CN107123869A - Livewire work gage lap device - Google Patents
Livewire work gage lap device Download PDFInfo
- Publication number
- CN107123869A CN107123869A CN201710162342.7A CN201710162342A CN107123869A CN 107123869 A CN107123869 A CN 107123869A CN 201710162342 A CN201710162342 A CN 201710162342A CN 107123869 A CN107123869 A CN 107123869A
- Authority
- CN
- China
- Prior art keywords
- push
- locking
- clamp
- seat
- splint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H01—ELECTRIC ELEMENTS
- H01R—ELECTRICALLY-CONDUCTIVE CONNECTIONS; STRUCTURAL ASSOCIATIONS OF A PLURALITY OF MUTUALLY-INSULATED ELECTRICAL CONNECTING ELEMENTS; COUPLING DEVICES; CURRENT COLLECTORS
- H01R11/00—Individual connecting elements providing two or more spaced connecting locations for conductive members which are, or may be, thereby interconnected, e.g. end pieces for wires or cables supported by the wire or cable and having means for facilitating electrical connection to some other wire, terminal, or conductive member, blocks of binding posts
- H01R11/11—End pieces or tapping pieces for wires, supported by the wire and for facilitating electrical connection to some other wire, terminal or conductive member
- H01R11/12—End pieces terminating in an eye, hook, or fork
- H01R11/14—End pieces terminating in an eye, hook, or fork the hook being adapted for hanging on overhead or other suspended lines, e.g. hot line clamp
Landscapes
- Clamps And Clips (AREA)
Abstract
本发明公开了一种带电作业引线搭接装置,旨在解决带电作业引线搭接操作过程中一次只能装卸一个线夹,相邻两线夹之间距离不易确定,线夹装卸不便,而且引线架空操作劳动强度大,费时费力的不足。该发明包括固定夹板、推动夹板,固定夹板上连接安装座,安装座上连接绝缘杆连接头,安装座上可转动连接压座,压座上连接锁紧杆,锁紧杆端部转动连接把手,把手上与锁紧杆连接端设有偏心锁紧盘,偏心锁紧盘抵接在固定夹板上,压座上设有锁紧夹槽,固定夹板上和锁紧夹槽相对位置设有若干压板,压板和锁紧夹槽之间安装引线,压座的两侧推动夹板和固定夹板之间均构成用于装夹线夹的定位夹槽,定位夹槽内安装线夹,线夹连接在引线上。
The invention discloses a lead wire lapping device for live work, which aims to solve the problem that only one wire clamp can be loaded and unloaded at a time during the live work lead wire lapping operation, the distance between two adjacent wire clamps is not easy to determine, the wire clamp is inconvenient to install and unload, and the lead wire Overhead operation is labor-intensive, time-consuming and labor-intensive. The invention includes a fixed splint, a pushing splint, a mounting seat connected to the fixed splint, an insulating rod connector connected to the mounting seat, a pressure seat rotatably connected to the mounting seat, a locking rod connected to the pressing seat, and a handle connected to the end of the locking rod by rotation. , the connection end of the handle and the locking rod is provided with an eccentric locking disc, the eccentric locking disc abuts against the fixed splint, the pressing seat is provided with a locking clamp groove, and the fixed splint and the locking clamp groove are provided with several The pressure plate, the lead wire is installed between the pressure plate and the locking clamp groove, the two sides of the pressure seat push the splint and the fixed splint to form a positioning clamp groove for clamping the clamp, and the clamp is installed in the positioning clamp groove, and the clamp is connected to the on the lead.
Description
技术领域technical field
本发明涉及一种电力操作工具,更具体地说,它涉及一种带电作业引线搭接装置。The present invention relates to an electric power operation tool, more specifically, it relates to a lead wire bonding device for live work.
背景技术Background technique
目前带电作业项目以搭接和拆除引线为主,其中绝缘杆作业法搭接引线的作业技术难度大,对工作人员的业务素质要求高,除了要有熟练的技术和强烈的安全意识,作业人员还必须有良好的体能状况。由于绝缘杆作业法带电搭接引线作业属于常见作业,劳动强度较大,特别是脚扣登杆作业时,手臂、腰、颈椎长时间受力,作业人员容易疲劳。At present, live work projects mainly focus on lapping and removing lead wires. Among them, the operation technology of lapping lead wires by insulating rod operation method is very difficult and requires high professional quality of staff. In addition to skilled technology and strong safety awareness, operators must Must also be in good physical condition. Since the insulation pole operation method is a common operation for live lapping and lead wire operation, the labor intensity is relatively high, especially when the foot buckles are used to climb the pole, the arms, waist, and cervical spine are stressed for a long time, and the operators are prone to fatigue.
中国专利公告号CN205692991U,公开了一种带电作业并沟线夹装拆器,包括绝缘杆体、固定夹体、固定架和活动夹板,固定架上设置有第一支架和第二支架,固定夹体设置于绝缘杆体的一端,固定架设置于固定夹体上,活动夹板一端与第一支架连接,活动夹板的另一端与第二支架连接,活动夹板与第一支架、第二支架形成用于夹持待固定物的夹持部。工作人员使用该装拆器可进行带电装设引线夹板,克服了传统操作时只能通过带电车靠近带电导线进行手工搭接的操作方式,操作更加安全方便。但是,一次只能装卸一个线夹,相邻两线夹之间距离不易确定,线夹装卸不便,而且引线架空操作劳动强度大,费时费力。Chinese Patent Announcement No. CN205692991U discloses a clamp installer and disassembler for parallel ditching for live work, including an insulating rod body, a fixed clamp body, a fixed frame and a movable splint. The fixed frame is provided with a first bracket and a second bracket, and the fixed clamp body Set on one end of the insulating rod body, the fixed frame is set on the fixed clip body, one end of the movable splint is connected with the first bracket, the other end of the movable splint is connected with the second bracket, and the movable splint is formed with the first bracket and the second bracket for clamping The clamping part that holds the object to be fixed. The staff can use the installer and disassembler to install the lead wire splint when it is live, which overcomes the traditional operation method that can only be manually lapped by a live car close to the live wire, and the operation is safer and more convenient. However, only one wire clip can be loaded and unloaded at a time, the distance between two adjacent wire clips is not easy to determine, the wire clips are inconvenient to load and unload, and the overhead operation of the leads is labor-intensive, time-consuming and laborious.
发明内容Contents of the invention
本发明克服了带电作业引线搭接操作过程中一次只能装卸一个线夹,相邻两线夹之间距离不易确定,线夹装卸不便,而且引线架空操作劳动强度大,费时费力的不足,提供了一种带电作业引线搭接装置,带电作业引线搭接操作过程中一次能装卸两个线夹,相邻两线夹之间距离控制方便,线夹装卸便捷,而且大大降低了引线架空操作的劳动强度,省时省力。The invention overcomes the disadvantages that only one wire clip can be loaded and unloaded at a time during the lapping operation of the lead wire in live work, the distance between two adjacent wire clips is not easy to determine, the installation and disassembly of the wire clip is inconvenient, and the overhead operation of the lead wire is labor-intensive, time-consuming and labor-intensive. It provides A lead wire lapping device for live work is developed. During the live work lead wire lapping operation, two wire clips can be loaded and unloaded at one time. The distance between two adjacent wire clips is convenient to control, the wire clips are convenient to install and unload, and the overhead operation of the lead wires is greatly reduced. Labor intensity, saving time and effort.
为了解决上述技术问题,本发明采用以下技术方案:一种带电作业引线搭接装置,包括固定夹板、推动夹板,固定夹板上连接安装座,安装座上连接绝缘杆连接头,推动夹板可滑动安装在固定夹板上,安装座上可转动连接压座,压座和安装座之间连接回位弹簧,压座上连接锁紧杆,锁紧杆贯穿固定夹板,锁紧杆端部转动连接把手,把手上与锁紧杆连接端设有偏心锁紧盘,偏心锁紧盘抵接在固定夹板上,压座上设有长条状呈V形的锁紧夹槽,固定夹板上和锁紧夹槽相对位置设有若干压板,压板和锁紧夹槽之间安装引线,压座的两侧均设有竖向设置的线夹挡片,压座的两侧推动夹板和固定夹板之间均构成用于装夹线夹的定位夹槽,定位夹槽内安装线夹,线夹连接在引线上,线夹侧边贴合在线夹挡片上。In order to solve the above technical problems, the present invention adopts the following technical solutions: a lead wire lapping device for live work, including a fixed splint, a push splint, a mounting seat connected to the fixed splint, an insulating rod connector connected to the mounting seat, and the push splint can be slidably installed On the fixed splint, the mounting seat is rotatably connected to the pressing seat, the return spring is connected between the pressing seat and the mounting seat, the locking rod is connected to the pressing seat, the locking rod penetrates the fixing splint, and the end of the locking rod is rotated to connect the handle. There is an eccentric locking disc on the connection end of the handle and the locking rod, and the eccentric locking disc abuts against the fixed splint, and a long V-shaped locking clip groove is provided on the pressure seat, and the fixed splint and the locking clip There are several pressure plates at the relative positions of the grooves, and lead wires are installed between the pressure plates and the locking clamp grooves. Both sides of the pressure seat are provided with vertical clamp blocks, and both sides of the pressure seat push the splint and the fixed splint. The positioning clip groove for clamping the wire clip, the wire clip is installed in the positioning clip groove, the wire clip is connected to the lead wire, and the side of the wire clip is attached to the wire clip block.
带电作业引线搭接装置使用时,将引线拉直装夹在压板和锁紧夹槽之间,然后转动把手,带动偏心锁紧盘转动,从而使锁紧杆拉动压座向压板方向移动,将引线锁紧在压板和锁紧夹槽之间。再将两线夹连接到引线上,两线夹分别定位插装在两定位夹槽内,此时线夹上的紧固螺栓处于松开状态。最后将绝缘杆连接头连接到绝缘杆上,操作人员手持操作杆将带电作业引线搭接装置向上顶起到主线位置,在主线位置的操作人员将线夹夹到主线上,拧紧线夹上的紧固螺栓,先拧靠近线夹挡片侧的紧固螺栓,紧固螺栓转动的过程中,垫在紧固螺栓和线夹之间的紧固座侧边抵靠在线夹挡片上,线夹挡片对紧固座进行限位,防止紧固螺栓转动过程中紧固座被带动转动,使线夹上紧固螺栓的拧紧操作更加便捷,有利于降低操作人员的劳动强度,省时省力。同理,转动线夹外侧的紧固螺栓时,外侧的紧固座侧边抵靠在内侧的紧固座侧面上,防止紧固螺栓转动过程中紧固座被带动转动。线夹锁紧到主线上后,移动推动夹板,增加定位夹槽的宽度,使线夹与定位夹槽分离,然后反向转动把手,锁紧杆反向移动,在压座自身重力和回位弹簧共同作用下,压座向下转动,从而使锁紧夹槽和引线分离,最后在下面的操作人员拿开绝缘杆将带电作业引线搭接装置从主线上取下,实现引线的搭接作业。带电作业引线搭接操作过程中一次能装卸两个线夹,通过控制两线夹挡片之间的距离就可以很方便地控制相邻两线夹之间的距离,距离控制准确、方便。整个线夹装卸过程便捷,而且操作过程中线夹上的紧固座定位方便,避免了操作失误造成的多次重复动作,大大降低了引线架空操作的劳动强度,省时省力。When using the lead wire lapping device for live work, straighten the lead wire and clamp it between the pressure plate and the locking clamp groove, then turn the handle to drive the eccentric locking disc to rotate, so that the locking rod pulls the pressure seat to move toward the pressure plate, and the The lead wire is locked between the pressing plate and the locking clip groove. Then the two wire clips are connected to the lead wires, and the two wire clips are respectively positioned and inserted in the two positioning clip grooves, and now the fastening bolts on the wire clips are in a loose state. Finally, connect the connecting head of the insulating rod to the insulating rod. The operator holds the operating rod and lifts the live work lead wire lapping device up to the position of the main line. To fasten the bolts, first screw the fastening bolts close to the side of the clamp block. During the rotation of the fastening bolts, the side of the fastening seat between the fastening bolts and the clamps is against the clamp block, and the clamps The baffle limits the fastening seat to prevent the fastening seat from being driven to rotate during the rotation of the fastening bolt, making the tightening operation of the fastening bolt on the wire clamp more convenient, which is beneficial to reduce the labor intensity of the operator, and saves time and effort. In the same way, when the fastening bolt on the outside of the wire clamp is rotated, the side of the fastening seat on the outside abuts against the side of the fastening seat on the inside to prevent the fastening seat from being driven to rotate during the rotation of the fastening bolt. After the wire clip is locked to the main line, move and push the splint to increase the width of the positioning clip groove, so that the wire clip is separated from the positioning clip groove, and then turn the handle in the opposite direction, and the locking lever moves in the opposite direction. Under the joint action of the spring, the pressure seat rotates downward, so that the locking clamp groove and the lead wire are separated. Finally, the operator below removes the insulating rod and removes the live working lead wire lapping device from the main line to realize the lapping operation of the lead wire. . During the lapping operation of live work lead wires, two clamps can be loaded and unloaded at one time, and the distance between two adjacent clamps can be easily controlled by controlling the distance between the retaining pieces of the two clamps. The distance control is accurate and convenient. The entire clamp loading and unloading process is convenient, and the fastening seat on the clamp is conveniently positioned during the operation process, which avoids repeated actions caused by operating errors, greatly reduces the labor intensity of the lead wire overhead operation, and saves time and effort.
作为优选,把手截面呈矩形框状结构,偏心锁紧盘相对设置有两块,锁紧杆设置在两偏心锁紧盘之间,两偏心锁紧盘之间连接转轴,锁紧杆上设有安装套,转轴活动插接在安装套内。把手轻量化设计,有利于减轻整个装置的重量,从而使操作人员举起绝缘杆更加省力。偏心锁紧盘通过转轴在安装套内转动,转动平稳可靠。Preferably, the cross section of the handle is a rectangular frame structure, two eccentric locking discs are arranged oppositely, the locking rod is arranged between the two eccentric locking discs, the rotating shaft is connected between the two eccentric locking discs, and the locking rod is provided with The installation sleeve, the rotating shaft is movably plugged in the installation sleeve. The lightweight design of the handle is conducive to reducing the weight of the entire device, so that the operator can lift the insulating rod with less effort. The eccentric locking disc rotates in the installation sleeve through the rotating shaft, and the rotation is stable and reliable.
作为优选,压座呈盒状结构,压座上设有两铰接片,两铰接片铰接在安装座两侧。压座轻量化设计,有利于减轻整个装置的重量,从而使操作人员举起绝缘杆更加省力。压座通过两铰接片铰接在安装座两侧,连接方便可靠。Preferably, the pressing seat is in a box-like structure, and the pressing seat is provided with two hinged pieces, and the two hinged pieces are hinged on both sides of the mounting seat. The lightweight design of the press seat is beneficial to reduce the weight of the whole device, so that the operator saves effort to lift the insulating rod. The pressure seat is hinged on both sides of the installation seat through two hinge pieces, and the connection is convenient and reliable.
