CN107090857A - A kind of mining of groundwater well closure construction - Google Patents
A kind of mining of groundwater well closure construction Download PDFInfo
- Publication number
- CN107090857A CN107090857A CN201710131916.4A CN201710131916A CN107090857A CN 107090857 A CN107090857 A CN 107090857A CN 201710131916 A CN201710131916 A CN 201710131916A CN 107090857 A CN107090857 A CN 107090857A
- Authority
- CN
- China
- Prior art keywords
- covering device
- cavity
- mining
- translot
- install
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
- E02D29/1418—Covers for manholes or the like; Frames for covers with implements to assist in lifting, e.g. counterweights, springs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/12—Manhole shafts; Other inspection or access chambers; Accessories therefor
- E02D29/14—Covers for manholes or the like; Frames for covers
- E02D29/1427—Locking devices
Landscapes
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
Abstract
A kind of mining of groundwater well closure construction, including fixed well body and the covering device being installed in roadbed, the well body is provided with and installs hole and positioned at the cavity installed below hole for install the covering device, described install is symmetrically set with lockhole on the wall of hole side, the covering device both sides are symmetrically set with the external translot of notch, cavity is provided with the covering device, the vertical slot stretched up and down is provided with the cavity, the passage being mutually communicated is provided between the translot and the cavity, slided in the translot and be installed on hammerlock, the hammerlock medial extremity is fixed and is installed on transmission arm, slided in the vertical slot and be installed on band motion block, the band motion block both sides, which are symmetrically arranged with, installs arm, it is described to install between arm and the transmission arm pivot joint and be installed on conductive bar, the band motion block upper end is fixed and is installed on handle;Apparatus of the present invention are simple in construction, install and dismounting is quite convenient to.
Description
Technical field
The present invention relates to engineering construction field, and in particular to a kind of mining of groundwater well closure construction.
Background technology
Well, is primarily used for the engineering structure of exploiting groundwater, at present to be present in rural area more.General well well head
It is larger, and surface does not have any covering, when well side is played easily falling accident occurs for child, extremely dangerous, in addition,
Because well head is opened, the booty that well water is easily fallen into by the external world pollutes, and influences water quality.
The content of the invention
It is an object of the invention to provide a kind of mining of groundwater well closure construction and its application method, it can overcome existing
The drawbacks described above of technology.
According to the present invention, a kind of mining of groundwater well closure construction of apparatus of the present invention, including fixation are installed in roadbed
Well body and covering device, the well body is provided with and installs hole and positioned at described for install the covering device
The cavity below hole is installed, described install is symmetrically set with lockhole on the wall of hole side, the covering device both sides are symmetrical
It is provided with the external translot of notch, the covering device and is provided with cavity, the vertical slot stretched up and down is provided with the cavity,
The covering device centre is provided with the vertical core of cavity described in insertion, is provided with and mutually passes through between the translot and the cavity
Slided in logical passage, the translot and be installed on hammerlock, the hammerlock medial extremity is fixed and is installed on transmission arm, and the transmission arm is passed through
Lead to the passage and reach in the cavity, slided in the vertical slot and be installed on band motion block, the band motion block both sides are symmetrical arranged
Install arm, described to install pivot joint between arm and the transmission arm and be installed on conductive bar, the band motion block upper end is fixed and is installed on
Handle, the handle upper end is reached in the vertical core and stretched upwards, and the handle top is provided with hook ring, and the well body is used
The interaction force that the covering device is produced is installed to reduce in being provided with beam on the end face for installing the covering device.
Further technical scheme, fixation is installed on the first bullet between the band motion block upper surface and the cavity upper end wall
Spring.
Further technical scheme, fixation is installed on second spring between the hammerlock and the translot inward bottom wall.
Further technical scheme, the bore open of installing is more than the cavity bore.
Further technical scheme, the handle upper end is equal with the covering device upper surface.
Further technical scheme, the thickness of the covering device and the deep equality for installing hole.
Further technical scheme, interval and the translot of the lockhole to the well body upper surface are covered to described
The interval of device upper surface is equal.
The beneficial effect of apparatus of the present invention is:
1. due to that in the presence of second spring and the first spring, when handle is carried, hammerlock can be made to be retracted in translot,
So that covering device can be installed into well body;
2. and be installed into covering device and install Kong Zhonghou, unclamp handle hammerlock can just be inserted into lockhole so as to cover
Device completes locking;
3. and when needing to take out covering device, will carry handing up just can complete unblock, and covering device is taken out using handle;
4. it is equal with covering device upper surface to carry part, covering device is put down with well body phase;
5. apparatus of the present invention are simple in construction, install and dismounting is quite convenient to, and can be filled automatically to covering after the completion of installing
Completion locking is put, so as to avoid falling accident, potential safety hazard is greatly reduced.
Brief description of the drawings
, below will be to embodiment or existing in order to illustrate more clearly of inventive embodiments or technical scheme of the prior art
The accompanying drawing used required in technology description is briefly described, it should be apparent that, drawings in the following description are only invention
Some embodiments, for those of ordinary skill in the art, on the premise of not paying creative work, can also basis
These accompanying drawings obtain other accompanying drawings.
Fig. 1 is a kind of overall structure diagram of mining of groundwater well closure construction of the present invention.
Fig. 2 is the structural representation of covering device in a kind of mining of groundwater well closure construction of the invention.
Fig. 3 is a kind of structural representation of mining of groundwater well closure construction reclaimed water well body of the present invention.
Embodiment
All features disclosed in this specification, or disclosed all methods or during the step of, except mutually exclusive
Feature and/or step beyond, can combine in any way.
This specification(Including any accessory claim, summary and accompanying drawing)Disclosed in any feature, except non-specifically is chatted
State, can alternative features equivalent by other or with similar purpose replaced.I.e., unless specifically stated otherwise, each feature
It is an example in a series of equivalent or similar characteristics.
As Figure 1-3, a kind of mining of groundwater well closure construction of the invention, including fixation are installed in roadbed 1
Well body 2 and covering device 3, the well body 2 are provided with and install hole and positioned at institute for install the covering device 3
State and install cavity 21 below hole, described install is symmetrically set with lockhole 20 on the wall of hole side, the both sides of covering device 3 are left
The right side, which is symmetrically arranged with the external translot 33 of notch, the covering device 3, is provided with cavity 31, is provided with the cavity 31
Under the vertical slot 34 that stretches, the centre of covering device 3 is provided with the vertical core 32 of cavity 31 described in insertion, the translot 33 and institute
State and be provided with what is be mutually communicated between cavity 31, slided in the translot 33 and be installed on hammerlock 50, the medial extremity of hammerlock 50 is consolidated
Dingan County is provided with transmission arm 51, and passage described in the insertion of transmission arm 51 is simultaneously reached in the cavity 31, is slided in the vertical slot 34
Band motion block 4 is installed on, the both sides of band motion block 4, which are symmetrically arranged with, installs arm, described to install pivot between arm and the transmission arm 51
Connect and be installed on conductive bar 45, the upper end of band motion block 4 is fixed and is installed on handle 41, and the upper end of handle 41 reaches the vertical core 32
In and stretch upwards, the top of handle 41 is provided with hook ring 410, and the well body 2 is used for the end for installing the covering device 3
Beam 22 is provided with face the interaction force that the covering device 3 is produced is installed to reduce.
Valuably, fixation is installed on the first spring 60, institute between the upper surface of band motion block 4 and the upper end wall of the cavity 31
The first spring 60 is stated the band motion block 4 to be pressed down against.
Valuably, it is fixed between hammerlock 50 and the translot 33 inward bottom wall to be installed on second spring 52, described the
Two springs 52 are the hammerlock 50 to be extruded laterally.
Valuably, the bore open of installing is described to limit so as to form shoulders more than the bore of cavity 21
Covering device 3 slides downwards.
Valuably, the upper end of handle 41 is equal with the upper surface of covering device 3, from without influenceing outward appearance, is also convenient for
To carrying upwards for handle 41.
Valuably, the thickness of the covering device 3 and the deep equality for installing hole, so that the covering device 3 exists
Can be equal with well body 2 when being installed described in being installed into hole.
Valuably, interval and the translot 33 to the covering device 3 of the lockhole 20 to the upper surface of well body 2
The interval of upper surface is equal, so that when the covering device 3 is being installed into described install in hole, can make the hammerlock 50 with
The lockhole 20 aligns.
The covering device 3 is in original state, due to the work in the second spring 52 and first spring 60
Under, the hammerlock 50 is protruding, and the band motion block 4 is located at the bottom of vertical slot 34, when needing the covering device 3
When being installed into the well body 2, the handle 41 is carried upwards first, and the deadweight of the covering device 3 can make described indulge
Slided to sliding block 4 and the roof of cavity 31 are relatively close, and the conductive bar 45 can drive the transmission arm 51 inwardly sideslip
It is dynamic, so that the hammerlock 50 is retracted in the translot 33, described hole is installed so as to be installed into the covering device 3
In, and when the lower end of covering device 3 with it is described install bottom hole end and offset after, the handle 41 is unclamped, in the second spring
52 and first spring 60 in the presence of, the band motion block 4 is extruded into the bottom of vertical slot 34, and the hammerlock 50 to
Overhang and reach the lockhole 20, be installed in so as to fix the covering device 3 in the well body 2;And when needs
When the covering device 3 is taken out from the well body 2, the handle 41 is carried upwards, the longitudinal sliding block 4 is relative to institute
The upward sliding of covering device 3 is stated, so that the hammerlock 50 inwardly retraction is driven in the presence of the conductive bar 45, when the lock
When arm 50 is inwardly retracted and leaves the lockhole 20, the covering device 3 just can take out from the well body 2.
The beneficial effects of the invention are as follows:, can when handle is carried due in the presence of second spring and the first spring
Hammerlock is set to be retracted in translot, so that covering device can be installed into well body;And be installed into covering device and install hole
In after, unclamp handle just hammerlock can be made to be inserted into lockhole so as to covering device complete lock;And need to take out covering device
When, will carry handing up just can complete unblock, and be taken out covering device using handle;Carry part and covering device upper surface phase
Flat, covering device is put down with well body phase;Apparatus of the present invention are simple in construction, install and dismounting is quite convenient to.
Embodiment described above, only inventing, but invention protection domain be not limited thereto, it is any without
The change or replacement that creative work is expected are crossed, should all be covered within the protection domain of invention.Therefore, the protection domain of invention
It should be determined by the scope of protection defined in the claims.
Claims (7)
1. a kind of mining of groundwater well closure construction, including fixed well body and the covering device being installed in roadbed, it is special
Levy and be:The well body is provided with and installs hole and positioned at the sky installed below hole for install the covering device
Chamber, described install is symmetrically set with lockhole on the wall of hole side, it is external that the covering device both sides are symmetrically set with notch
Translot, be provided with cavity, the cavity in the covering device and be provided with the vertical slot stretched up and down, in the covering device
The vertical core of cavity described in insertion is provided with centre, the passage being mutually communicated is provided between the translot and the cavity, it is described
Slided in translot and be installed on hammerlock, the hammerlock medial extremity is fixed and is installed on transmission arm, and passage described in the transmission arm insertion is simultaneously
Reach in the cavity, slided in the vertical slot and be installed on band motion block, the band motion block both sides, which are symmetrically arranged with, installs arm, described
Install pivot joint between arm and the transmission arm and be installed on conductive bar, the band motion block upper end is fixed and is installed on handle, the handle
Upper end reaches in the vertical core and stretched upwards, and the handle top is provided with hook ring, and the well body is used to install the screening
Beam is provided with the end face of lid arrangement.
2. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The band motion block upper surface with it is described
Fixation is installed on the first spring between cavity upper end wall.
3. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The hammerlock and translot inner side
Fixation is installed on second spring between end wall.
4. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The bore open of installing is more than described
Cavity bore.
5. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The handle upper end is covered with described
Device upper surface is equal.
6. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The thickness of the covering device and institute
State the deep equality for installing hole.
7. mining of groundwater well closure construction as claimed in claim 1, it is characterised in that:The lockhole is on the well body
The interval of end face is equal with the interval of the translot to the covering device upper surface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710131916.4A CN107090857A (en) | 2017-03-07 | 2017-03-07 | A kind of mining of groundwater well closure construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710131916.4A CN107090857A (en) | 2017-03-07 | 2017-03-07 | A kind of mining of groundwater well closure construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107090857A true CN107090857A (en) | 2017-08-25 |
Family
ID=59646231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710131916.4A Pending CN107090857A (en) | 2017-03-07 | 2017-03-07 | A kind of mining of groundwater well closure construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107090857A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113513044A (en) * | 2021-04-19 | 2021-10-19 | 中建筑港集团有限公司 | Anti-theft well cover and opener thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789317Y (en) * | 2005-04-25 | 2006-06-21 | 陈强彬 | Antitheft manhole cover and manhole cover key |
KR20080038555A (en) * | 2006-10-30 | 2008-05-07 | (주) 시흥 | Bolt locking type manhole cover |
CN103741721A (en) * | 2014-01-02 | 2014-04-23 | 上海大学 | Well lid device with mechanical lock |
CN105297780A (en) * | 2015-11-23 | 2016-02-03 | 周听昌 | Hole lid special for urban comprehensive pipe rack |
-
2017
- 2017-03-07 CN CN201710131916.4A patent/CN107090857A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2789317Y (en) * | 2005-04-25 | 2006-06-21 | 陈强彬 | Antitheft manhole cover and manhole cover key |
KR20080038555A (en) * | 2006-10-30 | 2008-05-07 | (주) 시흥 | Bolt locking type manhole cover |
CN103741721A (en) * | 2014-01-02 | 2014-04-23 | 上海大学 | Well lid device with mechanical lock |
CN105297780A (en) * | 2015-11-23 | 2016-02-03 | 周听昌 | Hole lid special for urban comprehensive pipe rack |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113513044A (en) * | 2021-04-19 | 2021-10-19 | 中建筑港集团有限公司 | Anti-theft well cover and opener thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107090857A (en) | A kind of mining of groundwater well closure construction | |
CN204532049U (en) | Novel iron tower cat ladder structure | |
CN107460893A (en) | A kind of simple closure construction of mining of groundwater well | |
CN203345973U (en) | Sleeve-frame roller wheel assembly of tower crane | |
CN209321184U (en) | A kind of pleasure-boat Special safety gangway ladder | |
CN107460892A (en) | A kind of mining of groundwater well capping apparatus | |
CN107039817A (en) | A kind of power receptacle jack protection cap | |
CN206448406U (en) | A kind of connection component of curtain wall cross beam and column | |
CN205116862U (en) | Beautify tower | |
CN204199329U (en) | Shock reducing type well lid | |
CN204282314U (en) | A kind of sluice of Novel water conservancy | |
CN203864581U (en) | Movable car trunk | |
CN204059715U (en) | The locking syndeton of channel cross connecting piece | |
CN204109093U (en) | A kind of plank drilling machine positioner | |
CN206465911U (en) | Wiper arm connection component | |
CN107202282A (en) | A kind of folding umbrella support of the street lamp with automatic umbrella | |
CN206232274U (en) | A kind of pressure code structure on the solid track of elevator | |
CN205818978U (en) | A kind of railway contact line pillar | |
CN205113912U (en) | World packing carton | |
CN209008475U (en) | A kind of high-strength aluminum pedal of SUV | |
CN107458740A (en) | A kind of novel bottle cap structure | |
CN205225072U (en) | Twofold formula ladder of climbing to top of a mountain | |
CN206813152U (en) | A kind of automobile arc rod member | |
CN202520203U (en) | Safety door | |
CN107465034A (en) | A kind of power receptacle jack dustproof protective cover |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170825 |
|
RJ01 | Rejection of invention patent application after publication |