CN107135481B - The resource allocation methods and device of remote radio unit common community - Google Patents

The resource allocation methods and device of remote radio unit common community Download PDF

Info

Publication number
CN107135481B
CN107135481B CN201710346276.9A CN201710346276A CN107135481B CN 107135481 B CN107135481 B CN 107135481B CN 201710346276 A CN201710346276 A CN 201710346276A CN 107135481 B CN107135481 B CN 107135481B
Authority
CN
China
Prior art keywords
doppler frequency
user terminal
rru
edge
absolute value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710346276.9A
Other languages
Chinese (zh)
Other versions
CN107135481A (en
Inventor
陆学兵
李钦竹
赵唯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Mobile Communications Group Co Ltd
China Mobile Group Jiangsu Co Ltd
Original Assignee
China Mobile Communications Group Co Ltd
China Mobile Group Jiangsu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Mobile Communications Group Co Ltd, China Mobile Group Jiangsu Co Ltd filed Critical China Mobile Communications Group Co Ltd
Priority to CN201710346276.9A priority Critical patent/CN107135481B/en
Publication of CN107135481A publication Critical patent/CN107135481A/en
Application granted granted Critical
Publication of CN107135481B publication Critical patent/CN107135481B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W4/00Services specially adapted for wireless communication networks; Facilities therefor
    • H04W4/02Services making use of location information
    • H04W4/025Services making use of location information using location based information parameters
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W24/00Supervisory, monitoring or testing arrangements
    • H04W24/08Testing, supervising or monitoring using real traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0289Congestion control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/04Wireless resource allocation
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/53Allocation or scheduling criteria for wireless resources based on regulatory allocation policies
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W88/00Devices specially adapted for wireless communication networks, e.g. terminals, base stations or access point devices
    • H04W88/08Access point devices
    • H04W88/085Access point devices with remote components

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the invention discloses a kind of resource allocation methods of remote radio unit common community and devices.This method comprises: being total to the physical site in cell for radio frequency remote unit RRU, detect whether that user terminal is in the edge of the signal cover for the RRU that the physical site includes;If having detected the resource allocation for the RRU that user terminal is in the edge, only includes by the physical site to the user terminal in the edge.The resource allocation methods and device of the remote radio unit common community of the embodiment of the present invention can be improved the capacity that RRU is total to cell, and then reduce business obstruction.

Description

The resource allocation methods and device of remote radio unit common community
Technical field
The present invention relates to mobile communication technology field more particularly to a kind of resource allocation sides of remote radio unit common community Method and device.
Background technique
Remote Radio Unit (Radio Remote Unit, RRU) is total to cellular technology and is developed based on distribution-type base station architecture, It is zoomed out by RRU, multiple set of locations under a baseband processing unit (Building Base band Unit, BBU) are physically It adheres to different sites separately, logically belongs to the same cell.
Currently, RRU, which is total to cellular technology, is mainly used in three scenes, high-speed rail covering scene, tunnel coverage scene and interior Covering scene.
For high-speed rail covering scene, when entering RRU there are two above train and being total to cell, RRU is total in cell RRU sends control information and business information to the user terminal of all trains simultaneously, i.e., the user terminal of all trains shares RRU Resource in cell altogether.Due to resource sharing, it is easy to business be caused to be blocked.In addition, if train is located at the edge that RRU is total to cell (i.e. cell switching spike zone), a large amount of hand off signaling can also occupy the resource that RRU is total in cell, also result in business resistance Plug.
To sum up, there are problems that business obstruction in the prior art.
Summary of the invention
The embodiment of the present invention provides the resource allocation methods and device of a kind of remote radio unit common community, can reduce industry Business obstruction.
On the one hand, the embodiment of the invention provides a kind of resource allocation methods of remote radio unit common community, method packets It includes:
It is total to the physical site in cell for RRU, detects whether that user terminal is in the RRU that the physical site includes The edge of signal cover;
If having detected the resource allocation for the RRU that user terminal is in the edge, only includes by the physical site to place User terminal in the edge.
On the other hand, the embodiment of the invention provides a kind of resource allocation device of remote radio unit common community, devices It include: detection module and distribution module, wherein
Detection module has detected whether that user terminal is in the physical station for being total to the physical site in cell for RRU The edge of the signal cover for the RRU that point includes;
Distribution module, in the case where detection module has detected that user terminal is in the edge, only by the physics The resource allocation for the RRU that website includes gives the user terminal in the edge.
It is small altogether to can be improved RRU for the resource allocation methods and device of the remote radio unit common community of the embodiment of the present invention The capacity in area, and then reduce business obstruction.
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, will make below to required in the embodiment of the present invention Attached drawing is briefly described, for those of ordinary skill in the art, without creative efforts, also Other drawings may be obtained according to these drawings without any creative labor.
Fig. 1 shows the first stream of the resource allocation methods of remote radio unit common community provided in an embodiment of the present invention Journey schematic diagram;
Fig. 2 shows second of streams of the resource allocation methods of remote radio unit common community provided in an embodiment of the present invention Journey schematic diagram;
Fig. 3 shows the first knot of the resource allocation device of remote radio unit common community provided in an embodiment of the present invention Structure schematic diagram;
Fig. 4 shows second of knot of the resource allocation device of remote radio unit common community provided in an embodiment of the present invention Structure schematic diagram.
Specific embodiment
The feature and exemplary embodiment of various aspects of the invention is described more fully below, in order to make mesh of the invention , technical solution and advantage be more clearly understood, with reference to the accompanying drawings and embodiments, the present invention is further retouched in detail It states.It should be understood that specific embodiment described herein is only configured to explain the present invention, it is not configured as limiting the present invention. To those skilled in the art, the present invention can be real in the case where not needing some details in these details It applies.Below the description of embodiment is used for the purpose of better understanding the present invention to provide by showing example of the invention.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence " including ... ", it is not excluded that including There is also other identical elements in the process, method, article or equipment of the element.
Fig. 1 shows the first stream of the resource allocation methods of remote radio unit common community provided in an embodiment of the present invention Journey schematic diagram.It may include:
S101: being total to the physical site in cell for RRU, detects whether that user terminal is in the physical site and includes The edge of the signal cover of RRU.
S102: if having detected the resource allocation for the RRU that user terminal is in the edge, only includes by the physical site To the user terminal for being in the edge.
Illustratively, it is illustrated by taking current high-speed rail private network planning as an example.
Current high-speed rail private network is planned to RRU and is distributed construction, and the linear chain structure of RRU along high-speed rail railway, multiple RRU merges into a RRU and is total to cell, it is generally the case that 8-12 RRU merges into a RRU and be total to cell.
Merged assuming that a RRU is total to cell by 12 RRU, wherein 12 RRU be respectively RRU1, RRU2, RRU3, RRU4, RRU5, RRU6, RRU7, RRU8, RRU9, RRU10, RRU11 and RRU12.Wherein, two RRU are a physical site. It includes 6 physical sites that then a RRU is total to cell altogether, respectively physical site 1, physical site 2, physical site 3, physical site 4, physical site 5 and physical site 6, wherein physical site 1 includes RRU1 and RRU2, and physical site 2 includes RRU3 and RRU4, Physical site 3 includes RRU5 and RRU6, and physical site 4 includes RRU7 and RRU8, and physical site 5 includes RRU9 and RRU10, physics Website 6 includes RRU11 and RRU12.
By taking physical site 1 as an example, for physical site 1, detect whether that user terminal is in physical site 1 and includes The edge of the signal cover of RRU1 and RRU2.
Assuming that the user terminal for detecting on train A is in the edge of the signal cover of RRU1 and RRU2, then only will The resource allocation of RRU1 and RRU2 is to the user terminal on train A, not by the resource allocation of RRU3 to RRU12 on train A User terminal.User terminal of the i.e. only RRU1 and RRU2 on train A sends control information and business information.
It is non-zero by the power adjustment of RRU1 and RRU2 specifically, can be zero by the power adjustment of RRU3 to RRU12, Specifically, can be power maximum value by the power adjustment of RRU1 and RRU2.At this point, RRU3-RRU12 no signal exports, RRU1 There is signal output with RRU2.Guarantee the resource for only enabling RRU1 and RRU2.
Specifically, the embodiment of the present invention detects whether that user terminal is in the signal for the RRU that the physical site includes The edge of coverage area may include:
The Doppler frequency shift between user terminal and the physical site is calculated in real time;
According to the Doppler frequency shift being calculated in real time, detect whether that user terminal is in the edge.
Specifically, the Doppler frequency shift that the foundation of the embodiment of the present invention is calculated in real time, has detected whether user terminal In the edge, may include:
The size of the absolute value of the absolute value and target Doppler frequency displacement for the Doppler frequency shift being calculated more in real time, In, target Doppler frequency displacement is the Doppler's frequency precalculated with movement speed identical with user terminal at the edge It moves;
If the absolute value for the Doppler frequency shift being calculated in real time is greater than the absolute value of target Doppler frequency displacement, detect User terminal is in except signal cover;
If the absolute value for the Doppler frequency shift being calculated in real time is equal to the absolute value of target Doppler frequency displacement, detect User terminal is in edge;
If the absolute value for the Doppler frequency shift being calculated in real time is less than the absolute value of target Doppler frequency displacement, detect User terminal is within signal cover.
Specifically, calculating Doppler frequency shift is the prior art, the embodiment of the present invention does not repeat it herein.Work as user When terminal moving direction is identical with Electromagnetic Wave Propagation direction (user terminal is mobile towards physical site), Doppler frequency shift is positive Value;When user terminal moving direction and contrary Electromagnetic Wave Propagation (user terminal is mobile far from physical site direction), Doppler frequency shift is negative value.
Illustratively, it is assumed that the edge of the signal cover for the RRU that physical site includes and the angle of RRU antenna are 10°。
It is 2GHz (Gigahertz) with carrier frequency, the movement speed of 300Km/h (kilometer per hour) precalculates to obtain Target Doppler frequency displacement absolute value be 547Hz (hertz).
When train is apart from physical site infinity, can regard the angle between train and RRU antenna as at this time is 0 °.When When train is mobile to physical site with the speed of 300Km/h, Doppler frequency shift is 555Hz at this time.
When the absolute value for the Doppler frequency shift being calculated in real time is greater than 547Hz, and is less than or equal to 555Hz, train exists Except signal cover.
When the absolute value for the Doppler frequency shift being calculated in real time is equal to 547Hz, train is in signal cover Edge.
When the absolute value for the Doppler frequency shift being calculated in real time be less than 547Hz when, train be in signal cover it It is interior.
The control information and business information for the user terminal on RRU independent bearing train for including due to physical site, when There are two trains to go in the same direction and when two trains are not in same signal cover, it is double that RRU is total to cell capacity, in turn Reduce business obstruction.
Fig. 2 shows second of streams of the resource allocation methods of remote radio unit common community provided in an embodiment of the present invention Journey schematic diagram.On the basis of embodiment illustrated in fig. 2 embodiment shown in Fig. 1 of the present invention, increase S103 after S102: if place User terminal in the edge is in except the signal cover for the RRU that the physical site includes, and discharges the money of the RRU Source.
In practical applications, there are more trains while being in same signal cover.Usual this feelings Condition is more common in railway station or is equipped with the section of a plurality of tracks.
Assuming that the signal that a certain moment train A, train B and train C are in RRU1 and RRU2 that physical site 1 includes covers Within the scope of lid.
When train A, train B and train C are in except the signal cover of RRU1 and RRU2 (i.e. train A, train B The signal cover of RRU1 and RRU2 are sailed out of with train C) when, discharge the resource of RRU1 and RRU2.If train A, train B It is within the signal cover of RRU1 and RRU2 with any one train in tri- trains of train C, does not then discharge RRU1 With the resource of RRU2.
Specifically, the resource of the release of the embodiment of the present invention RRU, may include: by the power adjustment of the RRU is zero.
It illustratively, is zero by the power adjustment of RRU1 and RRU2.At this point, RRU1 and RRU2 no signal exports, realize The release of the resource of RRU1 and RRU2.
It should be noted that above-mentioned be illustrated by taking current high-speed rail private network planning as an example, only of the invention one is specific Example, and do not constitute a limitation of the invention.
The resource allocation methods of the remote radio unit common community of the embodiment of the present invention can be improved the appearance that RRU is total to cell Amount, and then reduce business obstruction.
Corresponding with above-mentioned embodiment of the method, the embodiment of the present invention also provides a kind of money of remote radio unit common community Source distributor.
As shown in figure 3, Fig. 3 shows the resource allocation device of remote radio unit common community provided in an embodiment of the present invention The first structural schematic diagram.It may include: detection module 301 and distribution module 302, wherein
Detection module 301 has detected whether that user terminal is in the object for being total to the physical site in cell for RRU The edge of the signal cover for the RRU that reason website includes;
Distribution module 302, for only will in the case where detection module 301 has detected that user terminal is in the edge The resource allocation for the RRU that the physical site includes gives the user terminal in the edge.
Illustratively, it is illustrated by taking current high-speed rail private network planning as an example.
Current high-speed rail private network is planned to RRU and is distributed construction, and the linear chain structure of RRU along high-speed rail railway, multiple RRU merges into a RRU and is total to cell, it is generally the case that 8-12 RRU merges into a RRU and be total to cell.
Merged assuming that a RRU is total to cell by 12 RRU, wherein 12 RRU be respectively RRU1, RRU2, RRU3, RRU4, RRU5, RRU6, RRU7, RRU8, RRU9, RRU10, RRU11 and RRU12.Wherein, two RRU are a physical site. It includes 6 physical sites that then a RRU is total to cell altogether, respectively physical site 1, physical site 2, physical site 3, physical site 4, physical site 5 and physical site 6, wherein physical site 1 includes RRU1 and RRU2, and physical site 2 includes RRU3 and RRU4, Physical site 3 includes RRU5 and RRU6, and physical site 4 includes RRU7 and RRU8, and physical site 5 includes RRU9 and RRU10, physics Website 6 includes RRU11 and RRU12.
By taking physical site 1 as an example, for physical site 1, detect whether that user terminal is in physical site 1 and includes The edge of the signal cover of RRU1 and RRU2.
Assuming that the user terminal for detecting on train A is in the edge of the signal cover of RRU1 and RRU2, then only will The resource allocation of RRU1 and RRU2 is to the user terminal on train A, not by the resource allocation of RRU3 to RRU12 on train A User terminal.User terminal of the i.e. only RRU1 and RRU2 on train A sends control information and business information.
It is non-zero by the power adjustment of RRU1 and RRU2 specifically, can be zero by the power adjustment of RRU3 to RRU12, Specifically, can be power maximum value by the power adjustment of RRU1 and RRU2.At this point, RRU3-RRU12 no signal exports, RRU1 There is signal output with RRU2.Guarantee the resource for only enabling RRU1 and RRU2.
Optionally, the detection module 301 of the embodiment of the present invention may include: computational submodule and detection sub-module (in figure It is not shown), wherein
Computational submodule, for calculating the Doppler frequency shift between user terminal and physical site in real time;
Detection sub-module, for having detected whether that user terminal is in and being somebody's turn to do according to the Doppler frequency shift being calculated in real time Edge.
Optionally, the detection sub-module of the embodiment of the present invention, specifically can be used for:
The size of the absolute value of the absolute value and target Doppler frequency displacement for the Doppler frequency shift being calculated more in real time, In, target Doppler frequency displacement is the Doppler's frequency precalculated with movement speed identical with user terminal at the edge It moves;
If the absolute value for the Doppler frequency shift being calculated in real time is greater than the absolute value of target Doppler frequency displacement, detect User terminal is in except signal cover;
If the absolute value for the Doppler frequency shift being calculated in real time is equal to the absolute value of target Doppler frequency displacement, detect User terminal is in edge;
If the absolute value for the Doppler frequency shift being calculated in real time is less than the absolute value of target Doppler frequency displacement, detect User terminal is within signal cover.
Specifically, calculating Doppler frequency shift is the prior art, the embodiment of the present invention does not repeat it herein.Work as user When terminal moving direction is identical with Electromagnetic Wave Propagation direction (user terminal is mobile towards physical site), Doppler frequency shift is positive Value;When user terminal moving direction and contrary Electromagnetic Wave Propagation (user terminal is mobile far from physical site direction), Doppler frequency shift is negative value.
Illustratively, it is assumed that the edge of the signal cover for the RRU that physical site includes and the angle of RRU antenna are 10°。
It is 2GHz (Gigahertz) with carrier frequency, the movement speed of 300Km/h (kilometer per hour) precalculates to obtain Target Doppler frequency displacement absolute value be 547Hz (hertz).
When train is apart from physical site infinity, can regard the angle between train and RRU antenna as at this time is 0 °.When When train is mobile to physical site with the speed of 300Km/h, Doppler frequency shift is 555Hz at this time.
When the absolute value for the Doppler frequency shift being calculated in real time is greater than 547Hz, and is less than or equal to 555Hz, train exists Except signal cover.
When the absolute value for the Doppler frequency shift being calculated in real time is equal to 547Hz, train is in signal cover Edge.
When the absolute value for the Doppler frequency shift being calculated in real time be less than 547Hz when, train be in signal cover it It is interior.
The control information and business information for the user terminal on RRU independent bearing train for including due to physical site, when There are two trains to go in the same direction and when two trains are not in same signal cover, it is double that RRU is total to cell capacity, in turn Reduce business obstruction.
Fig. 4 shows second of knot of the resource allocation device of remote radio unit common community provided in an embodiment of the present invention Structure schematic diagram.On the basis of embodiment illustrated in fig. 4 embodiment shown in Fig. 3 of the present invention, increases resource release module 303, be used for In the case where the user terminal in the edge is in except the signal cover for the RRU that the physical site includes, release Put the resource of the RRU.
In practical applications, there are more trains while being in same signal cover.Usual this feelings Condition is more common in railway station or is equipped with the section of a plurality of tracks.
Assuming that the signal that a certain moment train A, train B and train C are in RRU1 and RRU2 that physical site 1 includes covers Within the scope of lid.
When train A, train B and train C are in except the signal cover of RRU1 and RRU2 (i.e. train A, train B The signal cover of RRU1 and RRU2 are sailed out of with train C) when, discharge the resource of RRU1 and RRU2.If train A, train B It is within the signal cover of RRU1 and RRU2 with any one train in tri- trains of train C, does not then discharge RRU1 With the resource of RRU2.
Optionally, the resource release module 303 of the embodiment of the present invention, specifically can be used for:
The feelings except the signal cover for the RRU that the physical site includes are in the user terminal in the edge It is zero by the power adjustment of the RRU under condition.
It illustratively, is zero by the power adjustment of RRU1 and RRU2.At this point, RRU1 and RRU2 no signal exports, realize The release of the resource of RRU1 and RRU2.
It should be noted that above-mentioned be illustrated by taking current high-speed rail private network planning as an example, only of the invention one is specific Example, and do not constitute a limitation of the invention.
The resource allocation device of the remote radio unit common community of the embodiment of the present invention can be improved the appearance that RRU is total to cell Amount, and then reduce business obstruction.
It should be clear that the invention is not limited to specific configuration described above and shown in figure and processing. For brevity, it is omitted here the detailed description to known method.In the above-described embodiments, several tools have been described and illustrated The step of body, is as example.But method process of the invention is not limited to described and illustrated specific steps, this field Technical staff can be variously modified, modification and addition after understanding spirit of the invention, or suitable between changing the step Sequence.
Functional block shown in structures described above block diagram can be implemented as hardware, software, firmware or their group It closes.When realizing in hardware, it may, for example, be electronic circuit, specific integrated circuit (ASIC), firmware appropriate, insert Part, function card etc..When being realized with software mode, element of the invention is used to execute program or the generation of required task Code section.Perhaps code segment can store in machine readable media program or the data-signal by carrying in carrier wave is passing Defeated medium or communication links are sent." machine readable media " may include any medium for capableing of storage or transmission information. The example of machine readable media includes electronic circuit, semiconductor memory devices, ROM, flash memory, erasable ROM (EROM), soft Disk, CD-ROM, CD, hard disk, fiber medium, radio frequency (RF) link, etc..Code segment can be via such as internet, inline The computer network of net etc. is downloaded.
It should also be noted that, the exemplary embodiment referred in the present invention, is retouched based on a series of step or device State certain methods or system.But the present invention is not limited to the sequence of above-mentioned steps, that is to say, that can be according in embodiment The sequence referred to executes step, may also be distinct from that the sequence in embodiment or several steps are performed simultaneously.
The above description is merely a specific embodiment, it is apparent to those skilled in the art that, For convenience of description and succinctly, the system, module of foregoing description and the specific work process of unit can refer to preceding method Corresponding process in embodiment, details are not described herein.It should be understood that scope of protection of the present invention is not limited thereto, it is any to be familiar with Those skilled in the art in the technical scope disclosed by the present invention, can readily occur in various equivalent modifications or substitutions, These modifications or substitutions should be covered by the protection scope of the present invention.

Claims (6)

1. a kind of resource allocation methods of remote radio unit common community, which is characterized in that the described method includes:
It is total to the physical site in cell for radio frequency remote unit RRU, has detected whether that user terminal is in the physical site The edge of the signal cover for the RRU for including;
If having detected that user terminal is in the edge, only the resource allocation of the RRU is given to the use in the edge Family terminal;Wherein,
The edge for detecting whether user terminal and being in the signal cover for the RRU that the physical site includes, comprising:
The Doppler frequency shift between user terminal and the physical site is calculated in real time;
According to the Doppler frequency shift, detect whether that user terminal is in the edge;Wherein,
It is described according to the Doppler frequency shift, detected whether that user terminal is in the edge, comprising:
Compare the size of the absolute value of the Doppler frequency shift and the absolute value of target Doppler frequency displacement, wherein the target is more General Le frequency displacement is the Doppler frequency shift precalculated with movement speed identical with the user terminal at the edge;
If the absolute value of the Doppler frequency shift is greater than the absolute value of the target Doppler frequency displacement, detect that the user is whole End is except the signal cover;
If the absolute value of the Doppler frequency shift is equal to the absolute value of the target Doppler frequency displacement, detect that the user is whole End is in the edge;
If the absolute value of the Doppler frequency shift is less than the absolute value of the target Doppler frequency displacement, detect that the user is whole End is within the signal cover.
2. the method according to claim 1, wherein being in institute in described only give the resource allocation of the RRU After the user terminal for stating edge, the method also includes:
If the user terminal in the edge is in except the signal cover, the money of the RRU is discharged Source.
3. according to the method described in claim 2, it is characterized in that, the resource of the release RRU, comprising:
Power adjustment by the RRU is zero.
4. a kind of resource allocation device of remote radio unit common community, which is characterized in that described device include: detection module and Distribution module, wherein
The detection module has detected whether user terminal for being total to the physical site in cell for radio frequency remote unit RRU The edge of the signal cover for the RRU for including in the physical site;
The distribution module, for only will in the case where the detection module has detected that user terminal is in the edge The resource allocation of the RRU gives the user terminal in the edge;Wherein,
The detection module, comprising: computational submodule and detection sub-module, wherein
The computational submodule, for calculating the Doppler frequency shift between user terminal and the physical site in real time;
The detection sub-module, for having detected whether that user terminal is in the edge according to the Doppler frequency shift;Its In,
The detection sub-module, is specifically used for:
Compare the size of the absolute value of the Doppler frequency shift and the absolute value of target Doppler frequency displacement, wherein the target is more General Le frequency displacement is the Doppler frequency shift precalculated with movement speed identical with the user terminal at the edge;
If the absolute value of the Doppler frequency shift is greater than the absolute value of the target Doppler frequency displacement, detect that the user is whole End is except the signal cover;
If the absolute value of the Doppler frequency shift is equal to the absolute value of the target Doppler frequency displacement, detect that the user is whole End is in the edge;
If the absolute value of the Doppler frequency shift is less than the absolute value of the target Doppler frequency displacement, detect that the user is whole End is within the signal cover.
5. device according to claim 4, which is characterized in that described device further include: resource release module, in institute It states in the case that the user terminal in the edge is in except the signal cover, discharges the resource of the RRU.
6. device according to claim 5, which is characterized in that the resource release module is specifically used for:
In the case where the user terminal in the edge is in except the signal cover, by the RRU Power adjustment be zero.
CN201710346276.9A 2017-05-15 2017-05-15 The resource allocation methods and device of remote radio unit common community Active CN107135481B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710346276.9A CN107135481B (en) 2017-05-15 2017-05-15 The resource allocation methods and device of remote radio unit common community

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710346276.9A CN107135481B (en) 2017-05-15 2017-05-15 The resource allocation methods and device of remote radio unit common community

Publications (2)

Publication Number Publication Date
CN107135481A CN107135481A (en) 2017-09-05
CN107135481B true CN107135481B (en) 2019-11-29

Family

ID=59732461

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710346276.9A Active CN107135481B (en) 2017-05-15 2017-05-15 The resource allocation methods and device of remote radio unit common community

Country Status (1)

Country Link
CN (1) CN107135481B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102468892A (en) * 2010-11-15 2012-05-23 中国移动通信集团公司 Simulation communication system-based test system and channel simulator
CN103476007A (en) * 2012-06-08 2013-12-25 中国科学院上海高等研究院 Cooperative diversity transmission method of radio base station and cellular communication base station
CN103688585A (en) * 2013-06-07 2014-03-26 华为技术有限公司 Signal transmission method and device for multi-RRU co-cell
CN103813462A (en) * 2011-09-19 2014-05-21 华为技术有限公司 Method and device for co-cell resource distribution of multiple remote radio units
CN105208568A (en) * 2015-10-26 2015-12-30 中国铁路总公司 Frequency planning method applied to LTE-R system based on distributed base station

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102468892A (en) * 2010-11-15 2012-05-23 中国移动通信集团公司 Simulation communication system-based test system and channel simulator
CN103813462A (en) * 2011-09-19 2014-05-21 华为技术有限公司 Method and device for co-cell resource distribution of multiple remote radio units
CN103476007A (en) * 2012-06-08 2013-12-25 中国科学院上海高等研究院 Cooperative diversity transmission method of radio base station and cellular communication base station
CN103688585A (en) * 2013-06-07 2014-03-26 华为技术有限公司 Signal transmission method and device for multi-RRU co-cell
CN105208568A (en) * 2015-10-26 2015-12-30 中国铁路总公司 Frequency planning method applied to LTE-R system based on distributed base station

Also Published As

Publication number Publication date
CN107135481A (en) 2017-09-05

Similar Documents

Publication Publication Date Title
CN1330102C (en) Data tramsitting method, system and network unit
US11026141B2 (en) Mobility in dense networks
Dent et al. CDMA-IC: A novel code division multiple access scheme based on interference cancellation
CN104301902B (en) A kind of configuring method for neighboring area and equipment
CN106304172A (en) A kind of method and apparatus determining moving velocity of terminal
CN104780592A (en) Method and device for selecting link
CN104782192A (en) Cloud-aware collaborative mobile platform power management using mobile sensors
CN106993291A (en) The frequency management method and system of low-power consumption wide area network based on radio and television frequency range
CN107135507A (en) A kind of return radio path information acquisition method and device
CN107846355A (en) A kind of data gateway equipment
JP6406700B2 (en) Wireless communication system, wireless terminal, and wireless communication method
CN104753560A (en) Narrow-band interference resisting method, eNodeB (evolved Node B)and communication system
CN105657769A (en) Cell switching method and device under high-speed movement state as well as mobile station and base station
CN107135481B (en) The resource allocation methods and device of remote radio unit common community
CN102870447B (en) The method of Microwave Network Planning and device
Vishvaksenan et al. Experimental study on Elliott wave theory for handoff prediction
Amraoui et al. Improving video conferencing application quality for a mobile terminal through cognitive radio
CN109640365A (en) Switching method, device and the storage medium of cell
CN107027182A (en) Resource allocation methods and device
CN108271196B (en) Method, equipment and system for positioning high-level signal drift
CN111866980A (en) Shunting method and device for high-speed rail private network and computing equipment
CN105592508A (en) Method and apparatus for establishing radio access network node adjacent cell relations
Alsamhi et al. Adaptive handoff prediction and appreciate decision using ANFIS between terrestrial communication and HAP
CN110366134B (en) Vehicle-to-vehicle networking method and device
CN104768163A (en) Cell state update method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant