CN102870447B - The method of Microwave Network Planning and device - Google Patents

The method of Microwave Network Planning and device Download PDF

Info

Publication number
CN102870447B
CN102870447B CN201280000864.2A CN201280000864A CN102870447B CN 102870447 B CN102870447 B CN 102870447B CN 201280000864 A CN201280000864 A CN 201280000864A CN 102870447 B CN102870447 B CN 102870447B
Authority
CN
China
Prior art keywords
link
planning
microwave network
node
equipment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201280000864.2A
Other languages
Chinese (zh)
Other versions
CN102870447A (en
Inventor
石礌
陈昌海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Pengbang Industrial Co ltd
Original Assignee
Huawei Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huawei Technologies Co Ltd filed Critical Huawei Technologies Co Ltd
Publication of CN102870447A publication Critical patent/CN102870447A/en
Application granted granted Critical
Publication of CN102870447B publication Critical patent/CN102870447B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W16/00Network planning, e.g. coverage or traffic planning tools; Network deployment, e.g. resource partitioning or cells structures
    • H04W16/18Network planning tools

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Data Exchanges In Wide-Area Networks (AREA)

Abstract

The embodiment of the invention discloses a kind of method and device of Microwave Network Planning, relate to communication technical field, the problem that frequency spectrum resource when solving current Microwave Network Planning is wasted.Method comprises: carry out topology planning to microwave network; According to the result of topology planning, carry out capacity planning, and determine that whether capacity planning is successful; If capacity planning failure, turn back to and topology planning is carried out to microwave network; If capacity planning success, carry out spectrum allocation may, and determine that whether spectrum allocation may is successful; If spectrum allocation may failure, turn back to and carry out capacity planning or carry out topology to microwave network planning to microwave network; If spectrum allocation may success, exports the result of Microwave Network Planning.The present invention is applicable in microwave network.

