CN107100196A - Spell the combined method in many cabins in box culvert list cabin - Google Patents
Spell the combined method in many cabins in box culvert list cabin Download PDFInfo
- Publication number
- CN107100196A CN107100196A CN201710252943.7A CN201710252943A CN107100196A CN 107100196 A CN107100196 A CN 107100196A CN 201710252943 A CN201710252943 A CN 201710252943A CN 107100196 A CN107100196 A CN 107100196A
- Authority
- CN
- China
- Prior art keywords
- cabin
- culvert
- cabins
- box
- interconnected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Structural Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Chemical & Material Sciences (AREA)
- Oil, Petroleum & Natural Gas (AREA)
- Compositions Of Macromolecular Compounds (AREA)
Abstract
The present invention relates to the combined method that many cabins are spelled in box culvert list cabin, belong to box and duct works technical field, including:Concrete floor, No. three culvert cabins, a culvert cabin and No. two culvert cabins, concrete floor is laid on ground, a number culvert cabin is interconnected to by box culvert, No. two culvert cabins are interconnected to by box culvert, contain cabin laminating for No. two to be arranged on the right side of a culvert cabin, contain at No. two on the right side of cabins or No. one contains directly over cabin or No. two contain directly over cabins or No. one contains cabin and contains with No. two above the seams of cabin, laminating is provided with No. three culvert cabins that box culvert is interconnected to.Flexible connection is employed between culvert of the present invention and solves side culvert because soil settles the phenomenon that breakage causes adjacent culvert to be destroyed, while being provided with modified asphalt waterproof layer between adjacent culvert, the problem of adjacent side's leak of culvert one influences the opposing party is solved.
Description
Technical field
The present invention relates to the combined method that many cabins are spelled in box culvert list cabin, belong to box and duct works technical field.
Background technology
Prefabricated reinforced concrete box culvert is as by electric power, communication, and the various utilities pipelines such as combustion gas, heat supply, plumbing are combined in
The tunnel space of one, constructs more convenient, compares pipe culvert more economical.At present, many compartment-boxs, which contain the adjacent culvert cabin constituted, kind
It is proposed with carrying out rigid connection each other by bolt, this connected mode has the drawback that, when a side contains cabin because of ground soil
Earth sedimentation causes to damage, and adjacent rigid connection can be influenceed to contain cabin while causing damage in various degree, form unnecessary loss.
The content of the invention
The invention aims to solve above-mentioned technical problem, and then the combined method in many cabins is spelled in offer box culvert list cabin,
Box culvert system stability is improved, it is cost-effective.
Technical scheme:
The combined method in many cabins is spelled in box culvert list cabin, is comprised the following steps,
Step 1: laying concrete floor on ground;
Step 2: on concrete floor, a culvert cabin is interconnected to by box culvert;
Step 3: on concrete floor, being interconnected to No. two culvert cabins by box culvert, containing cabin laminating for No. two and be arranged on one
Number contain the right side of cabin 1;
Step 4: No. two contain cabins on the right side of or No. one contain cabin directly over No. two contain cabins directly over or No. one contain cabin with No. two
Contain above the seam of cabin, laminating is provided with No. three culvert cabins that box culvert is interconnected to.
Further, described No. one connected modes contained between cabin, No. two culvert cabins and No. three culvert compartment-boxs culverts are identical.
Further, No. two culverts cabin, a culvert cabin and No. three are provided with modified asphalt waterproof floor between containing cabins.
The invention has the advantages that:
Flexible connection is employed between present invention culvert cabin and solves side culvert cabin because soil sedimentation breakage causes adjacent culvert cabin
The phenomenon destroyed, while being provided with modified asphalt waterproof layer between adjacent culvert cabin, solves the adjacent side's leak shadow of culvert cabin one
The problem of ringing the opposing party.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention one;
Fig. 2 is the structural representation of the embodiment of the present invention two;
Fig. 3 is the structural representation of the embodiment of the present invention three;
Fig. 4 is the structural representation of the embodiment of the present invention four.
Embodiment
Below with reference to accompanying drawing, the present invention is described in detail.
Embodiment one, with reference to the accompanying drawings 1:
The combined method in many cabins is spelled in box culvert list cabin, is comprised the following steps,
Step 1: laying concrete floor 3 on ground;
Step 2: on concrete floor 3, a culvert cabin 1 is interconnected to by box culvert;
Step 3: on concrete floor 3, being interconnected to No. two culvert cabins 2 by box culvert, containing the laminating of cabin 2 for No. two and set
Contain the right side of cabin 1 at No. one;
Step 4: containing the right side of cabin 2 at No. two, laminating is provided with No. three culvert cabins 4 that box culvert is interconnected to.
Described No. one connected modes contained between cabin 1, No. two culvert cabins 2 and No. three culvert box culverts of cabin 4 are identical.No. two culverts cabin
2nd, a culvert cabin 1 and No. three culvert cabins 4 are provided with modified asphalt waterproof floor each other.
Embodiment two, with reference to the accompanying drawings 2:
The combined method in many cabins is spelled in box culvert list cabin, is comprised the following steps,
Step 1: laying concrete floor 3 on ground;
Step 2: on concrete floor 3, a culvert cabin 1 is interconnected to by box culvert;
Step 3: on concrete floor 3, being interconnected to No. two culvert cabins 2 by box culvert, containing the laminating of cabin 2 for No. two and set
Contain the right side of cabin 1 at No. one;
Step 4: No. one contains directly over cabin 1, laminating is provided with No. three culvert cabins 4 that box culvert is interconnected to.
Described No. one connected modes contained between cabin 1, No. two culvert cabins 2 and No. three culvert box culverts of cabin 4 are identical.No. two culverts cabin
2nd, a culvert cabin 1 and No. three culvert cabins 4 are provided with modified asphalt waterproof floor each other.
Embodiment three, with reference to the accompanying drawings 3:
The combined method in many cabins is spelled in box culvert list cabin, is comprised the following steps,
Step 1: laying concrete floor 3 on ground;
Step 2: on concrete floor 3, a culvert cabin 1 is interconnected to by box culvert;
Step 3: on concrete floor 3, being interconnected to No. two culvert cabins 2 by box culvert, containing the laminating of cabin 2 for No. two and set
Contain the right side of cabin 1 at No. one;
Step 4: No. two contain directly over cabin 2, laminating is provided with No. three culvert cabins 4 that box culvert is interconnected to.
Described No. one connected modes contained between cabin 1, No. two culvert cabins 2 and No. three culvert box culverts of cabin 4 are identical.No. two culverts cabin
2nd, a culvert cabin 1 and No. three culvert cabins 4 are provided with modified asphalt waterproof floor each other.
Example IV, with reference to the accompanying drawings 4:
The combined method in many cabins is spelled in box culvert list cabin, is comprised the following steps,
Step 1: laying concrete floor 3 on ground;
Step 2: on concrete floor 3, a culvert cabin 1 is interconnected to by box culvert;
Step 3: on concrete floor 3, being interconnected to No. two culvert cabins 2 by box culvert, containing the laminating of cabin 2 for No. two and set
Contain the right side of cabin 1 at No. one;
Step 4: No. one contains above cabin 1 and No. two culvert seams of cabin 2, laminating is provided with box culvert is interconnected to three
Number contain cabin 4.
Described No. one connected modes contained between cabin 1, No. two culvert cabins 2 and No. three culvert box culverts of cabin 4 are identical.No. two culverts cabin
2nd, a culvert cabin 1 and No. three culvert cabins 4 are provided with modified asphalt waterproof floor each other.
Claims (3)
1. the combined method in many cabins is spelled in box culvert list cabin, it is characterised in that comprised the following steps,
Step 1: laying concrete floor (3) on ground;
Step 2: on concrete floor (3), being interconnected to No. one by box culvert and containing cabin (1);
Step 3: on concrete floor (3), being interconnected to No. two by box culvert and containing cabin (2), contain cabin (2) laminating for No. two and set
Put and contain at No. one on the right side of cabin (1);
Step 4: containing at No. two on the right side of cabin (2) or directly over culvert cabin (1) or directly over No. two culverts cabin (2) or culvert cabin
(1) contain with No. two above cabin (2) seam, laminating is provided with No. three culverts cabin (4) that box culvert is interconnected to.
2. the combined method in many cabins is spelled in box culvert list cabin according to claim 1, it is characterised in that culvert cabin (1),
No. two connected modes contained between cabin (2) and No. three culvert cabin (4) box culverts are identical.
3. the combined method in many cabins is spelled in box culvert list cabin according to claim 1, it is characterised in that No. two culverts cabin (2),
Contain for No. one and be provided with modified asphalt waterproof floor between cabin (1) and No. three culverts cabin (4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710252943.7A CN107100196A (en) | 2017-04-18 | 2017-04-18 | Spell the combined method in many cabins in box culvert list cabin |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710252943.7A CN107100196A (en) | 2017-04-18 | 2017-04-18 | Spell the combined method in many cabins in box culvert list cabin |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107100196A true CN107100196A (en) | 2017-08-29 |
Family
ID=59656668
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710252943.7A Pending CN107100196A (en) | 2017-04-18 | 2017-04-18 | Spell the combined method in many cabins in box culvert list cabin |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107100196A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132594A (en) * | 2011-11-21 | 2013-06-05 | 旭混凝土工业株式会社 | Joining method of concrete structure |
CN105756089A (en) * | 2016-03-17 | 2016-07-13 | 上海同预建筑科技有限公司 | Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery |
CN205662945U (en) * | 2016-06-05 | 2016-10-26 | 傅琼阁 | Precast concrete piping lane |
KR101682541B1 (en) * | 2016-02-25 | 2016-12-07 | 대실테크 주식회사 | Culvert crossing buried pipeline construction and pipeline laying method using the same |
-
2017
- 2017-04-18 CN CN201710252943.7A patent/CN107100196A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103132594A (en) * | 2011-11-21 | 2013-06-05 | 旭混凝土工业株式会社 | Joining method of concrete structure |
KR101682541B1 (en) * | 2016-02-25 | 2016-12-07 | 대실테크 주식회사 | Culvert crossing buried pipeline construction and pipeline laying method using the same |
CN105756089A (en) * | 2016-03-17 | 2016-07-13 | 上海同预建筑科技有限公司 | Transverse laminated connection type single compartment precast multiple-compartment assembled comprehensive pipe gallery |
CN205662945U (en) * | 2016-06-05 | 2016-10-26 | 傅琼阁 | Precast concrete piping lane |
Non-Patent Citations (2)
Title |
---|
安晶等: "《建筑材料》", 31 July 2016 * |
雷升祥等: "《综合管廊与管道盾构》", 31 July 2015, 中国铁道出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105350572B (en) | Assembled underground pipe gallery | |
CN102734556B (en) | Trenchless construction method for power pipes | |
CN105113354B (en) | Suitable for the pre-buried pipeline of pavement shallow | |
CN207176738U (en) | A kind of staggered joint erection comprehensive pipe gallery structure based on prestress system | |
WO2017071113A1 (en) | Cement-soil mixing pile protected underground pipe gallery | |
CN203583526U (en) | Waterproof structure of peat soft soil stratum subway station | |
CN104963705A (en) | Underground space excavating and constructing method | |
CN104947708A (en) | Combined foundation bed for immersed tube tunnels and construction method thereof | |
CN105926422B (en) | The monolithic construction of bridge and underground pipe gallery and its construction method | |
CN105525632A (en) | Waterproof structure for bellmouths and sockets of fabricated prefabricated composite pipe gallery | |
CN206157762U (en) | Prefabricate piecemeal assembled utility tunnel entirely | |
CN104482298A (en) | HDPE (high-density polyethylene) steel-plastic composite spiral winding drainage pipe installation construction method | |
CN105401593A (en) | Assembly type square underground pipe gallery | |
KR101820872B1 (en) | Reinforcement and waterproof structure of vertical shafts-utility tunnels interface | |
CN107134660A (en) | Underground pipe gallery electrical grounding net | |
CN108661075A (en) | Assembled underground one corridor | |
CN207378273U (en) | A kind of direct-buried thermal insulation pipe duct device | |
CN105065040A (en) | Top-plate-prefabricated underground space underground excavation building method | |
CN105041348A (en) | Underground space subsurface excavation construction method adopting combined roof | |
CN107100196A (en) | Spell the combined method in many cabins in box culvert list cabin | |
CN205224088U (en) | Cement mixing method protection underground pipe gallery | |
CN208123740U (en) | Vertical reinforcement concrete connectors reinforce regularization hoop bracket system | |
CN104294859A (en) | Stability judgment method of foundation pit basal-heave resistant system | |
CN103595001A (en) | Composite reinforced HDPE cable sheath tube | |
CN207298164U (en) | A kind of socket joint type pipeline socket connecting elements |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170829 |