CN107088319A - Filter press intelligent operation control device and control method - Google Patents

Filter press intelligent operation control device and control method Download PDF

Info

Publication number
CN107088319A
CN107088319A CN201710485673.4A CN201710485673A CN107088319A CN 107088319 A CN107088319 A CN 107088319A CN 201710485673 A CN201710485673 A CN 201710485673A CN 107088319 A CN107088319 A CN 107088319A
Authority
CN
China
Prior art keywords
level
grades
filter press
collecting vessel
delivery port
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710485673.4A
Other languages
Chinese (zh)
Inventor
巩固
吴东方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710485673.4A priority Critical patent/CN107088319A/en
Publication of CN107088319A publication Critical patent/CN107088319A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D25/00Filters formed by clamping together several filtering elements or parts of such elements
    • B01D25/003Filters formed by clamping together several filtering elements or parts of such elements integrally combined with devices for controlling the filtration
    • B01D25/006Filters formed by clamping together several filtering elements or parts of such elements integrally combined with devices for controlling the filtration by level measuring
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D37/00Processes of filtration
    • B01D37/04Controlling the filtration
    • B01D37/045Controlling the filtration by level measuring

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Filtration Of Liquid (AREA)

Abstract

Present invention relates particularly to a kind of filter press intelligent operation control device and control method;Including one-level collecting vessel, one-level level probe is installed, the one-level level probe is by cradle hangs inside one-level collecting vessel, and the one-level level probe connects liquid level gauge by signal wire, and the liquid level gauge connects PLC in the one-level collecting vessel;The side wall upper part of the one-level collecting vessel is provided with one-level overflow delivery port, and the bottom of one-level collecting vessel is provided with one-level control delivery port;One-level is provided with the one-level control delivery port and far controls valve, the one-level far controls valve connection PLC;The present invention controls to automatically generate filling and the filtration time of filter press using the change for detecting filtrate water-carrying capacity, by PLC, not only reduces the labor intensity of post worker, saves the electricity charge, and filter press is remained high-efficiency operation.

Description

Filter press intelligent operation control device and control method
Technical field
The present invention relates to Intellectualized controller, and in particular to a kind of filter press intelligent operation control device and controlling party Method.
Background technology
Filter press is a kind of pressure filtration facility of intermittent operation, it is adaptable to the separation of solid and liquid of various suspensions, is applicable Scope is wide, good separating effect, easy to operate, safe and reliable.Coal preparation plant of the country uses filter press mainly to slime water treatment at present.
Filter press used in Si He ore deposits coal preparation plant is the plate and frame type filter-press produced by Kang Ming Ces Co., Ltd of Spain, type Number be APN18S6 types, separate unit filter area:208m2, totally 9.In daily production process, the feed time of filter press can only be leaned on The streamflow size of filter press driver observation filtrate water, the dry and wet of briquette are manually set, due to individual's warp of filter press driver Test different with operating habit, the factors such as ature of coal situation change cause this operating method to have great hysteresis quality and shakiness It is qualitative, and cause filter press work efficiency very low.
The filling of filter press on domestic market and filtration time setting do not reach by pressing all by being manually set Filter sets the feed time each circulated automatically according to ature of coal situation and with dehydrating effect.
The content of the invention
The present invention needs to be manually set the filling of filter press and filtration time to solve existing filter press, it is impossible to according to ature of coal There is provided a kind of filter press intelligent operation control to control the filling of filter press and the technical problem of filtration time for situation and dehydrating effect Device processed and control method.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
One-level liquid level is installed in a kind of filter press intelligent operation control device, including one-level collecting vessel, the one-level collecting vessel Probe, the one-level level probe is by cradle hangs inside one-level collecting vessel, and the one-level level probe passes through signal wire First liquid level gauge is connected, the liquid level gauge connects PLC;The side wall upper part of the one-level collecting vessel is provided with one-level and overflow The mouth of a river is flowed out, the lower sides of one-level collecting vessel are provided with one-level control delivery port;It is provided with the one-level control delivery port One-level far controls valve, and the one-level far controls Valve controlling end connection PLC.
Said apparatus is applied to most of material and carries out press filtration control.
Said apparatus is in specific works, and one-level collecting vessel bucket is placed on the delivery port bottom of filter press filtrate water.
A kind of filter press intelligent operation control method, is realized using above-mentioned filter press intelligent operation control device, including Following steps,
A, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel, and the one-level on one-level control delivery port is set in advance The aperture of remote control valve, the filtrate water-carrying capacity that initial stage is flowed into one-level collecting vessel is controlled out more than one-level collecting vessel upper level Liquid level in the flow at the mouth of a river, one-level collecting vessel is increased;
B, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, the filtrate water-carrying capacity also all corresponding reduction of one-level collecting vessel is flowed into, when inflow one When filtrate water-carrying capacity in level collecting vessel is less than the flow of one-level control delivery port, the liquid level in one-level collecting vessel is gradually reduced, When one-level level probe is changed into touching less than filtrate water in one-level collecting vessel from touching filtrate water, connect with one-level level probe Signal is transmitted to PLC by the first liquid level gauge connect, and the feed pump of PLC control filter press is automatically stopped work, pressed The charging of filter terminates.
Set in the lower end of the one-level overflow delivery port in two grades of collecting vessels, two grades of collecting vessels and two grades of liquid are installed Position probe, two grades of level probes are by cradle hangs inside two grades of collecting vessels, and two grades of level probes pass through signal Line connects second liquid level gauge, and the liquid level gauge connects PLC;The side wall upper part of two grades of collecting vessels is provided with two grades Overflow delivery port, the lower sides of two grades of collecting vessels are provided with Two-stage control delivery port;Set on the Two-stage control delivery port There are two grades remote control valve, described two grades remote control Valve controlling end connection PLC.
The devices such as two grades of collecting vessels are set to be directed to some hardly possible dehydrations in the one-level overflow delivery port of one-level collecting vessel Material, is carried out set during press filtration during ature of coal situation extreme variation.Two grades of collecting vessels are intended to control on control one-level collecting vessel The aperture of outlet valve.
A kind of filter press intelligent operation control method, is realized using above-mentioned filter press intelligent operation control device, including Following steps,
A, the action time t for setting two grades of level probes in PLC first;
B, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel, and the one-level on one-level control delivery port is set in advance The aperture of remote control valve, the filtrate water-carrying capacity that initial stage is flowed into one-level collecting vessel is controlled out more than one-level collecting vessel upper level Liquid level in the flow at the mouth of a river, one-level collecting vessel is increased;After reaching a certain height, filtrate water in one-level collecting vessel is from one Level overflow delivery port flows into two grades of collecting vessels, the aperture of the two grades remote control valve on Two-stage control delivery port is set in advance, just The filtrate water-carrying capacity that stage phase is flowed into two grades of collecting vessels is more than the flow of Two-stage control delivery port;Liquid level in two grades of collecting vessels Increase;
C, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, and the filtrate water-carrying capacity for flowing into one-level collecting vessel and two grades of collecting vessels is also all corresponding Reduce;When the filtrate water-carrying capacity in two grades of collecting vessels of inflow is less than the flow of Two-stage control delivery port, in two grades of collecting vessels Liquid level is gradually reduced, when two grades of level probes are changed into touching less than the filtrate water in two grades of collecting vessels from that can touch filtrate water When, signal is transmitted to PLC by the second liquid level gauge being connected with two grades of level probes, and PLC starts according to filter press The action time t for running to two grade level probes of the time used in second liquid level gauge transmission signal with setting before is compared It is right:Divide following two situations;
If 1. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is less than the effect of two grades of level probes During time t, PLC control one-level is far controlled valve and closed rapidly, until two grades of level probes touch two grades of collections again During filtrate water in bucket and postpone 5 seconds, then, one-level far controls 90% that valve automatically opens up the aperture size to before closing;
If 2. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is more than the effect of two grades of level probes During time t, one-level far controls valve opening size and keeps constant;
D, over time, the filtrate for flowing into one-level collecting vessel accordingly reduces, when one-level level probe is by touching filtrate water When being changed into touching less than filtrate water in one-level collecting vessel, signal is transmitted to by the first liquid level gauge being connected with one-level level probe PLC, the feed pump of PLC control filter press is automatically stopped work, and the charging of filter press terminates.
Compared with prior art the invention has the advantages that:
1st, the traditional concept for setting manually filter press filling and filtration time is broken, using the change for detecting filtrate water-carrying capacity, Control to automatically generate filling and the filtration time of filter press by PLC, not only reduce the labor intensity of post worker, save electricity Take, and filter press is remained high-efficiency operation.
2nd, when ature of coal situation extreme variation, this device can be by two grades of collecting vessel intelligentized control method one-level collecting vessels One-level control the aperture size of outlet valve, can be according to the control system of this device of on-site actual situations intelligent optimization.
3rd, this patent is may be used on all filter presses and similar devices, realizes the automatic of filter press and similar devices Change, intellectuality is run, and is the important breakthrough in filter press and similar devices technological innovation, imitated with important economy and society Benefit.
Brief description of the drawings
Fig. 1 is filter press intelligent operation control device.
Fig. 2 is liquid level gauge connection line figure.
Fig. 3 is liquid level gauge and PLC connection line figure.
Marked in figure as follows:
1- one-level collecting vessels, 2- one-level level probes, 3- one-level overflow delivery ports, 4- one-levels control delivery port, 5- one-level blowdowns Delivery port, 6- one-levels far control valve, 7- one-level valves, bis- grades of collecting vessels of 8-, bis- grades of level probes of 9-, bis- grades of overflow water outlets of 10- Mouthful, 11- Two-stage control delivery ports, bis- grades of blowdown delivery ports of 12-, the bis- grades remote control valves of 13-, 14- secondary valves door.
Embodiment
Below in conjunction with specific embodiment, the invention will be further described.
Embodiment 1
One-level liquid is installed in a kind of filter press intelligent operation control device, including one-level collecting vessel 1, the one-level collecting vessel 1 Position probe 2, the one-level level probe 2 is by cradle hangs inside one-level collecting vessel 1, and the one-level level probe 2 passes through Signal wire connects first liquid level gauge, and the liquid level gauge connects PLC;The side wall upper part of the one-level collecting vessel 1 is provided with One-level overflow delivery port 3, the lower sides of one-level collecting vessel 1 are provided with one-level control delivery port 4;The one-level controls delivery port One-level is provided with 4 and far controls valve 6, the one-level far controls the control end of valve 6 connection PLC.
Described filter press intelligent operation control device, one-level blowdown delivery port is provided with the bottom of one-level collecting vessel 1 5, one-level valve 7 is provided with the one-level blowdown delivery port 5.
Set in the lower end of the one-level overflow delivery port 3 in two grades of collecting vessels 8, two grades of collecting vessels 8 and be provided with two Level level probe 9, two grades of level probes 9 by cradle hangs inside two grades of collecting vessels 8, two grades of level probes 9 Second liquid level gauge is connected by signal wire, the liquid level gauge connects PLC;The side wall upper part of two grades of collecting vessels 8 is set Two grades of overflow delivery ports 10 are equipped with, the lower sides of two grades of collecting vessels 8 are provided with Two-stage control delivery port 11;The Two-stage control Two grades remote control valve 13, described two grades remote control valve 13 control end connection PLC are provided with delivery port 11.
The bottom of two grades of collecting vessels 8 is provided with two grades of blowdown delivery ports 12, two grades of blowdown delivery ports 12 and is provided with Secondary valve door 14.
A kind of filter press intelligent operation control method, comprises the following steps,
A, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel 1, and one on one-level control delivery port 4 is set in advance The aperture of the remote control valve 6 of level, the filtrate water-carrying capacity that initial stage flows into one-level collecting vessel 1 is more than the upper level of one-level collecting vessel 1 The liquid level in the flow of delivery port 4, one-level collecting vessel is controlled to increase;
B, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, is flowed into the filtrate water-carrying capacity also all corresponding reduction of one-level collecting vessel 1, is worked as inflow When filtrate water-carrying capacity in one-level collecting vessel 1 is less than one-level and controls the flow of delivery port 4, liquid level in one-level collecting vessel gradually under Drop, when one-level level probe 2 is changed into touching less than filtrate water in one-level collecting vessel 1 from touching filtrate water, with one-level liquid level Signal is transmitted to PLC by the first liquid level gauge that probe 2 is connected, and the feed pump of PLC control filter press is automatically stopped Work, the charging of filter press terminates.
A kind of filter press intelligent operation control method, comprises the following steps,
A, the action time t for setting two grades of level probes 9 in PLC first;
B, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel 1, and one on one-level control delivery port 4 is set in advance The aperture of the remote control valve 6 of level, the filtrate water-carrying capacity that initial stage flows into one-level collecting vessel 1 is more than the upper level of one-level collecting vessel 1 The liquid level in the flow of delivery port 4, one-level collecting vessel is controlled to increase;After reaching a certain height, the filter in one-level collecting vessel Liquid water flows into two grades of collecting vessels 8 from one-level overflow delivery port 3, and the two grades remote control valve on Two-stage control delivery port 12 is set in advance The aperture of door 13, initial stage flows into two grades of collecting vessels 8 flow of the filtrate water-carrying capacity more than Two-stage control delivery port 12;Two Liquid level in level collecting vessel is increased;
C, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, flows into the filtrate water-carrying capacity of one-level collecting vessel 1 and two grades of collecting vessels 8 also all phase It should reduce;When the filtrate water-carrying capacity in two grades of collecting vessels 8 of inflow is less than the flow of Two-stage control delivery port 12, two grades of collecting vessels Interior liquid level is gradually reduced, when two grades of level probes 9 are changed into touching less than the filter in two grades of collecting vessels 8 from that can touch filtrate water During liquid water, signal is transmitted to PLC by the second liquid level gauge being connected with two grades of level probes 9, and PLC is according to filter press Bring into operation to second liquid level gauge and send the action time t of the time used in signal and the two grades of level probes 9 set before It is compared:Divide following two situations;
If 1. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is less than the effect of two grades of level probes 9 During time t, PLC control one-level far controls the closing rapidly of valve 6, until two grades of level probes 9 touch two grades of receipts again Collect bucket 8 in filtrate water when and postpone 5 seconds(Can separately it be set according to scene), then, one-level is far controlled valve 6 and automatically opened up to original The 90% of aperture size before aperture or closing(Can separately it be set according to scene);Over time, when two grades of collecting vessels of inflow Filtrate water-carrying capacity in 8 again less than Two-stage control delivery port 12 flow when, the liquid level in two grades of collecting vessels is gradually reduced, when When two grades of level probes 9 are changed into touching less than filtrate water in two grades of collecting vessels 8 from that can touch filtrate water again, with two grades of liquid Signal is transmitted to PLC by the second liquid level gauge that position probe 9 is connected, and PLC brings into operation to second according to filter press The action time t that liquid level gauge sends two grade level probes 9 of the time with setting before used in signal is compared, if small When the action time t of two grades of level probes 9, PLC control continues executing with the control of above-mentioned control valve remote to one-level, such as This is reciprocal, until filter press brings into operation to second liquid level gauge, the time sent used in signal is more than the two grades of liquid set before During the action time t of position probe 9, PLC is not performing control to the remote control valve of one-level;
If 2. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is more than the effect of two grades of level probes 9 During time t, one-level far controls the aperture size of valve 6 and keeps constant;
D, over time, flows into one-level collecting vessel(1)Filtrate accordingly reduce, when one-level level probe(2)By touching Filtrate water is changed into touching less than one-level collecting vessel(1)During interior filtrate water, with one-level level probe(2)The first liquid level gauge of connection Signal is transmitted to PLC, the feed pump of PLC control filter press is automatically stopped work, and the charging of filter press terminates.
The action time t of two grades of level probes 9 setting range is 800-1000 seconds, according to different ature of coal and thing The dehydration complexity of material is determined.
One-level blowdown delivery port 5 and two grades of blowdown water outlets that the bottom of the one-level collecting vessel 1 and two grades of collecting vessels 8 is set Mouth 12 is used for discharge impurities or the rubbish fallen into bucket.

