4th projection;3rd projection and the 4th projection thickness are a quarter of the thickness of side plate main;The 3rd on prefabricated side plate Projection stacks the direction extension that prefabricated side plate is extended along foundation ditch with the 4th projection on contiguous prefabricated side plate and constitutes side wall, And the 3rd form the second connection cavity between projection and the 4th projection;
One is opened up downward vertically on 1/2nd top surface E of foundation pit walls side in side plate main ranked fourth cavity, the Four cavitys are passed from the bottom surface F of side plate main through side plate main and docked with the first cavity on floor body, in side plate master One is opened up on body on two/one side away from foundation pit walls side and ranked fifth cavity, the 5th cavity passes through side plate main from side plate The side of upper 4th projection of main body is passed;The second connecting pipe is set between 4th cavity and the 5th cavity;
The prefabricated top plate includes the top plate main body of rectangular parallelepiped structure, and top plate main body is by a top surface I, bottom surface G, two sides Face, a front end face K and a rear end face L composition;It is rectangular along having of being extended sideways out at one of top plate main body of top surface I 5th projection of body structure;The 6th with rectangular parallelepiped structure extended along bottom surface G in the another side of top plate main body is convex Block;The thickness of 5th projection and the 6th projection is a quarter of the thickness of top plate main body;The 5th projection on prefabricated top plate The direction extension that prefabricated top plate is extended along foundation ditch is stacked with the 6th projection on contiguous prefabricated top plate and constitutes crown wall;And the The 3rd connection cavity is formed between five cavitys and the 6th cavity;
Two rows the 6th cavity arranged side by side, the 6th cavity are opened up downward vertically close to the both sides of foundation pit walls on top plate body top face I It is passed down through top plate main body to pass and dock with the 4th cavity of prefabricated side plate from bottom surface G, in top plate main body away from prefabricated side plate 1/2nd front end face K on open up one and ranked seventh cavity, the 7th cavity is passed through the 6th cavity and from rear end face L, Top plate main body opens up the 8th cavity close to two/one side of prefabricated side plate and passed from the side of the 6th projection;7th cavity And the 8th set third connecting pipeline between cavity;Multiple and the 7th cavity and the 3rd company are set on the top surface I of top plate main body Connect the second injected hole of cavity connection;
First steel reinforcement cage is plugged in second cavity, and the second steel reinforcement cage is plugged in the 3rd cavity, and the 3rd steel reinforcement cage is plugged In first cavity, the 4th cavity and the 6th cavity, the 4th steel reinforcement cage is plugged in the 5th cavity, and the 5th steel reinforcement cage is plugged In the 7th cavity, the 6th steel reinforcement cage is plugged in the 8th cavity;
From the first injected hole on the top surface A of prefabricated panel, the 4th cavity on the top surface E of prefabricated side plate and the first connection cavity Upper port, the second injected hole on the top surface I of prefabricated top plate and the 6th cavity upper port concrete perfusion cause the first cavity, Second cavity, the 3rd cavity, the 4th cavity, the 5th cavity, the 6th cavity, the 7th cavity, the 8th cavity, the first connecting pipe, Second connecting pipe, third connecting pipeline, the first connection cavity, the second connection cavity and the 3rd connection cavity are each filled with coagulation Soil.
2. pipe gallery as claimed in claim 1, it is characterised in that:Anti- second infiltration is filled between side wall and foundation pit walls Layer, fills the 3rd water impervious layer on crown wall.
3. pipe gallery as claimed in claim 1, it is characterised in that:Between crown wall and bottom wall set it is parallel with bottom wall in every Wall, forms the first cabin, for underground parking garage between mid-board and crown wall;The second cabin is formed between mid-board and bottom wall, For arranging pipeline.
4. pipe gallery as claimed in claim 3, sets some cross walls and several mediastinum walls in the second cabin, by Two cabins are divided into multiple subdivision rooms.
5. pipe gallery as claimed in claim 1, it is characterised in that:The second communicating pipe between 4th cavity and the 5th cavity Road and horizontal direction angle are 30-80 °.
6. a kind of construction method of pipe gallery as claimed in claim 1, it is characterised in that comprise the following steps:
