CN107119555A - Air-tightness steel bridge bearing waterproof construction - Google Patents

Air-tightness steel bridge bearing waterproof construction Download PDF

Info

Publication number
CN107119555A
CN107119555A CN201710168548.0A CN201710168548A CN107119555A CN 107119555 A CN107119555 A CN 107119555A CN 201710168548 A CN201710168548 A CN 201710168548A CN 107119555 A CN107119555 A CN 107119555A
Authority
CN
China
Prior art keywords
bucker
steel bridge
armored concrete
water outlet
air inlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710168548.0A
Other languages
Chinese (zh)
Inventor
陈二平
冀荣华
申晓平
许成宇
马洪龙
杨永强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Guizhou Municipal Engineering Co Ltd
Original Assignee
China Railway Guizhou Municipal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Guizhou Municipal Engineering Co Ltd filed Critical China Railway Guizhou Municipal Engineering Co Ltd
Priority to CN201710168548.0A priority Critical patent/CN107119555A/en
Publication of CN107119555A publication Critical patent/CN107119555A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/04Bearings; Hinges
    • E01D19/042Mechanical bearings
    • E01D19/046Spherical bearings
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention belongs to bridge pad waterproof technique field, and in particular to a kind of air-tightness steel bridge bearing waterproof construction.Air-tightness steel bridge bearing waterproof construction, including rubber fastening band, armored concrete bucker;Steel bridge pier is arranged on cushion block by spherical rubber bearing;Described armored concrete bucker is the case structure with opening, it is opening up, described spherical rubber bearing, cushion block are located inside armored concrete bucker, connected between the opening and steel bridge pier of armored concrete bucker with rubber fastening band, armored concrete bucker is internally formed sealing space.The air-tightness steel bridge bearing waterproof construction that the present invention is provided, by setting rubber fastening band between armored concrete bucker and bridge substructure, can effectively anti-water-stop body enter bucker space in, the air-tightness steel bridge bearing waterproof construction that the present invention is provided, it is simple in construction, easy construction, with very high practical value.

Description

Air-tightness steel bridge bearing waterproof construction
Technical field:
The invention belongs to bridge pad waterproof technique field, and in particular to a kind of air-tightness steel bridge bearing waterproof construction.
Technical background
Bridge pad is to transmit bridge upper load and deadweight to the structure of bridge pier, the fine or not direct relation of its waterproof effect Life-span and mechanical property to bridge pad, the life-span of bridge pad is easily caused to be die-offed if water-proofing treatment is improper, under performance Drop, is that later stage operation maintenance brings problems.Therefore, bridge pad typically can all take various water-proofing treatment measures, most often See and it is most widely used be to be sealed local space where bridge pad using rubber fastening band, its is simple in construction and constructs Aspect, but the sealing property of the lap-joint of sealing strong restricted rubber fastening band and surrounding structure, and receive the temperature difference and outer lotus Load is acted on, and is easily occurred transversely deforming repeatedly at bridge pad, is caused rubber fastening band to be sealed with surrounding structure lap-joint Not tight situation, causes later maintenance operational difficulties, and workload is big.
Chengdu Xinzhu Road & Bridge Machinery Co., Ltd is it is proposed that excessively a kind of bridge pad with waterproof cover structure, is also profit Space where bearing is sealed with rubber slab, but the patent there is also rubber and surrounding structure lap-joint by repeated deformation Influence, once local appearance is poorly sealed, then the waterproof effect of the structure will have a greatly reduced quality.In view of bridge pad waterproof is to ensure Bearing life-span and the key point of mechanical property, it is proposed that a kind of that there is multiple-protection and the steel with air-tightness easy to maintenance Bridge seat waterproof construction.
The content of the invention
In view of the disadvantage mentioned above of prior art, has air-tightness waterproof group cover it is an object of the invention to provide one kind and presses The steel box girder bridge bearing waterproof construction form of gas discharge structure, the sealing in space where bearing can be effectively ensured, so that really Protect bearing liner plate and support plate is not influenceed by water, improves bearing durability and life-span, and facilitate later stage operation maintenance.
Practical purpose specific implementation of the present invention is as follows:
Air-tightness steel bridge bearing waterproof construction, including:Rubber fastening band, armored concrete bucker, one-way water outlet valve group, Box waterproof skirtboard, Unidirectional air inlet valve group;Steel bridge pier is arranged on cushion block by spherical rubber bearing;Described box waterproof Skirtboard includes top plate and side wall, and described side wall is arranged on the lower edge of top plate, and mounting of roof plate is buckled on spherical rubber bearing On cushion block, described armored concrete bucker is the case structure with opening, opening up, described spherical rubber branch Seat, cushion block, box waterproof skirtboard are located inside armored concrete bucker, the opening of armored concrete bucker and steel bridge pier it Between connected with rubber fastening band, armored concrete bucker is internally formed sealing space;Described one-way water outlet valve group includes Upper one-way water outlet valve and lower one-way water outlet valve, are connected between upper one-way water outlet valve and lower one-way water outlet valve by waterpipe, described Unidirectional air inlet valve group include upper Unidirectional air inlet valve and lower Unidirectional air inlet valve, upper Unidirectional air inlet valve and lower one-way air inlet Connected between valve by feed channel;Described upper one-way water outlet valve and upper Unidirectional air inlet valve are separately mounted to rubber fastening band On, described lower Unidirectional air inlet valve is arranged on the top plate of box waterproof skirtboard, and described lower one-way water outlet valve is arranged on case On the side wall of type waterproof skirtboard.
Described rubber fastening band upper surface sets galvanized steel plain sheet, and rubber fastening band is fixed on reinforcing bar by fastening bolt to be mixed In the opening and steel bridge pier of solidifying soil bucker.
Beneficial technique effect:
The air-tightness steel bridge bearing waterproof construction that the present invention is provided, by armored concrete bucker and bridge lower junction Rubber fastening band is set between structure, can effectively anti-water-stop body enter bucker space in, by box beam bottom set box Skirtboard, it is ensured that under the conditions of rubber fastening band partial failure, the water body liquid level into armored concrete bucker is located at Below bearing liner plate, bearing will not be by influence on water body.
The air-tightness steel bridge bearing waterproof construction that the present invention is provided, by being protected in first layer --- rubber fastening band and Two layers of protection --- set between box waterproof skirtboard it is independent it is unidirectional calm the anger and discharge pipe line, enter in armored concrete bucker During water can easily by the method for from the injecting compressed air to air pipe by the water body in armored concrete bucker from In discharge pipe line discharge, with it is easy to maintenance the characteristics of.
The air-tightness steel bridge bearing waterproof construction that the present invention is provided, simple in construction, easy construction, with very high practical valency Value.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention.
Fig. 2 is local structural graph at the rubber fastening band of the present invention.
Fig. 3 is the box waterproof skirtboard local structural graph of the present invention.
Fig. 4 is the drainage principle schematic diagram of calming the anger of the present invention.
Embodiment
Further illustrate technical scheme below in conjunction with the accompanying drawings and by specific embodiment.
As shown in figure 1, air-tightness steel bridge bearing waterproof construction, including:Rubber fastening band 1, armored concrete bucker 3, One-way water outlet valve group, box waterproof skirtboard 5, Unidirectional air inlet valve group;Steel bridge pier 10 is arranged on cushion block by spherical rubber bearing 9 On 8;Described box waterproof skirtboard 5 includes top plate and side wall, and described side wall is arranged on the lower edge of top plate, and mounting of roof plate exists On spherical rubber bearing 9, it is buckled on cushion block 8, described armored concrete bucker 3 is the case structure with opening, opening Upward, described spherical rubber bearing 9, cushion block 8, box waterproof skirtboard 5 are located inside armored concrete bucker 3, and reinforcing bar is mixed Connected between the opening and steel bridge pier 10 of solidifying soil bucker 3 with rubber fastening band 1, armored concrete bucker 3 is internally formed Sealing space;Described one-way water outlet valve group includes upper one-way water outlet valve 402 and lower one-way water outlet valve 401, upper one-way water outlet valve Connected between 402 and lower one-way water outlet valve 401 by waterpipe 71, described Unidirectional air inlet valve group includes upper breather cheek valve Door 602 and lower Unidirectional air inlet valve 601, feed channel 7 is passed through between upper Unidirectional air inlet valve 602 and lower Unidirectional air inlet valve 601 Connection;Described upper one-way water outlet valve 402 and upper Unidirectional air inlet valve 602 is separately mounted on rubber fastening band 1, it is described under Unidirectional air inlet valve 601 is arranged on the top plate of box waterproof skirtboard 5, and described lower one-way water outlet valve 401 is anti-installed in box On the side wall of water skirtboard 5.
Box waterproof skirtboard 5 semitight space 11 formed below.
As shown in Fig. 2 specifically, rubber fastening band 1 is overlapped in bold concrete water-proof cover 3 and steel by fastening bolt 2 The side of bridge pier 10;Upper Unidirectional air inlet valve 602 and upper one-way water outlet valve 402 run through rubber fastening band 1, and through part should seal good It is good.
As shown in figure 3, lower Unidirectional air inlet valve 601 is arranged on the top plate of box waterproof skirtboard 5, lower one-way water outlet valve 401 are arranged on the side wall of box waterproof skirtboard 5, and junction should have good sealing.
As shown in figure 4, when progress waterproof bearing is safeguarded, passing through the upper injecting compressed air of Unidirectional air inlet valve 602, compression Air enters semitight space 11 by feed channel 7 and lower Unidirectional air inlet valve 601, raises air pressure in semitight space 11, Water body by water body higher than the lower edge height of waterproof skirtboard 5 passes through lower one-way water outlet valve 401, waterpipe 71 and upper one-way water outlet valve 402, it is expelled to outside armored concrete bucker 3, to ensure that spherical rubber bearing 9 is not immersed among water body.

Claims (3)

1. air-tightness steel bridge bearing waterproof construction, it is characterised in that including rubber fastening band (1), armored concrete bucker (3);Steel bridge pier (10) is arranged on cushion block (8) by spherical rubber bearing (9);Described armored concrete bucker (3) is Case structure with opening, opening up, described spherical rubber bearing (9), cushion block (8) are located at armored concrete bucker (3) it is internal, it is connected between the opening and steel bridge pier (10) of armored concrete bucker (3) with rubber fastening band (1), reinforcing bar is mixed Solidifying soil bucker (3) is internally formed sealing space.
2. air-tightness steel bridge bearing waterproof construction according to claim 1, it is characterised in that also including box waterproof skirtboard (5), one-way water outlet valve group, Unidirectional air inlet valve group;Described box waterproof skirtboard (5) includes top plate and side wall, described side Wall is arranged on the lower edge of top plate, and mounting of roof plate is buckled on cushion block (8) on spherical rubber bearing (9);Described unidirectional water outlet Valve group includes upper one-way water outlet valve (402) and lower one-way water outlet valve (401), upper one-way water outlet valve (402) and lower one-way water outlet valve (401) connected between by waterpipe (71), described Unidirectional air inlet valve group includes upper Unidirectional air inlet valve (602) and placed an order To air intake valve (601), between upper Unidirectional air inlet valve (602) and lower Unidirectional air inlet valve (601) by feed channel (7) even Connect;Described upper one-way water outlet valve (402) and upper Unidirectional air inlet valve (602) is separately mounted on rubber fastening band (1), described Lower Unidirectional air inlet valve (601) be arranged on the top plate of box waterproof skirtboard (5), described lower one-way water outlet valve (401) peace On the side wall of box waterproof skirtboard (5).
3. air-tightness steel bridge bearing waterproof construction according to claim 1 or 2, it is characterised in that described rubber water-proof Band (1) upper surface sets galvanized steel plain sheet, and rubber fastening band (1) is fixed on armored concrete bucker (3) by fastening bolt (2) Opening and steel bridge pier (10) on.
CN201710168548.0A 2017-03-21 2017-03-21 Air-tightness steel bridge bearing waterproof construction Pending CN107119555A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710168548.0A CN107119555A (en) 2017-03-21 2017-03-21 Air-tightness steel bridge bearing waterproof construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710168548.0A CN107119555A (en) 2017-03-21 2017-03-21 Air-tightness steel bridge bearing waterproof construction

Publications (1)

Publication Number Publication Date
CN107119555A true CN107119555A (en) 2017-09-01

Family

ID=59717372

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710168548.0A Pending CN107119555A (en) 2017-03-21 2017-03-21 Air-tightness steel bridge bearing waterproof construction

Country Status (1)

Country Link
CN (1) CN107119555A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019219829A1 (en) 2018-05-16 2019-11-21 Soletanche Freyssinet S.A.S. Protective cover
CN114182626A (en) * 2021-11-23 2022-03-15 上海市政工程设计研究总院(集团)有限公司 Support safety cover
CN114481823A (en) * 2022-02-25 2022-05-13 成都市新筑交通科技有限公司 Bridge beam supports watertight fittings

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006125905A (en) * 2004-10-27 2006-05-18 Mitsubishi Heavy Ind Ltd Metal airtight container and its corrosion prevention method
CN201620351U (en) * 2010-01-28 2010-11-03 成都市新筑路桥机械股份有限公司 Bridge support with waterproof cover
CN202023144U (en) * 2011-04-14 2011-11-02 柳州东方工程橡胶制品有限公司 Waterproof basin-type support
CN202023145U (en) * 2011-04-20 2011-11-02 交通运输部公路科学研究所 Dust-proof spherical bridge support
CN202559240U (en) * 2012-05-28 2012-11-28 衡水宝力工程橡胶有限公司 Underwater bearing
CN103433606A (en) * 2013-08-19 2013-12-11 天津大学 Special portable miniature drainage cover for automatic underwater local dry-method welding
CN103714988A (en) * 2012-09-29 2014-04-09 启东恒瑞防爆通讯电气有限公司 Improved waterproof and explosion-proof switch
CN103821116A (en) * 2014-03-17 2014-05-28 国电大渡河流域水电开发有限公司龚嘴水力发电总厂 Power station air-supplementing and waterproof device
CN203977279U (en) * 2014-04-15 2014-12-03 成都市新筑路桥机械股份有限公司 Non-maintaining bearing
CN204174528U (en) * 2014-03-11 2015-02-25 贵州省交通规划勘察设计研究院股份有限公司 A kind of water-proof spherical bearing
CN204662253U (en) * 2015-06-03 2015-09-23 江苏万宝桥梁构件有限公司 Railroad bridge ball shaped steel bearing
CN105014234A (en) * 2014-04-25 2015-11-04 天津大学 Underwater friction stitch welding local dry method small draining device
CN105672123A (en) * 2016-03-08 2016-06-15 河北桥致通科技有限公司 Life-cycle basin-shaped sphere steel support of bridge
CN206706559U (en) * 2017-03-21 2017-12-05 中铁(贵州)市政工程有限公司 Air-tightness steel bridge bearing waterproof construction

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006125905A (en) * 2004-10-27 2006-05-18 Mitsubishi Heavy Ind Ltd Metal airtight container and its corrosion prevention method
CN201620351U (en) * 2010-01-28 2010-11-03 成都市新筑路桥机械股份有限公司 Bridge support with waterproof cover
CN202023144U (en) * 2011-04-14 2011-11-02 柳州东方工程橡胶制品有限公司 Waterproof basin-type support
CN202023145U (en) * 2011-04-20 2011-11-02 交通运输部公路科学研究所 Dust-proof spherical bridge support
CN202559240U (en) * 2012-05-28 2012-11-28 衡水宝力工程橡胶有限公司 Underwater bearing
CN103714988A (en) * 2012-09-29 2014-04-09 启东恒瑞防爆通讯电气有限公司 Improved waterproof and explosion-proof switch
CN103433606A (en) * 2013-08-19 2013-12-11 天津大学 Special portable miniature drainage cover for automatic underwater local dry-method welding
CN204174528U (en) * 2014-03-11 2015-02-25 贵州省交通规划勘察设计研究院股份有限公司 A kind of water-proof spherical bearing
CN103821116A (en) * 2014-03-17 2014-05-28 国电大渡河流域水电开发有限公司龚嘴水力发电总厂 Power station air-supplementing and waterproof device
CN203977279U (en) * 2014-04-15 2014-12-03 成都市新筑路桥机械股份有限公司 Non-maintaining bearing
CN105014234A (en) * 2014-04-25 2015-11-04 天津大学 Underwater friction stitch welding local dry method small draining device
CN204662253U (en) * 2015-06-03 2015-09-23 江苏万宝桥梁构件有限公司 Railroad bridge ball shaped steel bearing
CN105672123A (en) * 2016-03-08 2016-06-15 河北桥致通科技有限公司 Life-cycle basin-shaped sphere steel support of bridge
CN206706559U (en) * 2017-03-21 2017-12-05 中铁(贵州)市政工程有限公司 Air-tightness steel bridge bearing waterproof construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019219829A1 (en) 2018-05-16 2019-11-21 Soletanche Freyssinet S.A.S. Protective cover
CN114182626A (en) * 2021-11-23 2022-03-15 上海市政工程设计研究总院(集团)有限公司 Support safety cover
CN114481823A (en) * 2022-02-25 2022-05-13 成都市新筑交通科技有限公司 Bridge beam supports watertight fittings

Similar Documents

Publication Publication Date Title
CN107119555A (en) Air-tightness steel bridge bearing waterproof construction
CN205975389U (en) Reinforcing structure for road and bridge crack
CN202830882U (en) Geomembrane impervious structure on concrete dam upstream surface
CN110183080B (en) Reinforced concrete septic tank and hoisting method thereof
CN206706559U (en) Air-tightness steel bridge bearing waterproof construction
CN201078547Y (en) Non-metal compensator with drainage device
JP5022947B2 (en) Temporary deadline box and installation method
CN205171502U (en) Device is flowed in lap guard of underground continuous wall flexible rubber hose formula
CN203144894U (en) Bridge draining device
CN111156036A (en) Novel plate anchor structure
CN2937361Y (en) Oil storage depot
CN207348340U (en) A kind of connection structure of precast stair plate and platen of having a rest
CN206189610U (en) Sliding connection between steel member and concrete
CN207062995U (en) Hoisting port
CN208056277U (en) A kind of mounting seat of novel all-in-one pumping plant
CN203768927U (en) Flexible underground impervious curtain structure
CN207295963U (en) A kind of efficient absorption tower drain pumps erecting device
CN207376762U (en) A kind of flood control electricity row station
CN205530721U (en) Outspoken fast plugging device of concrete wall opening
CN209279774U (en) A kind of air cooler sealing structure
CN207645589U (en) The cage of drainage arrangement is installed
CN206090714U (en) Stainless steel stamping arc rib type water tank
CN207776567U (en) A kind of reusable building module film-keel joints point
CN207608935U (en) A kind of basement bottom board water seepage treatment device
CN207092399U (en) It is a kind of to be used for power station hydraulic headstock gear and the water-tight device in roofing gap

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170901

RJ01 Rejection of invention patent application after publication