作为优选,压板朝向锁紧夹槽的表面上设有若干条凸起的防滑条。防滑条的设置防止压板和引线之间出现打滑现象,使引线的装夹更加可靠。Preferably, the surface of the pressure plate facing the locking clip groove is provided with several raised anti-slip strips. The setting of the anti-slip strip prevents slippage between the pressing plate and the lead wire, so that the clamping of the lead wire is more reliable.
作为优选,固定夹板上设有两L形的且相对设置的固定翼板,推动夹板上设有两L形的且相对设置的推动翼板,固定翼板和推动翼板均包括竖板和横板,两推动翼板的竖板分别可滑动连接在两固定翼板的竖板两侧,两固定翼板的竖板上均设有截面呈L形的导板,推动翼板的竖板限位在导板和固定翼板的竖板之间滑动,固定翼板和推动翼板的横板之间构成定位夹槽。推动夹板移动,从而使推动翼板的竖板在导板和固定翼板的竖板之间滑动,从而调整推动翼板横板和固定翼板横板之间的定位夹槽的宽度,从而实现对线夹的装卸,装卸过程方便。As a preference, two L-shaped and opposite fixed wings are provided on the fixed splint, two L-shaped and oppositely arranged push wings are arranged on the push splint, and both the fixed and push wings include vertical plates and horizontal plates. The vertical plates of the two push wing plates are respectively slidably connected to both sides of the vertical plates of the two fixed wing plates, and the vertical plates of the two fixed wing plates are provided with guide plates with an L-shaped cross-section to limit the position of the vertical plates of the push wing plates. Sliding between the guide plate and the vertical plate of the fixed wing plate, the positioning clip groove is formed between the fixed wing plate and the horizontal plate of the pushing wing plate. Push the splint to move, so that the vertical plate of the push wing slides between the guide plate and the vertical plate of the fixed wing, thereby adjusting the width of the positioning clip groove between the horizontal plate of the push wing and the horizontal plate of the fixed wing, so as to realize alignment The loading and unloading of the wire clip is convenient.
作为优选,安装座内可升降安装有推动块,固定夹板上设有支撑块,推动块上设有倾斜设置的推动面,支撑块上设有倾斜设置且和推动面贴合的支撑面,安装座上螺纹连接螺杆,螺杆端部抵接在推动块上,支撑块和安装座之间安装有推动弹簧。转动螺杆,螺杆带动推动块向支撑块方向推动,使支撑块向推动弹簧侧横向移动,实现对推动夹板的横向推动,减小定位夹槽的宽度,从而夹紧线夹。反向转动螺杆,在推动弹簧作用下实现支撑块和推动块的回位,定位夹槽宽度增加,卸下线夹。As a preference, a push block can be lifted and installed in the mounting seat, a support block is provided on the fixed splint, a push surface is provided on the push block, and a support surface is provided on the support block and is fitted with the push surface. The seat is threadedly connected with a screw rod, the end of the screw rod abuts on the push block, and a push spring is installed between the support block and the installation seat. When the screw is turned, the screw drives the push block to push toward the support block, so that the support block moves laterally to the side of the push spring, realizes the lateral push of the push splint, reduces the width of the positioning clip groove, and clamps the clamp. Rotate the screw rod in the opposite direction to realize the return of the support block and the push block under the action of the push spring, increase the width of the positioning clamp groove, and remove the clamp.
作为优选,绝缘杆连接头设置在螺杆上,绝缘杆连接头呈套筒状结构且端面均布设有若干径向设置的防转齿。防转齿的设置使绝缘杆与绝缘杆连接头的连接紧固可靠,防止出现相互转动现象。Preferably, the connecting head of the insulating rod is arranged on the screw rod, the connecting head of the insulating rod is in the shape of a sleeve, and a number of radially arranged anti-rotation teeth are evenly distributed on the end surface. The arrangement of the anti-rotation teeth makes the connection between the insulating rod and the connecting head of the insulating rod fast and reliable, and prevents mutual rotation.
与现有技术相比,本发明的有益效果是:带电作业引线搭接操作过程中一次能装卸两个线夹,相邻两线夹之间距离控制方便,线夹装卸便捷,而且大大降低了引线架空操作的劳动强度,省时省力。Compared with the prior art, the beneficial effect of the present invention is that two wire clamps can be loaded and unloaded at one time during the lapping operation of live work leads, the distance between two adjacent wire clamps is convenient to control, the wire clamps are conveniently loaded and unloaded, and the The labor intensity of the lead wire overhead operation saves time and effort.