Description

The method of Microwave Network Planning and device
Technical field
The present invention relates to communication technical field, particularly relate to a kind of method and device of Microwave Network Planning.
Background technology
Microwave network is the electromagnetic transmission network based on horizon communication, and microwave refers to the electromagnetic wave of frequency within the scope of 300MHz-300GHz, is the abbreviation of a limited frequency band in radio wave.Before microwave network is set up, need to plan the foundation of microwave network, concrete planning process can be divided into three parts: topology planning, capacity planning and parallel compensate.The method of current Microwave Network Planning is: first carry out topology planning to microwave network, specifically according to the actual landform of each node, judges that each internodally looks logical type, and determines the position of each node, arrange each internodal annexation; Capacity planning is carried out to microwave network, specifically according to each internodal bandwidth demand and Key Performance Indicator (KeyPerformanceIndicator, be called for short KPI) determine needed for each node microwave network equipment (as microwave antenna, indoor unit IDU, outdoor unit ODU etc.), and determine the gauge size of described microwave network equipment; Parallel compensate is carried out to microwave network, specifically according to each internodal topological program results and capacity planning result, determine each node can frequency spectrum resource, parallel compensate is carried out to each node, and guarantees that the frequency of each node described disturbs the requirement reaching described KPI mutually.
In the process realizing the embodiment of the present invention, inventor finds that in prior art, at least there are the following problems:
When parallel compensate, if there is the frequency of node mutually to disturb the requirement that cannot meet described KPI, then need replacement frequency to ensure networking success, because frequency spectrum resource is limited, therefore by arriving the waste that networking successfully can cause frequency spectrum resource for node replacement frequency.
Summary of the invention
Embodiments of the invention provide a kind of method and device of Microwave Network Planning, can solve because frequency spectrum resource is limited in prior art, by arriving the problem that networking successfully can cause the waste of frequency spectrum resource for node replacement frequency.
For achieving the above object, the present invention adopts following technical scheme:
A method for Microwave Network Planning, comprising:
Topology planning is carried out to microwave network;
According to the result of described topology planning, carry out capacity planning to described microwave network, and determine that whether described capacity planning is successful, described capacity planning is carry out Equipments Setting to each link of each node in described microwave network;
If described capacity planning failure, turns back to and carries out topology planning to microwave network;
If described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful;
If described spectrum allocation may failure, turn back to and carry out capacity planning or turn back to carrying out topology planning to microwave network to microwave network;
If described spectrum allocation may success, exports the result of described Microwave Network Planning.
A device for Microwave Network Planning, comprising:
Topology planning unit, for carrying out topology planning to microwave network;
Capacity planning unit, for the result according to described topology planning, carries out capacity planning to described microwave network, and determines that whether described capacity planning is successful, and described capacity planning is carry out Equipments Setting to each link of each node in described microwave network;
First returns unit, if for described capacity planning failure, turn back to and carry out topology planning to microwave network;
Spectrum allocation may unit, if for described capacity planning success, carry out spectrum allocation may, and determines that whether described spectrum allocation may is successful;
Second returns unit, if for described spectrum allocation may failure, turns back to and carries out capacity planning or turn back to carrying out topology planning to microwave network to microwave network;
Output unit, if for described spectrum allocation may success, export the result of described Microwave Network Planning.
The method of the Microwave Network Planning that the embodiment of the present invention provides and device, owing to planning by carrying out topology to microwave network, and carry out capacity planning according to the result of described topology planning, and determine that whether described capacity planning is successful, after described capacity planning failure, turn back to and topology planning is carried out to microwave network, when described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful, after described spectrum allocation may failure, turn back to and capacity planning or topology planning are carried out to microwave network, until described spectrum allocation may success, export the result of described Microwave Network Planning.Consider topology planning, capacity planning and the impact of frequency spectrum planning on Microwave Network Planning like this, can by re-starting topology planning or capacity planning solves the problem of parallel compensate failure during parallel compensate failure in Microwave Network Planning, thus avoid adopting by being node replacement frequency, the problem of the frequency spectrum resource caused waste.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
The method flow diagram of the Microwave Network Planning that Fig. 1 provides for the embodiment of the present invention;
The method flow diagram of the Microwave Network Planning that Fig. 2 provides for further embodiment of this invention;
The structural representation one of the device of the Microwave Network Planning that Fig. 3 provides for the embodiment of the present invention;
The structural representation two of the device of the Microwave Network Planning that Fig. 4 provides for the embodiment of the present invention.
Embodiment
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
For making the advantage of technical solution of the present invention clearly, below in conjunction with drawings and Examples, the present invention is elaborated.
As shown in Figure 1, the method for the Microwave Network Planning that the embodiment of the present invention provides, comprising:
Step 101, microwave network carried out to topology planning.
Concrete, described topology is planned to carries out node hierarchy to each node in microwave network, to determine the weight of link in described microwave network between each node, and according to the weight of link in described microwave network between each node described, the link between each node is planned.
