CN107119931B - Theater multistage curve auditorium concrete ladder plate device and its construction method - Google Patents

Theater multistage curve auditorium concrete ladder plate device and its construction method Download PDF

Info

Publication number
CN107119931B
CN107119931B CN201710308471.2A CN201710308471A CN107119931B CN 107119931 B CN107119931 B CN 107119931B CN 201710308471 A CN201710308471 A CN 201710308471A CN 107119931 B CN107119931 B CN 107119931B
Authority
CN
China
Prior art keywords
template
horizontal
theater
auditorium
outboard
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201710308471.2A
Other languages
Chinese (zh)
Other versions
CN107119931A (en
Inventor
刘辉
柳汉庆
秦智超
栾文爱
徐泽
陈晓东
皮佳亮
崔秀生
夏海林
李猛
张冬
赵华颖
魏昌智
谢春萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd, Third Construction Engineering Co Ltd of China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201710308471.2A priority Critical patent/CN107119931B/en
Publication of CN107119931A publication Critical patent/CN107119931A/en
Application granted granted Critical
Publication of CN107119931B publication Critical patent/CN107119931B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H3/00Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons
    • E04H3/10Buildings or groups of buildings for public or similar purposes; Institutions, e.g. infirmaries or prisons for meetings, entertainments, or sports
    • E04H3/12Tribunes, grandstands or terraces for spectators
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Ladders (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The present invention provides a kind of theater multistage curve auditorium concrete ladder plate device and its construction method, described device includes: template and the template support frame body for being used to support the template, the template includes for limiting the outboard template on the outside of ladder, it is connected per two pieces of adjacent outboard templates by back cord, the spacing between back cord is adjusted between per two adjacent back cords by least one adjusting screw rod, and then adjusts the radian of outboard template.The present invention not only reduces difficulty of construction, saves template, and is capable of the camber line curvature of accurate controlling curve ladder, improves concrete pouring quality, to ensure the construction quality of integrated curved, is not necessarily to subsequent repair.

Description

Theater multistage curve auditorium concrete ladder plate device and its construction method
Technical field
The present invention relates to building field, in particular to a kind of theater multistage curve auditorium concrete ladder plate device and Its construction method.
Background technique
With the development of the social economy, the demand of the people to spiritual culture the higher, in recent years, theater is also more and more Appear in city.Due to the particularity of theater itself, the design of auditorium must satisfy the demand at spectators visual angle, therefore Camber line is stepped to attend a banquet and is laid out essential, also therefore considerably increases the difficulty of construction.Currently, for theater multistage curve For the construction technology of auditorium concrete ladder, frequently with scattered spelling template, to complete the installation of segmental arc template curve.
However, the construction of theater multistage curve auditorium concrete ladder, using scattered spelling template carry out template processing and Installation, with material processing difficulties, waste template, the camber line curvature of curve ladder is difficult to the defect ensured simultaneously.It therefore, is guarantor Hinder integrated curved construction quality, the later period generally requires largely to pick chisel repair, this undoubtedly increases the work load of worker And economic cost.
In consideration of it, the present inventor design a kind of theater multistage curve auditorium concrete ladder plate device and Its construction method which not only reduces difficulty of construction, saves template, and is capable of the camber line curvature of accurate controlling curve ladder, Concrete pouring quality is improved, to ensure the construction quality of integrated curved, is not necessarily to subsequent repair.
Summary of the invention
The object of the present invention is to provide a kind of theater multistage curve auditorium concrete ladder plate device and its construction parties Method which not only reduces difficulty of construction, saves template, and is capable of the camber line curvature of accurate controlling curve ladder, improves mixed Solidifying soil pouring quality is not necessarily to subsequent repair to ensure the construction quality of integrated curved.
In order to achieve the above object, the present invention provides a kind of theater multistage curve auditorium concrete ladder plate device, comprising: Template and the template support frame body for being used to support the template, the template include for limiting the outer side mold on the outside of ladder Plate is connected per two pieces of adjacent outboard templates by back cord, adjusts spiral shell by least one between every two adjacent back cords Bar adjusts the spacing between back cord, and then adjusts the radian of outboard template.
The theater multistage curve auditorium concrete ladder plate device, wherein the template further includes for limiting Determine the inner side template on the inside of ladder, the inner side template reinforce by stay and radian controls, and Screw arbor with nut at both-ends passes through institute Inner side template is stated to be fixed with the outboard template and to the stay.
The theater multistage curve auditorium concrete ladder plate device, wherein the template support frame body includes Horizontal member, horizontal location steel pipe and upright bar arrange the horizontal member, the horizontal location steel pipe and institute in the upright bar Upright bar is stated to connect and hold out against the inner side template.
The theater multistage curve auditorium concrete ladder plate device, wherein the template further includes for limiting Determine the horizontal shuttering of ladder bottom side, the horizontal shuttering is arranged on the horizontal member.
The theater multistage curve auditorium concrete ladder plate device, wherein the back cord is located at outboard template Side far from inner side template.
The theater multistage curve auditorium concrete ladder plate device, wherein the stay includes vertical Main joist and vertical secondary joist are connected per two pieces of adjacent inner side templates by the vertical secondary joist, the Screw arbor with nut at both-ends Across the vertical secondary joist of the inner side template side and the back cord of the outboard template side, and the vertical main joist It is pressed on the vertical secondary joist and the back cord respectively by the effect of Screw arbor with nut at both-ends.
The theater multistage curve auditorium concrete ladder plate device, wherein the horizontal member includes level Main joist and horizontal secondary joist, the horizontal secondary joist are arranged vertically in the horizontal plane on the horizontal main joist, the water Flat die plate is arranged on the horizontal secondary joist.
The theater multistage curve auditorium concrete ladder plate device, wherein the nut on the Screw arbor with nut at both-ends It is provided with the rubber mat that can effectively prevent spillage between stay and can prevent outboard template and inner side template from being drawn The iron pad worn.
The present invention also provides a kind of for building the construction method of theater multistage curve auditorium concrete ladder, including with Lower step:
One, model is constructed according to design drawing;
Two, it formulates unwrapping wire figure: unwrapping wire figure is formulated according to model;
Three, surveying setting-out:
1) progress plane survey is projected to staircase curve to set, camber line is controlled according to each anchor point,
2) it is compared using theoretical chord length with practical chord length and measurement point is checked,
3) upright bar is positioned using projection coordinate, while in template installation process, is fallen using line to projection coordinate Pilot measurement is carried out, template radian and positioning accuracy are checked;
Four, set up frame body: according to upright bar position location, horizontal member and stay to template support frame body are carried out It sets up;
Five, template is installed:
1) it is positioned using arc incision of the projection coordinate of measurement to horizontal member, then horizontal shuttering is consolidated It is fixed,
2) inner side template reinforce according to horizontal member arc incision and radian controls,
3) outboard template is installed, adjacent outboard template is connected by back cord, is connected between every two adjacent back cords At least one adjusting screw rod;Drawknot is carried out to inner side template and outboard template using Screw arbor with nut at both-ends;
Six, radian is adjusted:
After outer side template is installed, the adjusting to template curvature is reached by fastening adjustment bolt, until meeting Design requirement,
Seven, concreting:
Between outside side template, inner side template and horizontal shuttering top casting concrete.
The construction method for being used to build theater multistage curve auditorium concrete ladder, wherein in step 5, It is provided with the rubber mat that can effectively prevent spillage on the Screw arbor with nut at both-ends and can prevent outboard template and inner side template from being drawn The iron pad worn.
The beneficial effects of the present invention are: the template with adjusting screw rod can effectively reduce the processing of template, install difficulty, It can be readily adjusted the curvature of template, the curvature of curve of curve ladder has also been ensured well, effectively ensured concrete Pouring quality and whole perception, the problem of avoiding the later period and reprocess.
Detailed description of the invention
The invention will be described in more detail below based on embodiments and refering to the accompanying drawings.Wherein:
Fig. 1 is the structural schematic diagram of theater multistage curve auditorium concrete ladder plate device;
Fig. 2 is the scheme of installation of outboard template.
In the accompanying drawings, identical component uses identical appended drawing reference.Attached drawing is not according to actual ratio.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings.
As depicted in figs. 1 and 2, the present invention provides a kind of theater multistage curve auditorium concrete ladder plate device, Specifically include that template support frame body 1 and template 2.
The template support frame body 1 uses fastener type steel pipe scaffold, specifically includes that horizontal member 11, stay 12, horizontal location steel pipe 13, upright bar 14 and Screw arbor with nut at both-ends 15.The horizontal member 11 includes horizontal main joist 111 and level Secondary joist 112, the stay 12 include vertical main joist 121 and vertical secondary joist 122.
Especially as shown in Fig. 2, the template 2 specifically includes that the outboard template for limiting ladder outside and ladder height 21, for limiting the inner side template 22 on the inside of ladder and the horizontal shuttering 23 for limiting ladder bottom side.It is outer per adjacent two pieces Side template 21 is connected by back cord 211, it should be noted that back cord 211 is located at outboard template 21 far from inner side template 22 Side is preferably often two adjusting screw rods 212 by least one adjusting screw rod 212(between two adjacent back cords 211) even It connects, and by the way that adjusting screw rod 212 is adjusted, so as to change the spacing between two adjacent back cords 211, in turn The curvature of one piece of outboard template 21 corresponding between two back cords 211 is adjusted, until meeting design requirement.
Theater multistage curve auditorium concrete ladder plate device of the invention is specifically described below, according to play Institute's multistage curve shape arranges the upright bar 121, is sequentially arranged horizontal main joist 111 and horizontal secondary joist in the upright bar 121 112, wherein horizontal main joist 111 and horizontal secondary joist 112 are arranged vertically in the horizontal plane.112 upper berth of horizontal secondary joist If horizontal shuttering 23, the both ends of the horizontal shuttering 23 are respectively arranged inner side template 22, and horizontal shuttering 23 and its both ends Inner side template 22 in staged head and the tail connection arrangement, i.e., horizontal shuttering 23 wherein one end inner side template 22 be higher than the horizontal mould Plate 23 arranges that the inner side template 22 of 23 other end of horizontal shuttering is then arranged lower than above-mentioned horizontal shuttering 23.In addition, the interior side form Plate 23 is provided with vertical secondary joist 122 far from the side of outboard template 21.
The horizontal location steel pipe 13 is attached with twice upright bar 14 and holds out against corresponding inner side template 22.The level Main joist 111 holds out against the vertical secondary joist 122 that 22 side of inner side template is arranged.The 21 relative inner mould of outboard template Plate 22 arranges that space between the two is concreting region.In addition, Screw arbor with nut at both-ends 15 passes through 21 side of outboard template There is thickness of wall body to control function for the vertical secondary joist 122 of 22 side of back cord 211 and inner side template, split type Screw arbor with nut at both-ends 15 Energy.The vertical main joist 121 uses reinforcing bar, and is attached fixation by Screw arbor with nut at both-ends 15.The vertical main joist 121 with it is perpendicular Straight secondary joist 122 is arranged vertically on perpendicular.Finally, after template support frame body 1 and the erection of template 2 are finished, to Between outboard template 21, inner side template 22 and 23 top casting concrete of horizontal shuttering.
Preferably, the template 2 uses 15mm overlay film wood plywood;Preferably, the horizontal main joist 111 times uses The flitch that 100mm × 100mm and spacing are 1200mm is arranged;Preferably, the horizontal secondary joist 112 times using 50mm × The flitch that 100mm and spacing are 200mm is arranged;Preferably, the vertical main joist 121 uses 2 16mm steel bar arrangements;It is preferred that Ground, the vertical secondary joist 122 use 50mm × 100mm and spacing to arrange for the flitch of 200mm;Preferably, described horizontal fixed Position steel pipe 13 is with spacing 1200mm arrangement.
More preferably, it is provided with and can effectively prevent between the nut 151 on the Screw arbor with nut at both-ends 15 and vertical main joist 121 The rubber mat 152 of leak-stopping slurry and the iron pad 152 that can prevent outboard template 21 and inner side template 22 from being pulled through.
The present invention also provides a kind of for building the construction method of theater multistage curve auditorium concrete ladder, main The following steps are included:
One, BIM(Building Information Modeling, Building Information Model) modeling audit drawing
Using BIM technology, model is constructed according to design drawing, drawing is audited, found drawing problem in advance and solve Certainly, ensure that construction is gone on smoothly.
Two, unwrapping wire figure is formulated
According to the BIM models coupling cad technique after the completion of audit, each section of the circular arc center of circle, arc length, radius are found out, and count The coordinate for choosing multiple spot in every section of circular arc vertex, two sides endpoint and arc is calculated, is finally made to formulate unwrapping wire figure.
Three, surveying setting-out
1) it uses total station to project progress plane survey to staircase curve to set, selection survey sets coordinate points spacing and is not more than 500mm.Camber line is controlled according to each anchor point.
2) it is compared using theoretical chord length with practical chord length and measurement point is checked.
3) it is positioned using the upright bar 14 that projection coordinate carries out template support frame body, while in 2 installation process of template, used Line pendant carries out pilot measurement to projection coordinate, checks template radian and positioning accuracy, it is ensured that wall form accurate positioning is errorless.
Four, frame body is set up
Template support frame body uses fastener type steel pipe scaffold, and scaffold transfer, advance and step pitch must not exceed 1200, Upright bar combination arc position is arranged, and horizontal main joist 111 and horizontal secondary joist 112 are sequentially arranged in the upright bar 121, Middle horizontal main joist 111 and horizontal secondary joist 112 are arranged vertically in the horizontal plane.
Five, template is installed
1) template horizontal member arc incision is positioned using the projection coordinate on the floor of original measurement, localization method It is fallen using line and carries out pilot measurement, horizontal shuttering is fixed after review is errorless.
2) ladder step inner side template reinforce according to horizontal member arc incision and radian controls.
3) installation curve ladder outboard template, adjacent outboard template by back cord connect, per two adjacent back cords it Between be connected at least one adjusting screw rod;And drawknot is carried out using Split-type opposite-drawing screw rod, not only using Split-type opposite-drawing screw rod Can play the role of outboard template in drawknot, moreover it is possible to vertical member thickness is effectively ensured, to curve ladder radian control play to Close important role.
Six, radian is adjusted
After outer side template 21 is installed, the adjusting to template curvature is reached by fastening adjustment bolt, thus full Sufficient design requirement.
Seven, concreting
By template support frame body 1 and template 2 erection finish after, between outside side template 21, inner side template 22 and 23 top casting concrete of horizontal shuttering.
In conclusion the template of the present invention with adjusting screw rod can effectively reduce the processing of template, install Difficulty can be readily adjusted the curvature of template, also ensure the curvature of curve of curve ladder well, effectively ensure mixed Coagulate soil pouring quality and whole perception, the problem of avoiding the later period and reprocess.
Although by reference to preferred embodiment, invention has been described, the case where not departing from the scope of the present invention Under, various improvement can be carried out to it and can replace component therein with equivalent.Especially, as long as there is no structures to rush Prominent, items technical characteristic mentioned in the various embodiments can be combined in any way.The invention is not limited to texts Disclosed in specific embodiment, but include all technical solutions falling within the scope of the claims.

Claims (8)

1. a kind of theater multistage curve auditorium concrete ladder plate device, comprising: template and be used to support the template Template support frame body, which is characterized in that the template includes for limiting the outboard template on the outside of ladder, per adjacent two pieces Outboard template is connected by back cord, is adjusted between back cord between every two adjacent back cords by least one adjusting screw rod Spacing, and then adjust outboard template radian;
The template further include for limiting the inner side template on the inside of ladder, the inner side template reinforce by stay and Radian control, Screw arbor with nut at both-ends pass through the inner side template and are fixed with the outboard template and to the stay;
The stay includes vertical main joist and vertical secondary joist, is passed through described vertical time per two pieces of adjacent inner side templates Keel are connected, the Screw arbor with nut at both-ends pass through the inner side template side vertical secondary joist and the outboard template side Back cord, and the vertical main joist is pressed on the vertical secondary joist and the back cord by the effect of Screw arbor with nut at both-ends respectively On.
2. theater multistage curve auditorium concrete ladder plate device according to claim 1, which is characterized in that described Template support frame body includes horizontal member, horizontal location steel pipe and upright bar, and the horizontal member is arranged in the upright bar, described Horizontal location steel pipe connect with the upright bar and holds out against the inner side template.
3. theater multistage curve auditorium concrete ladder plate device according to claim 2, which is characterized in that described Template further includes the horizontal shuttering for limiting ladder bottom side, and the horizontal shuttering is arranged on the horizontal member.
4. theater multistage curve auditorium concrete ladder plate device according to claim 1, which is characterized in that described Back cord is located at side of the outboard template far from inner side template.
5. theater multistage curve auditorium concrete ladder plate device according to claim 3, which is characterized in that described Horizontal member includes horizontal main joist and horizontal secondary joist, and the horizontal secondary joist is arranged vertically within the level in the horizontal plane On main joist, the horizontal shuttering is arranged on the horizontal secondary joist.
6. theater multistage curve auditorium concrete ladder plate device according to claim 1, which is characterized in that described It is provided with the rubber mat that can effectively prevent spillage between nut and stay on Screw arbor with nut at both-ends and outer side mold can be prevented The iron pad that plate and inner side template are pulled through.
7. a kind of applying using theater multistage curve auditorium concrete ladder plate device described in claim 1-6 any one Work method, which comprises the following steps:
One, model is constructed according to design drawing;
Two, unwrapping wire figure is formulated according to model;
Three, surveying setting-out:
1) progress plane survey is projected to staircase curve to set, camber line is controlled according to each anchor point,
2) it is compared using theoretical chord length with practical chord length and measurement point is checked,
3) upright bar is positioned using projection coordinate, while in template installation process, projection coordinate is carried out using line pendant Pilot measurement checks template radian and positioning accuracy;
Four, it sets up frame body: according to upright bar position location, the horizontal member and stay of template support frame body being taken If;
Five, template is installed:
1) it is positioned using arc incision of the projection coordinate of measurement to horizontal member, then horizontal shuttering is fixed,
2) inner side template reinforce according to horizontal member arc incision and radian controls,
3) outboard template is installed, adjacent outboard template is connected by back cord, is connected at least between every two adjacent back cords A piece adjusting screw rod;Drawknot is carried out to inner side template and outboard template using Screw arbor with nut at both-ends;
Six, radian is adjusted:
After outer side template is installed, the adjusting to template curvature is reached by fastening adjustment bolt, until meeting design It is required that
Seven, concreting:
Between outside side template, inner side template and horizontal shuttering top casting concrete.
8. the construction method according to claim 7 using theater multistage curve auditorium concrete ladder plate device, It is characterized in that, being provided with the rubber mat that can effectively prevent spillage on the Screw arbor with nut at both-ends in step 5 and can prevent The iron pad that outboard template and inner side template are pulled through.
CN201710308471.2A 2017-05-04 2017-05-04 Theater multistage curve auditorium concrete ladder plate device and its construction method Active CN107119931B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710308471.2A CN107119931B (en) 2017-05-04 2017-05-04 Theater multistage curve auditorium concrete ladder plate device and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710308471.2A CN107119931B (en) 2017-05-04 2017-05-04 Theater multistage curve auditorium concrete ladder plate device and its construction method

Publications (2)

Publication Number Publication Date
CN107119931A CN107119931A (en) 2017-09-01
CN107119931B true CN107119931B (en) 2019-09-10

Family

ID=59726613

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710308471.2A Active CN107119931B (en) 2017-05-04 2017-05-04 Theater multistage curve auditorium concrete ladder plate device and its construction method

Country Status (1)

Country Link
CN (1) CN107119931B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113389376B (en) * 2021-06-17 2022-11-08 苏州中设建设集团有限公司 Large-span step-shaped arc beam construction method based on adjustable template
CN114352004A (en) * 2021-12-30 2022-04-15 上海建工七建集团有限公司 Formwork reinforcing system of concrete circular structure and installation method thereof

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2564655Y (en) * 2002-07-31 2003-08-06 吴树本 Shuttering radian regulating part
CN100491675C (en) * 2007-03-16 2009-05-27 北京城建集团有限责任公司 Cast-in-situ clear-water concrete viewing platform moulding board and its construction method
ES2349968B1 (en) * 2008-11-25 2011-08-16 Sistemas Tecnicos De Encofrados, S.A. PANEL ADJUSTABLE FOR THE WRAPPING OF CURVED WALLS.
CN103362300B (en) * 2013-06-28 2015-11-18 中建七局第二建筑有限公司 Cast-in-situ concrete arc step viewing platform form board structure and mold method

Also Published As

Publication number Publication date
CN107119931A (en) 2017-09-01

Similar Documents

Publication Publication Date Title
CN104674945B (en) Tree-like steel pipe column structure and construction method thereof
CN106988525A (en) A kind of skyscraper aluminum alloy mould plate construction method
CN103362300B (en) Cast-in-situ concrete arc step viewing platform form board structure and mold method
CN103615110B (en) Random oblique netted nine-squares beam Hyperbolic Roof construction method
CN104358410B (en) Anti-arc wall form space orientation control method
CN105275209A (en) Special-shaped spatial curved surface water concrete construction method
CN1978838A (en) Construction method for combined V-shape steel pipe concrete pile
CN107119931B (en) Theater multistage curve auditorium concrete ladder plate device and its construction method
CN206616862U (en) Formwork root bracing means
CN103195247B (en) Saddle-shaped hyperboloidal concrete slab construction method
CN107700648A (en) Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
CN209799969U (en) A integrally lift up cantilever formwork device for quick construction shaft lining cutting
CN105544887A (en) Upturned roof-ridge cornice of Tang style simulation building and construction method thereof
CN105089184B (en) Multi-curved concrete hollow modelling wall construction method and rhombic hollow structure formwork
CN206917026U (en) A kind of steel disc shape node component for special-shaped Curtain wall frame
CN108589767A (en) A kind of turnbuckle single side formwork erection tiltedly throws support arrangement and its construction method
CN105155846A (en) Construction method for arc-shaped reinforced concrete stand
CN107345439A (en) A kind of making of precast stair component and installation method
CN109112903B (en) Trackless construction method for integral track bed of vertical column type inspection pit in field depot
CN109869153A (en) The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method
CN104594633A (en) Construction method and template structure for umbrella-shaped spatial curved-surface bare concrete
CN113202181A (en) Simple and accurate manufacturing method of arc-shaped edge-sealing template
CN116910854A (en) Large-span arch concrete structure construction method based on digital construction
CN112035915A (en) Design method of space three-dimensional curved surface template system for cable tower concrete structure
CN108487307B (en) Five-in-one construction method for comprehensive pipe gallery construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant