CN107063401A - Liquefied natural gas aerating machine calibration method and system - Google Patents

Liquefied natural gas aerating machine calibration method and system Download PDF

Info

Publication number
CN107063401A
CN107063401A CN201611062075.8A CN201611062075A CN107063401A CN 107063401 A CN107063401 A CN 107063401A CN 201611062075 A CN201611062075 A CN 201611062075A CN 107063401 A CN107063401 A CN 107063401A
Authority
CN
China
Prior art keywords
filling machine
checked
flow
verification
natural gas
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201611062075.8A
Other languages
Chinese (zh)
Inventor
张劲广
王彪
许斌
王增新
康永兴
林蔚
鲍兴涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Petroleum and Chemical Corp
Original Assignee
BEIJING RUISAI GREAT WALL AVIATION MEASUREMENT CONTROL TECHNOLOGY CO LTD
AVIC Intelligent Measurement Co Ltd
China Aviation Industry Corp of Beijing Institute of Measurement and Control Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING RUISAI GREAT WALL AVIATION MEASUREMENT CONTROL TECHNOLOGY CO LTD, AVIC Intelligent Measurement Co Ltd, China Aviation Industry Corp of Beijing Institute of Measurement and Control Technology filed Critical BEIJING RUISAI GREAT WALL AVIATION MEASUREMENT CONTROL TECHNOLOGY CO LTD
Priority to CN201611062075.8A priority Critical patent/CN107063401A/en
Publication of CN107063401A publication Critical patent/CN107063401A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • G01F25/13Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters using a reference counter
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/05Programmable logic controllers, e.g. simulating logic interconnections of signals according to ladder diagrams or function charts
    • G05B19/058Safety, monitoring
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/10Plc systems
    • G05B2219/16Plc to applications
    • G05B2219/163Domotique, domestic, home control, automation, smart, intelligent house

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Fluid Mechanics (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

This application discloses a kind of liquefied natural gas aerating machine calibration method and system, the system is connected with filling machine to be checked, and including:Proving flowmeter, it is connected with the aerating delivery outlet of filling machine to be checked, the aerating output flow for detecting filling machine to be checked, and outputting standard flow count value;Flow verification collector, it is connected with filling machine to be checked and the proving flowmeter, instructed for sending " calibrating starts " and " calibrating terminates " to filling machine to be checked and the proving flowmeter, and read from filling machine to be checked and the proving flowmeter flow count value and the normal flow count value of filling machine to be checked respectively.The present invention is for calibrating installation, and compact conformation, maneuverability is safe and reliable, improves LNG filling machine on-line metering calibration accuracies, is important calibration equipment during filling machine use, has great influence to the interests of trade transaction both sides.