附图说明Description of drawings
图1是本发明的一种结构示意图;Fig. 1 is a kind of structural representation of the present invention;
图2是本发明的侧视图;Fig. 2 is a side view of the present invention;
图3是本发明的图2的A-A剖视图;Fig. 3 is the A-A sectional view of Fig. 2 of the present invention;
图4是本发明的另一个方向的结构示意图;Fig. 4 is the structural representation of another direction of the present invention;
图中:1、固定夹板,2、推动夹板,3、安装座,4、绝缘杆连接头,5、压座,6、回位弹簧,7、锁紧杆,8、把手,9、偏心锁紧盘,10、锁紧夹槽,11、压板,12、引线,13、线夹挡片,14、定位夹槽,15、线夹,16、转轴,17、安装套,18、铰接片,19、防滑条,20、固定翼板,21、推动翼板,22、竖板,23、横板,24、导板,25、推动块,26、支撑块,27、推动面,28、支撑面,29、螺杆,30、推动弹簧,31、防滑齿。In the figure: 1. Fixing splint, 2. Pushing splint, 3. Mounting seat, 4. Connecting head of insulating rod, 5. Pressure seat, 6. Return spring, 7. Locking lever, 8. Handle, 9. Eccentric lock Tight disc, 10, locking clamp groove, 11, pressure plate, 12, lead wire, 13, wire clamp stopper, 14, positioning clamp groove, 15, wire clamp, 16, rotating shaft, 17, installation sleeve, 18, hinge piece, 19, anti-slip strip, 20, fixed wing plate, 21, push wing plate, 22, vertical plate, 23, horizontal plate, 24, guide plate, 25, push block, 26, support block, 27, push surface, 28, support surface , 29, screw rod, 30, push spring, 31, antiskid tooth.
具体实施方式detailed description
下面通过具体实施例,并结合附图,对本发明的技术方案作进一步的具体描述:Below by specific embodiment, in conjunction with accompanying drawing, the technical solution of the present invention is described in further detail:
实施例:一种带电作业引线搭接装置(参见附图1至4),包括固定夹板1、推动夹板2,固定夹板上连接安装座3,安装座上连接绝缘杆连接头4,推动夹板可滑动安装在固定夹板上,安装座上可转动连接压座5,压座和安装座之间连接回位弹簧6,压座上连接锁紧杆7,锁紧杆贯穿固定夹板,锁紧杆端部转动连接把手8,把手上与锁紧杆连接端设有偏心锁紧盘9,偏心锁紧盘抵接在固定夹板上,把手截面呈矩形框状结构,偏心锁紧盘相对设置有两块,锁紧杆设置在两偏心锁紧盘之间,两偏心锁紧盘之间连接转轴16,锁紧杆上设有安装套17,转轴活动插接在安装套内。压座上设有长条状呈V形的锁紧夹槽10,固定夹板上和锁紧夹槽相对位置设有两压板11,压板和固定夹板之间通过连接柱连接,压板和连接柱一体成型,连接柱紧固连接在固定夹板上。压板朝向锁紧夹槽的表面上设有若干条凸起的防滑条19,压板和锁紧夹槽之间安装引线12,压座的两侧均设有竖向设置的线夹挡片13,压座的两侧推动夹板和固定夹板之间均构成用于装夹线夹的定位夹槽14,定位夹槽内安装线夹15,线夹连接在引线上,线夹侧边贴合在线夹挡片上。线夹包括两夹体,两夹体之间连接紧固螺栓,紧固螺栓和一夹体之间连接紧固座,另一夹体上设有凸条,凸条夹持在定位夹槽内。压座呈盒状结构,压座上设有两铰接片18,两铰接片铰接在安装座两侧。回位弹簧倾斜设置有两根,回位弹簧与安装座的连接位置设置在铰接片下方。固定夹板上设有两L形的且相对设置的固定翼板20,推动夹板上设有两L形的且相对设置的推动翼板21,固定翼板和推动翼板均包括竖板22和横板23,两推动翼板的竖板分别可滑动连接在两固定翼板的竖板两侧,两固定翼板的竖板上均设有截面呈L形的导板24,推动翼板的竖板限位在导板和固定翼板的竖板之间滑动,固定翼板和推动翼板的横板之间构成定位夹槽。安装座呈盒状结构,安装座内可升降安装有推动块25,固定夹板上设有支撑块26,推动块上设有倾斜设置的推动面27,支撑块上设有倾斜设置且和推动面贴合的支撑面28,安装座上螺纹连接螺杆29,螺杆端部抵接在推动块上,支撑块和安装座之间安装有推动弹簧30。绝缘杆连接头设置在螺杆上,绝缘杆连接头呈套筒状结构且端面均布设有若干径向设置的防转齿31。Embodiment: A lead wire lapping device for live work (see accompanying drawings 1 to 4), including a fixed splint 1, a push splint 2, a mounting seat 3 connected to the fixed splint, and an insulating rod connector 4 connected to the mounting seat, and the pushing splint can be Slidingly installed on the fixed splint, the mounting seat is rotatably connected to the pressure seat 5, the return spring 6 is connected between the pressure seat and the mounting seat, the locking rod 7 is connected to the pressure seat, the locking rod runs through the fixed splint, and the end of the locking rod Rotate and connect the handle 8 at the top of the handle, and the connection end of the handle and the locking rod is provided with an eccentric locking disc 9, the eccentric locking disc abuts against the fixed splint, the cross section of the handle is in a rectangular frame structure, and two eccentric locking discs are arranged opposite to each other. , The locking lever is arranged between the two eccentric locking disks, the rotating shaft 16 is connected between the two eccentric locking disks, the locking lever is provided with a mounting sleeve 17, and the rotating shaft is movably inserted in the mounting sleeve. There is a long V-shaped locking clamp groove 10 on the pressure seat, and two pressure plates 11 are arranged on the fixed splint opposite to the locking clamp groove. The pressure plate and the fixed splint are connected by a connecting column, and the pressure plate and the connecting column are integrated. Formed, the connecting column is firmly connected to the fixed splint. Several raised anti-slip strips 19 are provided on the surface of the pressure plate towards the locking clamp groove, lead wires 12 are installed between the pressure plate and the locking clamp groove, and vertically arranged wire clamp baffles 13 are provided on both sides of the pressure seat. Both sides of the pressure seat push the splint and the fixed splint to form a positioning clamp groove 14 for clamping the clamp. The clamp 