CN107101068A - Infiltration plugging device and its construction method in a kind of pipeline - Google Patents

Infiltration plugging device and its construction method in a kind of pipeline Download PDF

Info

Publication number
CN107101068A
CN107101068A CN201710423796.5A CN201710423796A CN107101068A CN 107101068 A CN107101068 A CN 107101068A CN 201710423796 A CN201710423796 A CN 201710423796A CN 107101068 A CN107101068 A CN 107101068A
Authority
CN
China
Prior art keywords
air bag
pipeline
pipe
discharging opening
charging aperture
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710423796.5A
Other languages
Chinese (zh)
Other versions
CN107101068B (en
Inventor
张大千
刘优生
陈慈新
刘友平
吕丽坤
于川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Nuclear Engineering Research and Design Institute Co Ltd
China Nuclear Industry 24 Construction Co Ltd
Original Assignee
China Nuclear Industry 22 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Nuclear Industry 22 Construction Co Ltd filed Critical China Nuclear Industry 22 Construction Co Ltd
Priority to CN201710423796.5A priority Critical patent/CN107101068B/en
Publication of CN107101068A publication Critical patent/CN107101068A/en
Application granted granted Critical
Publication of CN107101068B publication Critical patent/CN107101068B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L55/00Devices or appurtenances for use in, or in connection with, pipes or pipe systems
    • F16L55/16Devices for covering leaks in pipes or hoses, e.g. hose-menders
    • F16L55/162Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe
    • F16L55/1645Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a sealing material being introduced inside the pipe by means of a tool moving in the pipe
    • F16L55/16455Devices for covering leaks in pipes or hoses, e.g. hose-menders from inside the pipe a sealing material being introduced inside the pipe by means of a tool moving in the pipe a part of the tool defining, together with the inner wall of the pipe, an enclosed space into which sealing material is injected

Abstract

The invention discloses plugging device and its construction method of being seeped water in a kind of pipeline, it includes being provided with air inlet, charging aperture and discharging opening on air bag, the air bag.The air inlet is connected with aerating device;The charging aperture is connected with pressurized tank sizing device;The discharging opening is connected with charging aperture by the pipeline that is in the milk;The discharging opening is arranged on the side wall of air bag.The air bag is provided at both ends with draw-gear.The air bag is made of high-temperature resistant rubber tube material, and air bag wall thickness is inconsistent, and the wall thickness of other positions is greater than positioned at the wall thickness of discharge outlet, and the two ends of the air bag are installed with pad by nut;The air bag after being inflated its two ends outer wall can between pipeline to be repaired gluing, sealing make its middle part formed closed cavity.It can be in the milk using the device in the pipeline of any diameter, so as to solve the problem of infiltration can not be blocked in pipeline.

Description

Infiltration plugging device and its construction method in a kind of pipeline
Technical field
The present invention relates to pipeline construction device field, seep water plugging device and its construction method in particularly a kind of pipeline.
Background technology
In work progress, there is crack unavoidably in concrete, and particularly in construction joint position, minute crack exists all the time, Occurs infiltration phenomenon at crack, existing infiltration closure mainly there are following methods:
Method one:The precious directly plugging method of leak stopping;It is larger for fracture width, using going out on the market more than the sufficient environment in operating space The leak stopping treasured sold carries out crack closure, so as to reach the purpose of sealing, but is used for crack is smaller, not easy-operating position more Method two.
Method two:Pressure grout method;For the smaller operating difficulties region of fracture width, the general side from pressure grouting Case, may be selected rigid material, such as cement base or flexible material, such as polyurethane obtain colloid substance according to varying environment grouting material.
Method three:Encapsulant perfusion;For unlike material(Steel plate, concrete etc.)Junction crack and seepage point can Up to region, fluid sealant typically is irrigated in seepage point upstream face, fluid sealant can effectively connect unlike material, crack be eliminated, so as to reach To sealing purpose.
For method one, using flexible, simple to operate, but using more limiting to, water-stagnating effect is poor;For method two, Because being irrigated using pressure, crack fills up that depth is larger, and the compactness in crack can meet requirement, water-stagnating effect preferably, but It is required that seepage point personnel are reachable;For method three, it can effectively solve the problem that unlike material produces crack infiltration because of physical property difference The problem of, but the region that upstream face can not be reached can not be constructed, construction is more limited to.
At present, for minor diameter long length pipeline(Diameter is at more than ten centimeters, and length reaches several meters)Closure also exist Certain the problem of, its reason is that the diameter of small diameter pipeline is thinner, and seepage part is complicated and changeable, and some infiltration positions are located at pipe At several meters or more than ten meters of road end, operating personnel can not smoothly arrive at or contact leakage point during closure, therefore can not adopt With the precious directly plugging method, and because operating space is limited of leak stopping in method one, the pressure note in method two can not be also used Slurry processes, encapsulant perfusion equally also in uncomfortable induction method three, accordingly, it would be desirable to design provisions for grouting in a kind of novel pipeline And construction method.
The content of the invention
The present invention provides infiltration plugging device and its construction method in a kind of pipeline, can be in any diameter using the device Pipeline in be in the milk, so as to solve the problem of can not blocking of seeping water in pipeline.
In order to solve the above-mentioned technical problem, the present invention proposes following technical scheme:Infiltration plugging device in a kind of pipeline, it Including air bag, air inlet, charging aperture and discharging opening are provided with the air bag.
The air inlet is connected with aerating device;The charging aperture is connected with pressurized tank sizing device;The discharging opening is with entering Material mouth is connected by the pipeline that is in the milk;The discharging opening is arranged on the side wall of air bag.
The air bag is provided at both ends with draw-gear.
The air bag is made of high-temperature resistant rubber tube material, and air bag wall thickness is inconsistent, positioned at the wall of discharge outlet Thickness is greater than the wall thickness of other positions, and the two ends of the air bag are installed with pad by nut;The air bag is in inflation The outer wall at its two ends can make its middle part form closed cavity by gluing, sealing between pipeline to be repaired afterwards.
The aerating device includes air inlet pipe, and one end of the air inlet pipe is connected with air inlet, the other end and pressure gauge and Charger is connected.
The pressurized tank sizing device includes slip casing by pressure machine, and the slip casing by pressure machine is connected by Grouting Pipe with charging aperture, The other end of the charging aperture is connected with grouting pipeline.
The grouting pipeline includes the first steel pipe, and one end of first steel pipe is fixedly linked with charging aperture, and the other end connects High-temperature resistant rubber pipe is connected to, the other end of the high-temperature resistant rubber pipe is connected with steel bend pipe, the other end of the control bend pipe It is connected with discharging opening;The slip casting of pressurized tank sizing device is all set with inside first steel pipe, high-temperature resistant rubber pipe and control bend pipe Pipe.
The draw-gear includes draw ring, and the draw ring is fixedly mounted on the two ends of air bag, is installed with draw ring Steel wire rope.
It also includes endoscope and image display device.
The endoscope and image display device include endoscope, and the endoscope is shown by signal transmssion line and image Equipment is connected.
The construction method of infiltration plugging device in pipeline, it comprises the following steps:
Step1:It is deep into and is treated inside blocking pipe using endoscope, and primarily determines that by image display the position of breakthrough Put;
Step2:The air bag of unaerated is extend into and treated inside blocking pipe, and by pulling the steel wire rope at its two ends, adjusts it The position inside blocking pipe is being treated, discharging opening is located at the position of breakthrough;
Step3:Inflated by pressure gauge and charger to inside air bag, and then make the two ends outer wall of air bag and treat blocking pipe Inwall between gluing, sealing, and form closed cavity in the middle;
Step4:Using slip casing by pressure machine by Grouting Pipe to injecting plugging material at breakthrough;
Step5:After plugging material injection and pressurize for a period of time, the pressure of air bag is laid down, air bag is pulled out by steel wire rope, most The closure of breakthrough is completed eventually.
Plugging material in the Step4 uses polyurethane.
Beneficial effects of the present invention:
1st, plugging device of the invention, can effectively be solved because space is limited, personnel can not operate in the environment of grouting work Make, because not producing destruction to structure in work progress, greatly save cost and accelerate the construction period, can be applicable Under to analogue in the construction such as leak stopping, grouting, sealing.
2nd, air bag of the invention can expand after being inflated, and then can treat blocking pipe and blocked, because, filling Slurry need provide an opposing seal environment, it is necessary to two ends sealing and also there is cavity centre, it requires air bag in different length Difference is deformed in the range of degree, passes through the adjustment to air bag wall thickness and stopping means is set, form the environment for meeting grouting needs.
3rd, by setting air inlet, charging aperture and discharging opening on air bag, air inlet can be inflated air in air bag, and Air bag is set to maintain in certain air pressure range, can be timely when air pressure is unsatisfactory for requiring by setting air gauge in air inlet Tonifying Qi.
4th, by being also provided with pressure gauge in charging aperture one end, inlet amount and charging rate are controlled according to pressure gauge reading, prevented Only feed pressure is excessive, and grouting material loses the effect of pressure grouting, causes pollution in pipeline from air bag and pipeline intermediate bleeder.
5th, by the way that discharging opening to be arranged on to the centre of air bag, and feed pipe, discharge nozzle are required to use steel in air bag Pipe, discharge nozzle need to set bend pipe, and bend pipe is needed also exist for using steel bend pipe, and these local materials can be produced without using steel-product It is raw melt, obstruction pipeline the problem of, connecting tube need to use high-temperature resistant rubber flexible pipe, if using steel pipe, the deformation of length direction with The deformation in balloon length direction is mismatched, the problem of causing shedding or be pulled off.
6th, the breakthrough situation treated inside blocking pipe can accurately be recognized by image display and endoscope, And then the convenient position for adjusting discharging opening.
7th, air bag wall thickness is different, and different section deformations are different during inflation, can reach tight closure air bag both sides, in Between formed cavity effect.
8th, material is leaked using polyurethane as inner pipeline plug, polyurethane is flexible blockage material, meets water meeting rapid condensation, compared with The good difficulty for playing plugging action, reducing filling process.
9th, threading apparatus is coordinated to make scale using steel wire rope, pipe walking path is complex, it is impossible to accurately measure leak The specific size of point, can be marked using steel wire rope in advance, and two ends are carried out when steel wire rope is pulled to mark position and are fixed, it is ensured that are gone out Material mouth is directed at seepage point.
Brief description of the drawings
The invention will be further described with reference to the accompanying drawings and examples.
Fig. 1 is overall structure diagram of the present invention.
Fig. 2 is air bag of the present invention and part connection figure.
Fig. 3 uses procedure structure schematic diagram for the present invention.
In figure:Image display 1, slip casing by pressure machine 2, Grouting Pipe 3, endoscope 4, steel wire rope 5, draw ring 6, pad 7, spiral shell Female 8, first steel pipe 9, high-temperature resistant rubber pipe 10, discharging opening 11, control bend pipe 12, air bag 13, air inlet pipe 14, pressure gauge and inflation Equipment 15, charging aperture 16, air inlet 17, plugging material 18, breakthrough 19, treat blocking pipe 20, concrete 21.
Embodiment
Embodiments of the present invention are described further below in conjunction with the accompanying drawings.
Embodiment 1:
Such as Fig. 1-2, a kind of interior infiltration plugging device of pipeline, it includes being provided with air inlet 17 on air bag 13, the air bag 13, entered Material mouth 16 and discharging opening 11.
Further, the air inlet 17 is connected with aerating device;The charging aperture 16 is connected with pressurized tank sizing device;Institute Discharging opening 11 is stated with charging aperture by the pipeline that is in the milk to be connected;The discharging opening 16 is arranged on the side wall of air bag 13.Air inlet can To inflate air in air bag, and require that air bag is maintained in certain air pressure range, so setting air gauge in air inlet, work as gas Timely tonifying Qi when pressure is unsatisfactory for requiring.
Further, the air bag 13 is provided at both ends with draw-gear.
Further, the air bag 13 is made of high-temperature resistant rubber tube material, and the wall thickness of air bag 13 is inconsistent, is located at Wall thickness at discharging opening 11 is greater than the wall thickness of other positions, and the two ends of the air bag 13 are installed with pad by nut 8 7;The air bag 13 after being inflated its two ends outer wall can between pipeline to be repaired gluing, sealing make its middle part formed it is close Close cavity.
Moreover, the sealing effectiveness in order to ensure air bag 13, balloon ends are fixed using steel plate pad, two ends are solid using steel plate Surely can effectively controlling air bag, deflection is less along its length during inflating pressure, it is to avoid break in interconnecting tube road Split.
This is that the two ends of air bag 13 are avoided that because high temperature causes pipeline to melt using steel pipe, the problem of causing line clogging, in Between high-temperature resistant rubber pipe 10 can be with a small amount of extension of air bag expansion, it is to avoid connecting tube fracture caused by air bag is deformed or even Adapter departs from feed pipe, causes grouting material leakage in air bag inner question.
Further, the aerating device includes air inlet pipe 14, and one end of the air inlet pipe 14 is connected with air inlet 17, separately One end is connected with pressure gauge and charger 15.High pressure gas can be filled with to inside air bag 13 by pressure gauge and charger 15 Body, and then closed cavity is formed it into, facilitate follow-up grouting.
Further, the pressurized tank sizing device include slip casing by pressure machine 2, the slip casing by pressure machine 2 by Grouting Pipe 3 with Charging aperture 16 is connected, and the other end of the charging aperture 16 is connected with grouting pipeline.
Further, the grouting pipeline includes the first steel pipe 9, and one end and the charging aperture 16 of first steel pipe 9 are fixed It is connected, the other end is connected with high-temperature resistant rubber pipe 10, and the other end of the high-temperature resistant rubber pipe 10 is connected with steel bend pipe 12, institute The other end for stating control bend pipe 12 is connected with discharging opening 11;In first steel pipe 9, high-temperature resistant rubber pipe 10 and control bend pipe 12 Portion is all set with the Grouting Pipe 3 of pressurized tank sizing device.
Moreover, feed pipe, discharge nozzle are required to use steel pipe in air bag, discharge nozzle need to set elbow, and elbow is needed also exist for Using steel bend pipe, the problem of these local materials can produce thawing, obstruction pipeline without using steel-product, connecting tube need to make With high-temperature resistant rubber flexible pipe 10, if using steel pipe, the deformation of length direction is mismatched with the deformation in balloon length direction, causes pipe The problem of road comes off or is pulled off.
Further, the draw-gear includes draw ring 6, and the draw ring 6 is fixedly mounted on the two ends of air bag 13, in draw ring Steel wire rope 5 is installed with 6.Threading apparatus is coordinated to make scale, because pipe walking path is complex, nothing using steel wire rope Method accurately measures the specific size of leakage point, can be marked, be carried out when steel wire rope is pulled to mark position using steel wire rope in advance Two ends are fixed, it is ensured that discharging opening is directed at seepage point.
Further, it also includes endoscope and image display device.
Further, the endoscope and image display device include endoscope 4, and the endoscope 4 is transmitted by signal Line is connected with image display 1.Personnel cannot be introduced into, and more can clearly observe inner case using endoscope, make Correct decisions.
Further, described one end of charging aperture 16 is also provided with pressure gauge, and inlet amount and charging are controlled according to pressure gauge reading Speed, prevents feed pressure excessive, and grouting material loses the effect of pressure grouting, causes pipeline from air bag and pipeline intermediate bleeder Interior pollution.
Embodiment 2:
Such as Fig. 3, the construction method of the interior infiltration plugging device of pipeline, it comprises the following steps:
Step1:It is deep into and is treated inside blocking pipe 20 using endoscope 4, and breakthrough is primarily determined that by image display 1 19 position;
Step2:The air bag 13 of unaerated is extend into and treated inside blocking pipe 20, and by pulling the steel wire rope 5 at its two ends, is adjusted Save it and treating the position inside blocking pipe 20, discharging opening 11 is located at the position of breakthrough 19;
Step3:By pressure gauge and charger 15 to the inner inflatable of air bag 13, and then the two ends outer wall of air bag 13 is set to be sealed with waiting Gluing, sealing between the inwall of blocked pipeline 20, and closed cavity is formed in the middle;
Step4:Using slip casing by pressure machine 2 by Grouting Pipe 3 to injecting plugging material at breakthrough 19;
Step5:After plugging material injection and pressurize for a period of time, the pressure of air bag 13 is laid down, air bag 13 is drawn by steel wire rope 5 Go out, be finally completed the closure of breakthrough 19.
Further, the plugging material in the Step4 uses polyurethane.
Because polyurethane is flexible blockage material, meets water meeting rapid condensation, preferably plays plugging action, reduce perfusion The difficulty of process.
The present invention operation principle be:
According to pipe diameter is narrow and small and the characteristics of larger length, pipeline blocked using air bag, because grouting needs offer one There is cavity the sealing of the environment of individual opposing seal, i.e. two ends, centre, it requires that air bag deforms difference in the range of different length, By the adjustment to air bag wall thickness and setting stopping means, it can be duroplasts set, form the environment for meeting grouting needs, be , need to be by endoscopic observation by discharging opening align with tube joint rises.
Air bag is needed to set air inlet, charging aperture and discharging opening, and air inlet can be inflated air in air bag, and requires gas Capsule is maintained in certain air pressure range, so setting air gauge, the timely tonifying Qi when air pressure is unsatisfactory for requiring in air inlet.
Perhaps, charging aperture one end sets pressure gauge, and inlet amount and charging rate are controlled according to pressure gauge reading, prevents charging Pressure is excessive, and grouting material loses the effect of pressure grouting, causes pollution in pipeline from air bag and pipeline intermediate bleeder.
Discharging opening should be in the middle of air bag, and feed pipe, discharge nozzle are required to use steel pipe in air bag, and discharge nozzle need to set curved Head, elbow needs also exist for using steel elbow, and these local materials can produce thawing, obstruction pipeline without using steel-product Problem, connecting tube need to use high-temperature resistant rubber flexible pipe, if using steel pipe, the deformation of length direction and the deformation in balloon length direction Mismatch, the problem of causing shedding or be pulled off.
By above-mentioned description, those skilled in the art completely can be in the model without departing from this invention technological thought In enclosing, various changes and amendments are carried out all within protection scope of the present invention.The unaccomplished matter of the present invention, belongs to ability The common knowledge of field technique personnel.

Claims (10)

1. infiltration plugging device in a kind of pipeline, it is characterised in that:It includes air bag(13), the air bag(13)On be provided with into Gas port(17), charging aperture(16)And discharging opening(11);
The air inlet(17)It is connected with aerating device;The charging aperture(16)It is connected with pressurized tank sizing device;The discharging opening (11)It is connected with charging aperture by the pipeline that is in the milk;The discharging opening(16)It is arranged on air bag(13)Side wall on;
The air bag(13)Be provided at both ends with draw-gear.
2. infiltration plugging device in a kind of pipeline according to claim 1, it is characterised in that:The air bag(13)Using resistance to Super heated rubber tube material is made, and air bag(13)Wall thickness is inconsistent, positioned at discharging opening(11)The wall thickness at place is greater than other positions The wall thickness put, the air bag(13)Two ends pass through nut(8)It is installed with pad(7);The air bag(13)In inflation The outer wall at its two ends can make its middle part form closed cavity by gluing, sealing between pipeline to be repaired afterwards.
3. infiltration plugging device in a kind of pipeline according to claim 1, it is characterised in that:The aerating device include into Tracheae(14), the air inlet pipe(14)One end and air inlet(17)It is connected, the other end and pressure gauge and charger(15)Phase Even.
4. infiltration plugging device in a kind of pipeline according to claim 1, it is characterised in that:The pressurized tank sizing device bag Include slip casing by pressure machine(2), the slip casing by pressure machine(2)Pass through Grouting Pipe(3)With charging aperture(16)It is connected, the charging aperture(16) The other end with grouting pipeline be connected.
5. seep water plugging device in a kind of pipeline according to claim 1 or 4, it is characterised in that:The grouting pipeline bag Include the first steel pipe(9), first steel pipe(9)One end and charging aperture(16)It is fixedly linked, the other end is connected with high temperature resistant rubber Sebific duct(10), the high-temperature resistant rubber pipe(10)The other end be connected with steel bend pipe(12), the control bend pipe(12)It is another One end and discharging opening(11)It is connected;First steel pipe(9), high-temperature resistant rubber pipe(10)With control bend pipe(12)Inside is all set with The Grouting Pipe of pressurized tank sizing device(3).
6. infiltration plugging device in a kind of pipeline according to claim 1, it is characterised in that:The draw-gear includes drawing Ring(6), the draw ring(6)It is fixedly mounted on air bag(13)Two ends, in draw ring(6)On be installed with steel wire rope(5).
7. infiltration plugging device in a kind of pipeline according to claim 1, it is characterised in that:It also includes endoscope and figure As display device.
8. infiltration plugging device in a kind of pipeline according to claim 7, it is characterised in that:The endoscope and image show Showing device includes endoscope(4), the endoscope(4)Pass through signal transmssion line and image display(1)It is connected.
9. using the construction method of infiltration plugging device in the pipeline described in claim 1-8 any one, it is characterised in that it Comprise the following steps:
Step1:Use endoscope(4)It is deep into and treats blocking pipe(20)Inside, and pass through image display(1)Primarily determine that Breakthrough(19)Position;
Step2:By the air bag of unaerated(13)It extend into and treats blocking pipe(20)Inside, and by pulling the steel wire rope at its two ends (5), adjust it and treating blocking pipe(20)Internal position, makes discharging opening(11)Positioned at breakthrough(19)Position;
Step3:Pass through pressure gauge and charger(15)To air bag(13)Inner inflatable, and then make air bag(13)Two ends outer wall With treating blocking pipe(20)Inwall between gluing, sealing, and form closed cavity in the middle;
Step4:Using slip casing by pressure machine(2)Pass through Grouting Pipe(3)To breakthrough(19)Place's injection plugging material;
Step5:After plugging material injection and pressurize for a period of time, air bag is laid down(13)Pressure, pass through steel wire rope(5)By air bag (13)Pull out, be finally completed breakthrough(19)Closure.
10. the construction method of infiltration plugging device in a kind of pipeline according to claim 9, it is characterised in that:It is described Plugging material in Step4 uses polyurethane.
CN201710423796.5A 2017-06-07 2017-06-07 Water seepage plugging device in pipeline and construction method thereof Active CN107101068B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710423796.5A CN107101068B (en) 2017-06-07 2017-06-07 Water seepage plugging device in pipeline and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710423796.5A CN107101068B (en) 2017-06-07 2017-06-07 Water seepage plugging device in pipeline and construction method thereof

Publications (2)

Publication Number Publication Date
CN107101068A true CN107101068A (en) 2017-08-29
CN107101068B CN107101068B (en) 2022-11-18

Family

ID=59660858

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710423796.5A Active CN107101068B (en) 2017-06-07 2017-06-07 Water seepage plugging device in pipeline and construction method thereof

Country Status (1)

Country Link
CN (1) CN107101068B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109595425A (en) * 2019-01-31 2019-04-09 湖南大麓科技有限公司 A kind of pipeline rehabilitation device and method
CN109630803A (en) * 2019-01-31 2019-04-16 湖南大麓科技有限公司 A kind of pipeline rehabilitation device, system and method
CN110630849A (en) * 2019-08-22 2019-12-31 杭州帆源强生态科技有限公司 Device and method for quickly repairing water damage of pipeline
CN112196057A (en) * 2020-09-18 2021-01-08 长江生态环保集团有限公司 In-pipe grouting device and grouting method
CN112377717A (en) * 2020-09-18 2021-02-19 中交第二航务工程勘察设计院有限公司 Grouting reinforcement and leakage repair construction method for cracking and damage of underground concrete pipeline
CN113819335A (en) * 2021-08-26 2021-12-21 中山大学 Pipeline repairing device and pipeline repairing method
CN113945323A (en) * 2020-07-16 2022-01-18 苏州协同创新智能制造装备有限公司 Air tightness detection method and detection system of ball valve equipment
CN114352839A (en) * 2022-01-12 2022-04-15 山东钢铁集团日照有限公司 Blast furnace cooling wall connecting pipe leakage stopping device and method
CN115030230A (en) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 Pile-first type slurry filling sealing packer and sealing method
CN115076507A (en) * 2022-06-10 2022-09-20 安徽碧盾环境工程技术有限公司 Non-excavation prosthetic devices of formula pipe network of being in milk

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1331602A (en) * 1970-12-21 1973-09-26 Press W & Son Ltd Method of and means for sealing joints of pipelines internally
US3834421A (en) * 1972-10-25 1974-09-10 Penetryn Prod Inc Packer for sealing pipe leaks
GB1406736A (en) * 1972-03-07 1975-09-17 Zegwaard A Device for providing a seal in piping systems
CN204901197U (en) * 2015-08-28 2015-12-23 管丽环境技术(上海)有限公司 Drainage pipe that diameter is 300 -600mm is with local slip casting prosthetic devices
CN105240644A (en) * 2015-07-31 2016-01-13 厦门市安越非开挖工程技术有限公司 Pipeline crack repairing device and method
CN206770869U (en) * 2017-06-07 2017-12-19 中国核工业第二二建设有限公司 Infiltration plugging device in a kind of pipeline

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1331602A (en) * 1970-12-21 1973-09-26 Press W & Son Ltd Method of and means for sealing joints of pipelines internally
GB1406736A (en) * 1972-03-07 1975-09-17 Zegwaard A Device for providing a seal in piping systems
US3834421A (en) * 1972-10-25 1974-09-10 Penetryn Prod Inc Packer for sealing pipe leaks
CN105240644A (en) * 2015-07-31 2016-01-13 厦门市安越非开挖工程技术有限公司 Pipeline crack repairing device and method
CN204901197U (en) * 2015-08-28 2015-12-23 管丽环境技术(上海)有限公司 Drainage pipe that diameter is 300 -600mm is with local slip casting prosthetic devices
CN206770869U (en) * 2017-06-07 2017-12-19 中国核工业第二二建设有限公司 Infiltration plugging device in a kind of pipeline

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109630803B (en) * 2019-01-31 2024-01-26 湖南大麓科技有限公司 Pipeline repairing device, system and method
CN109630803A (en) * 2019-01-31 2019-04-16 湖南大麓科技有限公司 A kind of pipeline rehabilitation device, system and method
CN109595425A (en) * 2019-01-31 2019-04-09 湖南大麓科技有限公司 A kind of pipeline rehabilitation device and method
CN110630849A (en) * 2019-08-22 2019-12-31 杭州帆源强生态科技有限公司 Device and method for quickly repairing water damage of pipeline
CN110630849B (en) * 2019-08-22 2024-04-16 杭州芦悦生态科技有限公司 Quick repair device and repair method for pipeline water damage
CN113945323A (en) * 2020-07-16 2022-01-18 苏州协同创新智能制造装备有限公司 Air tightness detection method and detection system of ball valve equipment
CN112196057A (en) * 2020-09-18 2021-01-08 长江生态环保集团有限公司 In-pipe grouting device and grouting method
CN112377717A (en) * 2020-09-18 2021-02-19 中交第二航务工程勘察设计院有限公司 Grouting reinforcement and leakage repair construction method for cracking and damage of underground concrete pipeline
CN112196057B (en) * 2020-09-18 2021-10-12 长江生态环保集团有限公司 In-pipe grouting device and grouting method
CN112377717B (en) * 2020-09-18 2022-03-18 中交第二航务工程勘察设计院有限公司 Grouting reinforcement and leakage repair construction method for cracking and damage of underground concrete pipeline
CN113819335A (en) * 2021-08-26 2021-12-21 中山大学 Pipeline repairing device and pipeline repairing method
CN114352839A (en) * 2022-01-12 2022-04-15 山东钢铁集团日照有限公司 Blast furnace cooling wall connecting pipe leakage stopping device and method
CN115076507A (en) * 2022-06-10 2022-09-20 安徽碧盾环境工程技术有限公司 Non-excavation prosthetic devices of formula pipe network of being in milk
CN115076507B (en) * 2022-06-10 2024-02-20 安徽碧之润生态环境科技有限公司 Grouting pipe network non-excavation repairing device
CN115030230A (en) * 2022-08-10 2022-09-09 衡橡科技股份有限公司 Pile-first type slurry filling sealing packer and sealing method

Also Published As

Publication number Publication date
CN107101068B (en) 2022-11-18

Similar Documents

Publication Publication Date Title
CN107101068A (en) Infiltration plugging device and its construction method in a kind of pipeline
CN206770869U (en) Infiltration plugging device in a kind of pipeline
CN209277160U (en) A kind of inflatable stop grouting plug for sleeve valve barrel grouting
CN109505634A (en) Emergency type water-impervious airbag apparatus and its application method in tunnel
CN102852535B (en) Underground two-fluid grouting device
CN209430219U (en) Emergency type water-impervious airbag apparatus in tunnel
CN107489435A (en) A kind of changeable type inflatable waterstop for Tunneling by mining method
CN208517936U (en) A kind of reacting cycle device for pile foundation secondary pile hole cleaning
CN207297041U (en) A kind of changeable type inflatable waterstop for Tunneling by mining method
CN106703010A (en) Jacket-material-bed-free sleeve valve pipe grouting quick construction method
CN107718266B (en) A kind of air guide of connection chamber and pressure benefit paste-making method for sleeve grouting connection
CN107338729A (en) A kind of prestress pipe anti-blocking device and construction method
CN205330611U (en) Mining hole packer
CN104695426A (en) Gas lift method based secondary hole cleaning construction process for overlength pile foundations
CN204476353U (en) A kind of mash gas pumping drilling plugging device
CN210482054U (en) Anti-blocking device for prestressed pipeline
CN102913183B (en) Multifunctional pneumatic power hole sealing device and the hole-sealing technology supporting with it
CN107237408A (en) It is a kind of to prevent the construction method of expansion joint position seepage
CN208131670U (en) Multi-level medicine-filling device in situ for contaminated site
CN106968439A (en) The classification temperature adjustment cooling system and method for a kind of mass concrete component
CN104612240B (en) A kind of use is losed heart the method being encapsulated stifled Large Diameter Pipeline storm sewer
CN109498943A (en) A kind of inflatable nasopharyngeal air duct
JPH10114942A (en) Downward placing method for concrete
CN210217766U (en) Anti-floating device for shield tunnel
CN209637783U (en) A kind of pin-connected panel structures connection gap reinforcing leak stopping structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230913

Address after: 443101 No.1, Wangjiang Road, Yiling District, Yichang City, Hubei Province

Patentee after: CHINA NUCLEAR INDUSTRY 22ND CONSTRUCTION Co.,Ltd.

Patentee after: Shanghai Nuclear Engineering Research and Design Institute Co.,Ltd.

Address before: 443101 No.1, Wangjiang Road, Yiling District, Yichang City, Hubei Province

Patentee before: CHINA NUCLEAR INDUSTRY 22ND CONSTRUCTION Co.,Ltd.