CN107090826A - A kind of method of water retaining structure foundation anti-seepage - Google Patents

A kind of method of water retaining structure foundation anti-seepage Download PDF

Info

Publication number
CN107090826A
CN107090826A CN201710466602.XA CN201710466602A CN107090826A CN 107090826 A CN107090826 A CN 107090826A CN 201710466602 A CN201710466602 A CN 201710466602A CN 107090826 A CN107090826 A CN 107090826A
Authority
CN
China
Prior art keywords
pulldown
wall section
manufacturing machine
bent moon
water retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710466602.XA
Other languages
Chinese (zh)
Inventor
慕乾喜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710466602.XA priority Critical patent/CN107090826A/en
Publication of CN107090826A publication Critical patent/CN107090826A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/12Restraining of underground water by damming or interrupting the passage of underground water
    • E02D19/18Restraining of underground water by damming or interrupting the passage of underground water by making use of sealing aprons, e.g. diaphragms made from bituminous or clay material
    • E02D19/185Joints between sheets constituting the sealing aprons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Structural Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A kind of method of water retaining structure foundation anti-seepage:The position of antiseepage is needed in water retaining structure, multigroup steel column stake is squeezed into steel column stake piling machine, every group of steel column stake is front and rear two arranged side by side, it is separated by the length of a double rounded head wall sections between every two groups adjacent steel column stakes, then a double rounded head wall section is manufactured between the stake of every two groups of steel columns with double rounded head wall section manufacturing machines, make double rounded head walls sections double round buckles close two of every group of steel column stake it is cylindrical, will multiple pairs of rounded head walls section progress interlockings by the stake of double steel columns.