Such as, described node hierarchy can be decide according to the geographical location information of each node in described microwave network, and decentre near weight in position is higher, otherwise weight is lower, but is not only confined to this.Such as, when doing Microwave Network Planning for certain a slice geographic area, the node that can arrange the center of described geographic area is 1 grade of Centroid, described microwave network comprises multiple sub-close quarters, described multiple sub-close quarters is connected by described 1 grade of Centroid, and the node that can arrange the marginal position of described geographic area is leaf node, 2 grades of nodes, 3 grades of nodes etc. can also be comprised in described microwave network, but be not only confined to this.
Step 102, the result planned according to described topology, carry out capacity planning to described microwave network, and determine that whether described capacity planning is successful.
Wherein, described capacity planning is carry out Equipments Setting to each link of each node in described microwave network.If described capacity planning failure, return and perform step 101, no person performs step 103.
Concrete, described capacity planning be according to described topology planning result and optimization aim, the weight of the equipment needed for every bar link of each Nodes described is set, wherein, described optimization aim comprises to be focused on performance or controls cost, traveling through the device databases in described microwave network, the weight of the equipment needed for every bar link of each Nodes described, is the corresponding equipment of link configuration between each node described.
Step 103, carry out spectrum allocation may, and determine the whether success of described spectrum allocation may.If described spectrum allocation may failure, turn back to step 101 or step 102, no person performs step 104.
Wherein, described spectrum allocation may is the weight according to the link between described optimization aim and each node described, prioritization is carried out to the link between each node described, according to the prioritization between each node described, travel through the frequency spectrum resource of each link, and be each link assignment frequency spectrum resource.
Step 104, export the result of described Microwave Network Planning.
Concrete, the result of described Microwave Network Planning comprises the configuration (as unit type, equipment size, equipment operating power etc.) of link annexation, the frequency of each link and the equipment of each Nodes between each node, but is not only confined to this.
The method of the Microwave Network Planning that the embodiment of the present invention provides, owing to planning by carrying out topology to microwave network, and carry out capacity planning according to the result of described topology planning, and determine that whether described capacity planning is successful, after described capacity planning failure, turn back to and topology planning is carried out to microwave network, when described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful, after described spectrum allocation may failure, turn back to and capacity planning or topology planning are carried out to microwave network, until described spectrum allocation may success, export the result of described Microwave Network Planning.Consider topology planning, capacity planning and the impact of frequency spectrum planning on Microwave Network Planning like this, can by re-starting topology planning or capacity planning solves the problem of parallel compensate failure during parallel compensate failure in Microwave Network Planning, thus avoid adopting by being node replacement frequency, the problem of the frequency spectrum resource caused waste.
As shown in Figure 2, the method for the Microwave Network Planning that further embodiment of this invention provides, comprising:
Step 201, node hierarchy is carried out to each node in microwave network, to determine the weight of link in described microwave network between each node.
Concrete, described node hierarchy can be decide according to the position of each node in described microwave network, and the link weight between the node that position decentre is near is higher, otherwise weight is lower, but is not only confined to this.Such as, when doing Microwave Network Planning for certain a slice geographic area, the node that can arrange the center of described geographic area is 1 grade of Centroid, described microwave network comprises multiple sub-close quarters, described multiple sub-close quarters is connected by described 1 grade of Centroid, and the node that can arrange the marginal position of described geographic area is leaf node, 2 grades of nodes, 3 grades of nodes etc. can also be comprised in described microwave network, but be not only confined to this.
Step 202, according to the weight of link in described microwave network between each node described, the link between each node described to be planned.
Concrete, described to carry out planning to the link between each node can be adopt multiple constraint minimal spanning tree algorithm, thus build the tree comprising each node described.
Step 203, according to the result of topology planning and optimization aim, the weight of the equipment needed for every bar link of each Nodes described is set.
Wherein, described optimization aim comprises to be focused on performance or controls cost, but is not only confined to this.Concrete, the equipment needed for every bar link of each Nodes described has multiple (such as antenna, outdoor unit equipment, indoor unit equipment etc.), and often kind can have multiple (such as antenna has different models etc.), if described optimization aim is for focusing on performance, during the weight of the equipment then needed for every bar link that each Nodes described is set, the equipment weight that performance is high is higher, and the equipment weight that performance is low is lower; If described optimization aim is for controlling cost, then, during the weight of the equipment needed for the every bar link arranging each Nodes described, cheap equipment weight is higher.Such as, but be not only confined to this, described optimization aim can also consider performance and the cost of equipment, and described optimization aim is cost performance, and the weight arranging the high equipment of cost performance is high.
Device databases in step 204, traversal microwave network, the weight of the equipment needed for every bar link of each Nodes described is the corresponding equipment of link configuration between each node described.
Concrete, different links may need to configure different equipment, the equipment that link between each node described needs can be recorded in the device databases in microwave network, such as identify label (the Identity of described device databases recording equipment, be called for short ID), the model of equipment, size and the link bandwidth etc. supported, but be not only confined to this.By the weight of the equipment needed for every bar link of each Nodes described, in described device databases, find the ID of the equipment that the weight of every bar link of each Nodes is the highest, thus be the corresponding equipment of every bar link configuration of each node described.
Step 205, detect corresponding equipment at each Nodes and whether normally can work on the link at corresponding equipment place, to determine whether corresponding equipment meets the demand of the link at its place.If corresponding equipment is cisco unity malfunction on the link at its place, then for not meeting the demand of the link at its place, described link can not normally work, and performs step 206, otherwise performs step 207.
Concrete, the described demand determining whether corresponding equipment meets the link at its place can be whether there will be problem by detecting described equipment when the antenna efficiency at its place, even cisco unity malfunction, the link transmission power of such as certain Nodes will reach a certain threshold value, and the transmitting power of the equipment selected by described optimization aim and equipment weight cannot reach described threshold value, then cause the described equipment selected by described optimization aim and equipment weight normally cannot work on the link at its place, then determine that described equipment does not meet the demand of the link at its place.
Step 206, the weight of the link of cisco unity malfunction to be increased.Return and perform step 202.
Concrete, due to corresponding equipment cisco unity malfunction on the link at its place, cause described link cisco unity malfunction, the weight of the link of cisco unity malfunction can be increased, change to make the chain circuit planning between each node, thus subsequent step is by again for the link between each node described carries out the configuration of equipment, is increased, make the probability again selecting this equipment applied in subsequent step reduce by the weight of described link.
Step 207, weight according to the link between described optimization aim and each node described, carry out prioritization to the link between each node described.
Concrete, when the later stage transmits, because different optimization aim may need to be transmitted by different link between the individual nodes, need the weight according to the link between described optimization aim and each node, prioritization is carried out to the link between each node described.
Step 208, prioritization according to the link between each node described, travel through the frequency spectrum resource of each link, and be each link assignment frequency spectrum resource.
Concrete, in frequency spectrum resource, there is preferably optimized frequency, described optimized frequency can be distributed to the link that link priority sequence is higher, but not only be confined to this.
Step 209, detect each link frequency spectrum resource between frequency interferences, determine whether described frequency interferences meets the requirement of Key Performance Indicator KPI.If described frequency interferences does not meet the requirement of described KPI, cause the link cisco unity malfunction after parallel compensate, perform step 210 or step 206, otherwise perform step 211.
Concrete, described KPI comprises: frequency availability and error performance criteria etc., but is not only confined to this.
Step 210, get rid of the currently used equipment of the node relevant to described link and receive performance index than described equipment interconnection and require higher equipment.Return and perform step 203.
Concrete, the requirement of described KPI can not be met in frequency interferences after, the requirement finally meeting described KPI can be realized by the mode reconfiguring the currently used equipment of the node relevant to described link, in order to make the peak frequency number of microwave network after networking success reduce, ratio equipment interconnection originally used can be adopted when reconfiguring the equipment of described relevant to described link node to receive performance index and to require the equipment that (such as transmitting power or received power) is lower.
Step 211, export the result of described Microwave Network Planning.
Concrete, if described frequency interferences meets the requirement of described KPI, export the result of described Microwave Network Planning, the result of described Microwave Network Planning comprises the configuration (as unit type, equipment size, equipment operating power etc.) of link annexation, the frequency of each link and the equipment of each Nodes between each node, but is not only confined to this.
The method of the Microwave Network Planning that further embodiment of this invention provides, owing to planning by carrying out topology to microwave network, and carry out capacity planning according to the result of described topology planning, and determine that whether described capacity planning is successful, after described capacity planning failure, turn back to and topology planning is carried out to microwave network, when described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful, after described spectrum allocation may failure, turn back to and capacity planning or topology planning are carried out to microwave network, until described spectrum allocation may success, export the result of described Microwave Network Planning.Consider topology planning, capacity planning and the impact of frequency spectrum planning on Microwave Network Planning like this, can by re-starting topology planning or capacity planning solves the problem of parallel compensate failure during parallel compensate failure in Microwave Network Planning, thus avoid adopting by being node replacement frequency, the problem of the frequency spectrum resource caused waste.
As shown in Figure 3, the device of the Microwave Network Planning that the embodiment of the present invention provides, comprising:
Topology planning unit 31, for carrying out topology planning to microwave network.Its specific implementation, see in Fig. 1 shown in step 101, repeats no more herein.
Capacity planning unit 32, for the result according to described topology planning, carries out capacity planning to described microwave network, and determines that whether described capacity planning is successful, and described capacity planning is carry out Equipments Setting to each link of each node in described microwave network.Its specific implementation, see in Fig. 1 shown in step 102, repeats no more herein.
First returns unit 33, if for described capacity planning failure, turn back to and carry out topology planning to microwave network.Its specific implementation, see in Fig. 1 shown in step 101, repeats no more herein.
Spectrum allocation may unit 34, if for described capacity planning success, carry out spectrum allocation may, and determines that whether described spectrum allocation may is successful.Its specific implementation, see in Fig. 1 shown in step 103, repeats no more herein.
Second returns unit 35, if for described spectrum allocation may failure, turns back to and carries out capacity planning or turn back to carrying out topology planning to microwave network to microwave network.Its specific implementation, see shown in step 102 in Fig. 1 and step 101, repeats no more herein.
Output unit 36, if for described spectrum allocation may success, export the result of described Microwave Network Planning.Its specific implementation, see in Fig. 1 shown in step 104, repeats no more herein.
Further, as shown in Figure 4, described topological planning unit 31, comprising:
Node hierarchy module 311, for carrying out node hierarchy to each node in microwave network, to determine the weight of link in described microwave network between each node.Its specific implementation, see in Fig. 2 shown in step 201, repeats no more herein.
Link planning module 312, for according to the weight of link in described microwave network between each node described, plans the link between each node described.Its specific implementation, see in Fig. 2 shown in step 202, repeats no more herein.
Further, as shown in Figure 4, described capacity planning unit 32, comprising:
First arranges module 321, and for according to the result of described topology planning and optimization aim, arrange the weight of the equipment needed for every bar link of each Nodes described, described optimization aim comprises to be focused on performance or controls cost.Its specific implementation, see in Fig. 2 shown in step 203, repeats no more herein.
Equipment configuration module 322, for traveling through the device databases in microwave network, the weight of the equipment needed for every bar link of each Nodes described is the corresponding equipment of link configuration between each node described.Its specific implementation, see in Fig. 2 shown in step 204, repeats no more herein.
Whether first detection module 323, normally can work for detecting corresponding equipment at each Nodes, to determine whether corresponding equipment meets the demand of the link at corresponding equipment place on the link at corresponding equipment place.Its specific implementation, see in Fig. 2 shown in step 205, repeats no more herein.
Further, as shown in Figure 4, described first returns unit 33, specifically for:
If corresponding equipment does not meet the demand of the link at its place, the weight of the link of cisco unity malfunction is increased, turn back to and described link between each node to be planned.Its specific implementation, see in Fig. 2 shown in step 206, repeats no more herein.
Further, as shown in Figure 4, described spectrum allocation may unit 34, comprising:
Second arranges module 341, if meet the demand of the link at its place for corresponding equipment, according to the weight of the link between described optimization aim and each node described, carries out prioritization to the link between each node described.Its specific implementation, see in Fig. 2 shown in step 207, repeats no more herein.
Frequency spectrum resource distribution module 342, for the prioritization according to the link between each node described, travels through the frequency spectrum resource of each link, and is each link assignment frequency spectrum resource.Its specific implementation, see in Fig. 2 shown in step 208, repeats no more herein.
Second detection module 343, for detect each link frequency spectrum resource between frequency interferences, determine whether described frequency interferences meets the requirement of Key Performance Indicator KPI.Its specific implementation, see in Fig. 2 shown in step 209, repeats no more herein.
Further, as shown in Figure 4, described second returns unit 35, comprising:
Get rid of module 351, if do not meet the requirement of described KPI for described frequency interferences, get rid of the currently used equipment of the node relevant to described link and receive performance index than described equipment interconnection and require higher equipment.Its specific implementation, see in Fig. 2 shown in step 210, repeats no more herein.
Return module 352, for remaining equipment after the result according to described topology planning, optimization aim and remover apparatus, turn back to the described weight that the equipment needed for every bar link of each Nodes described is set.Its specific implementation, see in Fig. 2 shown in step 203, repeats no more herein.
Further, as shown in Figure 4, described second returns unit 35, specifically for:
If described frequency interferences does not meet the requirement of described KPI, the weight of the link of cisco unity malfunction is increased, turn back to and described link between each node to be planned.Its specific implementation, see shown in step 206 in Fig. 2 and step 202, repeats no more herein.
The device of the Microwave Network Planning that the embodiment of the present invention provides, owing to carrying out topology planning by topological planning unit to microwave network, capacity planning unit carries out capacity planning according to the result of described topology planning to microwave network, and determine that whether described capacity planning is successful, first returns unit after described capacity planning failure, turn back to and topology planning is carried out to microwave network, spectrum allocation may unit is when described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful, second returns unit after described spectrum allocation may failure, turn back to and capacity planning or topology planning are carried out to microwave network, until described spectrum allocation may success, output unit exports the result of described Microwave Network Planning.Consider topology planning, capacity planning and the impact of frequency spectrum planning on Microwave Network Planning like this, can by re-starting topology planning or capacity planning solves the problem of parallel compensate failure during parallel compensate failure in Microwave Network Planning, thus avoid adopting by being node replacement frequency, the problem of the frequency spectrum resource caused waste.
Through the above description of the embodiments, those skilled in the art can be well understood to the mode that the present invention can add required common hardware by software and realize, and can certainly pass through hardware, but in a lot of situation, the former is better execution mode.Based on such understanding, technical scheme of the present invention can embody with the form of software product the part that prior art contributes in essence in other words, this computer software product is stored in the storage medium that can read, as the floppy disk of computer, hard disk or CD etc., comprise some instructions and perform method described in each embodiment of the present invention in order to make a computer equipment (can be personal computer, server, or the network equipment etc.).
The above; be only the specific embodiment of the present invention, but protection scope of the present invention is not limited thereto, is anyly familiar with those skilled in the art in the technical scope that the present invention discloses; change can be expected easily or replace, all should be encompassed within protection scope of the present invention.Therefore, protection scope of the present invention should described be as the criterion with the protection range of claim.

