CN107122957A - A kind of large enterprise based on internal network asks for leave management system - Google Patents

A kind of large enterprise based on internal network asks for leave management system Download PDF

Info

Publication number
CN107122957A
CN107122957A CN201710287215.XA CN201710287215A CN107122957A CN 107122957 A CN107122957 A CN 107122957A CN 201710287215 A CN201710287215 A CN 201710287215A CN 107122957 A CN107122957 A CN 107122957A
Authority
CN
China
Prior art keywords
module
leave
approver
written request
management system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710287215.XA
Other languages
Chinese (zh)
Inventor
张向军
韩章贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hefei Vision Mdt Infotech Ltd
Original Assignee
Hefei Vision Mdt Infotech Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Vision Mdt Infotech Ltd filed Critical Hefei Vision Mdt Infotech Ltd
Priority to CN201710287215.XA priority Critical patent/CN107122957A/en
Publication of CN107122957A publication Critical patent/CN107122957A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/109Time management, e.g. calendars, reminders, meetings or time accounting
    • G06Q10/1091Recording time for administrative or management purposes

Abstract

Asked for leave management system the invention discloses a kind of large enterprise based on internal network, including:Written request for leave submits module, approver to confirm module, work attendance inquiry module, approval module, notification module and urge batch module.A kind of large enterprise based on internal network that the present invention is provided asks for leave management system, by main to time multiple approvers of arrangement first in approver confirms module, then the current most forward approver that ranks in company is obtained by work attendance inquiry module and is used as target approver, determine to be examined by target approver by approval module.In this way, avoiding approver's situation that the written request for leave examination & approval time can not determine not caused by company, the stand-by period for asking dummy is saved, written request for leave treatment effeciency is improved.

Description

A kind of large enterprise based on internal network asks for leave management system
Technical field
Asked for leave the present invention relates to enterprise intelligent administrative skill field, more particularly to a kind of large enterprise based on internal network Management system.
Background technology
The management of asking for leave of current enterprise, typically there is paper shelves and with no paper two kinds.Wherein, management of asking for leave with no paper at all is applied to big Type enterprise.General large enterprise is all based on Intranet and sets up system of asking for leave, with no paper so as to management of asking for leave.But, it is existing large-scale In enterprise, when being asked for leave in the system of asking for leave, due to the unicity of examination & approval flow direction, when approver is not in company, written request for leave can not Examined in time.
The content of the invention
The technical problem existed based on background technology, the present invention is proposed a kind of large enterprise based on internal network and asked for leave Management system.
A kind of large enterprise based on internal network proposed by the present invention asks for leave management system, including:
Written request for leave submits module, and applicant module writes written request for leave and is submitted asking for leave to submit;
Approver confirms module, and multiple approvers are preset with for each applicant, and by approver by lead it is secondary according to Minor sort;Approver confirms that module submits module to be connected with written request for leave, and it is according to applicant validation of information approver;
Work attendance inquiry module, it confirms that module is connected with approver, and connects attendance checking system;Work attendance inquiry module is examined Criticize after people's information, approver's same day attendance information is checked to secondary by master, when its investigation to first current approver in company Stop investigation attendance checking system after information, and regard the current approver in company investigated as target approver;
Approval module, it connects written request for leave and submits module and work attendance inquiry module respectively;Approval module is submitted from written request for leave Module obtains written request for leave and sends it to the corresponding target approver that work attendance inquiry module recalls and examined;
People's communication modes of respectively asking for leave are preset with notification module, notification module is connected with approval module, notification module from examine Criticize and the result that target approver examines written request for leave is obtained in module, and notify to ask dummy.
Preferably, in addition to batch module is urged, it is connected with work attendance inquiry module;Batch module is urged to obtain work attendance investigation mould in real time The target approver that block confirms, and be sent to urge batch information.
Preferably, the mode for urging batch module to send information to target approver is SMS or mailbox.
Preferably, approver confirms to be preset with corporate structure in module, and correspondence corporate structure is provided with each employee or each The approver that asks for leave of department.
Preferably, default people's communication modes of respectively asking for leave are cell-phone number in notification module.
A kind of large enterprise based on internal network that the present invention is provided asks for leave management system, confirms mould in approver first By main to time multiple approvers of arrangement in block, the current ranking in company is then obtained by work attendance inquiry module most forward careful People is criticized as target approver, determines to be examined by target approver by approval module.Do not exist in this way, avoiding approver The situation that the written request for leave examination & approval time can not determine caused by company, has saved the stand-by period for asking dummy, has improved at written request for leave Manage efficiency.
In the present invention, written request for leave approval results are sent directly to ask dummy by notification module, be compared to existing In Company's Management System, the system, ask dummy constantly to log in the system of asking for leave and check examination & approval situation, directly wait and notify mould Block notifies that work is divert one's attention caused by being conducive to avoiding asking dummy due to waiting written request for leave examination & approval.
Brief description of the drawings
Fig. 1 is that a kind of large enterprise based on internal network proposed by the present invention asks for leave management system structure diagram.
Embodiment
Reference picture 1, a kind of large enterprise based on internal network proposed by the present invention asks for leave management system, including:Ask for leave Bar submits module, approver to confirm module, work attendance inquiry module, approval module, notification module and urge batch module.
Written request for leave submits module to fill in written request for leave for applicant and submit..Please specifically, being preset with written request for leave module Leave request masterplate, applicant logs in and enters written request for leave and submits after module, can directly be filled on written request for leave masterplate, fill in completion Afterwards, written request for leave is submitted automatically by internal network.
Approver confirms that module submits module to be connected with written request for leave, and it is according to applicant validation of information approver.Specifically, Approver confirms that inside modules are preset with multiple approvers for each applicant, and approver secondary is arranged successively by leading Sequence.In present embodiment, approver confirms to be preset with corporate structure in module, and correspondence corporate structure is provided with each employee or each The approver that asks for leave of department.For example, can according to corporate structure, automatic identification ask for leave applicant department department receive or Group is received as approver, and according to approver's authority size, and multiple approvers secondary are sorted successively by leading.
Work attendance inquiry module confirms that module is connected with approver, and Connected Corp.'s attendance checking system.Work attendance inquiry module is obtained Approver confirms after multiple approver's information that module is determined that secondary putting in order checks that approver works as by leading according to approver Day attendance information, investigation attendance checking system is stopped after its investigation is to first current approver's information in company, and will investigation The current approver in company arrived is used as target approver.That is, work attendance inquiry module attendance checking system by inquiry, obtains current Target approver is used as in the most forward approver that ranks of company.In present embodiment, work attendance inquiry module investigation to first It is individual it is current stop investigation attendance checking system after approver's information of company, i.e., not to follow-up approver whether company without Investigation, it is to avoid redundancy of effort, is conducive to economizing on resources, and improves operating efficiency.
Approval module, it connects written request for leave and submits module and work attendance inquiry module respectively.Approval module is submitted from written request for leave Module obtains written request for leave and sends it to the corresponding target approver that work attendance inquiry module recalls and examined.Specifically, Approval module accesses the approval tool terminal such as office computer of each approver, in this way, when it obtains written request for leave and corresponding mesh Mark after approver, directly written request for leave is delivered in the approval tool of target approver, so that target approver examines.
Batch module is urged to be connected with work attendance inquiry module.Batch module is urged to obtain the target examination & approval of work attendance inquiry module confirmation in real time People, and be sent to urge batch information.Specifically, after urging batch module to know the work of work attendance inquiry module, just investigating mould to work attendance The target approver that block confirms sends announcement information, so that target approver has found copending written request for leave in time, realizes quick Examination & approval.In present embodiment, the mode for urging batch module to send information to target approver is SMS or mailbox.
People's communication modes of respectively asking for leave are preset with notification module, notification module is connected with approval module, notification module from examine Criticize and the result that target approver examines written request for leave is obtained in module, and notify to ask dummy.It is default in notification module respectively to ask dummy Communication modes are cell-phone number.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art the invention discloses technical scope in, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (5)

  1. The management system 1. a kind of large enterprise based on internal network asks for leave, it is characterised in that including:
    Written request for leave submits module, and applicant module writes written request for leave and is submitted asking for leave to submit;
    Approver confirms module, and multiple approvers are preset with for each applicant, and approver secondary is arranged successively by leading Sequence;Approver confirms that module submits module to be connected with written request for leave, and it is according to applicant validation of information approver;
    Work attendance inquiry module, it confirms that module is connected with approver, and connects attendance checking system;Work attendance inquiry module obtains approver After information, approver's same day attendance information is checked to secondary by master, when its investigation to first current approver's information in company Stop investigation attendance checking system afterwards, and regard the current approver in company investigated as target approver;
    Approval module, it connects written request for leave and submits module and work attendance inquiry module respectively;Approval module submits module from written request for leave Obtain written request for leave and send it to the corresponding target approver that work attendance inquiry module recalls and examined;
    People's communication modes of respectively asking for leave are preset with notification module, notification module is connected with approval module, notification module from examination & approval mould The result that target approver examines written request for leave is obtained in block, and notifies to ask dummy.
  2. The management system 2. large enterprise as claimed in claim 1 based on internal network asks for leave, it is characterised in that also including urging Module is criticized, it is connected with work attendance inquiry module;Urge and criticize the target approver that module obtains the confirmation of work attendance inquiry module in real time, and to It, which sends, urges batch information.
  3. The management system 3. large enterprise as claimed in claim 2 based on internal network asks for leave, it is characterised in that urge batch module The mode for sending information to target approver is SMS or mailbox.
  4. The management system 4. large enterprise as claimed in claim 1 based on internal network asks for leave, it is characterised in that approver is true Recognize and corporate structure is preset with module, and ask for leave approver of the correspondence corporate structure provided with each employee or all departments.
  5. The management system 5. large enterprise as claimed in claim 1 based on internal network asks for leave, it is characterised in that notification module In default people's communication modes of respectively asking for leave for cell-phone number.
CN201710287215.XA 2017-04-27 2017-04-27 A kind of large enterprise based on internal network asks for leave management system Pending CN107122957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710287215.XA CN107122957A (en) 2017-04-27 2017-04-27 A kind of large enterprise based on internal network asks for leave management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710287215.XA CN107122957A (en) 2017-04-27 2017-04-27 A kind of large enterprise based on internal network asks for leave management system

Publications (1)

Publication Number Publication Date
CN107122957A true CN107122957A (en) 2017-09-01

Family

ID=59726370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710287215.XA Pending CN107122957A (en) 2017-04-27 2017-04-27 A kind of large enterprise based on internal network asks for leave management system

Country Status (1)

Country Link
CN (1) CN107122957A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491942A (en) * 2017-09-08 2017-12-19 业本科技(北京)有限公司 One kind asks Leave Management system
CN112465446A (en) * 2020-11-09 2021-03-09 深圳市和讯华谷信息技术有限公司 Work order data processing method and device, electronic equipment and storage medium

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102043981A (en) * 2009-10-13 2011-05-04 天津融商科技有限公司 Public real-time attendance management system and method
CN102542387A (en) * 2010-12-20 2012-07-04 西安众擎电子科技有限公司 Administrative affair management system
CN104933520A (en) * 2015-06-05 2015-09-23 上海斐讯数据通信技术有限公司 Processing method of examination and approval items
CN105389674A (en) * 2015-12-21 2016-03-09 用友网络科技股份有限公司 Workflow cyclic approval system
CN105809305A (en) * 2014-12-30 2016-07-27 金蝶软件(中国)有限公司 Method and device for realizing flow automatic approval
CN105956831A (en) * 2016-05-11 2016-09-21 广东诚进科技股份有限公司 Control method of employee leave-asking system
CN106485389A (en) * 2015-09-01 2017-03-08 北京奇虎科技有限公司 The dynamic updating method of examination & approval stream and device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102043981A (en) * 2009-10-13 2011-05-04 天津融商科技有限公司 Public real-time attendance management system and method
CN102542387A (en) * 2010-12-20 2012-07-04 西安众擎电子科技有限公司 Administrative affair management system
CN105809305A (en) * 2014-12-30 2016-07-27 金蝶软件(中国)有限公司 Method and device for realizing flow automatic approval
CN104933520A (en) * 2015-06-05 2015-09-23 上海斐讯数据通信技术有限公司 Processing method of examination and approval items
CN106485389A (en) * 2015-09-01 2017-03-08 北京奇虎科技有限公司 The dynamic updating method of examination & approval stream and device
CN105389674A (en) * 2015-12-21 2016-03-09 用友网络科技股份有限公司 Workflow cyclic approval system
CN105956831A (en) * 2016-05-11 2016-09-21 广东诚进科技股份有限公司 Control method of employee leave-asking system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107491942A (en) * 2017-09-08 2017-12-19 业本科技(北京)有限公司 One kind asks Leave Management system
CN112465446A (en) * 2020-11-09 2021-03-09 深圳市和讯华谷信息技术有限公司 Work order data processing method and device, electronic equipment and storage medium

Similar Documents

Publication Publication Date Title
CN102572134B (en) Worksheet method, work order set up system and worksheet system
CN106452506B (en) A kind of method that multiple data item disposably acquire
CN202443506U (en) Automobile passenger station intelligent operation management system
CN108234784A (en) Intelligent cloud customer service system
CN108182138A (en) Acquisition methods, system, device and the storage medium of BMC SEL daily records
CN106296285A (en) Procurement inquiry method and system based on purchasing system
CN101588311A (en) Method and system for submitting user questions through online customer service system
EP2324605B1 (en) A communication device
CN107122957A (en) A kind of large enterprise based on internal network asks for leave management system
CN102957594A (en) Message queue-based message processing method, related device and system
CN112887474A (en) Address book management method, server and computer readable storage medium
CN109600250A (en) Operation system failure notification method, device, electronic device and storage medium
CN107222392B (en) Communication method, device, system and computer storage medium
CN105701638A (en) Logistics direct train system
CN106789271B (en) Fault reporting processing method and system
CN111401819B (en) Intersystem data pushing method and system
CN103745314A (en) Receipt table transmission method and receipt table transmission device
CN111382062B (en) Joint debugging test method and device for real estate transaction system and external institution business system
CN105871917A (en) Transmission control protocol TCP connection scheduling method and device
CN107194662A (en) A kind of quick measures and procedures for the examination and approval of management of asking for leave based on data processing
CN113034036A (en) Unified business handling system and method based on government business process
CN112783450A (en) Self-service information reading, distributing and printing method and device for delivery documents
CN112950226A (en) Industrial and commercial cluster registration method and device, electronic equipment and readable storage medium
CN104618494A (en) Method for configuring service rules of intelligent storage cabinet online
CN112183050A (en) Method and system for realizing automatic data report design and collection

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170901

RJ01 Rejection of invention patent application after publication