CN107082550A - Sewage sludge dehydration device based on electromagnetic force - Google Patents

Sewage sludge dehydration device based on electromagnetic force Download PDF

Info

Publication number
CN107082550A
CN107082550A CN201710410610.2A CN201710410610A CN107082550A CN 107082550 A CN107082550 A CN 107082550A CN 201710410610 A CN201710410610 A CN 201710410610A CN 107082550 A CN107082550 A CN 107082550A
Authority
CN
China
Prior art keywords
filter plate
secondary filter
electromagnetic
plate
electromagnetic force
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710410610.2A
Other languages
Chinese (zh)
Other versions
CN107082550B (en
Inventor
张岩
饶宾期
万延见
卢锡龙
梁培
徐祖芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Huijin Environmental Protection Technology Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710410610.2A priority Critical patent/CN107082550B/en
Publication of CN107082550A publication Critical patent/CN107082550A/en
Application granted granted Critical
Publication of CN107082550B publication Critical patent/CN107082550B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening
    • C02F11/121Treatment of sludge; Devices therefor by de-watering, drying or thickening by mechanical de-watering
    • C02F11/122Treatment of sludge; Devices therefor by de-watering, drying or thickening by mechanical de-watering using filter presses
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D25/00Filters formed by clamping together several filtering elements or parts of such elements
    • B01D25/003Filters formed by clamping together several filtering elements or parts of such elements integrally combined with devices for controlling the filtration
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D25/00Filters formed by clamping together several filtering elements or parts of such elements
    • B01D25/12Filter presses, i.e. of the plate or plate and frame type
    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/12Treatment of sludge; Devices therefor by de-watering, drying or thickening

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Treatment Of Sludge (AREA)

Abstract

The present invention relates to a kind of sewage sludge dehydration device based on electromagnetic force, including the secondary filter plate (7) in front end, rear end pair filter plate (19), middle main filter plate (11), middle pair filter plate (10), electromagnetic core (4) and magnet coil (5), described magnet coil (5) volume is on corresponding electromagnetic core (4), form electromagnetic module, the outside of the secondary filter plate (7) in described front end is provided with electromagnetic module, the inner side of the secondary filter plate (19) in the rear end is provided with electromagnetic module, multiple strainer plate modules are provided between the secondary filter plate (19) of the secondary filter plate (7) in described front end and rear end, each strainer plate module includes a main filter plate in centre (11), secondary filter plate (10) and an electromagnetic module in the middle of one.The present invention uses electromagnetic force, with few easy workout part, dehydrated sludge moisture content relatively low advantage low without hydraulic system, energy consumption.

Description

Sewage sludge dehydration device based on electromagnetic force
Technical field
The present invention relates to sewage sludge process field, specifically a kind of sewage sludge dehydration dress based on electromagnetic force Put.
Background technology
In the prior art, it is diaphragm plate frame filter press that more deep dehydration device for sludge, which occurs, in the market, during dehydration, effect Rate is relatively low, and squeeze pressure is only 1.6MPa, its squeezing is injected water into inside diaphragm plate frame by high-pressure hydraulic pump, and bulging barrier film reduces Filter chamber area, the plastic deformation of diaphragm plate frame backup plate frame is extruded;Diaphragm plate frame compression ratio is small, long with respect to the work period.In addition, On the market on common elasticity squeezing sheet frame its structure construction, filter is all the injection module of an entirety, and filter is easy Being damaged the filter after deformation, and damage needs integral replacing so that maintenance cost is higher, it is often more important that, due to structure Feature and squeeze pressure be not high, the currently employed diaphragm plate frame filter press may by municipal sludge press dewatering to 60% or so, Plate and frame filter press moisture content reduction than before is many, and main cause is because barrier film bulging produces twice pressing to sludge, i.e., Sludge press filtration chamber is variable chamber, but the equipment needs to add the lime and molysite of over dry mud amount 30% or so, so that greatly The processing disposal follow-up to sludge such as the amount of sludge, and the lime and iron chloride of addition is added greatly brings detrimental effect, Run counter to the minimizing of specific resistance to filtration and innoxious principle.
Currently there is a kind of superelevation compression elasticity squeezing sludge dewatering equipment, the equipment mainly includes high-voltage oil cylinder, superelevation press filtration The compositions such as plate, matching board, spring medium, filter cloth specialized, the secondary filter plate in rear end, push pedal, girder, super-pressure squeezing sheet frame includes filter Frame, filter plate, filter cloth, operating room, spring and piston plate, spring are arranged between filter frame and filter plate, and piston plate is arranged on operating room Between filter plate so that filter plate produces compression by piston plate to operating room.Rammer board dehydration is broadly divided into two-stage, The first order is to transport material to filter chamber by feed pump, and separation of solid and liquid, i.e., one are carried out by the pressure of feed pump while charging Secondary filtering means dehydration;The second level is elastic squeezing, and one end of equipment is fixed, and the other end applies ambient pressure by hydraulic jack, is led to Cross elastic force-transmitting device (spring) compression chamber space and squeezing progress second dehydration is carried out to material.By carrying out superelevation to sludge Pressure squeezing, squeeze pressure is in 5MPa or so, and high-pressure oil pump needs to provide 25-30MPa or so pressure, can drop moisture percentage in sewage sludge To 50% or so.Equally, the superelevation compression elasticity squeezer realizes the change to sludge pressing chamber volume by setting spring To realize that super-pressure is extruded, because spring often completes the processes such as elongation-compression, it is necessary to bear alternate load, spring is easily sent out Raw fatigue rupture, spring is that 10-20 high-strength spring is needed between a kind of consumable accessory, and every group of sheet frame, 50-100 block plates Frame then needs nearly 1000-2000 high-strength spring, moreover, also needing to the bullet for overcoming spring initial when extruding spring Power is acted on, and squeeze pressure actual suffered by sludge is smaller than the pressure that superpressure oil pump is supplied to during twice pressing.For example, entering When expecting pressure for 1MPa, spring must be provided more than 1MPa elastic force so that the maximization of chamber can be kept between filter plate and filter frame, At the end of squeezing is fed, when high-pressure pump carries out second of high-pressure compressing to sludge, it is necessary to overcome spring to start what is had Elastic force, this partial pressure is the pressure of consumption, so as to cause high-pressure pump to be less than actual pressure to the pressure produced by sludge Power.
Existing market also has a kind of super-pressure diaphragm plate frame filter press, and the equipment is on original diaphragm plate frame filter press Upgrading, provide nearly 10MPa pressure to sludge by the water that 10MPa is injected in barrier film, be also for two grades of expressing process, Feed pressure is begun through, highly pressurised liquid is then injected in barrier film, carrying out bulging to barrier film further presses sludge Dehydration is squeezed, municipal moisture percentage in sewage sludge can be down to 50% or so after equipment dehydration.There is a subject matter in the equipment Barrier film is under so high pressure and large deformation, the service life problem of barrier film.
The equipment such as above-mentioned diaphragm plate frame filter press, high-pressure elastomeric machine are all to realize to take off sludge pressing by high-voltage oil cylinder Water provide power, it is necessary to configure special a set of hydraulic system, and when being high-pressure compressing, hydraulic system pressure is very high. Need to pull open filter plate during dump, this requires one special plate pulling device of configuration to pull open filter plate one piece for one piece, plate pulling efficiency Relatively low, the time is long, influences the whole working time.
Analyzed more than, it can be seen that to realize that the deep dehydration of sludge has to realize sludge pressing chamber volume Changeability, while to sludge carry out high-pressure compressing.Either diaphragm plate frame filter press or superelevation compression elasticity squeezer all has There is the changeability of sludge pressing chamber, but at present there is following subject matter in deep dehydration device for sludge:(1) it is common The sludge pressing pressure of diaphragm plate frame filter press is smaller, and super-pressure diaphragm plate frame filter press squeeze pressure is enough, but barrier film Life problems;(2) superelevation compression elasticity squeezer is the change for realizing sludge pressing chamber volume by spring, and spring is fragile And substantial amounts of squeeze pressure can be consumed;(3) pressure is bigger, more solid in the sludge being close on filter plate, easily forms one The closely knit sludge blanket of layer, the sludge blanket is bonded on filter cloth, increase moisture discharge resistance, influences dehydrating effect;(4) due to sewage High-compressibility, high-moisture percentage and the sewage sludge that sludge has contain capillary water, adsorb sludge dewatering caused by water and internal water Difficult the characteristics of, completely using mechanical pressure be difficult to sludge carry out high depth dehydration so that moisture percentage in sewage sludge reach one compared with Low level.
The content of the invention
In view of this, the consumable accessory that the present invention exists for above-mentioned prior art is more, high energy consumption, and oil cylinder working-pressure requires high Technical problem, proposes a kind of use electromagnetic force, the sewage sludge dehydration device based on electromagnetic force without hydraulic system, reduces Device complexity, saves cost and energy consumption.
The technical solution of the present invention is to provide a kind of a kind of sewage sludge dehydration based on electromagnetic force of following structure Device, including the secondary filter plate in front end, the secondary filter plate in rear end, middle main filter plate, middle secondary filter plate, electromagnetic core and magnet coil, it is described Magnet coil volume on the corresponding electromagnetic core, form electromagnetic module, the outside of the secondary filter plate in described front end is provided with electromagnetism Module, the inner side of the secondary filter plate in the rear end is provided between electromagnetic module, the secondary filter plate of the secondary filter plate in described front end and rear end provided with many Individual strainer plate module, each strainer plate module includes a main filter plate in centre, a middle secondary filter plate and an electromagnetic module, described One main filter plate in centre and a middle secondary filter plate are separately fixed in the two ends of the electromagnetic module, the multiple strainer plate module Between main filter plate towards the secondary filter plate in front end, secondary filter plate is towards the secondary filter plate in rear end in the middle of multiple strainer plate modules so that secondary filter plate and master Filter plate, which is corresponded, to be coordinated, and forms multiple press filtration chambers, and sewage sludge enters the press filtration chamber by enters mud pipe;
The secondary filter plate in described front end, middle main filter plate, the secondary filter plate of middle secondary filter plate and rear end pass sequentially through linkage company Connect, linked with being realized under the electromagnetic force of electromagnetic module;
First stage is dehydrated:Magnet coil into electromagnetic module is passed through the first electric current, keeps the electromagnetic force produced by it Major-minor filter plate can be inhaled and be combined together, magnet coil is powered off after adhesive, obtains electric by stopping means coil, so as to limit connecting rod machine The structure anglec of rotation;Sewage sludge is injected in press filtration cavity, realizes that the first stage is dehydrated under feed pressure effect;
Second stage is dehydrated:The magnet coil in electromagnetic module is powered again, the second electric current is passed through, when direction is with adhesive The sense of current it is identical, second electric current be more than first electric current, second electric current be gradually increased to cause major-minor filter Pressure between plate is stepped up;
The dump stage:First to the coil blackout on stopping means, release to the spacing of the linkage, changing section electricity The sense of current of magnetic coil so that the electromagnetic force of all press filtration chambers can all become repulsion, major-minor is filtered in the presence of repulsion Plate, which can be separated from, to be come, to realize dump.
Optionally, sealing ring is provided with the outer ring of the main filter plate in described centre, and successively from interior on middle main filter plate Outwards set gradually reinforcing line and filter cloth.
Optionally, by air inlet supervisor connection many air intake branches, many air intake branches accordingly with multiple press filtration chambers Room is connected, for being passed through gases at high pressure in being responsible for from air inlet and entering corresponding press filtration chamber by air intake branch.
Optionally, respectively it is provided with the secondary filter plate in described front end, middle main filter plate and middle secondary filter plate for discharging Filter out the filter plate drainpipe of moisture.
Optionally, described linkage includes master connecting-rod and slave connecting rod, and described master connecting-rod is arranged in the middle of odd number block On the rotation central axis of secondary filter plate, described slave connecting rod is arranged in the middle of even numbered blocks on the rotation central axis of secondary filter plate, master connecting-rod and pair Connecting rod is connected through the hinge.
Optionally, secondary filter plate is additionally provided with stopping means in the middle of described odd number block, and described stopping means includes limited block Slide rail in electromagnetic core, limited block coil, spring stop, back-moving spring, slide rail and sliding block, described each stopping means is consolidated It is scheduled on middle secondary filter plate, the angle of master connecting-rod rotation can be accurately defined after sliding block stretching to realize, so as to define centre The distance of secondary filter plate and middle main filter plate, described limited block electromagnetic core is fixed on position limiting slide block, described spring stop Slide rail is fixed on, described back-moving spring is used for connection sliding block and slide rail.
Optionally, described slider tail is magnetisable material, when limited block coil obtains electric rear slider and slide rail generation relatively Motion, while compression reseting spring, slip front, which is stretched out, blocks master connecting-rod.
Optionally, described minimizing dehydration device also includes dust arrester, and the dust arrester is by negative pressure by high pressure The sludge dust that gas is brought is drawn onto dust arrester and removed.
Using above structure, compared with prior art, the present invention has advantages below:(1) provide powerful by electromagnetic field Squeeze force sludge is squeezed, without hydraulic coupling and hydraulic system, in addition, the electric current side by changing magnet coil To the suction of electromagnet is changed into repulsion, automatic pulling plate, without plate pulling device;(2) middle main filter plate, sealing ring, middle pair are passed through The structure coordinated between filter plate, reinforcing line and filter cloth, the cavity of the variable volume of the closing of composition meets the high-compressibility of sludge Characteristic, in the absence of using consumable accessorys such as spring, barrier films, improves equipment dependability and service life;(3) dredge pump is pressed into using height, This enters dredge pump for high-pressure plunger pump, and first time feed pressure dehydration, Ran Houzai can be carried out to sludge by the high pressure charging pressure By increasing coil current, pressure is incrementally increased between increasing electromagnetic force causes major-minor filter press plate, to sludge progress adding progressively Pressure, carries out second stage press dewatering;(4) due to also having part moisture mechanically to remove in sludge, this programme High pressure gas generator and component are employed, is acted on by gases at high pressure, the moisture that mechanical system in sludge is difficult to remove is led to Cross high pressure draught mode to take away, that is, realize mechanical expression and air-flow double effects, so as to further reduce the moisture of sludge, reach Sludge deep minimizing purpose.
Brief description of the drawings
Fig. 1 is the front view of the sewage sludge dehydration device of the invention based on electromagnetic force;
Fig. 2 is the top view of the sewage sludge dehydration device of the invention based on electromagnetic force;
Fig. 3 is the sectional view of the sewage sludge dehydration device of the invention based on electromagnetic force;
Fig. 4 is the partial enlarged drawing of the sewage sludge dehydration device sectional view of the invention based on electromagnetic force;
Fig. 5 is the structural representation of stopping means;
Structural representation when Fig. 6 opens for sewage sludge dehydration device chamber of the present invention based on electromagnetic force;
Structural representation when Fig. 7 closes for sewage sludge dehydration device chamber of the present invention based on electromagnetic force;
Side view when Fig. 8 closes for sewage sludge dehydration device chamber of the present invention based on electromagnetic force.
As illustrated, 1, enters mud pipe, 2, plunger pump, 3, pneumatic ball valve, 4, electromagnetic core, 5, magnet coil, 6, air inlet branch Pipe, 7, the secondary filter plate in front end, 8, air inlet supervisor, 9, sealing ring, 10, middle secondary filter plate, 11, middle main filter plate, 12, master connecting-rod, 13, Slave connecting rod, 14, stopping means, 14-1, limited block electromagnetic core, 14-2, limited block coil, 14-3, spring stop are 14-4, multiple Position spring, 14-5, slide rail, 14-6, sliding block, 15, dust arrester, 16, high-pressure pump, 17, rotation central axis, 18, latch, 19, after The secondary filter plate in end, 20, filter plate journal stirrup, 21, reinforcing line, 22, filter cloth, 23, major-minor filter plate connecting tube, 24, limit to salient point, 25, filter plate Drainpipe, 26, controlling bus, 27, the secondary filter plate enters mud pipe in front end, 28, system controller.
Embodiment
The invention will be further described with specific embodiment below in conjunction with the accompanying drawings.
The present invention covers any replacement, modification, equivalent method and scheme made in the spirit and scope of the present invention.For Make the public have the present invention thoroughly to understand, concrete details is described in detail in present invention below preferred embodiment, and Description without these details can also understand the present invention completely for a person skilled in the art.In addition, the accompanying drawing of the present invention In in order to illustrate the need for, be not drawn to scale accurately completely, be explained herein.
As illustrated, the sewage sludge minimizing dehydration device based on electromagnetic force of the present invention, including enters mud pipe 1, high pressure Enter dredge pump 2, pneumatic ball valve 3, the secondary filter plate 7 in front end, sealing ring 10, dust arrester 15, the secondary filter plate 19 in rear end, filter plate journal stirrup 20 plus Strong lining 21, filter cloth 22, enters mud pipe 27, filter plate drainpipe 25, controlling bus 26, system controller 28, described minimizing dehydration Device also includes electromagnetic core 4, magnet coil 5, air intake branch 6, air inlet supervisor 8, middle secondary filter plate 9, middle main filter plate 11, master Connecting rod 12, slave connecting rod 13, stopping means 14, high-pressure pump 16, rotation central axis 17, hinge 18, major-minor filter plate connecting tube 23, limit to Multiple electromagnetic cores 4, magnet coil 5 and major-minor filter plate connecting tube 23 are provided between salient point 24, described middle secondary filter plate 9, 23 groups of multiple electromagnetic cores 4, magnet coil 5 and major-minor filter plate connecting tube are provided between middle main filter plate 11, middle secondary filter plate 9 Into relatively-stationary unit, described magnet coil is passed through electric current for alternating current, and its size and direction can be adjusted, front end pair Filter plate 7 is fixedly connected with electromagnet and pneumatic ball valve 3, and rear end pair filter plate 19 is fixedly connected with middle main filter plate 11.Master connecting-rod 12, Slave connecting rod 13 connects all middle secondary filter plates 10, the secondary filter plate 7 in front end and rear end pair filter plate 19.Outside middle main filter press plate 11 Circle, which is provided with semicircle groove, to be used to install sealing ring 10, and the diameter of sealing ring 10 is smaller than middle main filter plate overall diameter, middle pair filter plate 9, Middle main filter plate 11, sealing ring 10, reinforcing line 20, filter cloth 19 constitute the closed chamber of a variable-volume, and the closed chamber is Sludge press filtration chamber, the more excellent scheme of filtrating-pressing plate frame structure is made as circle, and preferably, specific demand can also make sealing property It is square.
Press filtration chamber includes middle main filter plate 11, middle secondary filter plate 10, reinforcing line 21, filter cloth 22, the middle main He of filter plate 11 There are annular, bar shaped water outlet groove, three through holes that its top half is connected with air intake branch 6, lower half on middle pair filter plate 10 Divide seven through holes being connected with filter plate drainpipe 25 so that filter plate drainpipe 25 can be flowed to and by height by being press-filtered out the water come Body of calming the anger accelerates the flow velocity of water while blowing out the water on mud cake surface, middle pair filter plate 10, the secondary filter plate 7 in front end and rear end pair filter plate 19 Both sides, which have on boss, boss, to be had rotation central axis 17 and limits to salient point 24, for installing connection master connecting-rod 12 and limiting its rotation Direction, reinforcing line 21 is fixed on each piece of filter plate, and reinforcing line 21 is wrapped on filter plate by filter cloth 22, middle main filter plate 11, Middle pair filter plate 10, reinforcing line 21, the center of filter cloth 22 are opened up into mud hole so that sludge can be sequentially entered from sludge hole is entered In next group of major-minor filter pad chamber.
Secondary filter plate is further fixed on including limited block electromagnetism in stopping means 14, described stopping means 14 in the middle of odd number block Iron core 14-1, limited block coil 14-2, spring stop 14-3, back-moving spring 14-4, slide rail 14-5, sliding block 14-6 etc., it is described Slide rail 14-5 in each stopping means 14 is fixed on the determination position of middle filter plate, to ensure that sliding block can be accurately defined after stretching out The angle that master connecting-rod 12 rotates, so as to define the distance of middle secondary filter plate 10 and middle main filter plate 11 indirectly, and then ensures pressure Filter chamber room keeps closing during mud is entered, and described limited block electromagnetic core 14-1 is fixed on position limiting slide block 14-6, described Limited block coil 14-2 be connected with controller, receive switching signal, described spring stop 14-3 is fixed on slide rail 14-5, makes Obtaining back-moving spring 14-4 has enough lifting surface areas, and described back-moving spring 14-4 is responsible for connection sliding block 14-6 and slide rail 14-5, And ensure that sliding block 14-6 and slide rail 14-5 can reset into original position, described sliding block 14-6 tails after occurring relative motion Portion is magnetisable material, relative motion is produced when limited block coil 14-2 obtains electric rear slider 14-6 and slide rail 14-5, while compression is multiple Position spring 14-4, slip front, which is stretched out, blocks master connecting-rod 12.Filter press plate refers to count since mud inlet end in the middle of the odd number block, i.e., To count from left to right in figure, exemplified by the press filtration chamber in such as Fig. 2 thin frame, the middle filter press plate of first and the 3rd inframe As filter press plate in the middle of odd number, is filter press plate in the middle of even number positioned at the middle filter press plate of second middle inframe.
Master connecting-rod 12 is arranged in the middle of odd number block on the rotation central axis 17 of secondary filter plate, and described slave connecting rod 12 is arranged on even number In the middle of block on the rotation central axis 17 of secondary filter plate, master connecting-rod 12 and slave connecting rod 12 are connected by latch, and described limit exists to salient point 24 On the boss edge of filter plate both sides so that master connecting-rod 12 can only be being limited to the rotated down of salient point 24.
Front end pair filter plate 7, middle secondary filter plate 10, the upper end of middle main filter plate 11 offer high pressure air intake hole and and air inlet Branch pipe 6 is connected, and through hole is offered on described filter plate, and high pressure gas generator and component include high-pressure pump 16, air intake branch 6th, air inlet supervisor 8, described air intake branch 6 is that flexible pipe can be moved with filter plate, and gases at high pressure pass through high-pressure pump 16, air inlet Supervisor 8, air intake branch 6 and through hole can enter sludge press filtration intracavitary, the secondary filter plate 7 in described front end, middle secondary filter plate 10, centre The lower end of main filter plate 11 offers liquid discharge through hole and is connected with filter plate drainpipe 25, and drainpipe 25 passes through flexible pipe and draining master Pipe is connected, and drain header end is provided with magnetic valve.
System controller 28 and controlling bus 26 are also equipped with by electromagnetic force sewage sludge dehydration minimizing device, is realized System is automatically controlled.Described pneumatic ball valve 3 is connected with system controller 28, and automatic shutter, described each filter can be achieved Magnet coil 5 and limited block coil 142 on plate are connected by controlling bus 26 with system controller 28.
Outlet valve is electromagnetic outlet valve, can automatic controller opening and closing combination.The electromagnetic force sewage sludge minimizing dehydration Device also includes dust arrester 15, and the sludge dust that the dust arrester 15 is brought gases at high pressure by negative pressure is removed, just heavy dress Put can for cloth bag, cyclone separator or both combination.
Present apparatus operation principle is as follows:
It is exemplified by all chambers are all opened, an instruction at this moment to be sent by controller, to magnet coil by initial state Lead to a upper less electric current, be combined together as long as the electromagnetic force produced by the electric current can inhale major-minor filter plate, adhesive Magnet coil is powered off afterwards, and stopping means coil obtains electric so that position limiting slide block stretches out spacing slide rail, limits the master connecting-rod anglec of rotation, Then pneumatic ball valve is opened, and height is pressed into dredge pump and injects mud in press filtration cavity, major-minor filter press plate by mud pressure toward two Lateral movement, press filtration chamber becomes larger, and position limiting slide block will block the rotation of master connecting-rod when reaching maximum so that chamber volume size Fixed, relative position is fixed between two filter press plates of major-minor, and the size of the press filtration chamber is sludge initial volume size, mud After, mud is first entered back into second chamber full of first press filtration chamber, promote the main filter press plate of second chamber to Right motion, similarly fixes two filter press plates of major-minor, example is pushed away according to this, when sludge is entered finally using major-minor connecting rod and stopping means During one chamber, each filter press plate is connected by major-minor connecting rod and stopping means, and all press filtration chambers reach maximum.Entering Expect under pressure effect, the pressure that sludge is subject to is between 1.5-2.0MPa, and mud continues to be pumped to, and moisture passes through filter cloth and reinforcement Lining is entered in water outlet groove and through hole on filter plate, and from outlet valve discharge, and sludge then stays in press filtration intracavitary, during by one section Between charging dehydration, press filtration chamber is substantial, and mud cannot be introduced into, and closes pneumatic ball valve, stops into mud, first stage Charging dehydration terminates.
Prepare second stage dehydration, be again solenoid ON power supply, sense of current when direction is with adhesive is identical, but Size is much larger than operating current, and electric current can be gradually increased to so that the pressure between major-minor filter plate is stepped up.Each chamber The room independent electromagnetic attraction that paddles one's own canoe is squeezed to the sludge in respective chamber, real to sludge after lasting squeezing a period of time Existing second stage press dewatering;
Controller control high-pressure pump is started working, the high pressure admission that gases at high pressure are entered on filter plate by air intake branch Hole, through hole carry out blowback to being close on the filter cloth on reinforcing line, and gases at high pressure blow the mud cake being close on filter cloth open, simultaneously The mud granule sticked on filter cloth is blown off, filter cloth is cleaned, gases at high pressure also take away moisture certain in sludge;In addition While mechanical expression, gases at high pressure enter, and will be difficult to the moisture deviate from more by water by mechanical expression in sludge Vaporous form is taken out of, when outlet valve does not almost have water outlet, and squeezing stops, and whole dehydration terminates.
Into the dump stage, first to the coil blackout on stopping means so that position limiting slide block is returned to by back-moving spring Position originally, then changes the sense of current of magnet coil on the combination filter plate block for be mounted with stopping means, so all The electromagnetic force of press filtration chamber can all become repulsion, and major-minor filter plate, which can be separated from, in the presence of repulsion comes, and sludge is between filter plate The conveying mechanism of the space lower section that drops to device transfer out, this stage high pressure air pump is still working in order to mud Block comes off from chamber and blows out the water of residual and the water on mud cake surface, until dump is finished, is when chamber is opened Prevent from closing master connecting-rod next time to rotate up so that stopping means failure, we increase on filter plate boss limit to salient point, During so that press filtration chamber moving maximum to, master connecting-rod keeps a less angle with horizontal direction all the time, and this not only improves next Secondary rotation, it also avoid the reverse rotation of connecting rod.Running to this cycle has been completed, and each mechanism is turned again to initially State, is prepared to enter into next cycle period, iterative cycles running.
Dependence electromagnetic force sewage sludge dehydration quantitative reduction method based on the device has following steps:
(1) magnet coil leads to the electricity of a smaller current and makes to produce suction between major-minor filter plate, major-minor filter plate closure, its Middle pair filter plate, middle main filter plate, sealing ring, reinforcing line and filter cloth constitute a minimum volume closed chamber, major-minor connecting rod It is rotated down;
(2) magnet coil is powered off, and stopping means coil obtains electric so that position limiting slide block stretches out spacing slide rail, limits master connecting-rod The anglec of rotation;
(3) pneumatic ball valve is opened, and height is pressed into dredge pump and injects mud in press filtration cavity, and major-minor filter press plate is pressed by mud Power becomes larger toward two lateral movements, press filtration chamber, the position limiting slide block rotation dry by main company is blocked when reaching maximum so that chamber body Product size is fixed, and relative position is fixed between two filter press plates of major-minor, and the size of the press filtration chamber is that sludge initial volume is big It is small;
(4) mud enters, and mud enters second chamber full of first press filtration chamber, promotes the master of second chamber Filter press plate is moved right, and similarly fixes two filter press plates of major-minor using major-minor connecting rod and stopping means, example is pushed away according to this, when sludge enters When entering to last chamber, each filter press plate is connected by major-minor connecting rod and stopping means, and all press filtration chambers reach It is maximum;
(5) under feed pressure effect, the pressure that sludge is subject to is between 1.5-2.0MPa, and mud continues to be pumped to, water Divide and entered by filter cloth and reinforcing line in water outlet groove and through hole on filter plate, from outlet valve discharge, and sludge then stays in pressure In filter chamber, it is dehydrated through charging after a while, press filtration chamber is substantial, and mud cannot be introduced into, closes pneumatic ball valve, Stop into mud, first stage charging dehydration terminates;
(6) start second stage dehydration, be again solenoid ON power supply, sense of current phase when direction is with adhesive Together, but size is much larger than operating current, and electric current can be gradually increased to so that the pressure between major-minor filter plate is stepped up.Often The individual chamber independent electromagnetic attraction that paddles one's own canoe is squeezed to the sludge in respective chamber, to dirt after lasting squeezing a period of time Mud realizes second stage press dewatering;
(7) controller control high-pressure pump is started working, and the height that gases at high pressure are entered on filter plate by air intake branch is pressed into Stomata, through hole carry out blowback to being close on the filter cloth on reinforcing line, and gases at high pressure blow the mud cake being close on filter cloth open, together When the mud granule sticked on filter cloth is blown off, clean filter cloth, gases at high pressure also take away moisture certain in sludge;
(8) while mechanical expression, gases at high pressure enter, and will be difficult to the moisture deviate from more by mechanical expression in sludge Many is taken out of by vapor, when outlet valve does not almost have water outlet, and squeezing stops, and whole dehydration terminates.
(9) the dump stage, first to the coil blackout on stopping means so that position limiting slide block returns to original by back-moving spring The position come, then changes the sense of current of magnet coil on the combination filter plate block for be mounted with stopping means, so all pressures The electromagnetic force of filter chamber room can all become repulsion, and major-minor filter plate, which can be separated from, in the presence of repulsion comes, and sludge is between filter plate The conveying mechanism that space drops to the lower section of device is transferred out, and this stage high pressure air pump is still working on, until dump Finish;
(10) after dump is finished, all major-minor filter press plate separation return to original state, wait to enter next circulation.
Only preferred embodiments of the present invention are described above, but are not to be construed as limiting the scope of the invention.This Invention is not only limited to above example, and its concrete structure allows to change.In a word, all guarantors in independent claims of the present invention The various change made in the range of shield is within the scope of the present invention.

Claims (8)

1. a kind of sewage sludge dehydration device based on electromagnetic force, including the secondary filter plate (7) in front end, the secondary filter plate (19) in rear end, centre Main filter plate (11), middle secondary filter plate (10), electromagnetic core (4) and magnet coil (5), described magnet coil (5) volume are located at phase On the electromagnetic core (4) answered, electromagnetic module is formed, the outside of the secondary filter plate (7) in described front end is provided with electromagnetic module, the rear end The inner side of secondary filter plate (19) is provided between electromagnetic module, the secondary filter plate (19) of the secondary filter plate (7) in described front end and rear end provided with multiple Strainer plate module, each strainer plate module includes a main filter plate in centre (11), a middle secondary filter plate (10) and an electromagnetic module, A described main filter plate in centre (11) and a middle secondary filter plate (10) are separately fixed at the two ends of the electromagnetic module, described many The main filter plate in centre of individual strainer plate module is towards the secondary filter plate (7) in front end, and secondary filter plate (10) is towards rear end in the middle of multiple strainer plate modules Secondary filter plate (19) so that secondary filter plate is corresponded with main filter plate to be coordinated, and forms multiple press filtration chambers, sewage sludge passes through enters mud pipe (1) the press filtration chamber is entered;
The secondary filter plate (7) in described front end, middle main filter plate (11), the secondary filter plate (19) of middle secondary filter plate (10) and rear end pass sequentially through Linkage is connected, and is linked with being realized under the electromagnetic force of electromagnetic module;
First stage is dehydrated:Magnet coil into electromagnetic module is passed through the first electric current, keeps electromagnetic force produced by it can be by Major-minor filter plate, which is inhaled, to be combined together, and magnet coil is powered off after adhesive, obtains electric by stopping means coil, so as to limit linkage rotation Gyration;Sewage sludge is injected in press filtration cavity, realizes that the first stage is dehydrated under feed pressure effect;
Second stage is dehydrated:The magnet coil in electromagnetic module is powered again, the second electric current, electricity when direction is with adhesive is passed through Flow direction it is identical, second electric current be more than first electric current, second electric current be gradually increased to so that major-minor filter plate it Between pressure be stepped up;
The dump stage:First to the coil blackout on stopping means, release to the spacing of the linkage, changing section electromagnetic wire The sense of current of circle so that the electromagnetic force of all press filtration chambers can all become repulsion, the major-minor filter plate meeting in the presence of repulsion It is separated from and, realizes dump.
2. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 1, it is characterised in that:In described Between main filter plate (11) outer ring on be provided with sealing ring (9), and set gradually from inside to outside successively on middle main filter plate (11) Reinforcing line (21) and filter cloth (22).
3. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 1 or 2, it is characterised in that:By entering Gas supervisor (8) connect many air intake branches (6), many air intake branches (6) accordingly with multiple press filtration chambers, be used for Gases at high pressure are passed through from air inlet supervisor and corresponding press filtration chamber is entered by air intake branch (6).
4. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 2, it is characterised in that:Before described The filter that moisture is filtered out for discharging respectively is provided with the secondary filter plate (7) in end, middle main filter plate (11) and middle secondary filter plate (10) Plate drainpipe (25).
5. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 1, it is characterised in that:Described company Linkage includes master connecting-rod (12) and slave connecting rod (13), and described master connecting-rod (12) is arranged on secondary filter plate (10) in the middle of odd number block On rotation central axis (17), described slave connecting rod (13) is arranged in the middle of even numbered blocks on the rotation central axis (17) of secondary filter plate (10), main Connecting rod (12) and slave connecting rod (13) are connected through the hinge.
6. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 5, it is characterised in that:Described is strange Secondary filter plate (10) is additionally provided with stopping means (14) in the middle of several piece, described stopping means include limited block electromagnetic core (14-1), Limited block coil (14-2), spring stop (14-3), back-moving spring (14-4), slide rail (14-5) and sliding block (14-6), it is described Slide rail (14-5) in each stopping means (14) is fixed on middle secondary filter plate (10), to realize after sliding block (14-6) stretching The angle of master connecting-rod (12) rotation can be accurately defined, thus define middle secondary filter plate (10) and middle main filter plate (11) away from From described limited block electromagnetic core (14-1) is fixed on sliding block, and described spring stop (14-3) is fixed on slide rail, described Back-moving spring (14-4) be used for connection sliding block (14-6) and slide rail (14-5).
7. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 6, it is characterised in that:Described cunning Block (14-6) afterbody is magnetisable material, when limited block coil (14-2) obtains electric rear slider (14-6) and slide rail (14-5) generation relatively Motion, while compression reseting spring (14-4), sliding block (14-6) front end, which is stretched out, blocks master connecting-rod (12).
8. a kind of sewage sludge dehydration device based on electromagnetic force according to claim 1, it is characterised in that:Described subtracts Quantifying dehydration device also includes dust arrester (15), the sludge powder that the dust arrester (15) is brought gases at high pressure by negative pressure Dirt is drawn onto dust arrester (15) and removed.
CN201710410610.2A 2017-06-03 2017-06-03 Sewage sludge dewatering device based on electromagnetic force Active CN107082550B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710410610.2A CN107082550B (en) 2017-06-03 2017-06-03 Sewage sludge dewatering device based on electromagnetic force

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710410610.2A CN107082550B (en) 2017-06-03 2017-06-03 Sewage sludge dewatering device based on electromagnetic force

Publications (2)

Publication Number Publication Date
CN107082550A true CN107082550A (en) 2017-08-22
CN107082550B CN107082550B (en) 2023-11-10

Family

ID=59609166

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710410610.2A Active CN107082550B (en) 2017-06-03 2017-06-03 Sewage sludge dewatering device based on electromagnetic force

Country Status (1)

Country Link
CN (1) CN107082550B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111802666A (en) * 2020-07-27 2020-10-23 张海明 Washing and dewatering device for vegetable processing
CN113480127A (en) * 2021-07-22 2021-10-08 深圳市市政工程总公司 A concentrated dehydration filter-pressing device for solidifying mud
CN113975864A (en) * 2021-12-04 2022-01-28 浙江艺乡环保科技有限公司 Filter pressing assembly and filter press
CN115212618A (en) * 2021-04-21 2022-10-21 景津装备股份有限公司 Height-adjustable combined filter plate handle and filter plate assembly suitable for different frames

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0824517A (en) * 1994-07-12 1996-01-30 Shinko Pantec Co Ltd Filter press and dehydrating method by the same
CN101544459A (en) * 2009-05-11 2009-09-30 华章电气(桐乡)有限公司 Plate-type sludge dewatering machine and dewatering method therefor
CN105800901A (en) * 2016-03-21 2016-07-27 饶宾期 Reduction dehydration device for sewage sludge
CN205886327U (en) * 2016-08-19 2017-01-18 四川四通欧美环境工程有限公司 Compact form filter press is inhaled to electromagnetism

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0824517A (en) * 1994-07-12 1996-01-30 Shinko Pantec Co Ltd Filter press and dehydrating method by the same
CN101544459A (en) * 2009-05-11 2009-09-30 华章电气(桐乡)有限公司 Plate-type sludge dewatering machine and dewatering method therefor
CN105800901A (en) * 2016-03-21 2016-07-27 饶宾期 Reduction dehydration device for sewage sludge
CN205886327U (en) * 2016-08-19 2017-01-18 四川四通欧美环境工程有限公司 Compact form filter press is inhaled to electromagnetism

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111802666A (en) * 2020-07-27 2020-10-23 张海明 Washing and dewatering device for vegetable processing
CN111802666B (en) * 2020-07-27 2021-10-15 安徽福顺食品有限公司 Washing and dewatering device for vegetable processing
CN115212618A (en) * 2021-04-21 2022-10-21 景津装备股份有限公司 Height-adjustable combined filter plate handle and filter plate assembly suitable for different frames
CN113480127A (en) * 2021-07-22 2021-10-08 深圳市市政工程总公司 A concentrated dehydration filter-pressing device for solidifying mud
CN113480127B (en) * 2021-07-22 2022-11-18 深圳市市政工程总公司 A concentrated dehydration filter-pressing device for solidifying mud
CN113975864A (en) * 2021-12-04 2022-01-28 浙江艺乡环保科技有限公司 Filter pressing assembly and filter press

Also Published As

Publication number Publication date
CN107082550B (en) 2023-11-10

Similar Documents

Publication Publication Date Title
CN107008042A (en) Sewage sludge minimizing dehydration device based on electromagnetic force
CN107998707B (en) Electromagnetic force filter pressing dewatering device for sewage and sludge
CN107082550A (en) Sewage sludge dehydration device based on electromagnetic force
CN107008041A (en) Sewage sludge minimizing dewatering based on electromagnetic force
CN101544459B (en) Plate-type sludge dewatering machine and dewatering method therefor
CN104803575B (en) Supertension sewage sludge deep dehydrator
CN105330118B (en) A kind of sludge filter press and method for sludge treatment
CN205349888U (en) Hydraulic control system of pressure filter
CN102814063A (en) Pressure filter and pressure filtration method thereof
CN104817245B (en) Ultrahigh-pressure dehydration apparatus for sewage sludge
CN106946435B (en) Deep reduction method for sewage sludge with large treatment capacity
CN107382009A (en) Super-pressure sludge high-drying degree dewatering
CN207130128U (en) A kind of sewage sludge dehydration device based on electromagnetic force
CN203108295U (en) Plate-and-frame filter press
CN106946436B (en) Multistage sewage sludge depth reduction method
CN104817246B (en) Ultrahigh-pressure deep dehydration method for sewage sludge
CN106943779B (en) Large-treatment-capacity sewage sludge depth reduction device
CN207062125U (en) A kind of super-pressure sludge high-drying degree dehydration device
CN107982973B (en) Gas extrusion drying filter
CN113698062B (en) Full-automatic horizontal deep solid-liquid separator and working method thereof
CN202020958U (en) Sliding sleeve type double-piston filter pressing device
CN107434345B (en) Sludge press plate
CN102284205B (en) Flexible tube presser for discharging mud cake by using multi-layer water permeable plate through extrusion method
CN204034357U (en) Filter-pressing process and control system
CN102728119A (en) Sheathed circular truncated cone type filter press

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20231011

Address after: 323300 long ban Shan District, Yunfeng Street Industrial Park, Suichang County, Lishui City, Zhejiang Province

Applicant after: Zhejiang Huijin Environmental Protection Technology Co.,Ltd.

Address before: 310018 China Metrology University, 258 Xiyuan street, Xiasha, Jianggan District, Hangzhou, Zhejiang

Applicant before: Rao Binqi

GR01 Patent grant
GR01 Patent grant