Description

A kind of method of water retaining structure foundation anti-seepage
Technical field
The present invention relates to a kind of method of foundation anti-seepage, multiple pairs of rounded head wall sections are locked in particularly a kind of steel column stake The method of the water retaining structure foundation anti-seepage connect.
Background technology
At present, the connection between multiple diaphragm walls is all attached by flush joint connection.
The content of the invention
The invention provides a kind of water retaining structure ground that multiple pairs of rounded head wall sections are carried out to interlocking by steel column stake The method of antiseepage.
To achieve the above object, the technical method that the present invention is used is as follows:
A kind of method of water retaining structure foundation anti-seepage, methods described needs equipment to include steel column stake piling machine and double rounded head walls Section manufacturing machine, described pair of rounded head wall section manufacturing machine includes:The master of the lead one on the left side, the lead two on the right and centre Post one, principal post two collectively constitute a support, the framework being oriented to;
The lower end of the principal post one is hinged the upper right quarter of pulldown one, and the lower end of principal post two is hinged the upper left quarter of pulldown two, principal post one Upper end and principal post two upper end set assembly pulley;
One is set between the principal post one and principal post two and promotes mainly cylinder, is promoted mainly cylinder upper end and is fixed on framework, promotes mainly cylinder lower end and be hinged Sliding block, the left end of sliding block is hinged the upper end of left side connecting rod, and the right-hand member of sliding block is hinged the upper end of the right connecting rod, the lower end of left side connecting rod The upper left quarter of pulldown one is hinged, the lower end of the right connecting rod is hinged the upper right quarter of pulldown two;
The lower left quarter of the pulldown one sets a bent moon body one, and the upper end of bent moon body one, which is fixed on axis body one, axis body one, to be rotated Wheel body one is set, and axis body one is fixed on the upper left quarter of pulldown one by fagging one;Axis body three, axis body are fixed in the lower end of bent moon body one Rotated on three and wheel body three is set, axis body three is fixed on the bottom of pulldown one by fagging three;
The border of the bent moon body one sets track neck, the circular flow of circulation knife chain one in the track neck of bent moon body one, The border of circulation knife chain one is placed equidistant multiple pairs of dise knifes one;
The right lower quadrant of the pulldown two sets a bent moon body two, and the upper end of bent moon body two, which is fixed on axis body two, axis body two, to be rotated Wheel body two is set, and axis body two is fixed on the upper right quarter of pulldown two by fagging two;Axis body four, axis body are fixed in the lower end of bent moon body two Rotated on four and wheel body four is set, axis body four is fixed on the bottom of pulldown two by fagging four;
The border of the bent moon body two sets track neck, the circular flow of circulation knife chain two in the track neck of bent moon body two, The border of circulation knife chain two is placed equidistant multiple pairs of dise knifes two.
The present invention can will multiple pairs of rounded head walls section progress interlockings by the stake of double steel columns.
Brief description of the drawings
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is structural representation of the invention;
Fig. 2 is Fig. 1 A-A, B-B view;
Fig. 3 is the cross-sectional view that steel column stake is connected with double rounded head wall sections.
In figure:1. assembly pulley, 2. leads one, 3. leads two, 4. promote mainly cylinder, 5. principal posts one, 6. principal posts two, 7. cunnings Block, 8. connecting rods, 9. faggings one, 10. faggings two, 11. faggings three, 12. faggings four, 13. pulldowns one, 14. pulldowns two, 15. axis bodies One, 16. axis bodies two, 17. axis bodies three, 18. axis bodies four, 19. wheel bodys one, 20. wheel bodys two, 21. wheel bodys three, 22. wheel bodys four, 23. Bent moon body one, 24. bent moon bodies two, 25. circulation knife chains one, 26. circulation knife chains two, 27. pairs of dise knifes one, 28. pairs of dise knifes two.
Embodiment
Accompanying drawing is specific embodiment of the invention, and the embodiment needs equipment to include steel column stake piling machine and double rounded head walls Section manufacturing machine, the structure of described pair of rounded head wall section manufacturing machine includes:The lead 1 on the left side, the lead 23 on the right and Principal post 1, the principal post 26 of centre collectively constitute a support, the framework being oriented to;
The lower end of the principal post one is hinged the upper right quarter of pulldown 1, and the lower end of principal post two is hinged the upper left quarter of pulldown 2 14, main The upper end of post one and the upper end of principal post two set assembly pulley 1;
One is set between the principal post one and principal post two and promotes mainly cylinder 4, is promoted mainly cylinder upper end and is fixed on framework, promotes mainly cylinder lower end and be hinged Sliding block 7, the left end of sliding block is hinged the upper end of left side connecting rod 8, and the right-hand member of sliding block is hinged the upper end of the right connecting rod 8, left side connecting rod Lower end is hinged the upper left quarter of pulldown one, and the lower end of the right connecting rod is hinged the upper right quarter of pulldown two;
The lower left quarter position of the pulldown one sets a bent moon body 1, and axis body 1, axis body are fixed in the upper end of bent moon body one Rotated on one and wheel body 1 is set, axis body one is fixed on the upper left quarter of pulldown one by fagging 1;The lower end of bent moon body one is fixed Rotated on axis body 3 17, axis body three and wheel body 3 21 is set, axis body three is fixed on the bottom of pulldown one by fagging 3 11;
The border of the bent moon body one sets track neck, and the circular flow of circulation knife chain 1 is in the track neck of bent moon body one Interior, the border of circulation knife chain one is placed equidistant multiple pairs of dise knifes 1;
The right lower quadrant position of the pulldown two sets a bent moon body 2 24, and axis body 2 16, axis body are fixed in the upper end of bent moon body two Rotated on two and wheel body 2 20 is set, axis body two is fixed on the upper right quarter of pulldown two by fagging 2 10;The lower end of bent moon body two is consolidated Rotated on dead axle body 4 18, axis body four and wheel body 4 22 is set, axis body four is fixed on the bottom of pulldown two by fagging 4 12;
The border of the bent moon body two sets track neck, and the circular flow of circulation knife chain 2 26 is in the track neck of bent moon body two Interior, the border of circulation knife chain two is placed equidistant multiple pairs of dise knifes 2 28;
The pulldown one is quadrant, and the pulldown two is quadrant, and pulldown one is buckled into semicircle with pulldown two and grabbed Bucket;
The bent moon body one is the component of falcate;
The bent moon body two is the component of falcate;
Described pair of dise knife one is the cutter hub that two semicircles are dug up at blade end;
Described pair of dise knife two is the cutter hub that two semicircles are dug up at blade end.
Described pair of rounded head wall section manufacturing machine is needed and hoisting frame cooperating, and hoisting frame passes through steel wire rope, assembly pulley Wall section manufacturing machine is played, is slowly transferred during work, starts wall section manufacture until the lower end of wall section manufacturing machine touches ground soon The power set of machine, power set drive the up time direction shuttling movement of circulation knife chain one, and power set drive circulation knife chain two inverse Shi Fangxiang shuttling movements;The soil that double dise knifes one on circulation knife chain one are excavated in shuttling movement passes through the upper left quarter of pulldown one When, soil is fallen into pulldown one, and the soil that double dise knifes two on circulation knife chain two are excavated in shuttling movement is right by pulldown two During top, soil is fallen into pulldown two;Then hoisting frame is proposed wall section manufacturing machine outside groove by steel wire rope, assembly pulley, main Cylinder lifting sliding block is pushed away, pulldown one, pulldown two are opened, soil is poured out, cylinder is then promoted mainly and elects sliding block, by pulldown one, pulldown two Close, wall section manufacturing machine is returned in groove, is worked on, and excavates cell body of the two ends with two semicircles, irrigates mixed in cell body Solidifying soil, forms double rounded head walls section of the two ends with two semicircles.
The construction method of the water retaining structure foundation anti-seepage is:The position of antiseepage is needed in water retaining structure, steel column is used Stake piling machine squeezes into multigroup steel column stake, and every group of steel column stake is front and rear two arranged side by side, is separated by one between every two groups adjacent steel column stakes The length of individual pair of rounded head wall section, then uses double rounded head wall section manufacturing machines one pair of nose circles of manufacture between the stake of every two groups of steel columns Head wall section, make double rounded head walls sections double round buckles close two of every group of steel column it is cylindrical.

Claims (6)

1. a kind of method of water retaining structure foundation anti-seepage, methods described needs equipment to include steel column stake piling machine and double rounded heads Wall section manufacturing machine, it is characterised in that:Described pair of rounded head wall section manufacturing machine includes:The lead one on the left side(2), the right guiding Post two(3)And middle principal post one(5), principal post two(6)Collectively constitute a support, the framework being oriented to;
The lower end of the principal post one is hinged pulldown one(13)Upper right quarter, the lower end of principal post two is hinged pulldown two(14)Upper left Portion, the upper end of principal post one and the upper end of principal post two set assembly pulley(1);
One, which is set, between the principal post one and principal post two promotes mainly cylinder(4), promote mainly cylinder upper end and be fixed on framework, promote mainly cylinder lower end hinge Connect sliding block(7), the left end of sliding block is hinged left side connecting rod(8)Upper end, the right-hand member of sliding block is hinged the right connecting rod(8)Upper end, it is left The lower end of side rod is hinged the upper left quarter of pulldown one, and the lower end of the right connecting rod is hinged the upper right quarter of pulldown two;
The lower left quarter position of the pulldown one sets a bent moon body one(23), axis body one is fixed in the upper end of bent moon body one(15), Rotated on axis body one and wheel body one is set(19), axis body one passes through fagging one(9)It is fixed on the upper left quarter of pulldown one;Bent moon body one Axis body three is fixed in lower end(17), rotate on axis body three and wheel body three be set(21), axis body three passes through fagging three(11)It is fixed on pulldown One bottom;
The border of the bent moon body one sets track neck, circulation knife chain one(25)Circular flow is in the track neck of bent moon body one Interior, the border of circulation knife chain one is placed equidistant multiple pairs of dise knifes one(27);
The right lower quadrant position of the pulldown two sets a bent moon body two(24), axis body two is fixed in the upper end of bent moon body two(16), Rotated on axis body two and wheel body two is set(20), axis body two passes through fagging two(10)It is fixed on the upper right quarter of pulldown two;Bent moon body two Lower end fix axis body four(18), rotate on axis body four and wheel body four be set(22), axis body four passes through fagging four(12)It is fixed on and grabs The bottom of piece two;
The border of the bent moon body two sets track neck, circulation knife chain two(26)Circular flow is in the track neck of bent moon body two Interior, the border of circulation knife chain two is placed equidistant multiple pairs of dise knifes two(28);
Described pair of rounded head wall section manufacturing machine is needed and hoisting frame cooperating, and hoisting frame is played by steel wire rope, assembly pulley Wall section manufacturing machine, is slowly transferred during work, starts wall section manufacturing machine until the lower end of wall section manufacturing machine touches ground soon Power set, power set drive the up time direction shuttling movement of circulation knife chain one, and power set drive the inverse time side of circulation knife chain two To shuttling movement;When the soil that double dise knifes one on circulation knife chain one are excavated in shuttling movement passes through one upper left quarter of pulldown, mud Soil is fallen into pulldown one, and the soil that double dise knifes two on circulation knife chain two are excavated in shuttling movement passes through the upper right quarter of pulldown two When, soil is fallen into pulldown two;Then hoisting frame is proposed wall section manufacturing machine outside groove by steel wire rope, assembly pulley, promotes mainly cylinder Sliding block is lifted, pulldown one, pulldown two are opened, soil is poured out, cylinder is then promoted mainly and elects sliding block, pulldown one, pulldown two are closed, Wall section manufacturing machine is returned in groove, is worked on, and excavates cell body of the two ends with two semicircles, the concrete perfusion in cell body, Form double rounded head walls section of the two ends with two semicircles;
The construction method of the water retaining structure foundation anti-seepage is:The position of antiseepage is needed in water retaining structure, is beaten with steel column stake Stake machine squeezes into multigroup steel column, and every group of steel column stake is front and rear two arranged side by side, is separated by one pair between every two groups adjacent steel column stakes The length of rounded head wall section, then uses double rounded head wall section manufacturing machines one pair of rounded head walls of manufacture between the stake of every two groups of steel columns Section, make double rounded head walls sections double round buckles close two of every group of steel column it is cylindrical.
2. a kind of method of water retaining structure foundation anti-seepage according to claim 1, the described of wall section manufacturing machine grabs Piece one is quadrant, and the pulldown two is quadrant, and pulldown one is buckled into semicircle grab bucket with pulldown two.
3. a kind of method of water retaining structure foundation anti-seepage according to claim 1, the wall section manufacturing machine it is described curved Month body one is the component of falcate.
4. a kind of method of water retaining structure foundation anti-seepage according to claim 1, the wall section manufacturing machine it is described curved Month body two is the component of falcate.
5. a kind of method of water retaining structure foundation anti-seepage according to claim 1, described pair of the wall section manufacturing machine Dise knife one is the cutter hub that two semicircles are dug up at blade end.
6. a kind of method of water retaining structure foundation anti-seepage according to claim 1, described pair of the wall section manufacturing machine Dise knife two is the cutter hub that two semicircles are dug up at blade end.
CN201710466602.XA 2017-06-20 2017-06-20 A kind of method of water retaining structure foundation anti-seepage Pending CN107090826A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710466602.XA CN107090826A (en) 2017-06-20 2017-06-20 A kind of method of water retaining structure foundation anti-seepage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710466602.XA CN107090826A (en) 2017-06-20 2017-06-20 A kind of method of water retaining structure foundation anti-seepage

Publications (1)

Publication Number Publication Date
CN107090826A true CN107090826A (en) 2017-08-25

Family

ID=59640290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710466602.XA Pending CN107090826A (en) 2017-06-20 2017-06-20 A kind of method of water retaining structure foundation anti-seepage

Country Status (1)

Country Link
CN (1) CN107090826A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924389U (en) * 2011-02-14 2011-08-10 张永忠 Trenching machine with double grab buckets
CN203320592U (en) * 2013-06-03 2013-12-04 刘玉秋 Crescent knife slotting machine
CN106013110A (en) * 2016-06-22 2016-10-12 张葵英 Manufacturing equipment for double circular arc interlocking pile wall
CN106677224A (en) * 2017-02-28 2017-05-17 浙江绩丰岩土技术股份有限公司 Milling wheel wall brushing device for underground diaphragm wall lock catch pipe connector
CN106836190A (en) * 2017-04-02 2017-06-13 刘玉兴 The chain wall manufacture machinery of one Seed King letter stencil

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201924389U (en) * 2011-02-14 2011-08-10 张永忠 Trenching machine with double grab buckets
CN203320592U (en) * 2013-06-03 2013-12-04 刘玉秋 Crescent knife slotting machine
CN106013110A (en) * 2016-06-22 2016-10-12 张葵英 Manufacturing equipment for double circular arc interlocking pile wall
CN106677224A (en) * 2017-02-28 2017-05-17 浙江绩丰岩土技术股份有限公司 Milling wheel wall brushing device for underground diaphragm wall lock catch pipe connector
CN106836190A (en) * 2017-04-02 2017-06-13 刘玉兴 The chain wall manufacture machinery of one Seed King letter stencil

Similar Documents

Publication Publication Date Title
CN216342184U (en) Self-made simple movable formwork for efficient construction of small tunnel concrete
CN106759858A (en) The connecting node and preparation method of a kind of H profile steel beam and rectangular steel-tube concrete column
CN204000755U (en) A kind of Chained slope protection building block
CN205501843U (en) Consolidate rigid framed arch bridge
CN104074131B (en) A kind of assembled inverted T-shaped slab bridge structure and construction method thereof
CN107090826A (en) A kind of method of water retaining structure foundation anti-seepage
CN206215824U (en) Filling pile cage of reinforcement processing unit (plant)
CN203007977U (en) Composite protective structure for reinforced net-plane stopping wall
CN208748648U (en) A kind of Prefabricated Reinforced Concrete Square Pile
CN214657014U (en) Lime-soil compaction pile construction equipment
CN108842759A (en) The built pile and its construction technology of prefabricated tubular pile and bored concrete pile
CN211596741U (en) Pretensioned prestressed concrete dado V-shaped pile
CN203827799U (en) Greenhouse frame high in wind survability
CN208121757U (en) A kind of Bougainvillea spectabilis flower-shape concrete tubular pile
CN206180488U (en) Cable pit moving die carrier
CN209339128U (en) Quick Release pile crown bored concrete pile
CN209227579U (en) Assembled prismoid shaped basis and rod structure
CN206389734U (en) A kind of crawler type ditching machine
CN208121790U (en) Engineering construction cofferdam device
CN207004568U (en) A kind of interim sump
CN206212850U (en) A kind of shore protection plants tree device with survival high
CN2729151Y (en) High-strength hollow pile top
CN206706750U (en) Civil engineering hollow pile
CN206052718U (en) The pile foundation mud pit of dismantled and assembled filter cleaning dregs
CN109653213A (en) A kind of ground-connecting-wall forming construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825

RJ01 Rejection of invention patent application after publication