Claims (7)

1. a kind of filter press intelligent operation control device, it is characterised in that:Including one-level collecting vessel(1), the one-level collecting vessel (1)One-level level probe is inside installed(2), the one-level level probe(2)By cradle hangs in one-level collecting vessel(1)It is interior Portion, the one-level level probe(2)First liquid level gauge is connected by signal wire, the liquid level gauge connects PLC;It is described One-level collecting vessel(1)Side wall upper part be provided with one-level overflow delivery port(3), one-level collecting vessel(1)Lower sides be provided with One-level controls delivery port(4);The one-level controls delivery port(4)On be provided with one-level and far control valve(6), the one-level far controls valve Door(6)Control end connects PLC.
2. filter press intelligent operation control device according to claim 1, it is characterised in that:One-level collecting vessel(1)Bottom Portion is provided with one-level blowdown delivery port(5), the one-level blowdown delivery port(5)On be provided with one-level valve(7).
3. filter press intelligent operation control device according to claim 1 or 2, it is characterised in that:In the one-level overflow Delivery port(3)Lower end set two grades of collecting vessels(8), two grades of collecting vessels(8)Two grades of level probes are inside installed(9), institute State two grades of level probes(9)By cradle hangs in two grades of collecting vessels(8)Inside, two grades of level probes(9)Pass through signal Line connects second liquid level gauge, and the liquid level gauge connects PLC;Two grades of collecting vessels(8)Side wall upper part be provided with two Level overflow delivery port(10), two grades of collecting vessels(8)Lower sides be provided with Two-stage control delivery port(11);The Two-stage control Delivery port(11)On be provided with two grades remote control valves(13), described two grades remote control valve(13)Control end connects PLC.
4. filter press intelligent operation control device according to claim 3, it is characterised in that:Two grades of collecting vessels(8)Bottom Portion is provided with two grades of blowdown delivery ports(12), two grades of blowdown delivery ports(12)On be provided with secondary valve door(14).
5. a kind of filter press intelligent operation control method, controls to fill using filter press intelligent operation as claimed in claim 1 or 2 Put to realize, it is characterised in that:Comprise the following steps,
A, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel(1), one-level control delivery port is set in advance(4)On One-level far control valve(6)Aperture, initial stage flow into one-level collecting vessel in(1)Filtrate water-carrying capacity be more than one-level collecting vessel (1)Upper level controls delivery port(4)Flow, the liquid level in one-level collecting vessel increases;
B, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, flows into one-level collecting vessel(1)Filtrate water-carrying capacity it is also all corresponding reduce, work as stream Enter one-level collecting vessel(1)Interior filtrate water-carrying capacity is less than one-level and controls delivery port(4)Flow when, the liquid level in one-level collecting vessel It is gradually reduced, when one-level level probe(2)It is changed into touching less than one-level collecting vessel from filtrate water can be touched(1)Interior filtrate water When, with one-level level probe(2)Signal is transmitted to PLC by the first liquid level gauge of connection, PLC control filter press Feed pump is automatically stopped work, and the charging of filter press terminates.
6. a kind of filter press intelligent operation control method, using filter press intelligent operation control device as claimed in claim 3 To realize, it is characterised in that:Comprise the following steps,
A, two grades of level probes are set in PLC first(9)Action time t;
B, filter press close filter plate, are formed after filter chamber, and filter press feed pump starts charging, after material filling full filter chamber, material Dehydration starts, and the filtrate water flowed out from filter press flows into one-level collecting vessel(1), one-level control delivery port is set in advance(4)On One-level far control valve(6)Aperture, initial stage flow into one-level collecting vessel in(1)Filtrate water-carrying capacity be more than one-level collecting vessel (1)Upper level controls delivery port(4)Flow, the liquid level in one-level collecting vessel increases;After reaching a certain height, one-level is received Collect the filtrate water in bucket from one-level overflow delivery port(3)Flow into two grades of collecting vessels(8), Two-stage control delivery port is set in advance (12)On two grades remote control valve(13)Aperture, initial stage flow into two grades of collecting vessels in(8)Filtrate water-carrying capacity be more than two Level control delivery port(12)Flow;Liquid level in two grades of collecting vessels is increased;
C, over time, filter cake is gradually formed in filter press filter chamber, and solids content gradually increases in filter chamber, out of filter chamber The filtrate water of discharge is gradually decreased, at the same time, flows into one-level collecting vessel(1)With two grades of collecting vessels(8)Filtrate water-carrying capacity It is all corresponding to reduce;When two grades of collecting vessels of inflow(8)Interior filtrate water-carrying capacity is less than Two-stage control delivery port(12)Flow when, two Liquid level in level collecting vessel is gradually reduced, when two grades of level probes(9)It is changed into less than two grades receipts of touching from filtrate water can be touched Collect bucket(8)During interior filtrate water, with two grades of level probes(9)Signal is transmitted to PLC, PLC by the second liquid level gauge of connection Controller was brought into operation according to filter press to the time used in second liquid level gauge transmission signal and the two grades of liquid levels set before Probe(9)Action time t be compared:Divide following two situations;
If 1. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is less than two grades of level probes(9)Work During with time t, PLC control one-level far controls valve(6)It is rapid to close, until two grades of level probes(9)Touch again Two grades of collecting vessels(8)During interior filtrate water and postpone 5 seconds, then, one-level far controls valve(6)It is big that aperture is automatically opened up to before closing Small 90%;
If 2. filter press, which brought into operation to the time used in second liquid level gauge transmission signal, is more than two grades of level probes(9)Work During with time t, one-level far controls valve(6)Aperture size keeps constant;
D, over time, flows into one-level collecting vessel(1)Filtrate accordingly reduce, when one-level level probe(2)By touching Filtrate water is changed into touching less than one-level collecting vessel(1)During interior filtrate water, with one-level level probe(2)The first liquid level gauge of connection Signal is transmitted to PLC, the feed pump of PLC control filter press is automatically stopped work, and the charging of filter press terminates.
7. a kind of filter press intelligent operation control method according to claim 6, it is characterised in that:Two grades of liquid levels are visited Pin(9)Action time t setting range be 800-1000 seconds.
CN201710485673.4A 2017-06-23 2017-06-23 Filter press intelligent operation control device and control method Pending CN107088319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710485673.4A CN107088319A (en) 2017-06-23 2017-06-23 Filter press intelligent operation control device and control method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710485673.4A CN107088319A (en) 2017-06-23 2017-06-23 Filter press intelligent operation control device and control method

Publications (1)

Publication Number Publication Date
CN107088319A true CN107088319A (en) 2017-08-25

Family

ID=59641216

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710485673.4A Pending CN107088319A (en) 2017-06-23 2017-06-23 Filter press intelligent operation control device and control method

Country Status (1)

Country Link
CN (1) CN107088319A (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108245951A (en) * 2018-02-13 2018-07-06 常州信息职业技术学院 A kind of method of work and press filteration system of antiseep press filteration system
CN108298604A (en) * 2018-01-19 2018-07-20 常州信息职业技术学院 A kind of working method and press filteration system of the press filteration system resetted based on electromagnetism
CN109865325A (en) * 2017-12-05 2019-06-11 南京机器人研究院有限公司 A kind of sewage disposal system and its working method
CN109865327A (en) * 2017-12-05 2019-06-11 南京机器人研究院有限公司 A kind of plate and frame press filteration system and its working method suitable for carrying drying function
CN111111275A (en) * 2019-12-31 2020-05-08 天津中新智冠信息技术有限公司 Control system, filter press feeding state detection method and monitoring equipment
CN112361217A (en) * 2020-09-29 2021-02-12 中核四0四有限公司 Debugging method of long-distance high-differential-pressure water transmission pipeline

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2252058A (en) * 1991-01-25 1992-07-29 Fernando Martinez Mugica Filter cleaning system
US20040060850A1 (en) * 2002-09-26 2004-04-01 Chiaphua Industries Limited Water purifier
CN203281086U (en) * 2013-06-20 2013-11-13 中铁十一局集团城市轨道工程有限公司 Movable sewage treating pond
CN204543687U (en) * 2015-03-17 2015-08-12 景津环保股份有限公司 Filter press charging automaton
CN205672662U (en) * 2016-05-31 2016-11-09 北京市市政工程设计研究总院有限公司 Filter tank initial filter water safe discharge equipment
CN206965230U (en) * 2017-06-23 2018-02-06 巩固 Filter press intelligent operation control device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2252058A (en) * 1991-01-25 1992-07-29 Fernando Martinez Mugica Filter cleaning system
US20040060850A1 (en) * 2002-09-26 2004-04-01 Chiaphua Industries Limited Water purifier
CN203281086U (en) * 2013-06-20 2013-11-13 中铁十一局集团城市轨道工程有限公司 Movable sewage treating pond
CN204543687U (en) * 2015-03-17 2015-08-12 景津环保股份有限公司 Filter press charging automaton
CN205672662U (en) * 2016-05-31 2016-11-09 北京市市政工程设计研究总院有限公司 Filter tank initial filter water safe discharge equipment
CN206965230U (en) * 2017-06-23 2018-02-06 巩固 Filter press intelligent operation control device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109865325A (en) * 2017-12-05 2019-06-11 南京机器人研究院有限公司 A kind of sewage disposal system and its working method
CN109865327A (en) * 2017-12-05 2019-06-11 南京机器人研究院有限公司 A kind of plate and frame press filteration system and its working method suitable for carrying drying function
CN108298604A (en) * 2018-01-19 2018-07-20 常州信息职业技术学院 A kind of working method and press filteration system of the press filteration system resetted based on electromagnetism
CN108245951A (en) * 2018-02-13 2018-07-06 常州信息职业技术学院 A kind of method of work and press filteration system of antiseep press filteration system
CN111111275A (en) * 2019-12-31 2020-05-08 天津中新智冠信息技术有限公司 Control system, filter press feeding state detection method and monitoring equipment
CN112361217A (en) * 2020-09-29 2021-02-12 中核四0四有限公司 Debugging method of long-distance high-differential-pressure water transmission pipeline

Similar Documents

Publication Publication Date Title
CN107088319A (en) Filter press intelligent operation control device and control method
CN109181862A (en) Rape oil-pressing continuously filters production system
CN208883626U (en) A kind of oil field produced water treatment facilities
CN206965230U (en) Filter press intelligent operation control device
CN207886766U (en) A kind of recycling machine oil separating device
CN203474554U (en) Wet flue gas desulfurized waste water treatment device
CN208232376U (en) A kind of full-automatic camellia oil filter-pressing device
CN208688804U (en) A kind of mobile cart for the detection of multi-way valve cleannes
CN202490479U (en) Circulating piping system for filter pressing working section
CN204745867U (en) A oil water separator for food and beverage
CN205421521U (en) A class device is abandoned to positive displacement rainwater
CN206372592U (en) A kind of Full-automatic backwashing filter
CN104096397A (en) Process for filtering gray water generated in coal gasification
CN204582718U (en) A kind of siphon control device of integral water purifier
CN209178222U (en) A kind of tailings sludge dewatering system
CN220078900U (en) Plate-and-frame filter press device
CN208526063U (en) A kind of coke-stove gas separation equipment is counter online to clean automatic control device
CN202671320U (en) Sewage treatment integrated machine
CN104801101A (en) Siphon control device of integrated water purifier
CN214436701U (en) Automatic phase splitting device in furfural intermittent production
CN101653674B (en) Liquid-solid separation process and system for suspending liquid
CN108465282A (en) A kind of short grained filtration wash unit of ternary precursor and its filtration washing technique
CN209779846U (en) Solid-liquid separation device for sewage lifter
CN203002052U (en) Multifunctional automatic oil discharging and sewage discharging device of oil field oily sewage filtering tank
CN109139093A (en) A kind of ground drilling low concentration coal-bed gas methane drainage and utilization project system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170825

RJ01 Rejection of invention patent application after publication