Description

Liquefied natural gas aerating machine calibration method and system
Technical field
The present invention relates to the technical field of liquefied natural gas (LNG) aerating equipment calibrating, and in particular to liquefied natural gas adds Mechanism of qi calibration method and system.
Background technology
Liquefied natural gas (abbreviation LNG) be changed by natural gas a kind of cleaning, the efficient energy.Fired in all cleanings In material, natural gas is so that its application technology is ripe, safe and reliable, economically feasible and be considered as at present most by world many countries and expert Suitable alternative fuel for cars.China is to possess one of most country of clean energy vehicle in the world.
However, the LNG gas stations of these operations cause LNG up to the present also without more scientific follow-up calibration method Filling machine metering accuracy is greatly reduced, with potential metering risk.LNG as block trade commodity, be related to trade settlement and Security protection, it is necessary to solve the accurate of value and trace to the source problem, this is not only directly connected to the interests of trade both sides, and according to Country《Measurement Law》Regulation, the LNG filling machines for trade transaction should include mandatory administration scope in accordance with the law, it is therefore necessary to carry out Examined and determine in type evaluation, first calibrating, follow-up calibrating and use.
The content of the invention
The purpose of the present invention is that there is provided a kind of liquefied natural gas (LNG) filling machine calibrating side in view of the shortcomings of the prior art Method and system.Calibration method application specific calibrating interface synchronization obtains LNG filling machine data, and the system calibration precision reaches 1%.Present invention also offers a kind of portable verification system, such as vehicular verification system, its internal structure is compact, by anti- Quick-fried lithium electric installation is powered to standard calibrating device, explosion-proof control device.The present invention is logical using wireless Wifi encryptions and computer orientation Letter, can be such that calibrating data are accurately and quickly transmitted between calibrating installation and computer without wiring.
Embodiments in accordance with the present invention are there is provided a kind of liquefied natural gas aerating machine verification system, itself and filling machine to be checked Connection, it is characterised in that the liquefied natural gas aerating machine verification system includes:Proving flowmeter, itself and the aerating to be checked The aerating delivery outlet connection of machine, the aerating output flow for detecting the filling machine to be checked, and outputting standard flow count value; Flow verification collector, it is connected with the filling machine to be checked and the proving flowmeter, for filling machine to be checked and The proving flowmeter sends " calibrating starts " and " calibrating terminates " and instructed, and from the filling machine to be checked and the normal stream Gauge reads the flow count value and the normal flow count value of filling machine to be checked respectively.
Embodiments in accordance with the present invention, the proving flowmeter includes titer multi-phase flowmeter and Standard Gases multi-phase flowmeter, It is connected by fieldbus with the flow verification collector respectively.
Embodiments in accordance with the present invention, the liquefied natural gas aerating machine verification system also includes Programmable logical controller Device, pressure transmitter, the programmable logic controller (PLC) are connected with display screen, interchanger, radio communication converter, guard grating, The pressure transmitter is connected to the guard grating by analog input loop.
Embodiments in accordance with the present invention, the flow verification collector is connected with the controlling device of filling machine to be checked, the meter Control device is connected with the flowmeter of filling machine to be checked.
There is provided the liquefaction realized by above-mentioned liquefied natural gas aerating machine verification system is natural for embodiments in accordance with the present invention Gas filling machine calibration method, comprises the following steps:Step 1, verification system start after calibrating, and the flow verification collector is simultaneously " taking present flow rate count value " instruction is sent to proving flowmeter and filling machine to be checked, the filling machine to be checked starts simultaneously at aerating Output;Step 2, the proving flowmeter are after described " taking present flow rate count value " instruction is received, by its current time Count value MB1 is sent to the flow verification collector;Step 3, the filling machine to be checked described " take current flow meter receiving After numerical value " instruction, the count value MJ1 at its current time is sent to the flow verification collector;It is step 4, described to be checked Filling machine continues aerating output;Step 5, the filling machine to be checked stop aerating output, also, the flow verification collector is same When send " taking present flow rate count value " instruction to proving flowmeter and filling machine to be checked;Step 6, the proving flowmeter are being received To after described " taking present flow rate count value " instruction, the count value MB2 at its current time is sent to the flow verification and adopted Storage;Step 7, the filling machine to be checked are after described " taking present flow rate count value " instruction is received, by its current time Count value MJ2 is sent to the flow verification collector.
The present invention is had the advantage that with beneficial effect:
1st, the on-line metering calibrating to liquefied natural gas (LNG) filling machine is realized, 1% calibration accuracy, precision is reached National metrological verification regulations regulation is exceeded.
2nd, liquid phase flow verification and the complete machine calibrating to filling machine have been respectively completed, efficiently, verification result is real for calibration method Existing dual backup;
3rd, the present invention is for calibrating installation, and compact conformation, maneuverability is safe and reliable.The present invention improves LNG aeratings Machine on-line metering calibration accuracy, is important calibration equipment during filling machine use, has weight to the interests of trade transaction both sides Big influence.
Brief description of the drawings
Fig. 1 is to be shown according to liquefied natural gas (LNG) the filling machine calibration method of embodiments of the invention and the structure of system It is intended to;
Fig. 2 is liquefied natural gas (LNG) the filling machine calibration method and the principle frame of system according to embodiments of the invention Figure;
Fig. 3 is the pipeline of liquefied natural gas (LNG) filling machine liquid phase flow verification method according to embodiments of the invention Connection figure;
Fig. 4 is to be connected according to the pipeline of liquefied natural gas (LNG) filling machine complete machine calibration method of embodiments of the invention Figure;
Fig. 5 is the instruction sequencing figure of liquefied natural gas (LNG) filling machine calibration method according to embodiments of the invention;
Fig. 6 is the data sampling time sequence of liquefied natural gas (LNG) filling machine calibration method according to embodiments of the invention Figure.
