CN107063705A - Universal gas extraction system mould measurement fixing device - Google Patents

Universal gas extraction system mould measurement fixing device Download PDF

Info

Publication number
CN107063705A
CN107063705A CN201611192490.5A CN201611192490A CN107063705A CN 107063705 A CN107063705 A CN 107063705A CN 201611192490 A CN201611192490 A CN 201611192490A CN 107063705 A CN107063705 A CN 107063705A
Authority
CN
China
Prior art keywords
section bar
aluminium section
fixed plate
self
extraction system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611192490.5A
Other languages
Chinese (zh)
Inventor
彭鹏
胡明惠
李东晗
辛海峰
吴元军
晁林强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Weifu Lida Catalytic Converter Co Ltd
Original Assignee
Wuxi Weifu Lida Catalytic Converter Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Weifu Lida Catalytic Converter Co Ltd filed Critical Wuxi Weifu Lida Catalytic Converter Co Ltd
Priority to CN201611192490.5A priority Critical patent/CN107063705A/en
Publication of CN107063705A publication Critical patent/CN107063705A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M17/00Testing of vehicles
    • G01M17/007Wheeled or endless-tracked vehicles

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Sampling And Sample Adjustment (AREA)

Abstract

The present invention relates to a kind of universal gas extraction system mould measurement fixing device, it is characterized in that:Including aluminium section bar main frame, aluminium section bar travel mechanism, clarifier inlet flange fixed mechanism and suspender member fixed mechanism;The aluminium section bar travel mechanism includes being slidably arranged in the 5th aluminium section bar of aluminium section bar main frame front and rear sides, and the 6th aluminium section bar that can be slided up and down or lock is connected between the 5th aluminium section bar of front and rear sides;The clarifier inlet flange fixed mechanism includes setting adapting rod in the fixed plate being slidably arranged on the 6th aluminium section bar, fixed plate, and adapting rod is connected with one end joint of self-locking universal joint, and the other end of self-locking universal joint is connected with clarifier flange fixed plate;The suspender member fixed mechanism includes sliding the fixed plate set along the 6th aluminium section bar, and suspension hook is set in fixed plate.The present invention is applied to the fixed installation of main flow Exhaust System of Passenger Car on the market, and installment state presses close to real vehicle installment state, makes mould measurement more effective.

Description

Universal gas extraction system mould measurement fixing device
Technical field
It is especially a kind of to be used for hammering method measurement the present invention relates to a kind of universal gas extraction system mould measurement fixing device The experimental rig of gas extraction system is fixed during gas extraction system mode, belongs to automobile exhaust system experimental test technical field.
Background technology
When investigating automobile exhaust system reliability, it is often necessary to carry out mould measurement to gas extraction system with hammering method.And When carrying out mould measurement with hammering method, the installation restrained condition of gas extraction system is closer to vehicle installment state, the mode of collection Data are closer to actual conditions.This is accomplished by a kind of gas extraction system fixing device close to vehicle installment state, but each is whole Chassis deployment scenarios are all different, i.e. gas extraction system deployment scenarios are all different, and this requires fixing device to need to do as far as possible To universal.
The content of the invention
The purpose of the present invention is to overcome the deficiencies in the prior art there is provided a kind of universal gas extraction system mould measurement Fixing device, it is adaptable to which the fixed installation of main flow Exhaust System of Passenger Car on the market, installment state is pressed close to real vehicle installment state, made Mould measurement is more effective.
The technical scheme provided according to the present invention, the universal gas extraction system mould measurement fixing device, it is characterized in that: Mainly include aluminium section bar main frame, aluminium section bar travel mechanism, clarifier inlet flange fixed mechanism and suspender member fixed mechanism;
The aluminium section bar travel mechanism includes being arranged on aluminium section bar main frame front and rear sides and can slided along aluminium section bar main frame or so Dynamic or locking the 5th aluminium section bar, connects the 6th aluminium that can be slided up and down or lock between the 5th aluminium section bar of front and rear sides Section bar;
The clarifier inlet flange fixed mechanism includes fixed plate, adapting rod, self-locking universal joint and clarifier flange fixed plate, Fixed plate is slidably arranged on the 6th aluminium section bar, and adapting rod is set in fixed plate, and one end of adapting rod and self-locking universal joint is closed Section connection, the other end of self-locking universal joint is connected with clarifier flange fixed plate;
The suspender member fixed mechanism includes sliding the fixed plate set along the 6th aluminium section bar and is fixed on hanging in fixed plate Hook.
Further, the aluminium section bar main frame is by the first aluminium section bar, the second aluminium section bar, the 3rd aluminium section bar, the 4th aluminium profiles Material connects into frame structure.
Further, two self-locking universal wheels and self-locking are set respectively in the bottom left and right ends of the aluminium section bar main frame One-way wheel.
Further, in first aluminium section bar, the second aluminium section bar, the 3rd aluminium section bar, the 4th aluminium section bar, the 5th aluminium section bar With dovetail groove is equipped with the 6th aluminium section bar, the trapezoidal slide block is inserted in the dovetail groove, and T-shaped plate and trapezoidal slide block pass through bolt Connection, the two ends of the 5th aluminium section bar are realized by T-shaped plate, bolt and trapezoidal slide block with aluminium section bar main frame to be connected.
Further, fixed between the 6th aluminium section bar and the 5th aluminium section bar by aluminium section bar corner fittings, aluminium section bar corner fittings Locked by trapezoidal bolt.
Further, the fixed plate is slidably arranged on the 6th aluminium section bar by trapezoidal bolt and dovetail groove.
Further, self-locking nut is connected on the bulb of the self-locking universal joint, the end of self-locking nut can be promoted Brake block inside self-locking universal joint bulb.
Further, U-shaped hole is provided with the fixed plate.
Further, the 7th aluminium section bar is arranged on the one end of aluminium section bar main frame, is provided with the 7th aluminium section bar Suspender member fixed mechanism.
Further, two installations matched with holes clarifier flange are set in the clarifier flange fixed plate Hole.
The present invention has advantages below:(1)Simple in construction, compact, reasonable, manufacturing cost is low, and material requested is largely Standard component, is easy to buying on the market;(2)Conveniently moving, installs simple, universal strong, it is adaptable to main flow passenger car on the market The fixation and installation of gas extraction system mould measurement;(3)Practical operation is easy, can quick change soon for different automobile types gas extraction system Dress, it is basic to use vehicle suspender member, farthest close to vehicle installment state.
Brief description of the drawings
Fig. 1 is the structural representation of universal gas extraction system mould measurement fixing device of the present invention.
Description of reference numerals:The aluminium section bars of 1- first, the aluminium section bars of 2- second, the aluminium section bars of 3- the 3rd, the aluminium section bars of 4- the 4th, 5- Five aluminium section bars, the aluminium section bars of 6- the 6th, 7-T templates, 8- fixed plates, 9- adapting rods, 10- self-lockings universal joint, 11- self-locking nuts, 12- Clarifier inlet flange fixed plate, 13- suspension hooks, the aluminium section bars of 14- the 7th, 15- self-lockings universal wheel, 16- self-locking one-way wheels.
Embodiment
With reference to specific accompanying drawing, the invention will be further described.
In the description of detailed description below, left side is in the direction using in Fig. 1 to the left, and direction to the right is right side, face Direction to paper is rear side, is front side back to the direction of paper.
As shown in figure 1, universal gas extraction system mould measurement fixing device of the present invention, mainly includes the main frame of aluminium section bar Frame, aluminium section bar travel mechanism, clarifier inlet flange fixed mechanism and suspender member fixed mechanism.
The aluminium section bar main frame is connected by the first aluminium section bar 1, the second aluminium section bar 2, the 3rd aluminium section bar 3, the 4th aluminium section bar 4 Into frame structure;The aluminium section bar main frame is major bearing structures, is set respectively in the bottom left and right ends of aluminium section bar main frame Put two self-locking universal wheels 15 and self-locking one-way wheel 16, it is possible to achieve the movement and fixation of the fixing device.
The aluminium section bar travel mechanism includes the 5th aluminium section bar 5, the 6th aluminium section bar 6, T-shaped plate 7 and corresponding ladder type sliding block; 5th aluminium section bar 5 is connected to the front and rear sides of aluminium section bar main frame vertically;The 6th aluminium section bar 6 connection front and rear sides 5th aluminium section bar 5, the two ends of the 6th aluminium section bar 6 are connected to the middle part optional position of the 5th aluminium section bar of front and rear sides, institute State the end that T-shaped plate 7 is arranged on the 5th aluminium section bar 5.In first aluminium section bar 1, the second aluminium section bar 2, the 3rd aluminium section bar 3, Dovetail groove is equipped with four aluminium section bars 4, the 5th aluminium section bar 5 and the 6th aluminium section bar 6, the trapezoidal slide block is inserted in the dovetail groove, T Template 7 and trapezoidal slide block are bolted, and the two ends of the 5th aluminium section bar 5 pass through T-shaped plate 7 and trapezoidal slide block and the main frame of aluminium section bar Frame realizes connection, and trapezoidal slide block can lock corresponding 5th aluminium section bar 5 by trapezoidal bolt, realize aluminium section bar travel mechanism It is fixed;Unclamp trapezoidal bolt and aluminium section bar travel mechanism horizontally slipping on aluminium section bar main frame can be achieved.6th aluminium Fixed between the aluminium section bar 5 of section bar 6 and the 5th by aluminium section bar corner fittings, the 6th can be realized by unclamping the bolt of aluminium section bar corner fittings Aluminium section bar 6 is moved up and down along the 5th aluminium section bar 5.
The clarifier inlet flange fixed mechanism includes fixed plate 8, adapting rod 9, self-locking universal joint 10, self-locking nut 11 With clarifier flange fixed plate 12, fixed plate 8 is slidably arranged on the 6th aluminium section bar 6 by trapezoidal bolt and dovetail groove, solid Adapting rod 9 is set in fixed board 8, and adapting rod 9 is connected with one end joint of self-locking universal joint 10, the other end of self-locking universal joint 10 and Clarifier flange fixed plate 12 is connected.Can be in a plane by the joint connected between adapting rod 9 and self-locking universal joint 10 The adjustment of larger angle is inside realized, can also be realized in all angles certain limit of space and adjusted by the bulb of self-locking universal joint 10 Section, is adjusted to required angle as needed.Self-locking nut 11, self-locking nut 11 are connected on the bulb of the self-locking universal joint 10 End can promote the brake block inside the bulb of self-locking universal joint 10, to realize the locked of self-locking universal joint 10.In addition, Fixed plate 8 is provided with U-shaped hole, and fixed plate 8 can be realized in certain limit by U-shaped hole and adjusted.The present invention is by above-mentioned several Means are the fixation for the clarifier inlet flange that different angle and directions can be achieved.Furthermore it is possible to according to actual needs, in purification Two mounting holes, the common purifying device for fixing holes are set in device flange fixed plate 12;, can be with for manifold-type clarifier According further to needing to make corresponding clarifier flange fixed plate.
The suspender member fixed mechanism includes sliding the fixed plate 8 set along the 6th aluminium section bar 6, is welded in fixed plate 8 The aluminium section bar 14 of suspension hook 13 and the 7th.The fixed plate 8 is bolted on the dovetail groove of the 6th aluminium section bar 6 by trapezoidal, pine Opening trapezoidal bolt rear fixed plate 8 can on a large scale slide along before and after the 6th aluminium section bar 6, can be realized and moved down by U-shaped hole Dynamic, locking trapezoidal bolt can position.The position adjustment of suspender member can be realized by above two means.7th aluminium profiles Material 14 is arranged on the one end of aluminium section bar main frame, and suspender member fixed mechanism also is provided with the 7th aluminium section bar 14;Described 7th Aluminium section bar 14 can realize the adjustment of position with corresponding suspender member by similar cooperation, and erecting by overhang typically herein can be with Suspension hook on disappearing after fixation.
The aluminium section bar travel mechanism of the present invention is fastened on aluminium profiles by T-shaped plate 7, corresponding ladder type sliding block and bolt On material main frame, you being horizontally slipped on aluminium section bar main frame can also be locked.Clarifier inlet flange fixed mechanism is hung Suspension member fixed mechanism, can be that different angle and direction clarifier inlet flanges can be achieved by the angle adjustment of itself each part Fixation.Suspender member fixed mechanism is also mounted in aluminium section bar travel mechanism, the fixation Board position by aluminium section bar and with U-shaped hole The fine setting of suspender member position can be achieved in adjustment, and suspender member just can be by the suspension hook of gas extraction system by corresponding vehicle rubber hanger It is fixed.
As described above, the present invention passes through aluminium section bar main frame, aluminium section bar travel mechanism, clarifier fixed mechanism, suspender member Cooperation adjustment between fixed mechanism, you can adapt to the installation and fixation of the inlet flange and suspender member of different gas extraction system, and And installment state presses close to whole vehicle state.
Compact conformation of the present invention, rationally;Manufacturing cost is low, and material requested is largely standard component, and purchase is easy on the market , simple and convenient assembly, without excessive skill;Universal strong, it is adaptable to main Exhaust System of Passenger Car mould measurement on the market Fixation and installation;Practical operation is easy, installs and adjust all prompt quickly for different gas extraction system.

