CN107090980A - A kind of novel building mud hangs connection device - Google Patents

A kind of novel building mud hangs connection device Download PDF

Info

Publication number
CN107090980A
CN107090980A CN201611247566.XA CN201611247566A CN107090980A CN 107090980 A CN107090980 A CN 107090980A CN 201611247566 A CN201611247566 A CN 201611247566A CN 107090980 A CN107090980 A CN 107090980A
Authority
CN
China
Prior art keywords
sleeve pipe
rope
described sleeve
pillar
extension bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611247566.XA
Other languages
Chinese (zh)
Other versions
CN107090980B (en
Inventor
施洲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zining Construction Group Co ltd
Original Assignee
Guangzhou Top Security Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Top Security Technology Co Ltd filed Critical Guangzhou Top Security Technology Co Ltd
Priority to CN201611247566.XA priority Critical patent/CN107090980B/en
Publication of CN107090980A publication Critical patent/CN107090980A/en
Application granted granted Critical
Publication of CN107090980B publication Critical patent/CN107090980B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/02Conveying or working-up concrete or similar masses able to be heaped or cast
    • E04G21/04Devices for both conveying and distributing
    • E04G21/0418Devices for both conveying and distributing with distribution hose
    • E04G21/0427Devices for both conveying and distributing with distribution hose on a static support, e.g. crane

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Underground Or Underwater Handling Of Building Materials (AREA)
  • Tents Or Canopies (AREA)

Abstract

Connection device is hung the invention discloses a kind of novel building mud, including sleeve pipe, connecting portion is provided with the bottom die of described sleeve pipe, pillar is combined with the connecting portion, pedestal is provided with below the pillar, it is well-balanced on the outside of described sleeve pipe to be provided with two slippage slots, it is provided with the interior sliding of described sleeve pipe and hangs extension bar, it is well-balanced on the outside for hanging extension bar to be provided with two scimitar portions, intert the slippage slot and extend into the outside of described sleeve pipe in the scimitar portion, the outside of described sleeve pipe and a tensioning member is connected between two scimitar portions, the present apparatus is slid by tensing payout so that hanging above and below extension bar, the decline of mud tank can be achieved, it is simple to operate, the adjustable height of mud tank can be adjusted according to different construction requirements and can be realized synchronous fixed, the structure of the present apparatus is relatively simple, cost is more cheap, it is adapted to promote the use of.

Description

A kind of novel building mud hangs connection device
Technical field
The present invention relates to the realm of building construction, more particularly to a kind of novel building mud hangs connection device.
Background technology
Mud is commonly used in construction, and mud is elongated on some auxiliary facilities relatively complete large-scale building site is It is transported to by Cargo Lift on floor, but is all often logical on some small-sized building sites or auxiliary facility relatively incomplete building site Manpower self carrying is crossed, its process not only takes time and effort, and operating efficiency and its low, also have much makes in the prior art Mud is conveyed with pulley apparatus, but it can not meet workmen and synchronously be fixed for mud tank in external wall construction Demand, and install it is excessively cumbersome, safety guarantee is not high, and use cost is too high.
The content of the invention
Connection device is hung the technical problem to be solved in the present invention is to provide a kind of novel building mud.
To solve the above problems, the present invention is adopted the following technical scheme that:
A kind of novel building mud hangs and is provided with connecting portion at connection device, including sleeve pipe, the bottom die of described sleeve pipe, described It is combined with connecting portion below pillar, the pillar and is provided with pedestal, it is well-balanced on the outside of described sleeve pipe to be provided with two cunnings Groove is moved, is provided with the interior sliding of described sleeve pipe and hangs extension bar, it is well-balanced on the outside for hanging extension bar to be provided with two scimitar portions, institute State the outside that scimitar portion interts the slippage slot and extends into described sleeve pipe, the outside of described sleeve pipe and between two scimitar portions A tensioning member is connected with, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with mounting groove, in the peace Put and pulley is provided with groove, axle portion is combined between the madial wall of the pulley and the mounting groove, the pulley has Annular groove, the rope, which leaves, to be pressed close to bottom end on the excessively described annular groove of a pendant of the tensioning member, the pillar and is provided with groove, The rope interts the groove after leaving the excessively described annular groove of a pendant of the tensioning member, and the rope interts the groove It is provided with Access Division on that side, the Access Division is to be provided with elastic card socket part, the Access Division to wear as the rope Slotting inserting hole, the Access Division is movably set on the rope, when the groove is inserted in the Access Division so that The Access Division crimp, the rope is fixedly clamped by the crimp of the Access Division, in the top surface of the pedestal On be operably provided with one around part, it is described around part to the part for the being interspersed with inserting hole rope is described around part around being connected on On, so as to prevent the in disorder stacking of the part for the being interspersed with inserting hole rope, the generation of the rope knotting problem is caused, is influenceed The use of the later rope.
Preferably, a bolt is combined between the connecting portion and the pillar, between the pedestal and the pillar It is combined with No. two bolts, the inner side for being provided with balancing weight, the axle portion and the mounting groove of the left and right ends activity of the pedestal Wall is fixedly connected, and the pulley is operably arranged on the midpoint of the axle portion.
Preferably, described hang slides cooperation between extension bar and described sleeve pipe, is provided with and is hung as described in described sleeve pipe The sliding chamber slid above and below extension bar, the Access Division has shrinkage.
The beneficial effects of the invention are as follows:The suspension of mud tank is realized by two scimitar portions, then by the pulling of rope, The upper-lower position in two scimitar portions is changed, extension bar is hung and is slid up and down in sliding chamber, it is necessary to when rising, pull rope to make Hang extension bar to slide upwards, then drive and rise, to complete the conveying for mud;If desired for real to mud tank in external wall construction Apply synchronous fix and treat position of the mobile Access Division on rope after the completion of height regulation, groove is inserted into Access Division so that clamping Portion occurs crimp and clamps rope, so that rope not stretchy, and now two scimitar portions are fixed on the height of needs Degree, while mud tank is also suspended in the height of needs, it is necessary to when declining, it is only necessary to extract Access Division, then move Access Division Position on rope, it is simple to operate by payout so that hanging extension bar downslide, you can realize the decline of mud tank, The adjustable height of mud tank can be adjusted according to different construction requirements and can be realized and is synchronously fixed, the structure of the present apparatus is more Simply, cost is more cheap, is adapted to promote the use of.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is the overall structure diagram that novel building mud of the present invention hangs connection device;
Fig. 2 is the partial enlarged drawing at A in Fig. 1;
Fig. 3 is the structural representation of Access Division and rope in the present invention.
Fig. 4 is the enlarged diagram of connecting portion.
Embodiment
The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
Connection device, including sleeve pipe 1, the bottom die of described sleeve pipe 1 are hung refering to a kind of novel building mud shown in Fig. 1-4 Place is provided with connecting portion 2, and pillar 3 is combined with the connecting portion 2, and the lower section of the pillar 3 is provided with pedestal 4, the set It is well-balanced on the outside of pipe 1 to be provided with two slippage slots 101, it is provided with the interior sliding of described sleeve pipe 1 and hangs extension bar 5, described hang connects The outside of bar 5 is well-balanced to be provided with two scimitar portions 501, and the scimitar portion 501 interts the slippage slot 101 and extends into the set The outside of pipe 1, the outside of described sleeve pipe 1 and is connected with a tensioning member 502 between two scimitar portions 501, the tensioning member 502 Head be connected with rope 6, the head of described sleeve pipe 1 is provided with mounting groove 102, and pulley is provided with the mounting groove 102 7, axle portion 103 is combined between the madial wall of the pulley 7 and the mounting groove 102, and the pulley 7 has annular groove 701, The rope 6 leave press close on the excessively described annular groove 701 of a pendant of the tensioning member 502, the pillar 3 bottom end be provided with it is logical Groove 311, the rope 6 interts the groove 311, the rope after leaving the excessively described annular groove 701 of a pendant of the tensioning member 502 Rope 6, which interts, is provided with Access Division 8 on that side of the groove 311, the Access Division 8 is elastic card socket part, the Access Division 8 In be provided with as the rope 6 intert inserting hole, the Access Division 8 is movably set on the rope 6, when described When the groove 311 is inserted in Access Division 8 so that the crimp of Access Division 8, the rope 6 by the Access Division 8 extruding Deform and be fixedly clamped, the setting of the inserting hole adds the clamping force between the rope 6 and the Access Division 8, so that Enable the Access Division 8 more preferably more steady clamping rope 6, be operably provided with the top surface of the pedestal 4 One around part 91, it is described around part 91 to the part for the being interspersed with inserting hole rope 6 is described on part 91 around being connected on so that anti- The in disorder stacking of the part rope 6 of inserting hole is only interspersed with, the generation of the knotting problem of rope 6, institute after influence is caused State the use of rope 6.
A preferred embodiment in the present invention, a bolt 201 is combined between the connecting portion 2 and the pillar 3, It is combined with No. two bolts 401 between the pedestal 4 and the pillar 3, the left and right ends activity of the pedestal 4 is provided with balancing weight 402, the connecting portion 2 is fixed with the pillar 3 by a bolt 201, by No. two bolts 401 by the pedestal 4 with The pillar 3 is fixed, and can be matched somebody with somebody by the balancing weight 901 that activity is set on pedestal 4 according to practical operation situation Weight, so that the pedestal is more firm, the axle portion 103 is fixedly connected with the madial wall of the mounting groove 102, the pulley 7 are operably arranged on the midpoint of the axle portion 103, to facilitate the rope 6 to pull the tensioning member 502 to lift.
A preferred embodiment in the present invention, described hang slides cooperation, described sleeve pipe 1 between extension bar 5 and described sleeve pipe 1 In be provided with and hang the sliding chamber 503 that extension bar slides about 5 as described, in order to which the extension bar 5 that hangs is in described sleeve pipe 1 Slide up and down to drive two scimitar portions 501 to move up and down, the Access Division 8 has shrinkage, can preferably be squeezed Deformation also allows for being changed so that the rope 6 is fixed after the Access Division 8 is damaged.
The beneficial effects of the invention are as follows:The suspension of mud tank is realized by two scimitar portions, then by the pulling of rope, The upper-lower position in two scimitar portions is changed, extension bar is hung and is slid up and down in sliding chamber, it is necessary to when rising, pull rope to make Hang extension bar to slide upwards, then drive and rise, to complete the conveying for mud;If desired for real to mud tank in external wall construction Apply synchronous fix and treat position of the mobile Access Division on rope after the completion of height regulation, groove is inserted into Access Division so that clamping Portion occurs crimp and clamps rope, so that rope not stretchy, and now two scimitar portions are fixed on the height of needs Degree, while mud tank is also suspended in the height of needs, it is necessary to when declining, it is only necessary to extract Access Division, then move Access Division Position on rope, it is simple to operate by payout so that hanging extension bar downslide, you can realize the decline of mud tank, The adjustable height of mud tank can be adjusted according to different construction requirements and can be realized and is synchronously fixed, the structure of the present apparatus is more Simply, cost is more cheap, is adapted to promote the use of.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent is defined.

Claims (3)

1. a kind of novel building mud hangs connection device, it is characterised in that:Including sleeve pipe, it is provided with the bottom die of described sleeve pipe Connecting portion, is combined with below pillar, the pillar in the connecting portion and is provided with pedestal, well-balanced on the outside of described sleeve pipe Two slippage slots are provided with, is provided with the interior sliding of described sleeve pipe and hangs extension bar, it is well-balanced on the outside for hanging extension bar to be provided with Two scimitar portions, the scimitar portion interts the slippage slot and extends into the outside of described sleeve pipe, the outside of described sleeve pipe and A tensioning member is connected between two scimitar portions, the head of the tensioning member is connected with rope, and the head of described sleeve pipe is provided with Mounting groove, pulley is provided with the mounting groove, axle portion is combined between the pulley and the madial wall of the mounting groove, institute Stating pulley has annular groove, and the rope leaves presses close to bottom on the excessively described annular groove of a pendant of the tensioning member, the pillar Groove is provided with end, the rope interts the groove, the rope after leaving the excessively described annular groove of a pendant of the tensioning member Rope, which interts, is provided with Access Division on that side of the groove, be provided with the Access Division as interting that the rope interts Hole, is operably provided with one around part on the top surface of the pedestal, it is described around part to the part institute by inserting hole is interspersed with State rope described on part around being connected on.
2. novel building mud according to claim 1 hangs connection device, it is characterised in that:The connecting portion and the pillar Between be combined with a bolt, be combined with No. two bolts between the pedestal and the pillar, the left and right ends of the pedestal are lived Dynamic is provided with balancing weight, and the axle portion is fixedly connected with the madial wall of the mounting groove, and the pulley is operably arranged on institute State the midpoint of axle portion.
3. novel building mud according to claim 1 hangs connection device, it is characterised in that:It is described to hang extension bar and described sleeve pipe Between slide and coordinate, be provided with described sleeve pipe and hang the sliding chamber slid above and below extension bar as described, the Access Division has Shrinkage.
CN201611247566.XA 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device Active CN107090980B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611247566.XA CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611247566.XA CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Publications (2)

Publication Number Publication Date
CN107090980A true CN107090980A (en) 2017-08-25
CN107090980B CN107090980B (en) 2019-05-24

Family

ID=59646402

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611247566.XA Active CN107090980B (en) 2016-12-29 2016-12-29 A kind of construction slurry hangs connection device

Country Status (1)

Country Link
CN (1) CN107090980B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487639A (en) * 2018-04-09 2018-09-04 陈云珍 A kind of construction slurry hangs connection device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000064613A (en) * 1998-08-25 2000-02-29 Asuku Techno Koji Kk Spray-coating refractory cement feeder
CN201062777Y (en) * 2007-07-17 2008-05-21 中国二十冶建设有限公司 Height-adjustable lighting lamp stand for building site
CN101866595A (en) * 2010-02-05 2010-10-20 成都市宇中梅科技有限责任公司 Liftable slogan bracket
CN204702430U (en) * 2015-01-12 2015-10-14 北京汽车研究总院有限公司 A kind of hoisting fixture
CN105257018A (en) * 2015-10-19 2016-01-20 陆霞芸 Support frame capable of being conveniently moved and placed for construction site
CN105251076A (en) * 2015-11-17 2016-01-20 任巧凤 Infusion hanging device for hospital
CN205502590U (en) * 2016-04-20 2016-08-24 周建南 Low -noise building material lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108487639A (en) * 2018-04-09 2018-09-04 陈云珍 A kind of construction slurry hangs connection device

Also Published As

Publication number Publication date
CN107090980B (en) 2019-05-24

Similar Documents

Publication Publication Date Title
CN203097755U (en) Hydraulic bidirectional-control slip
CN107090980A (en) A kind of novel building mud hangs connection device
CN107377696A (en) A kind of metal plate rolling and unrolling machine
CN104016220B (en) The adjustable handling suspension bracket of waste heat boiler module
CN107089583A (en) A kind of construction slurry hangs connection device
CN106836813A (en) A kind of construction mud hangs connection device
CN207600851U (en) A kind of 90 degree of layback tension test fixtures
CN107090978A (en) A kind of construction hangs connection device with displaceable mud
CN203865929U (en) Portable crane
CN107090979A (en) A kind of durable building construction slurry hangs connection device
CN206654647U (en) A kind of steel wire rope balance system
CN212222170U (en) Sling for hoisting thick plate
CN203005864U (en) Novel metal coiled material coil tilter
CN203903768U (en) Adjustable loading and unloading lifting bracket for waste heat boiler module
CN209651728U (en) The hanging apparatus of thin-wall barrel workpiece
CN204454193U (en) A kind of lift car glass side plate structure easy to assemble
CN206637572U (en) High-Pole Lamp bar top transmission mechanism
CN206188206U (en) A hoist that is used for self -locking function that takes of work piece application
CN207330289U (en) A kind of packaged type coal mine hydraulic supporting maintenance platform
CN206223544U (en) Traction steel-cable detection means
CN204873768U (en) Maximum height adjustable cloth lifting machine
CN204607377U (en) Equalizing bar
CN217201578U (en) Aluminum coil hoisting device
CN209702039U (en) A kind of construction elevator guardrail
CN106185603A (en) A kind of triangular hanging tool being applicable to annular workpieces

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190422

Address after: 610500 No. 88 Xindu Street, Xindu Town, Chengdu City, Sichuan Province

Applicant after: ZINING CONSTRUCTION GROUP Co.,Ltd.

Address before: 510000 B5 building, No. 6, No. 6, Ying Long Road, Tianhe District, Guangzhou, Guangdong (Part 6, floor)

Applicant before: GUANGZHOU TUOXUN SECURITY TECHNOLOGY CO.,LTD.

GR01 Patent grant
GR01 Patent grant
PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20240410

Granted publication date: 20190524