Step one:Excavation pit, permeable layer of being set up defences on foundation ditch bottom surface upper berth inserts the first steel reinforcement cage in the second chamber of prefabricated panel In body, on hoisting prefabricated bottom plate to water impervious layer, by the first projection on prefabricated panel with it is second convex on contiguous prefabricated bottom plate Block, which is stacked, causes prefabricated panel to extend along the direction that foundation ditch extends, and second is plugged in the 3rd cavity of adjacent prefabricated panel Steel reinforcement cage;
Step 2:Close to the hoisting prefabricated side plate of two side positions of foundation pit walls on the top surface A of prefabricated panel, by prefabricated side plate 3rd projection is stacked with the 4th projection on contiguous prefabricated side plate causes prefabricated side plate to extend along the direction that foundation ditch extends, and makes The 4th cavity obtained on prefabricated side plate is docked with the first cavity on prefabricated panel;In the 5th cavity of adjacent prefabricated side plate Plug the 4th steel reinforcement cage, from the top surface E of prefabricated side plate plug downwards the 3rd steel reinforcement cage to the bottom of the first cavity and with prefabricated bottom The first steel reinforcement cage in plate is crossed, and the 3rd steel reinforcement cage is passed above prefabricated side plate top surface E for follow-up prefabricated top plate In the 6th cavity pass through;Detachable ribs is installed in the intersection of prefabricated panel and prefabricated side plate, from the of prefabricated panel The upper port of one injected hole and the 4th cavity on prefabricated side plate top surface E irrigates coagulation simultaneously to prefabricated side plate and prefabricated panel Soil;So that the first cavity, the second cavity, the 3rd cavity, the first connection cavity and the first connecting pipe in prefabricated panel are filled up Concrete;So that the 4th cavity, the 5th cavity, the second connection cavity and the second connecting pipe in prefabricated side plate fill up coagulation Soil;
Step 3:In the 7th cavity that 5th steel reinforcement cage is inserted to prefabricated top plate, on the prefabricated side plate top close to foundation pit walls both sides Hoisting prefabricated top plate on the E of face so that pass prefabricated side plate the 3rd steel reinforcement cage insert into the 6th cavity of prefabricated top plate and with 3rd steel reinforcement cage crosses;The 6th projection on the 5th projection on prefabricated top plate and contiguous prefabricated top plate is stacked and causes prefabricated bottom Plate extends along the direction that foundation ditch extends, and the 6th steel reinforcement cage is plugged in the 8th cavity of adjacent prefabricated top plate;In prefabricated side The intersection of plate and prefabricated top plate disposes detachable ribs, from the second injected hole and the top surface I of prefabricated top plate of prefabricated top plate On the 6th cavity upper port simultaneously concrete perfusion so that the 6th cavity, the 7th cavity, the 8th chamber in prefabricated top plate Body, the 3rd connection cavity and third connecting pipeline fill up concrete.
7. the construction method of pipe gallery as claimed in claim 6, it is characterised in that:Also include step 4:By prefabricated side The second water impervious layer of laying, lays the 3rd water impervious layer above the crown wall being made up of prefabricated top plate on the outside of the side wall of plate composition.
8. the construction method of pipe gallery as claimed in claim 6, it is characterised in that:Also include step 5:In crown wall and bottom The mid-board parallel with bottom wall is set between wall, the first cabin is formed between mid-board and crown wall, for underground parking garage;In every The second cabin is formed between wall and bottom wall, for arranging pipeline.
9. the construction method of pipe gallery as claimed in claim 8, it is characterised in that:Also include step 6:In the second cabin Some cross walls of middle setting and some mediastinum walls, multiple subdivision rooms are divided into by the second cabin.
10. the construction method of pipe gallery as claimed in claim 6, it is characterised in that:In step 2, the 4th cavity and The second connecting pipe and horizontal direction angle between five cavitys are 30-80 °.
CN201710423279.8A 2017-06-07 2017-06-07 A kind of pipe gallery and its construction method Pending CN107142962A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710423279.8A CN107142962A (en) 2017-06-07 2017-06-07 A kind of pipe gallery and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710423279.8A CN107142962A (en) 2017-06-07 2017-06-07 A kind of pipe gallery and its construction method

Publications (1)

Publication Number Publication Date
CN107142962A true CN107142962A (en) 2017-09-08

Family

ID=59780520

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710423279.8A Pending CN107142962A (en) 2017-06-07 2017-06-07 A kind of pipe gallery and its construction method

Country Status (1)

Country Link
CN (1) CN107142962A (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047676A (en) * 2000-08-02 2002-02-15 Hanshin Expressway Public Corp Buoyancy preventing structure and its construction method
KR20070115112A (en) * 2006-05-30 2007-12-05 삼성엔지니어링 주식회사 Construction method for utility-pipe conduit
CN105756087A (en) * 2016-02-05 2016-07-13 青岛润国生态科技发展有限公司 Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN106400835A (en) * 2016-11-08 2017-02-15 江苏金贸科技发展有限公司 Assembly type underground integrated pipe gallery
CN206052778U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of steel and Combined concrete piping lane
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
CN106555408A (en) * 2017-01-06 2017-04-05 中建科技(北京)有限公司 The structure and construction method of underground pipe gallery

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002047676A (en) * 2000-08-02 2002-02-15 Hanshin Expressway Public Corp Buoyancy preventing structure and its construction method
KR20070115112A (en) * 2006-05-30 2007-12-05 삼성엔지니어링 주식회사 Construction method for utility-pipe conduit
CN105756087A (en) * 2016-02-05 2016-07-13 青岛润国生态科技发展有限公司 Assembling-type anchoring structure for adjacent plates of prefabricated comprehensive pipe rack
CN105951876A (en) * 2016-05-04 2016-09-21 东北大学 Cover plate type precast concrete urban comprehensive pipe gallery and construction method thereof
CN105839666A (en) * 2016-06-03 2016-08-10 长沙远大住宅工业集团股份有限公司 Total-prefabricated superimposed assembly type underground pipe gallery and connecting node thereof
CN106013228A (en) * 2016-06-24 2016-10-12 中国建筑股份有限公司 Overlapping integral type prefabricated assembly structure for comprehensive pipe gallery and construction method thereof
CN206052778U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of steel and Combined concrete piping lane
CN206052779U (en) * 2016-09-29 2017-03-29 陕西建筑产业投资集团有限公司 A kind of prefabricated pipe gallery splicing structure
CN106400835A (en) * 2016-11-08 2017-02-15 江苏金贸科技发展有限公司 Assembly type underground integrated pipe gallery
CN106555408A (en) * 2017-01-06 2017-04-05 中建科技(北京)有限公司 The structure and construction method of underground pipe gallery

Similar Documents

Publication Publication Date Title
CN107152036A (en) A kind of pipe gallery and its construction method
CN207348091U (en) A kind of assembled pipe gallery
CN108086693A (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN108951870A (en) A kind of method of construction of the full assembly concrete shear wall structure system of low layer
CN107401217B (en) A kind of beamless hollow floor-chamber concrete-filled steel tube shear wall combined structure system and method
CN103334422A (en) Assembled embedded type prefabricated hollow underground continuous wall and construction method thereof
CN108571321A (en) A kind of construction method of the subway station of combined highway and metro
CN109555112A (en) A kind of structure superposition formula diaphram wall and construction method
CN105297893B (en) Mortise and tenon type concrete composite beam cross connecting structure and its construction method
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN207998860U (en) A kind of assembled pipe gallery
CN110777850A (en) Existing pipe gallery underground space, supporting structure thereof and construction method of supporting structure
CN107761759A (en) A kind of L-type concrete guard wall
CN203334270U (en) Mountable buried type prefabricated hollow underground diaphragm wall
CN206396892U (en) Building block and building structure
CN205669211U (en) A kind of prefabricated Gravity Retaining Wall
CN115324104B (en) Permanent-face combined assembled station and construction method thereof
CN205116220U (en) Pour cable pit after assembly of L type precast concrete spare
CN104895379B (en) Reinforced concrete water pool and construction method for same
CN111502748A (en) Construction method for backfilling foundation of railway crossing giant karst cave
CN107142962A (en) A kind of pipe gallery and its construction method
CN216640669U (en) Assembled underground space structure suitable for riparian greenbelt
CN214574077U (en) Open caisson structure with multi-layer horizontal inner ring plates
CN211037527U (en) Take vertical connected node structure of floor is assembled to full assembled of hidden beam
CN209619998U (en) A kind of superposed type continuous underground wall structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170908