Claims (10)

1. a kind of universal gas extraction system mould measurement fixing device, it is characterized in that:Mainly include aluminium section bar main frame, aluminium section bar Travel mechanism, clarifier inlet flange fixed mechanism and suspender member fixed mechanism;
The aluminium section bar travel mechanism includes being arranged on aluminium section bar main frame front and rear sides and can slided along aluminium section bar main frame or so Dynamic or locking the 5th aluminium section bar(5), the 5th aluminium section bar in front and rear sides(5)Between connection can slide up and down or lock 6th aluminium section bar(6);
The clarifier inlet flange fixed mechanism includes fixed plate(8), adapting rod(9), self-locking universal joint(10)And clarifier Flange fixed plate(12), fixed plate(8)It is slidably arranged in the 6th aluminium section bar(6)On, in fixed plate(8)Upper setting adapting rod(9), Adapting rod(9)With self-locking universal joint(10)One end joint connection, self-locking universal joint(10)The other end and clarifier flange consolidate Fixed board(12)Connection;
The suspender member fixed mechanism is included along the 6th aluminium section bar(6)Slide the fixed plate set(8)And it is fixed on fixed plate (8)On suspension hook(13).
2. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:The main frame of aluminium section bar Frame is by the first aluminium section bar(1), the second aluminium section bar(2), the 3rd aluminium section bar(3), the 4th aluminium section bar(4)Connect into frame structure.
3. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:In the aluminium section bar master The bottom left and right ends of framework set two self-locking universal wheels respectively(15)With self-locking one-way wheel(16).
4. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:In first aluminium profiles Material(1), the second aluminium section bar(2), the 3rd aluminium section bar(3), the 4th aluminium section bar(4), the 5th aluminium section bar(5)With the 6th aluminium section bar(6) On be equipped with dovetail groove, the trapezoidal slide block is inserted in the dovetail groove, T-shaped plate(7)It is bolted with trapezoidal slide block, the 5th Aluminium section bar(5)Two ends pass through T-shaped plate(7)Realize and be connected with aluminium section bar main frame with trapezoidal slide block.
5. universal gas extraction system mould measurement fixing device as claimed in claim 4, it is characterized in that:6th aluminium section bar (6)With the 5th aluminium section bar(5)Between fixed by aluminium section bar corner fittings, aluminium section bar corner fittings is locked by trapezoidal bolt.
6. universal gas extraction system mould measurement fixing device as claimed in claim 4, it is characterized in that:The fixed plate(8) 6th aluminium section bar is slidably arranged in by trapezoidal bolt and dovetail groove(6)On.
7. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:It is universal in the self-locking Section(10)Bulb on connect self-locking nut(11), self-locking nut(11)End can promote self-locking universal joint(10)Bulb Internal brake block, realizes that universal joint is locked.
8. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:In the fixed plate (8)It is provided with U-shaped hole.
9. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:7th aluminium section bar (14)The one end of aluminium section bar main frame is arranged on, in the 7th aluminium section bar(14)It is provided with suspender member fixed mechanism.
10. universal gas extraction system mould measurement fixing device as claimed in claim 1, it is characterized in that:In the clarifier Flange fixed plate(12)It is upper that two mounting holes matched with holes clarifier flange are set.
CN201611192490.5A 2016-12-21 2016-12-21 Universal gas extraction system mould measurement fixing device Pending CN107063705A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611192490.5A CN107063705A (en) 2016-12-21 2016-12-21 Universal gas extraction system mould measurement fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611192490.5A CN107063705A (en) 2016-12-21 2016-12-21 Universal gas extraction system mould measurement fixing device

Publications (1)

Publication Number Publication Date
CN107063705A true CN107063705A (en) 2017-08-18

Family

ID=59618661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611192490.5A Pending CN107063705A (en) 2016-12-21 2016-12-21 Universal gas extraction system mould measurement fixing device

Country Status (1)