15 is installed in the positioning clamp groove. The clamp is connected to the lead wire, and the side of the clamp is attached to the clamp on the flap. The wire clip includes two clip bodies, the fastening bolts are connected between the two clip bodies, the fastening seat is connected between the fastening bolt and one clip body, and the other clip body is provided with a convex line, which is clamped in the positioning clip groove . The press seat is a box-shaped structure, and the press seat is provided with two hinged pieces 18, and the two hinged pieces are hinged on both sides of the mounting seat. There are two return springs arranged obliquely, and the connection position between the return spring and the mounting seat is arranged below the hinge piece. Two L-shaped and oppositely arranged fixed flaps 20 are arranged on the fixed splint, and two L-shaped and oppositely arranged push flaps 21 are arranged on the push splint. Both the fixed flap and the pushed flap include vertical plates 22 and horizontal Plate 23, the vertical plates of the two pushing wings are respectively slidably connected to both sides of the vertical plates of the two fixed wings, and the vertical plates of the two fixed wings are all provided with a guide plate 24 with an L-shaped cross section, and the vertical plates of the pushing wings The limit slides between the guide plate and the vertical plate of the fixed wing, and a positioning clip groove is formed between the fixed wing and the horizontal plate of the push wing. The mounting seat is a box-shaped structure, and a push block 25 can be lifted and installed in the mounting seat, and a support block 26 is provided on the fixed splint, and the push block is provided with an inclined pushing surface 27. The attached supporting surface 28 is threadedly connected to the screw rod 29 on the mounting seat, and the end of the screw rod abuts on the pushing block, and a pushing spring 30 is installed between the supporting block and the mounting seat. The connecting head of the insulating rod is arranged on the screw rod, and the connecting head of the insulating rod is in the shape of a sleeve, and a plurality of radially arranged anti-rotation teeth 31 are uniformly arranged on the end surface.
带电作业引线搭接装置使用时,将引线拉直装夹在压板和锁紧夹槽之间,然后转动把手,带动偏心锁紧盘转动,从而使锁紧杆拉动压座向压板方向移动,将引线锁紧在压板和锁紧夹槽之间。再将两线夹连接到引线上,两线夹分别定位插装在两定位夹槽内,此时线夹上的紧固螺栓处于松开状态。最后将绝缘杆连接头连接到绝缘杆上,操作人员手持操作杆将带电作业引线搭接装置向上顶起到主线位置,在主线位置的操作人员将线夹夹到主线上,拧紧线夹上的紧固螺栓,先拧靠近线夹挡片侧的紧固螺栓,紧固螺栓转动的过程中,垫在紧固螺栓和线夹之间的紧固座侧边抵靠在线夹挡片上,线夹挡片对紧固座进行限位,防止紧固螺栓转动过程中紧固座被带动转动,使线夹上紧固螺栓的拧紧操作更加便捷,有利于降低操作人员的劳动强度,省时省力。同理,转动线夹外侧的紧固螺栓时,外侧的紧固座侧边抵靠在内侧的紧固座侧面上,防止紧固螺栓转动过程中紧固座被带动转动。线夹锁紧到主线上后,移动推动夹板,增加定位夹槽的宽度,使线夹与定位夹槽分离,然后反向转动把手,锁紧杆反向移动,在压座自身重力和回位弹簧共同作用下,压座向下转动,从而使锁紧夹槽和引线分离,最后在下面的操作人员拿开绝缘杆将带电作业引线搭接装置从主线上取下,实现引线的搭接作业。带电作业引线搭接操作过程中一次能装卸两个线夹,通过控制两线夹挡片之间的距离就可以很方便地控制相邻两线夹之间的距离,距离控制准确、方便。整个线夹装卸过程便捷,而且操作过程中线夹上的紧固座定位方便,避免了操作失误造成的多次重复动作,大大降低了引线架空操作的劳动强度,省时省力。When using the lead wire lapping device for live work, straighten the lead wire and clamp it between the pressure plate and the locking clamp groove, then turn the handle to drive the eccentric locking disc to rotate, so that the locking rod pulls the pressure seat to move toward the pressure plate, and the The lead wire is locked between the pressing plate and the locking clip groove. Then the two wire clips are connected to the lead wires, and the two wire clips are respectively positioned and inserted in the two positioning clip grooves, and now the fastening bolts on the wire clips are in a loose state. Finally, connect the connecting head of the insulating rod to the insulating rod. The operator holds the operating rod and lifts the live work lead wire lapping device up to the position of the main line. To fasten the bolts, first screw the fastening bolts close to the side of the clamp block. During the rotation of the fastening bolts, the side of the fastening seat between the fastening bolts and the clamps is against the clamp block, and the clamps The baffle limits the fastening seat to prevent the fastening seat from being driven to rotate during the rotation of the fastening bolt, making the tightening operation of the fastening bolt on the wire clamp more convenient, which is beneficial to reduce the labor intensity of the operator, and saves time and effort. In the same way, when the fastening bolt on the outside of the wire clamp is rotated, the side of the fastening seat on the outside abuts against the side of the fastening seat on the inside to prevent the fastening seat from being driven to rotate during the rotation of the fastening bolt. After the wire clip is locked to the main line, move and push the splint to increase the width of the positioning clip groove, so that the wire clip is separated from the positioning clip groove, and then turn the handle in the opposite direction, and the locking lever moves in the opposite direction. Under the joint action of the spring, the pressure seat rotates downward, so that the locking clamp groove and the lead wire are separated. Finally, the operator below removes the insulating rod and removes the live working lead wire lapping device from the main line to realize the lapping operation of the lead wire. . During the lapping operation of live work lead wires, two clamps can be loaded and unloaded at one time, and the distance between two adjacent clamps can be easily controlled by controlling the distance between the retaining pieces of the two clamps. The distance control is accurate and convenient. The entire clamp loading and unloading process is convenient, and the fastening seat on the clamp is conveniently positioned during the operation process, which avoids repeated actions caused by operating errors, greatly reduces the labor intensity of the lead wire overhead operation, and saves time and effort.
以上所述的实施例只是本发明的一种较佳的方案,并非对本发明作任何形式上的限制,在不超出权利要求所记载的技术方案的前提下还有其它的变体及改型。The embodiment described above is only a preferred solution of the present invention, and does not limit the present invention in any form. There are other variations and modifications on the premise of not exceeding the technical solution described in the claims.
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710162342.7A CN107123869B (en) | 2017-03-17 | 2017-03-17 | Live work lead bonding device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710162342.7A CN107123869B (en) | 2017-03-17 | 2017-03-17 | Live work lead bonding device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107123869A true CN107123869A (en) | 2017-09-01 |
| CN107123869B CN107123869B (en) | 2019-01-29 |
Family
ID=59717490
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710162342.7A Active CN107123869B (en) | 2017-03-17 | 2017-03-17 | Live work lead bonding device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107123869B (en) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108173098A (en) * | 2017-12-05 | 2018-06-15 | 国网浙江省电力公司丽水供电公司 | Lead and parallel groove clamp integrated lock lever apparatus |
| CN108233264A (en) * | 2017-12-11 | 2018-06-29 | 国网河北省电力有限公司景县供电分公司 | A kind of wire clamp installation tool |
| CN110601095A (en) * | 2019-11-05 | 2019-12-20 | 贵州电网有限责任公司 | Composite type parallel groove lap joint device capable of live working and operation method thereof |
| CN110661212A (en) * | 2019-11-05 | 2020-01-07 | 贵州电网有限责任公司 | Special-shaped parallel-groove lap joint device capable of working in hot-line mode and operation method thereof |
| CN111864678A (en) * | 2020-07-14 | 2020-10-30 | 黄涛 | Special parallel groove clamp installer |
| CN112202023A (en) * | 2020-09-15 | 2021-01-08 | 国网山东省电力公司济南供电公司 | A new type of insulation rod with electric speed connection and drainage wire clamp fixing device |
| CN112736817A (en) * | 2020-12-22 | 2021-04-30 | 国网河北省电力有限公司邢台供电分公司 | Special-shaped wire clamp installer for live working |
| CN113580058A (en) * | 2021-07-20 | 2021-11-02 | 合肥工业大学 | A quick replacement device for preventing wind fastener |
| CN116759938A (en) * | 2023-08-16 | 2023-09-15 | 国网江苏省电力有限公司常州供电分公司 | An assembled lead clamp with controllable opening for live work |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2012011960A1 (en) * | 2010-07-22 | 2012-01-26 | Tyco Electronics Brasil Ltda | Electrical connector for power conductors |
| CN202330484U (en) * | 2011-12-01 | 2012-07-11 | 北京市电力公司 | Live test brake rod for lightning arrester |
| CN104143785A (en) * | 2014-07-18 | 2014-11-12 | 国家电网公司 | Method and device for 10 kV electrified work for connecting lead of branch connecting circuit |
| CN104810745A (en) * | 2015-03-30 | 2015-07-29 | 国家电网公司 | 10 kV hot-line lead lapping and removing special tool |
| CN205692991U (en) * | 2016-06-24 | 2016-11-16 | 国网重庆市电力公司南岸供电分公司 | A kind of livewire work parallel groove clamp tool for fastening/disengaging |
-
2017
- 2017-03-17 CN CN201710162342.7A patent/CN107123869B/en active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2012011960A1 (en) * | 2010-07-22 | 2012-01-26 | Tyco Electronics Brasil Ltda | Electrical connector for power conductors |
| CN202330484U (en) * | 2011-12-01 | 2012-07-11 | 北京市电力公司 | Live test brake rod for lightning arrester |
| CN104143785A (en) * | 2014-07-18 | 2014-11-12 | 国家电网公司 | Method and device for 10 kV electrified work for connecting lead of branch connecting circuit |
| CN104810745A (en) * | 2015-03-30 | 2015-07-29 | 国家电网公司 | 10 kV hot-line lead lapping and removing special tool |
| CN205692991U (en) * | 2016-06-24 | 2016-11-16 | 国网重庆市电力公司南岸供电分公司 | A kind of livewire work parallel groove clamp tool for fastening/disengaging |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108173098A (en) * | 2017-12-05 | 2018-06-15 | 国网浙江省电力公司丽水供电公司 | Lead and parallel groove clamp integrated lock lever apparatus |
| CN108173098B (en) * | 2017-12-05 | 2020-06-05 | 国网浙江省电力公司丽水供电公司 | Integrated locking rod device of lead wire and parallel groove wire clip |
| CN108233264A (en) * | 2017-12-11 | 2018-06-29 | 国网河北省电力有限公司景县供电分公司 | A kind of wire clamp installation tool |
| CN110601095A (en) * | 2019-11-05 | 2019-12-20 | 贵州电网有限责任公司 | Composite type parallel groove lap joint device capable of live working and operation method thereof |
| CN110661212A (en) * | 2019-11-05 | 2020-01-07 | 贵州电网有限责任公司 | Special-shaped parallel-groove lap joint device capable of working in hot-line mode and operation method thereof |
| CN111864678A (en) * | 2020-07-14 | 2020-10-30 | 黄涛 | Special parallel groove clamp installer |
| CN112202023A (en) * | 2020-09-15 | 2021-01-08 | 国网山东省电力公司济南供电公司 | A new type of insulation rod with electric speed connection and drainage wire clamp fixing device |
| CN112736817A (en) * | 2020-12-22 | 2021-04-30 | 国网河北省电力有限公司邢台供电分公司 | Special-shaped wire clamp installer for live working |
| CN113580058A (en) * | 2021-07-20 | 2021-11-02 | 合肥工业大学 | A quick replacement device for preventing wind fastener |
| CN113580058B (en) * | 2021-07-20 | 2022-07-05 | 合肥工业大学 | A quick replacement device for preventing wind fastener |
| CN116759938A (en) * | 2023-08-16 | 2023-09-15 | 国网江苏省电力有限公司常州供电分公司 | An assembled lead clamp with controllable opening for live work |
| CN116759938B (en) * | 2023-08-16 | 2023-11-14 | 国网江苏省电力有限公司常州供电分公司 | Opening-controllable assembly type live working wire connecting clamp |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107123869B (en) | 2019-01-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107123869A (en) | Livewire work gage lap device | |
| CN107123942B (en) | A kind of lead overhead device | |
| CN206685798U (en) | A kind of livewire work gage lap device | |
| CN106002404B (en) | A kind of clamping device of square workpiece | |
| CN221984528U (en) | A disc-type workpiece fixing fixture | |
| CN206277150U (en) | A kind of drill jig | |
| CN108092176A (en) | A kind of 10kV distributions uninterrupted operation abnormal shape wire clamp rapid dismounting apparatus | |
| CN204771743U (en) | Lock body anchor clamps | |
| CN111283098A (en) | A nut riveting device for machining | |
| CN207782282U (en) | A kind of 10kV distributions uninterrupted operation abnormal shape wire clamp rapid dismounting apparatus | |
| CN206685553U (en) | A kind of gage lap device thread clamping mechanism | |
| CN203109644U (en) | Automatic clamping device for milling crankshaft key groove | |
| CN222259759U (en) | Clamp for LCD screen processing test | |
| CN206685806U (en) | A kind of gage lap device wire clamp mounting structure | |
| CN212192790U (en) | Clamp for electromechanical equipment | |
| CN220671125U (en) | Clamp for stretching building materials | |
| CN218984491U (en) | A positioning fixture for parts processing | |
| CN211277323U (en) | High torque tightening device | |
| CN211136208U (en) | A small distance double luer nut tightening device | |
| CN209618769U (en) | Lifting device for motor maintenance | |
| CN210805122U (en) | Progress show board for construction management | |
| CN209113377U (en) | A product transfer using a hoisting jig | |
| CN204954672U (en) | Automobile glass riser detects anchor clamps | |
| CN206343815U (en) | A kind of guide rail support welding tooling | |
| CN208179342U (en) | An adjustable double-head pressing mechanism |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |