CN107092764A - 一种基于bim的混凝土装配式施工方法 - Google Patents
一种基于bim的混凝土装配式施工方法 Download PDFInfo
- Publication number
- CN107092764A CN107092764A CN201710447148.3A CN201710447148A CN107092764A CN 107092764 A CN107092764 A CN 107092764A CN 201710447148 A CN201710447148 A CN 201710447148A CN 107092764 A CN107092764 A CN 107092764A
- Authority
- CN
- China
- Prior art keywords
- bim
- prefabricated components
- construction method
- sequence
- assemble
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
Abstract
本发明公开了一种基于BIM的混凝土装配式施工方法,包括以下步骤:1)、在数据库中建立每个预制构件的基本信息;2)、建立装配式混凝土结构的BIM模型:将所有预制构件按照一定的装配顺序进行建模;3)、将步骤2)获得的BIM模型录入数据库;4)、重复步骤2)和步骤3),重复步骤2)时对预制构件的装配顺序进行调整;5)、BIM模型结合实际施工,从数据库中挑选出最合理的预制构件的装配顺序;6)、按照步骤5)挑选出的BIM模型记载的预制构件的装配顺序进行现场施工。本发明利用BIM技术合成不同的模型,从中选取效果最好的安装顺序,获得混凝土装配式施工方法,解决了现有施工方法中因构件安装顺序不当导致混泥土的使用性能降低的问题。
Description
技术领域
本发明涉及建筑施工技术领域,具体涉及一种基于BIM的混凝土装配式施工方法。
背景技术
整体装配式建筑因其工业化程度高、有效减少资源浪费、工人劳动强度低、大量减少建筑用工、适用性广、符合绿色建筑要求等特点,逐渐被各地推广应用。
装配式混凝土建筑设计注重全生命周期的设计与应用,BIM技术是解决装配式混凝土建筑全产业链的信息集成与传递的重要手段。其中,预制构件是装配式混凝土建筑中重要的组成部分,利用BIM技术,对预制构件系统进行分析研究,提出装配式混凝土建筑中各类预制构件的适用性。
在装配式混凝土建筑设计中,构件的安装顺序对最终的装配效果影响很大,会直接影响到混凝土的强度和使用性能。
发明内容
本发明的目的在于提供一种基于BIM的混凝土装配式施工方法,改变构件的安装顺序,利用BIM技术合成不同的模型,从中选取效果最好的安装顺序,获得混凝土装配式施工方法,以解决现有施工方法中因构件安装顺序不当导致混泥土的强度和使用性能降低的问题。
本发明通过下述技术方案实现:
一种基于BIM的混凝土装配式施工方法,包括以下步骤:
1)、在数据库中建立每个预制构件的基本信息;
2)、建立装配式混凝土结构的BIM模型:将所有预制构件按照一定的装配顺序进行建模;
3)、将步骤2)获得的BIM模型录入数据库;
4)、重复步骤2)和步骤3),每次重复步骤2)时对预制构件的装配顺序进行调整;
5)、根据BIM模型结合实际施工,从数据库中挑选出最合理的预制构件的装配顺序;
6)、按照步骤5)挑选出的BIM模型记载的预制构件的装配顺序进行现场施工。
进一步地,在现场施工过程,收集施工信息,将施工信息录入数据库,以便后期进行分析。
在现有的混泥土装配式施工方法中,通常上直接根据施工经验设定预制构件的装配顺序,这样的施工方法易导致施工后的混泥土的强度和使用性能均达不到预期的效果。
本发明通过改变构件的安装顺序,利用BIM技术合成不同的模型,从中选取效果最好的安装顺序,获得混凝土装配式施工方法,解决了现有施工方法中因预制构件安装顺序不当导致混泥土的强度和使用性能降低的问题。
进一步地,施工信息包括施工条件、施工时间、施工地点、施工顺序,以及所使用的材料和设备仪器的规格。
本发明与现有技术相比,具有如下的优点和有益效果:
本发明通过改变构件的安装顺序,利用BIM技术合成不同的模型,从中选取效果最好的安装顺序,获得混凝土装配式施工方法,以解决现有施工方法中因构件安装顺序不当导致混泥土的强度和使用性能降低的问题。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚明白,下面结合实施例,对本发明作进一步的详细说明,本发明的示意性实施方式及其说明仅用于解释本发明,并不作为对本发明的限定。
实施例:
一种基于BIM的混凝土装配式施工方法,包括以下步骤:
1)、在数据库中建立每个预制构件的基本信息;
2)、建立装配式混凝土结构的BIM模型:将所有预制构件按照一定的装配顺序进行建模;
3)、将步骤2)获得的BIM模型录入数据库;
4)、重复步骤2)和步骤3),每次重复步骤2)时对预制构件的装配顺序进行调整;
5)、根据BIM模型结合实际施工,从数据库中挑选出最合理的预制构件的装配顺序;
6)、按照步骤5)挑选出的BIM模型记载的预制构件的装配顺序进行现场施工;在现场施工过程,收集施工信息,将施工信息录入数据库,以便后期进行分析;所述施工信息包括施工条件、施工时间、施工地点、施工顺序,以及所使用的材料和设备仪器的规格。
以上所述的具体实施方式,对本发明的目的、技术方案和有益效果进行了进一步详细说明,所应理解的是,以上所述仅为本发明的具体实施方式而已,并不用于限定本发明的保护范围,凡在本发明的精神和原则之内,所做的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (3)
1.一种基于BIM的混凝土装配式施工方法,其特征在于,包括以下步骤:
1)、在数据库中建立每个预制构件的基本信息;
2)、建立装配式混凝土结构的BIM模型:将所有预制构件按照一定的装配顺序进行建模;
3)、将步骤2)获得的BIM模型录入数据库;
4)、重复步骤2)和步骤3),每次重复步骤2)时对预制构件的装配顺序进行调整;
5)、根据BIM模型结合实际施工,从数据库中挑选出最合理的预制构件的装配顺序;
6)、按照步骤5)挑选出的BIM模型记载的预制构件的装配顺序进行现场施工。
2.根据权利要求1所述的一种基于BIM的混凝土装配式施工方法,其特征在于,在现场施工过程,收集施工信息,将施工信息录入数据库,以便后期进行分析。
3.根据权利要求2所述的一种基于BIM的混凝土装配式施工方法,其特征在于,所述施工信息包括施工条件、施工时间、施工地点、施工顺序,以及所使用的材料和设备仪器的规格。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447148.3A CN107092764A (zh) | 2017-06-14 | 2017-06-14 | 一种基于bim的混凝土装配式施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710447148.3A CN107092764A (zh) | 2017-06-14 | 2017-06-14 | 一种基于bim的混凝土装配式施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107092764A true CN107092764A (zh) | 2017-08-25 |
Family
ID=59639357
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710447148.3A Pending CN107092764A (zh) | 2017-06-14 | 2017-06-14 | 一种基于bim的混凝土装配式施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107092764A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679297A (zh) * | 2017-09-20 | 2018-02-09 | 中国十七冶集团有限公司 | 一种基于bim的预制装配式散水坡施工方法 |
CN110359550A (zh) * | 2019-07-26 | 2019-10-22 | 彭子茂 | 基于bim技术的装配式建筑pc构件布置方法 |
CN112819338A (zh) * | 2021-02-02 | 2021-05-18 | 郑州铁路职业技术学院 | 一种基于物联网的装配式建筑施工质量监测系统 |
CN116611963A (zh) * | 2023-05-23 | 2023-08-18 | 中建安装集团有限公司 | 一种基于物联网的工程数据监测分析系统及方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458731A (zh) * | 2008-12-21 | 2009-06-17 | 中铁宝桥股份有限公司 | 钢结构组件计算机模拟拼装方法 |
CN101916970A (zh) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | 变电站的室内通风系统及变电站的室内通风系统设计方法 |
US20130134962A1 (en) * | 2011-11-28 | 2013-05-30 | Expanergy, Llc | Energy search engine methods and systems |
CN204901084U (zh) * | 2015-08-31 | 2015-12-23 | 科宇智能环境技术服务有限公司 | 一种基于bim的预制一体化装配式组合支架 |
CN106485411A (zh) * | 2016-10-08 | 2017-03-08 | 上海建工五建集团有限公司 | 基于bim技术的装配式混凝土结构建造管理方法及系统 |
CN106815415A (zh) * | 2016-12-30 | 2017-06-09 | 中建三局第建设工程有限责任公司 | 基于bim的工程桩施工方法 |
-
2017
- 2017-06-14 CN CN201710447148.3A patent/CN107092764A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101458731A (zh) * | 2008-12-21 | 2009-06-17 | 中铁宝桥股份有限公司 | 钢结构组件计算机模拟拼装方法 |
CN101916970A (zh) * | 2010-07-29 | 2010-12-15 | 广州电力设计院 | 变电站的室内通风系统及变电站的室内通风系统设计方法 |
US20130134962A1 (en) * | 2011-11-28 | 2013-05-30 | Expanergy, Llc | Energy search engine methods and systems |
CN204901084U (zh) * | 2015-08-31 | 2015-12-23 | 科宇智能环境技术服务有限公司 | 一种基于bim的预制一体化装配式组合支架 |
CN106485411A (zh) * | 2016-10-08 | 2017-03-08 | 上海建工五建集团有限公司 | 基于bim技术的装配式混凝土结构建造管理方法及系统 |
CN106815415A (zh) * | 2016-12-30 | 2017-06-09 | 中建三局第建设工程有限责任公司 | 基于bim的工程桩施工方法 |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107679297A (zh) * | 2017-09-20 | 2018-02-09 | 中国十七冶集团有限公司 | 一种基于bim的预制装配式散水坡施工方法 |
CN110359550A (zh) * | 2019-07-26 | 2019-10-22 | 彭子茂 | 基于bim技术的装配式建筑pc构件布置方法 |
CN112819338A (zh) * | 2021-02-02 | 2021-05-18 | 郑州铁路职业技术学院 | 一种基于物联网的装配式建筑施工质量监测系统 |
CN112819338B (zh) * | 2021-02-02 | 2023-05-23 | 郑州铁路职业技术学院 | 一种基于物联网的装配式建筑施工质量监测系统 |
CN116611963A (zh) * | 2023-05-23 | 2023-08-18 | 中建安装集团有限公司 | 一种基于物联网的工程数据监测分析系统及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107092764A (zh) | 一种基于bim的混凝土装配式施工方法 | |
CN108280276A (zh) | 基于Revit软件楼梯模型标准创建和用量统计方法 | |
CN105781064A (zh) | 基于bim的地砖铺设施工方法 | |
CN107092720A (zh) | 一种基于两级参数化节点库的bim模型构建方法 | |
CN109811931A (zh) | 一种基于bim的装配式剪力墙建筑结构及其施工方法 | |
CN112257160B (zh) | 一种基于bim的垃圾焚烧发电厂标准化正向设计方法 | |
CN109753672A (zh) | 基于bim技术的装配式预制混凝土结构工程优化方法 | |
CN107330153B (zh) | 一种装配式混凝土结构bim模型两级参数化构建方法 | |
CN105279329A (zh) | 一种基于bim的样板引路质量管理方法 | |
CN111339587A (zh) | 基于bim模型的二次结构墙体深化设计方法 | |
CN110674548A (zh) | 基于bim的装配式建筑设计方法及系统 | |
CN111177824A (zh) | 一种基于bim技术的铝合金模板施工方法 | |
WO2024027437A1 (zh) | 基于构件参数库的装配式建筑设计与建造一体化协同方法 | |
CN107229802A (zh) | 基于bim的建筑施工方法 | |
CN109159258A (zh) | 可拆装组合式建筑叠合板模具 | |
CN110175028A (zh) | 一种revit参数化可变组合窗族的构建方法 | |
CN107194112A (zh) | 基于bim对园林景观布局的方法 | |
CN109409850A (zh) | 基于bim技术的装配式建筑混凝土浇铸生产方法 | |
CN103993659A (zh) | 一种楼面结构模块及其拼装方法 | |
CN107862133A (zh) | 一种批量生成桥墩bim模型的方法 | |
Alawag et al. | Application of Industrialised Building System in the Field of Construction toward Sustainability: Future Routes and a Theoretical Mapping | |
CN108416076B (zh) | 一种基于bim技术的装配式建筑设计方法 | |
CN112069562B (zh) | 矩形构件中三向环箍型钢筋笼结构零碰撞快速布置方法 | |
CN109583145A (zh) | 一种装配式建筑设计方法 | |
CN105844016B (zh) | 一种基于建筑模型切割的获得拟建建筑工程量的方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170825 |
|
RJ01 | Rejection of invention patent application after publication |