Embodiment
Below, the implementation of technical scheme is described in further detail with reference to accompanying drawing.
Although it will be appreciated by those of skill in the art that the following description is related to many of embodiment for the present invention Ins and outs, but be only for for illustrate the present invention principle example and do not mean that any limitation.The present invention can be applicable Occasion outside different from ins and outs exemplified below, principle and spirit without departing from the present invention.
, may pair can be in description in this manual in addition, miscellaneous in order to avoid being limited to the description of this specification The portion of techniques details obtained in prior art data has carried out the processing such as omission, simplification, accommodation, this technology for this area It will be understood by for personnel, and this does not interfere with the open adequacy of this specification.
Specific embodiment is described in detail below in conjunction with the accompanying drawings.
Embodiments in accordance with the present invention are there is provided a kind of liquefied natural gas (LNG) filling machine verification system, and it mainly includes Three layers below:Bottom is instrument layer, including standard calibrating device is responsible for docking with scene filling machine;Middle level is field control layer, Including explosion-proof control device, it is responsible for system data acquisition control, system coordination, logic execution etc.;Upper strata is management level, is responsible for system Reason under the overall leadership, system monitoring, continuous data are integrated, report generation.
The standard calibrating device includes low temperature mass flowmenter, pressure transmitter;The low temperature mass flowmenter passes through RS485 communication loops are connected to the flow verification collector;The pressure transmitter is connected to by analog input loop The guard grating.
As further scheme of the invention, liquefied natural gas (LNG) the filling machine calibration method includes liquid phase flow Calibrating and complete machine calibrating, the explosion-proof control device are encrypted and compunlcation by wireless Wifi;The colorful display screen is furnished with External memorizer stores verification result.
Fig. 1 is to be shown according to liquefied natural gas (LNG) the filling machine calibration method of embodiments of the invention and the structure of system It is intended to.
As shown in figure 1, liquefied natural gas (LNG) filling machine verification system in the present embodiment, explosion-proof control device includes PLC, flow verification collector;
PLC has following functions:Calibrating point Row control;Auxiliary parameter (temperature, pressure) is gathered;Man-machine interface Interactive controlling;Upper and lower computer interactive communication is controlled.The verifying process flow control of device is completed by PLC.PLC is occupy The intermediate layer of whole LNG filling machine measurement verification systems, is system bottom execution, monitoring device and top level computer man-machine interface Between information bridge, effect be receive top level computer calibrating set and verification parameters, including LNG filling machines manufacturer and Its acquisition mode that communicates is set, calibrating flow point is set, verifying process flow (liquid phase verifying process flow, complete machine verifying process flow) is set, stream Measure stability is set, calibrating number of times is set etc..
The flow verification collector is used to carry out proving flowmeter flow signal acquisition, LNG filling machine aerating amount signals Collection, communication logic control.
Fig. 2 is liquefied natural gas (LNG) the filling machine calibration method and the principle frame of system according to embodiments of the invention Figure.
As shown in Fig. 2 the explosion-proof control device includes PLC (controller), flow verification collector, the PLC connections Chromatic colour display screen, flow verification collector, interchanger, radio communication converter, guard grating.For example, the PLC passes through RS232 communication loops are connected to the flow verification collector, the colorful display screen, are connected to by ethernet communication loop The interchanger, the radio communication converter;The PLC is also connected to the guard grating by rigid line.
Specifically, guard grating is used to carry out insulation blocking to system, and colorful display screen is as human-computer interaction interface, by data It is shown on interface, Ethernet wire signal is converted to wireless Wifi signals by radio communication converter, data is carried out with computer Interaction.
Fig. 3 is the pipeline of liquefied natural gas (LNG) filling machine liquid phase flow verification method according to embodiments of the invention Connection figure.
Reference picture 3, present invention calibrating operating process is described as follows.
Liquefied natural gas aerating machine calibrating car is docked at by LNG filling machines, anti-static device is connected.According to Fig. 3 pipe Line is docked with live filling machine, and liquid phase flow verification is carried out first.
Before calibrating, filling machine and calibrating installation will carry out pre-cooling cycle flow.By filling machine and calibrating installation using fast Dress mode is mutually concatenated, and the air filling gun of filling machine is inserted on the liquid feeding rifle interface of calibrating installation, the connection liquid phase interface of calibrating installation Air filling gun be inserted on the circulation port of filling machine;Filling machine pre-cooling cycle is opened, the LNG stream body that calibrating installation is shown during which is observed State parameter (flow, temperature, density etc.), while adjusting calibrating installation liquid phase pipeline end installs flow control valve adjustment stream Amount.When the flow value for observing circulation process meets 32kg/min to range of flow between 80kg/min, and filling machine and calibrating When device liquidus temperature differs ± 2 DEG C, stop pre-cooling cycle flow.
Complete after pre-cooling cycle flow, into liquid phase flow verifying process flow.The air filling gun of filling machine is inserted into calibrating installation On liquid feeding rifle interface, the air filling gun of the connection liquid phase interface of calibrating installation is inserted on the circulation port of filling machine, and filling machine is not connected to Return line.In the case of pre-cooling cycle flow state is constant, filling machine starts aerating flow, the inspection of calibrating installation subsequent start-up It is fixed.Direct circulation aerating completes at least three not good liquor multi-phase flowmeters and individually examined and determine.
Fig. 4 is to be connected according to the pipeline of liquefied natural gas (LNG) filling machine complete machine calibration method of embodiments of the invention Figure.Reference picture 4, illustrates the complete machine calibrating of next step below.
After liquid phase flow verifying process flow is completed, into complete machine verifying process flow.The air filling gun of filling machine is inserted into calibrating installation Liquid feeding rifle interface on, the return-air rifle of filling machine is inserted on the return-air rifle interface of calibrating installation;The connection liquid phase of calibrating installation connects The air filling gun of mouth is inserted into the aerating mouthful of air container (for example, motorbus), the return-air of the connection gas phase interface of calibrating installation Rifle is inserted on the gas returning port of the air container;Filling machine starts aerating flow, the calibrating of calibrating installation subsequent start-up.Aerating terminates Afterwards, calibrating installation gathers filling machine cumulative flow value and calibrating installation cumulative flow value simultaneously.Then result of calculation, generates metering Form.
Illustrate referring to Fig. 5 and 6:How embodiments in accordance with the present invention, realize the raising of measurement verification precision.
Fig. 5 is the instruction sequencing figure of liquefied natural gas (LNG) filling machine calibration method according to embodiments of the invention;Figure 6 be the data sampling time sequence figure of liquefied natural gas (LNG) filling machine calibration method according to embodiments of the invention.
Standard calibrating device of the present invention is standard transfer device, mainly assign high-performance, high accuracy flowmeter as mark Quasi- flow measurement utensil is used to examine and determine other flowmeters.
Standard calibrating device is exactly " to be continued through in same time interval with LNG filling machine flow verification fundamentals The mass flow of standard calibrating device and LNG filling machines is equal " this rule.So, standard calibrating device and LNG filling machine numbers It is synchronously the key for ensureing measurement verification precision according to acquisition time.
The present invention is examined and determine by private communication interface and communication protocol, and calibrating installation can be with accurate perception standard test Device and LNG filling machine data sampling time sequences, it is ensured that standard calibrating device and LNG filling machine numbers are obtained in same time interval According to.
Calibrating installation data acquisition is strictly completed according to data acquisition communication protocol and calibrating collector timing.According to communication Agreement provides that it is independent interface that calibrating collector communicates with standard calibrating device, LNG filling machines, can be set simultaneously with two Preparation send instruction.It is all 8 bytes to send instruction to standard calibrating device and LNG filling machines, each 10 data of byte, baud Rate is 9600bps, so, the instruction transmission time is 8.33ms.Similarly, it is also that specific duration, i.e. standard test are filled to receive data It is a constant interval that acquisition time, which is put, with LNG filling machine flowmeter acquisition times.It is illustrated in figure 5 the knot that experiment is drawn Really.
First illustrate the implication of the mark in accompanying drawing below.
Proving flowmeter self-starting was examined and determine to real-time accumulated flow value " MB1 " the loopback deadline:t1
LNG filling machine flowmeter self-startings were examined and determine to real-time accumulated flow value " MJ1 " the loopback deadline:t2
Proving flowmeter and filling machine flowmeter collection initial proving flow value deadline are poor (t1-t2):t3
Proving flowmeter is from calibrating is terminated to real-time accumulated flow value " MB2 " the loopback deadline:t1'
LNG filling machine flowmeter self-startings were examined and determine to real-time accumulated flow value " MJ2 " the loopback deadline:t2'
It is poor (t1'-t2') that proving flowmeter terminates the calibrating flow value deadline with the collection of filling machine flowmeter:t3'
Calibrating installation sends startup calibrating instruction with sending the end calibrating command interval time:tC
Proving flowmeter gathers primary quantity to the amount of end time interval:tB
LNG filling machines flowmeter gathers primary quantity to the amount of end time interval:tJ
Illustrate verifying process flow according to an embodiment of the invention below.
As shown in fig. 6, calibrating installation starts after calibrating, flow verification collector adds to standard calibrating device with LNG simultaneously Mechanism of qi, which is sent, takes the aggregate-value instruction of calibrating initial flow.
Proving flowmeter is connected to flow verification collector and taken after the instruction of initial flow aggregate-value, will add up at current time at once Flow value " MB1 " loop back traffic examines and determine collector.
LNG filling machine controlling devices are connected to flow verification collector and taken after the instruction of initial flow aggregate-value, at once to its flow Meter, which is sent, takes initial flow aggregate-value to instruct.LNG filling machine flowmeters are connected to controlling device instruction at once will current time accumulative stream Integrated flow value " MJ1 " is transmitted back to flow verification collector by value " MJ1 " loopback controlling device, LNG filling machines controlling device again.Stream Amount calibrating collector has obtained proving flowmeter and the initial flow aggregate-value " MB1 " of LNG filling machines and " MJ1 ".
According to verification system host computer set collection capacity parameter, flow verification collector simultaneously to proving flowmeter with LNG filling machines, which are sent, takes calibrating to terminate the instruction of flux cumulating value.The sequential for ibid " taking calibrating initial flow aggregate-value " equally.
Proving flowmeter is connected to flow verification collector and taken after the value instruction of end flux cumulating, will add up at current time at once Flow value " MB2 " loop back traffic examines and determine collector.
LNG filling machine controlling devices are connected to flow verification collector and take calibrating to terminate after the instruction of flux cumulating value, at once to it Flowmeter, which is sent, takes calibrating to terminate the instruction of flux cumulating value.LNG filling machine flowmeters are connected to controlling device instruction when at once will be current Integrated flow value " MJ2 " loopback controlling device is carved, integrated flow value " MJ2 " is transmitted back to flow verification by LNG filling machines controlling device again Collector.Flow verification collector obtained proving flowmeter and LNG filling machines calibrating terminate flux cumulating value " MB2 " and “MJ2”.So far, flow verification collector has obtained all numerical value of one calibrating point of proving flowmeter and LNG filling machines, and send Calculated to PLC, finally obtain metric results.
Due to proving flowmeter and LNG filling machines flowmeter collection initial proving flow value with terminate calibrating flow value this two The program of individual collection period is to call identical subprogram, so ensureing t1=t1' and t2=t2'.
In addition, because t2-t1=t3, t2'-t1'=t3', t3=t3' thereby ensures that tB=tC=tJ.
This result shows that proving flowmeter gathers primary quantity to the amount of end time interval phase with LNG filling machines flowmeter Deng.And the two flowmeters are connected in a pipeline, it is ensured that " continue through standard calibrating device in same time interval It is equal with the mass flow of LNG filling machines " this rule.
Finally, it will be appreciated by those of skill in the art that various modifications, change can be made to the above embodiment of the present invention Type and replacement, it is each fallen within such as protection scope of the present invention defined in the appended claims.

Claims (5)

1. a kind of liquefied natural gas aerating machine verification system, it is connected with filling machine to be checked, it is characterised in that the liquefaction is natural Gas filling machine verification system includes:
Proving flowmeter, it is connected with the aerating delivery outlet of the filling machine to be checked, for detecting adding for the filling machine to be checked Gas output flow, and outputting standard flow count value;
Flow verification collector, it is connected with the filling machine to be checked and the proving flowmeter, for filling machine to be checked And the proving flowmeter sends " calibrating starts " and " calibrating terminates " and instructed, and from the filling machine to be checked and the mark Quasi- flowmeter reads the flow count value and the normal flow count value of filling machine to be checked respectively.
2. liquefied natural gas aerating machine verification system according to claim 1, it is characterised in that the proving flowmeter bag Titer multi-phase flowmeter and Standard Gases multi-phase flowmeter are included, it is connected by fieldbus with the flow verification collector respectively.
3. liquefied natural gas aerating machine verification system according to claim 1, it is characterised in that the liquefied natural gas adds Mechanism of qi verification system also includes programmable logic controller (PLC), pressure transmitter, and the programmable logic controller (PLC) is connected with display Screen, interchanger, radio communication converter, guard grating, the pressure transmitter are connected to the peace by analog input loop Full grid.
4. liquefied natural gas aerating machine verification system according to claim 1, it is characterised in that the flow verification collection Device is connected with the controlling device of filling machine to be checked, and the controlling device is connected with the flowmeter of filling machine to be checked.
5. the liquefied natural gas that the liquefied natural gas aerating machine verification system described in one in Claims 1-4 is realized Filling machine calibration method, comprises the following steps:
Step 1, verification system start after calibrating, and the flow verification collector is sent out to proving flowmeter and filling machine to be checked simultaneously Go out " taking present flow rate count value " instruction, the filling machine to be checked starts simultaneously at aerating output;
Step 2, the proving flowmeter are after described " taking present flow rate count value " instruction is received, by the meter at its current time Numerical value MB1 is sent to the flow verification collector;
Step 3, the filling machine to be checked are after described " taking present flow rate count value " instruction is received, by the meter at its current time Numerical value MJ1 is sent to the flow verification collector;
Step 4, the filling machine to be checked continue aerating output;
Step 5, the filling machine to be checked stop aerating output, also, the flow verification collector is simultaneously to proving flowmeter " taking present flow rate count value " instruction is sent with filling machine to be checked;
Step 6, the proving flowmeter are after described " taking present flow rate count value " instruction is received, by the meter at its current time Numerical value MB2 is sent to the flow verification collector;
Step 7, the filling machine to be checked are after described " taking present flow rate count value " instruction is received, by the meter at its current time Numerical value MJ2 is sent to the flow verification collector.
CN201611062075.8A 2016-11-28 2016-11-28 Liquefied natural gas aerating machine calibration method and system Withdrawn CN107063401A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611062075.8A CN107063401A (en) 2016-11-28 2016-11-28 Liquefied natural gas aerating machine calibration method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611062075.8A CN107063401A (en) 2016-11-28 2016-11-28 Liquefied natural gas aerating machine calibration method and system

Publications (1)

Publication Number Publication Date
CN107063401A true CN107063401A (en) 2017-08-18

Family

ID=59619726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611062075.8A Withdrawn CN107063401A (en) 2016-11-28 2016-11-28 Liquefied natural gas aerating machine calibration method and system

Country Status (1)

Country Link
CN (1) CN107063401A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398277A (en) * 2018-04-25 2019-11-01 中国航空油料有限责任公司 A kind of aviation kerosine tank service truck calibration method and system

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3958443A (en) * 1974-06-17 1976-05-25 Air Products And Chemicals, Inc. Apparatus for proving and calibrating cryogenic flow meters
CN201925716U (en) * 2010-12-17 2011-08-10 中国测试技术研究院流量研究所 Metering calibration standard device for liquefied natural gas (LNG) dispenser
CN202546274U (en) * 2012-04-25 2012-11-21 中国测试技术研究院流量研究所 Liquefied natural gas filling machine verification device
CN102998028A (en) * 2012-12-27 2013-03-27 重庆川仪自动化股份有限公司 Ultrasonic heat meter verification system
CN104089687A (en) * 2014-07-30 2014-10-08 张家港富瑞特种装备股份有限公司 Online calibration device and method for LNG filling machine
CN204286557U (en) * 2014-12-30 2015-04-22 中国石油天然气股份有限公司 The real-time checking system of the real stream calibrating of a kind of rock gas
CN205593617U (en) * 2015-12-24 2016-09-21 四川中测流量科技有限公司 LNG adds mechanism of qi metrological verification standard device with show flow data discernment
CN206223267U (en) * 2016-11-28 2017-06-06 北京瑞赛长城航空测控技术有限公司 Liquefied natural gas aerating machine verification system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3958443A (en) * 1974-06-17 1976-05-25 Air Products And Chemicals, Inc. Apparatus for proving and calibrating cryogenic flow meters
CN201925716U (en) * 2010-12-17 2011-08-10 中国测试技术研究院流量研究所 Metering calibration standard device for liquefied natural gas (LNG) dispenser
CN202546274U (en) * 2012-04-25 2012-11-21 中国测试技术研究院流量研究所 Liquefied natural gas filling machine verification device
CN102998028A (en) * 2012-12-27 2013-03-27 重庆川仪自动化股份有限公司 Ultrasonic heat meter verification system
CN104089687A (en) * 2014-07-30 2014-10-08 张家港富瑞特种装备股份有限公司 Online calibration device and method for LNG filling machine
CN204286557U (en) * 2014-12-30 2015-04-22 中国石油天然气股份有限公司 The real-time checking system of the real stream calibrating of a kind of rock gas
CN205593617U (en) * 2015-12-24 2016-09-21 四川中测流量科技有限公司 LNG adds mechanism of qi metrological verification standard device with show flow data discernment
CN206223267U (en) * 2016-11-28 2017-06-06 北京瑞赛长城航空测控技术有限公司 Liquefied natural gas aerating machine verification system

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
吴志刚;: "PLC在天然气调压站智能监控系统的应用" *
许维峰;: "西门子S7-300 PLC在LNG系统中的应用" *
赵普俊;熊茂涛;尹保来;杨修杰;雷励;张宗平;: "液化天然气加气机计量检定方法的研究" *
赵普俊;熊茂涛;罗雁飞;杨修杰;: "JJG1114-2015《液化天然气加气机检定规程》解读" *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110398277A (en) * 2018-04-25 2019-11-01 中国航空油料有限责任公司 A kind of aviation kerosine tank service truck calibration method and system
CN110398277B (en) * 2018-04-25 2021-08-03 中国航空油料有限责任公司 Aviation kerosene fuelling vehicle verification method and system

Similar Documents

Publication Publication Date Title
CN109725281A (en) A kind of long-range source tracing method of digitalized electrical energy meter based on quantum techniques and system
CN103792419B (en) Realize analog quantity and mix the synchronous sampling method accessed with digital quantity
CN105262656A (en) Implementation method for time-triggered communication bus of aeroengine distributed control system
CN103837214A (en) Combined container type gas flow detection device by pVTt method
CN106707898A (en) Remote data acquisition and real-time analysis system for filling production line
CN106154030B (en) A kind of intelligent electric meter and its data encryption and transmission method
CN103175588A (en) Full-automatic series verification calibrating device with pressure-resistant water meter
CN206657065U (en) A kind of portable charging pile calibrating installation
CN206707987U (en) A kind of air compressor machine Auto-Test System
CN202433063U (en) Device for verifying and calibrating water meter
CN103398863B (en) Ground-based simulation and detection device for space TDICCD camera electronics system
CN105319529A (en) System and method for calibrating errors of watt-hour meters
CN105162649B (en) For the test method and its system of npp safety grade network performance index
CN102401235A (en) LNG (Liquefied Natural Gas) dispenser calibrating device
CN201373758Y (en) Natural gas flow monitoring and checking device through computer measurement
CN202349591U (en) Calibration device of liquefied natural gas (LNG) dispenser
CN107300404A (en) Natural gas flowmeter verification system
CN104215803A (en) Synchronous standard source and control method applied to distributive type intelligent testing platform
CN206223267U (en) Liquefied natural gas aerating machine verification system
CN107943153A (en) The parallel temperature-controlling system of multi-measuring point multiloop under vacuum low-temperature environment
CN107063401A (en) Liquefied natural gas aerating machine calibration method and system
CN1952624A (en) Self-calibration control system of water flow standard apparatus
CN106352911B (en) Realize that the single of multichannel low frequency pick-up signal acquisition interrupts CPU verification systems and calibrating acquisition method
CN207798220U (en) The check device of flowmeter calibration system
CN104409119B (en) A kind of nuclear power station flow sampling display system and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210824

Address after: 100027 Chaoyangmen North Street, Chaoyang District, Chaoyang District, Beijing

Applicant after: China Petroleum & Chemical Corp.

Address before: 100176 No. 10, Longqing street, economic and Technological Development Zone, Daxing District, Beijing

Applicant before: BEIJING RUISAI CHANG CHENG AERONAUTICAL M & C TECHNOLOGY Co.,Ltd.

Applicant before: CHINA AVIATION INDUSTRY CORPORATION BEIJING Research Institute OF MEASUREMENT & CONTROL TECHNOLOGY

Applicant before: AVIC INTELLIGENT MEASUREMENT Co.,Ltd.

TA01 Transfer of patent application right
WW01 Invention patent application withdrawn after publication

Application publication date: 20170818