CN107086599A - 一种三相平衡情况下整流站对发电机轴系影响的评估方法 - Google Patents
一种三相平衡情况下整流站对发电机轴系影响的评估方法 Download PDFInfo
- Publication number
- CN107086599A CN107086599A CN201710241435.9A CN201710241435A CN107086599A CN 107086599 A CN107086599 A CN 107086599A CN 201710241435 A CN201710241435 A CN 201710241435A CN 107086599 A CN107086599 A CN 107086599A
- Authority
- CN
- China
- Prior art keywords
- mrow
- generator
- converting plant
- case
- msub
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/36—Arrangements for transfer of electric power between ac networks via a high-tension dc link
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02E60/60—Arrangements for transfer of electric power between AC networks or generators via a high voltage DC link [HVCD]
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Control Of Eletrric Generators (AREA)
Abstract
本发明公开了一种三相平衡情况下整流站对发电机轴系影响的评估方法,包括以下步骤:(1)发电机发出的是基波正弦电压,经变压器变换后传递到整流站;(2)整流站使用三相整流桥,整流侧电流为经过电力电子器件整流的电流;(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,abc三相的电流均为方波,通过傅里叶变换,变换为无穷项正弦波的和,不考虑换相过程,可求出abc三相的傅里叶级数的系数;(4)假设原动机的输入电磁力矩保持恒定,电磁力矩也恒定,发电机匀速运行,计算得到电磁力矩是波动的,说明对发电机轴系寿命有影响,为评估三相不平衡情况下整流站对发电机轴系影响提供理论依据基础。
Description
技术领域
本发明属于电力系统次同步振荡技术领域,特别是涉及一种三相平衡情况下整流站对发电机轴系影响的评估方法。
背景技术
高压送电具有损耗小的特点。中国两大电网公司,国家电网公司,南方电网公司,在高压输电这方面,国网进行800kv高压交流输电项目,南网进行500kv高压直流输电项目。
这些传统电厂发出交流电,经过整流站变成直流后输送到高压直流输电线路。但是由于经过电力电子器件(整流)的作用,与传统直接连接交流线路相比,这些电厂更容易出现振荡问题,特别是交流电力系统中比较相当少见,但在直流中被发现的次同步振荡问题(振荡频率远高于低频振荡但又小于同步频率)。
云南电网作为南网直流的送端,部分电厂离500KV直流线路有一定距离,但考虑到发电机电压出厂经变压器升到220KV电压送到整流站,电气距离也可以认为不长,可用发电机厂—整流站—无穷大系统模型。这些电厂出现一些次同步振荡问题,这时一种不同于以往多见的低频振荡新问题。并且,在如风力发电这类发电机要经过整流逆变电路再接入电网的情况,也出现过次同步振荡问题。
发明内容
本发明目的在于提出一种三相平衡情况下整流站对发电机轴系影响的评估方法,以解决三相平衡情况下次同步振荡的问题。
为此,本发明提出一种三相平衡情况下整流站对发电机轴系影响的评估方法,包括以下步骤:
(1)建立整流站对发电机轴系影响的评估系统,发电机发出的是基波正弦电压,经变压器变换后传递到整流站;
(2)整流站使用三相整流桥,发电机定子的电流由负载决定,由整流侧传递过来,整流侧电流为经过电力电子器件整流的电流;
(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,abc三相的电流均为方波,运用以下公式,可以通过傅里叶变换,变换为无穷项正弦波的和,
n=1,2,3......
这里并不考虑换相过程,可求出abc三相的傅里叶级数的系数;
(4)假设原动机的输入电磁力矩保持恒定,恒定运行时,电磁力矩也为恒定,发电机匀速运行,将abc三相电流代入电磁力矩公式,可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响。
进一步地,步骤(1)中所述的整流站对发电机轴系影响的评估系统包括:发电机、换流器、升压器、整流站,所述发电机、换流器、升压器依次串联连接,所述升压器通过高压直流输电线路连接整流站。
进一步地,所述换流器为PWM整流器。
进一步地,所述升压器为DC-DC升压器。
进一步地,所述升压器将直流电升压至35KV以上。
进一步地,所述整流站包括逆变器和整流变压器。
进一步地,所述高压直流输电线路采用柔性高压直流电缆。
进一步地,步骤(2)中所述三相整流桥为6脉波三相整流桥。
进一步地,步骤(4)中所述电磁力矩保持恒定的方法是调节火电厂气门或水电厂水门。
本发明与现有技术对比的有益效果包括:
(1)本发明的评估方法可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响;
(2)本发明采用无穷大系统模型进行评估三相平衡情况下整流站对发电机轴系影响,为评估三相不平衡情况下整流站对发电机轴系影响提供理论依据基础。
附图说明
图1是本发明的整流站对发电机轴系影响的评估系统结构示意图;
图2是本发明的三相整流桥模型图;
图3是本发明的经整流后得到的abc三相的电流图。
具体实施方式
实施例1
一种三相平衡情况下整流站对发电机轴系影响的评估方法,包括以下步骤:
(1)建立整流站对发电机轴系影响的评估系统,如图1所示,发电机发出的是基波正弦电压,经变压器变换后传递到整流站;
所述的整流站对发电机轴系影响的评估系统包括:发电机、换流器、升压器、整流站,所述发电机、换流器、升压器依次串联连接,所述升压器通过高压直流输电线路连接整流站;
所述换流器为PWM整流器;
所述升压器为DC-DC升压器;
所述升压器将直流电升压至35KV;
所述整流站包括逆变器和整流变压器;
所述高压直流输电线路采用柔性高压直流电缆;
(2)整流站使用6脉波三相整流桥,发电机定子的电流由负载决定,由整流侧传递过来,整流侧电流为经过电力电子器件整流的电流,模型如图2所示;
(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,如图3所示,abc三相的电流均为方波,运用以下公式,可以通过傅里叶变换,变换为无穷项正弦波的和,
n=1,2,3......
这里并不考虑换相过程,可求出abc三相的傅里叶级数的系数;
(4)假设原动机的输入电磁力矩保持恒定(通过火电厂调节气门),恒定运行时,电磁力矩也为恒定,发电机匀速运行,将abc三相电流代入电磁力矩公式,可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响。
实施例2
一种三相平衡情况下整流站对发电机轴系影响的评估方法,包括以下步骤:
(1)建立整流站对发电机轴系影响的评估系统,如图1所示,发电机发出的是基波正弦电压,经变压器变换后传递到整流站;
所述的整流站对发电机轴系影响的评估系统包括:发电机、换流器、升压器、整流站,所述发电机、换流器、升压器依次串联连接,所述升压器通过高压直流输电线路连接整流站;
所述换流器为PWM整流器;
所述升压器为DC-DC升压器;
所述升压器将直流电升压至220KV;
所述整流站包括逆变器和整流变压器;
所述高压直流输电线路采用柔性高压直流电缆;
(2)整流站使用6脉波三相整流桥,发电机定子的电流由负载决定,由整流侧传递过来,整流侧电流为经过电力电子器件整流的电流,模型如图2所示;
(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,如图3所示,abc三相的电流均为方波,运用以下公式,可以通过傅里叶变换,变换为无穷项正弦波的和,
n=1,2,3......
这里并不考虑换相过程,可求出abc三相的傅里叶级数的系数;
(4)假设原动机的输入电磁力矩保持恒定(通过水电厂调节水门),恒定运行时,电磁力矩也为恒定,发电机匀速运行,将abc三相电流代入电磁力矩公式,可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响。
实施例3
一种三相平衡情况下整流站对发电机轴系影响的评估方法,包括以下步骤:
(1)建立整流站对发电机轴系影响的评估系统,如图1所示,发电机发出的是基波正弦电压,经变压器变换后传递到整流站;
所述的整流站对发电机轴系影响的评估系统包括:发电机、换流器、升压器、整流站,所述发电机、换流器、升压器依次串联连接,所述升压器通过高压直流输电线路连接整流站;
所述换流器为PWM整流器;
所述升压器为DC-DC升压器;
所述升压器将直流电升压至500KV;
所述整流站包括逆变器和整流变压器;
所述高压直流输电线路采用柔性高压直流电缆;
(2)整流站使用6脉波三相整流桥,发电机定子的电流由负载决定,由整流侧传递过来,整流侧电流为经过电力电子器件整流的电流,模型如图2所示;
(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,如图3所示,abc三相的电流均为方波,运用以下公式,可以通过傅里叶变换,变换为无穷项正弦波的和,
n=1,2,3......
这里并不考虑换相过程,可求出abc三相的傅里叶级数的系数;
(4)假设原动机的输入电磁力矩保持恒定(通过火电厂调节气门),恒定运行时,电磁力矩也为恒定,发电机匀速运行,将abc三相电流代入电磁力矩公式,可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响。
本领域技术人员将认识到,对以上描述做出众多变通是可能的,所以实施例和附图仅是用来描述特定实施方式。
尽管已经描述和叙述了被看作本发明的示范实施例,本领域技术人员将会明白,可以对其作出各种改变和替换,而不会脱离本发明的精神。另外,可以做出许多修改以将特定情况适配到本发明的教义,而不会脱离在此描述的本发明中心概念。所以,本发明不受限于在此披露的特定实施例,但本发明可能还包括属于本发明范围的所有实施例及其等同物。
Claims (9)
1.一种三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,包括以下步骤:
(1)建立整流站对发电机轴系影响的评估系统,发电机发出的是基波正弦电压,经变压器变换后传递到整流站;
(2)整流站使用三相整流桥,发电机定子的电流由负载决定,由整流侧传递过来,整流侧电流为经过电力电子器件整流的电流;
(3)经整流后,得到三相平衡情况下整流侧abc三相的电流,abc三相的电流均为方波,运用以下公式,可以通过傅里叶变换,变换为无穷项正弦波的和,
<mrow>
<mi>F</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
<mo>=</mo>
<msub>
<mi>A</mi>
<mrow>
<mo>(</mo>
<mn>0</mn>
<mo>)</mo>
</mrow>
</msub>
<mo>+</mo>
<munderover>
<mo>&Sigma;</mo>
<mrow>
<mi>n</mi>
<mo>=</mo>
<mn>1</mn>
</mrow>
<mi>&infin;</mi>
</munderover>
<mrow>
<mo>(</mo>
<msub>
<mi>A</mi>
<mrow>
<mo>(</mo>
<mi>n</mi>
<mo>)</mo>
</mrow>
</msub>
<mi>cos</mi>
<mi>n</mi>
<mi>&omega;</mi>
<mi>t</mi>
<mo>+</mo>
<msub>
<mi>B</mi>
<mrow>
<mo>(</mo>
<mi>n</mi>
<mo>)</mo>
</mrow>
</msub>
<mi>sin</mi>
<mi>n</mi>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
<mfenced open = "{" close = "">
<mtable>
<mtr>
<mtd>
<mrow>
<msub>
<mi>A</mi>
<mrow>
<mo>(</mo>
<mn>0</mn>
<mo>)</mo>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</mfrac>
<msubsup>
<mo>&Integral;</mo>
<mn>0</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</msubsup>
<mi>f</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
<mi>d</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>A</mi>
<mrow>
<mo>(</mo>
<mi>n</mi>
<mo>)</mo>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</mfrac>
<msubsup>
<mo>&Integral;</mo>
<mn>0</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</msubsup>
<mi>f</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
<mi>cos</mi>
<mi>n</mi>
<mi>&omega;</mi>
<mi>t</mi>
<mi>d</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
<mtr>
<mtd>
<mrow>
<msub>
<mi>B</mi>
<mrow>
<mo>(</mo>
<mi>n</mi>
<mo>)</mo>
</mrow>
</msub>
<mo>=</mo>
<mfrac>
<mn>1</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</mfrac>
<msubsup>
<mo>&Integral;</mo>
<mn>0</mn>
<mrow>
<mn>2</mn>
<mi>&pi;</mi>
</mrow>
</msubsup>
<mi>f</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
<mi>sin</mi>
<mi>n</mi>
<mi>&omega;</mi>
<mi>t</mi>
<mi>d</mi>
<mrow>
<mo>(</mo>
<mi>&omega;</mi>
<mi>t</mi>
<mo>)</mo>
</mrow>
</mrow>
</mtd>
</mtr>
</mtable>
</mfenced>
n=1,2,3......
这里并不考虑换相过程,可求出abc三相的傅里叶级数的系数;
(4)假设原动机的输入电磁力矩保持恒定,恒定运行时,电磁力矩也为恒定,发电机匀速运行,将abc三相电流代入电磁力矩公式,可得到电磁力矩是波动的,即作用在发电机轴两端的力不平衡,说明对发电机轴系寿命有影响。
2.根据权利要求1所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,步骤(1)中所述的整流站对发电机轴系影响的评估系统包括:发电机、换流器、升压器、整流站,所述发电机、换流器、升压器依次串联连接,所述升压器通过高压直流输电线路连接整流站。
3.根据权利要求2所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,所述换流器为PWM整流器。
4.根据权利要求2所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,所述升压器为DC-DC升压器。
5.根据权利要求2所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,所述升压器将直流电升压至35KV以上。
6.根据权利要求2所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,所述整流站包括逆变器和整流变压器。
7.根据权利要求2所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,所述高压直流输电线路采用柔性高压直流电缆。
8.根据权利要求1所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,步骤(2)中所述三相整流桥为6脉波三相整流桥。
9.根据权利要求1所述的三相平衡情况下整流站对发电机轴系影响的评估方法,其特征在于,步骤(4)中所述电磁力矩保持恒定的方法是调节火电厂气门或水电厂水门。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710241435.9A CN107086599A (zh) | 2017-04-13 | 2017-04-13 | 一种三相平衡情况下整流站对发电机轴系影响的评估方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710241435.9A CN107086599A (zh) | 2017-04-13 | 2017-04-13 | 一种三相平衡情况下整流站对发电机轴系影响的评估方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107086599A true CN107086599A (zh) | 2017-08-22 |
Family
ID=59613149
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710241435.9A Pending CN107086599A (zh) | 2017-04-13 | 2017-04-13 | 一种三相平衡情况下整流站对发电机轴系影响的评估方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107086599A (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102624012A (zh) * | 2012-03-26 | 2012-08-01 | 中国电力科学研究院 | 基于力矩分解的积分算法识别负阻尼低频振荡的方法 |
CN103490682A (zh) * | 2013-10-11 | 2014-01-01 | 重庆理工大学 | 一种交流伺服电机转子位置检测系统及检测方法 |
CN104227194A (zh) * | 2014-07-18 | 2014-12-24 | 上海广为焊接设备有限公司 | 全电压输入的电焊机及其控制系统 |
CN104951763A (zh) * | 2015-06-16 | 2015-09-30 | 北京四方继保自动化股份有限公司 | 基于录波大数据异常检测的发电机组次同步风险评估方法 |
CN105244911A (zh) * | 2015-10-23 | 2016-01-13 | 华北电力大学 | 高渗透率的新能源电力并网系统及稳定性控制方法 |
-
2017
- 2017-04-13 CN CN201710241435.9A patent/CN107086599A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102624012A (zh) * | 2012-03-26 | 2012-08-01 | 中国电力科学研究院 | 基于力矩分解的积分算法识别负阻尼低频振荡的方法 |
CN103490682A (zh) * | 2013-10-11 | 2014-01-01 | 重庆理工大学 | 一种交流伺服电机转子位置检测系统及检测方法 |
CN104227194A (zh) * | 2014-07-18 | 2014-12-24 | 上海广为焊接设备有限公司 | 全电压输入的电焊机及其控制系统 |
CN104951763A (zh) * | 2015-06-16 | 2015-09-30 | 北京四方继保自动化股份有限公司 | 基于录波大数据异常检测的发电机组次同步风险评估方法 |
CN105244911A (zh) * | 2015-10-23 | 2016-01-13 | 华北电力大学 | 高渗透率的新能源电力并网系统及稳定性控制方法 |
Non-Patent Citations (2)
Title |
---|
上海交通大学数学系组: "《数学物理方法》", 30 September 2016 * |
陈季权等: "《电机学》", 31 December 2008, 中国电力出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yan et al. | Voltage-sag tolerance of DFIG wind turbine with a series grid side passive-impedance network | |
Nguyen et al. | A series-connected topology of a diode rectifier and a voltage-source converter for an HVDC transmission system | |
EP2893606B1 (en) | Connection system for power generation system with dc output | |
US9577557B2 (en) | Turbine-generator system with DC output | |
US9525284B2 (en) | Medium voltage DC collection system with power electronics | |
Nian et al. | Coordinated control strategy for doubly‐fed induction generator with DC connection topology | |
US10153642B2 (en) | Multiphase generator-conversion systems | |
US20130181688A1 (en) | System and method for variable speed generation of controlled high-voltage dc power | |
CN101645606A (zh) | 用于转换风力发电机产生的电力的模块变流器和采用所述变流器的风力发电站 | |
CN102400849A (zh) | 变频风力设备 | |
CN103208816B (zh) | 一种风电场的集电输电系统及其交流母线电压控制方法 | |
CA2800663A1 (en) | Electric energy conversion device | |
Bulatov et al. | Use of power routers and renewable energy resources in smart power supply systems | |
Leng et al. | Smart grid connection of an induction motor using a three-phase floating h-bridge system as a series compensator | |
CN107895962A (zh) | 一种电流源型高压直流输电系统及其运行方法 | |
Jahan et al. | Simplified model of HVDC transmission system connecting offshore wind farm to onshore grid | |
Seman et al. | Analysis of a 1.7 MVA doubly fed wind-power induction generator during power systems disturbances | |
CN106356889A (zh) | 永磁风力发电机组 | |
Sikorski et al. | Cooperation of induction squirrel-cage generator with grid connected AC/DC/AC converter | |
Rahman et al. | Modeling and design of a multiport magnetic bus-based novel wind-wave hybrid ocean energy technology | |
CN107086599A (zh) | 一种三相平衡情况下整流站对发电机轴系影响的评估方法 | |
CN206850444U (zh) | 一种三相平衡情况下整流站对发电机轴系影响的评估装置 | |
CN106953341A (zh) | 一种三相平衡情况下整流站对发电机轴系影响的评估系统 | |
JP2019041477A (ja) | 分散電源システムの制御装置、分散電源システム、分散電源システムの制御方法、及び分散電源システムの制御プログラム | |
CN102761127A (zh) | 三相并网逆变器在电网不平衡跌落时的无功电流补偿方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170822 |
|
RJ01 | Rejection of invention patent application after publication |