Claims (12)

1. a method for Microwave Network Planning, is characterized in that, comprising:
Topology planning is carried out to microwave network;
According to the result of described topology planning, carry out capacity planning to described microwave network, and determine that whether described capacity planning is successful, described capacity planning is carry out Equipments Setting to each link of each node in described microwave network;
If described capacity planning failure, turns back to and carries out topology planning to microwave network;
If described capacity planning success, carry out spectrum allocation may, and determine that whether described spectrum allocation may is successful;
If described spectrum allocation may failure, turn back to and carry out capacity planning or turn back to carrying out topology planning to microwave network to microwave network;
If described spectrum allocation may success, exports the result of described Microwave Network Planning;
Described to microwave network carry out topology planning, comprising:
Node hierarchy is carried out to each node in microwave network, to determine the weight of link in described microwave network between each node;
According to the weight of link in described microwave network between each node described, the link between each node described is planned.
2. method according to claim 1, is characterized in that, the described result according to described topology planning, carries out capacity planning to described microwave network, and determines that whether described capacity planning is successful, comprising:
According to result and the optimization aim of described topology planning, arrange the weight of the equipment needed for every bar link of each Nodes described, described optimization aim comprises to be focused on performance or controls cost;
Device databases in traversal microwave network, the weight of the equipment needed for every bar link of each Nodes described is the corresponding equipment of link configuration between each node described;
Detect corresponding equipment at each Nodes whether normally to work on the link at corresponding equipment place, to determine whether corresponding equipment meets the demand of the link at corresponding equipment place.
3. method according to claim 2, is characterized in that, if described capacity planning failure, turns back to and carries out topology planning to microwave network, comprising:
If corresponding equipment does not meet the demand of the link at its place, the weight of the link of cisco unity malfunction is increased, turns back to and the link between each node is planned.
4. method according to claim 2, is characterized in that, if described capacity planning success, carries out spectrum allocation may, and determines that whether described spectrum allocation may is successful, comprising:
If corresponding equipment meets the demand of the link at its place, according to the weight of the link between described optimization aim and each node described, prioritization is carried out to the link between each node described;
According to the prioritization of the link between each node described, travel through the frequency spectrum resource of each link, and be each link assignment frequency spectrum resource;
Frequency interferences between the frequency spectrum resource detecting each link, determines whether described frequency interferences meets the requirement of Key Performance Indicator KPI.
5. method according to claim 4, is characterized in that, if the failure of described spectrum allocation may, turns back to and carries out capacity planning to microwave network, comprising:
If described frequency interferences does not meet the requirement of described KPI, get rid of the currently used equipment of the node relevant to described link and receive performance index than described equipment interconnection and require higher equipment;
According to remaining equipment after result, optimization aim and remover apparatus that described topology is planned, turn back to the described weight that the equipment needed for every bar link of each Nodes described is set.
6. method according to claim 4, is characterized in that, if the failure of described spectrum allocation may, turns back to and carries out topology planning to microwave network, comprising:
If described frequency interferences does not meet the requirement of described KPI, the weight of the link of cisco unity malfunction is increased, turns back to and the link between each node is planned.
7. a device for Microwave Network Planning, is characterized in that, comprising:
Topology planning unit, for carrying out topology planning to microwave network;
Capacity planning unit, for the result according to described topology planning, carries out capacity planning to described microwave network, and determines that whether described capacity planning is successful, and described capacity planning is carry out Equipments Setting to each link of each node in described microwave network;
First returns unit, if for described capacity planning failure, turn back to and carry out topology planning to microwave network;
Spectrum allocation may unit, if for described capacity planning success, carry out spectrum allocation may, and determines that whether described spectrum allocation may is successful;
Second returns unit, if for described spectrum allocation may failure, turns back to and carries out capacity planning or turn back to carrying out topology planning to microwave network to microwave network;
Output unit, if for described spectrum allocation may success, export the result of described Microwave Network Planning;
Described topological planning unit, comprising:
Node hierarchy module, for carrying out node hierarchy to each node in microwave network, to determine the weight of link in described microwave network between each node;
Link planning module, for according to the weight of link in described microwave network between each node described, plans the link between each node described.
8. device according to claim 7, is characterized in that, described capacity planning unit, comprising:
First arranges module, and for according to the result of described topology planning and optimization aim, arrange the weight of the equipment needed for every bar link of each Nodes described, described optimization aim comprises to be focused on performance or controls cost;
Equipment configuration module, for traveling through the device databases in microwave network, the weight of the equipment needed for every bar link of each Nodes described is the corresponding equipment of link configuration between each node described;
Whether first detection module, normally can work for detecting corresponding equipment at each Nodes, to determine whether corresponding equipment meets the demand of the link at corresponding equipment place on the link at corresponding equipment place.
9. device according to claim 8, it is characterized in that, described first returns unit, specifically for: if corresponding equipment does not meet the demand of the link at its place, the weight of the link of cisco unity malfunction is increased, turns back to and the link between each node is planned.
10. device according to claim 8, is characterized in that, described spectrum allocation may unit, comprising:
Second arranges module, if meet the demand of the link at its place for corresponding equipment, according to the weight of the link between described optimization aim and each node described, carries out prioritization to the link between each node described;
Frequency spectrum resource distribution module, for the prioritization according to the link between each node described, travels through the frequency spectrum resource of each link, and is each link assignment frequency spectrum resource;
Second detection module, for detect each link frequency spectrum resource between frequency interferences, determine whether described frequency interferences meets the requirement of Key Performance Indicator KPI.
11. devices according to claim 10, is characterized in that, described second returns unit, comprising:
Get rid of module, if do not meet the requirement of described KPI for described frequency interferences, get rid of the node relevant to described link;
Currently used equipment and the equipment higher than the requirement of described equipment interconnection receipts performance index;
Return module, for remaining equipment after the result according to described topology planning, optimization aim and remover apparatus, turn back to the described weight that the equipment needed for every bar link of each Nodes described is set.
12. devices according to claim 10, is characterized in that, described second returns unit, specifically for:
If described frequency interferences does not meet the requirement of described KPI, the weight of the link of cisco unity malfunction is increased, turns back to and the link between each node is planned.
CN201280000864.2A 2012-06-26 2012-06-26 The method of Microwave Network Planning and device Active CN102870447B (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/CN2012/077569 WO2014000164A1 (en) 2012-06-26 2012-06-26 Microwave network planning method and device

Publications (2)

Publication Number Publication Date
CN102870447A CN102870447A (en) 2013-01-09
CN102870447B true CN102870447B (en) 2016-01-13

Family

ID=47447779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201280000864.2A Active CN102870447B (en) 2012-06-26 2012-06-26 The method of Microwave Network Planning and device

Country Status (2)

Country Link
CN (1) CN102870447B (en)
WO (1) WO2014000164A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019032174A1 (en) * 2017-08-09 2019-02-14 Commscope Technologies Llc Method and system for planning and operating fixed microwave communications systems

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105744536A (en) * 2014-12-09 2016-07-06 富士通株式会社 Wireless network deployment method and device
CN105516992B (en) * 2015-12-14 2018-12-14 中通服建设有限公司 A kind of PCI planing method of LTE network
CN108419245B (en) * 2017-02-09 2021-11-12 中兴通讯股份有限公司 Subnet division method and device
CN109561436B (en) * 2017-09-26 2021-04-30 中国移动通信集团公司 Physical layer cell identity (PCI) optimization method, equipment, computer readable storage medium and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1596021A (en) * 2003-09-10 2005-03-16 华为技术有限公司 A wireless network planning method for high speed data service
CN101513093A (en) * 2006-09-08 2009-08-19 高通股份有限公司 Recovery from resource mismatch in a wireless communication system
CN101662783A (en) * 2009-08-26 2010-03-03 东南大学 Frequency spectrum distribution method based on graph theory in cognitive radio system
CN101945398A (en) * 2009-07-07 2011-01-12 华为技术有限公司 Method and device for planning wireless network
CN102404752A (en) * 2011-12-23 2012-04-04 广东省电信工程有限公司 Frequency planning method in GSM network

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1098455B1 (en) * 1999-11-03 2007-01-03 Intel Corporation Spatially switched router for wireless data packets
CN100544508C (en) * 2002-09-13 2009-09-23 艾利森电话股份有限公司 The network plan method and the mobile network that are used for mobile network infrastructure
US7561876B2 (en) * 2003-02-21 2009-07-14 Groundhog Technologies Inc. System with user interface for network planning and mobility management optimization in a mobile communication network and method thereof
CN1556661A (en) * 2004-01-12 2004-12-22 中兴通讯股份有限公司 Method of radio network contemplation
US7574179B2 (en) * 2006-07-13 2009-08-11 Designart Networks Ltd Mobile broadband wireless network with interference mitigation mechanism to minimize interference within a cluster during multiple concurrent transmissions
CN102137405B (en) * 2010-06-01 2014-04-02 华为技术有限公司 Method and device for constructing network topology

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1596021A (en) * 2003-09-10 2005-03-16 华为技术有限公司 A wireless network planning method for high speed data service
CN101513093A (en) * 2006-09-08 2009-08-19 高通股份有限公司 Recovery from resource mismatch in a wireless communication system
CN101945398A (en) * 2009-07-07 2011-01-12 华为技术有限公司 Method and device for planning wireless network
CN101662783A (en) * 2009-08-26 2010-03-03 东南大学 Frequency spectrum distribution method based on graph theory in cognitive radio system
CN102404752A (en) * 2011-12-23 2012-04-04 广东省电信工程有限公司 Frequency planning method in GSM network

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019032174A1 (en) * 2017-08-09 2019-02-14 Commscope Technologies Llc Method and system for planning and operating fixed microwave communications systems

Also Published As

Publication number Publication date
CN102870447A (en) 2013-01-09
WO2014000164A1 (en) 2014-01-03

Similar Documents

Publication Publication Date Title
CN102870447B (en) The method of Microwave Network Planning and device
Khalil et al. Feasibility, architecture and cost considerations of using TVWS for rural Internet access in 5G
CN102316469B (en) Method and system for configuring antenna parameters
US10425860B2 (en) System and method for value optimized mobile networks
US11683259B2 (en) Systems and methods for building wireless mesh networks
CN114745791B (en) Power service slice arrangement and resource allocation method and device
CN115146691A (en) Method, device and system for managing and controlling model training
CN113825259A (en) Electric power little basic station information receiving arrangement based on 5G technique
CN115277449B (en) Space-earth integrated network route simulation method based on OPNET and application
CN116527562A (en) Routing method, system, device and medium for grid connection of roof photovoltaic power station
KR20230142438A (en) System and method for implementing intelligent reflective surfaces (IRS) in networks
US9756509B2 (en) Defining logical cells
CN108900325A (en) A kind of suitability appraisal procedure of energy communication service and wireless private network technology
CN106385688A (en) Baseband resource distribution method and system, and controller
CN106792950A (en) A kind of super-intensive network transfer method, base station, UE and network element
CN102316485B (en) Method, system and equipment for modifying cell parameters
Sánchez‐González et al. A multi‐cell multi‐objective self‐optimisation methodology based on genetic algorithms for wireless cellular networks
US11546919B1 (en) Systems and methods for controlling beam parameters to improve signal strength
KR20190120260A (en) Method and apparatus for selecting cooperative nodes
Centeno García Functional models and procedures for the automated management of RAN Slicing
Passos et al. Linear mesh network planning for power transmission line management
CN115174466B (en) High-reliability route optimization method for multimode electric field distribution domain network control service
KR20060040134A (en) System and method for optimizing radio access network using traffic morphology
Rajalakshmi et al. A survey on cost effective survivable network design in wireless access network
Xie et al. DRL Enhanced Reconfigurable Intelligent Surface for Efficient Air-Ground Vehicle Communications

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211116

Address after: 510670 Room 518, No. 91 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee after: Guangzhou Fangwei Information Technology Co.,Ltd.

Address before: 518129 Huawei headquarters office building, Bantian, Longgang District, Shenzhen, Guangdong

Patentee before: HUAWEI TECHNOLOGIES Co.,Ltd.

Effective date of registration: 20211116

Address after: 314500 02, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee after: Jiaxing Zhixu Information Technology Co.,Ltd.

Address before: 510670 Room 518, No. 91 Kefeng Road, Huangpu District, Guangzhou City, Guangdong Province

Patentee before: Guangzhou Fangwei Information Technology Co.,Ltd.

TR01 Transfer of patent right

Effective date of registration: 20220907

Address after: Room A02, Room 1906, No. 7 Shuangshan Avenue, Nansha District, Guangzhou City, Guangdong Province, 510000

Patentee after: Guangdong Lampang New Energy Co.,Ltd.

Address before: 314500 02, No. 4, South Zaoqiang street, No. 1, Nanmen Gongnong Road, Chongfu Town, Tongxiang City, Jiaxing City, Zhejiang Province

Patentee before: Jiaxing Zhixu Information Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230915

Address after: 200237 floor 1, building 1, No. 1755, Hongmei South Road, Minhang District, Shanghai

Patentee after: Shanghai Nanbang Hua New Energy Co.,Ltd.

Address before: Room A02, Room 1906, No. 7 Shuangshan Avenue, Nansha District, Guangzhou City, Guangdong Province, 510000

Patentee before: Guangdong Lampang New Energy Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20240218

Address after: 201800 Two Five Floors of 333 Huangqing Road, Jiading District, Shanghai

Patentee after: SHANGHAI PENGBANG INDUSTRIAL Co.,Ltd.

Country or region after: China

Address before: 200237 floor 1, building 1, No. 1755, Hongmei South Road, Minhang District, Shanghai

Patentee before: Shanghai Nanbang Hua New Energy Co.,Ltd.

Country or region before: China

TR01 Transfer of patent right