Country Link
CN (1) CN107063705A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107941529A (en) * 2018-01-05 2018-04-20 南京航空航天大学 Auto parts and components mould measurement platform
CN108763766A (en) * 2018-05-30 2018-11-06 无锡威孚力达催化净化器有限责任公司 Oscillation intensity analysis method for exhaust system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5426962A (en) * 1992-12-16 1995-06-27 Kuo; Stanley Automobile lock
CN201673088U (en) * 2010-04-26 2010-12-15 宝山钢铁股份有限公司 Sampling bench for Vickers hardness tester
CN203396567U (en) * 2013-07-09 2014-01-15 上海天纳克排气系统有限公司 Durability test clamp for double shaft components of automobile exhaust system
CN204050709U (en) * 2014-09-03 2014-12-31 王志明 Floor multifunction emergency rescue fixator
CN104960479A (en) * 2015-07-07 2015-10-07 安徽泽众安全科技有限公司 Vehicle-mounted support device for mobile terminal
CN205601719U (en) * 2016-05-04 2016-09-28 常州机电职业技术学院 Mobile phone bracket for automobile
CN106124215A (en) * 2016-07-27 2016-11-16 奇瑞汽车股份有限公司 A kind of can the engine exhaust pipe holder of regulation quick, multidirectional

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5426962A (en) * 1992-12-16 1995-06-27 Kuo; Stanley Automobile lock
CN201673088U (en) * 2010-04-26 2010-12-15 宝山钢铁股份有限公司 Sampling bench for Vickers hardness tester
CN203396567U (en) * 2013-07-09 2014-01-15 上海天纳克排气系统有限公司 Durability test clamp for double shaft components of automobile exhaust system
CN204050709U (en) * 2014-09-03 2014-12-31 王志明 Floor multifunction emergency rescue fixator
CN104960479A (en) * 2015-07-07 2015-10-07 安徽泽众安全科技有限公司 Vehicle-mounted support device for mobile terminal
CN205601719U (en) * 2016-05-04 2016-09-28 常州机电职业技术学院 Mobile phone bracket for automobile
CN106124215A (en) * 2016-07-27 2016-11-16 奇瑞汽车股份有限公司 A kind of can the engine exhaust pipe holder of regulation quick, multidirectional

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
徐献阳: "车辆排气系统的振动模态分析及优化", 《中国优秀硕士学位论文全文数据库 工业科技Ⅱ辑》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107941529A (en) * 2018-01-05 2018-04-20 南京航空航天大学 Auto parts and components mould measurement platform
CN108763766A (en) * 2018-05-30 2018-11-06 无锡威孚力达催化净化器有限责任公司 Oscillation intensity analysis method for exhaust system
CN108763766B (en) * 2018-05-30 2022-04-12 无锡威孚力达催化净化器有限责任公司 Vibration intensity analysis method for exhaust system

Similar Documents

Publication Publication Date Title
KR101314809B1 (en) Front/rear and left/right movable work platform for repairing rail equipment
CN107063705A (en) Universal gas extraction system mould measurement fixing device
CN207160698U (en) A kind of tower storehouse falling proof device
CN208813371U (en) Bicycle stand and its backing device
CN103940617B (en) A kind of vehicle bridge running-in platform
CN106378366B (en) A kind of correcting automobile body system
CN207964283U (en) Auto parts and components mould measurement platform
EP3057814B1 (en) Axle raising device
CN210941770U (en) Disassembling and assembling device for car coupler buffer
JP5756479B2 (en) Ladder equipment for railway vehicles
CN210391166U (en) Clamping rod and rail vehicle
CN208604426U (en) Column unit with detachable track girder support component
CN208559174U (en) A kind of alarming device that municipal traffic is observed with nighttime emergency parking
CN108945177A (en) A kind of bicycle stand and its backing device
CN202320038U (en) Newly-built civil container vehicle
CN206691202U (en) Suitable for the body frame structure for automotive of the universal wide dumper of various engines installation
CN205840451U (en) A kind of traversing anti-sway device of lifting cross sliding type parking equipment ride
JP2007186947A (en) Method of forming working scaffold on girder back face, and working scaffold on girder back face
CN212423136U (en) Portable track car covering device
CN205577533U (en) Automobile bearing device
CN210941514U (en) Ladder fixing frame structure of pickup carriage
CN208947331U (en) Railway freight-car anticreep hand brake lever
JP3175687U (en) Guardrail installation aid
CN218431496U (en) Car coupler mounting trolley
CN207387016U (en) Small sized loader front frame lock dress drive axle turns round universal fixture surely automatically

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication