CN107060878A - The inspection window and its application method of a kind of tunnel drainage system - Google Patents

The inspection window and its application method of a kind of tunnel drainage system Download PDF

Info

Publication number
CN107060878A
CN107060878A CN201710173336.1A CN201710173336A CN107060878A CN 107060878 A CN107060878 A CN 107060878A CN 201710173336 A CN201710173336 A CN 201710173336A CN 107060878 A CN107060878 A CN 107060878A
Authority
CN
China
Prior art keywords
inspection
casing
tunnel
drainage system
removable cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710173336.1A
Other languages
Chinese (zh)
Other versions
CN107060878B (en
Inventor
蒋雅君
申玉生
赵菊梅
李国庆
唐秀军
李彬
陶双江
邱品茗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201710173336.1A priority Critical patent/CN107060878B/en
Publication of CN107060878A publication Critical patent/CN107060878A/en
Application granted granted Critical
Publication of CN107060878B publication Critical patent/CN107060878B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F16/00Drainage
    • E21F16/02Drainage of tunnels

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses the inspection window and its application method of a kind of tunnel drainage system, belong to tunnel water handling technical field, including casing, casing is arranged in the secondary lining of draining pipe surface;Removable cover is connected with the top of casing, bottom is surrounded by the edge of a wing;The edge of a wing is connected with splash guard, and covering on inspection socket, inspection socket is offered on the splash guard of bottom half overlay area and is connected with inspection cover plate.The flush of the height of the casing and the consistency of thickness of secondary lining, removable cover and secondary lining.Pattern of the present invention is simple, install convenient, and tunnel easily can carry out examination and maintenance during runing to tunnel drainage guard system, ensure the unimpeded of tunnel drainage system, and do not influence the existing structure type in tunnel.

Description

The inspection window and its application method of a kind of tunnel drainage system
Technical field
The present invention relates to tunnel water handling technical field, and in particular to a kind of tunnel drainage system inspection window and its make Use method.
Background technology
At present in tunnel structure of the Tunnel Engineering field using composite lining, generally supporting in the early stage and secondary lining Between lay drainpipe, including ring direction drainpipe, longitudinal drainage pipe, transverse drain and central ditch etc., for secondary lining Infiltration after block and splash guard is discharged, to eliminate hydraulic pressure.But during tunnel is runed, the silt taken out of due to seeping water becomes silted up Product, it will usually cause the blocking of drainpipe, the document as disclosed in Chen Li《Drainpipe blockage problem is probed into railway tunnel construction》 (《Technology and market》, the 4th phase of volume 22, page 80, in April, 2015 in 2015), it is indicated that tunnel drainage system is vulnerable to mud The influence of husky, calcareous crystal and form blocking, cause hydraulic pressure gather or Lining cracks infiltration etc. consequence.In karst Magnesia, calcareous ion is generally rich in the tunnel that area is built, underground water, crystal is formed and gradually blocks tunneling drain.Due to After tunneling is finished, drainpipe is generally enclosed in secondary lining behind, it is impossible to opens liner structure and checks and cleaning row Water pipe, causes current effective dredging measure less.The countermeasure being usually taken is that inspection shaft and sand setting are set in central ditch Pond, but this measure can only clear up the silting at central water ditch position.Also have by the way of water under high pressure and pressure-air to lining cutting both sides Local draining pipe cleared up, but the draining scope tube that can be cleared up is also very limited.Above measure can not be effectively to tunnel The blocking of road drainage system is cleared up, and recovers its drainability.
The problem of being easily blocked for tunneling drain, part expert proposes certain methods:The paper delivered such as Zhou Zhuo 《Groundwater In The Karst Area seepage flow Crystallization Plugging tunneling drain study mechanism and punishment suggestion》(Chang An University's master's degree opinion Text, the 57-60 pages, in June, 2015), it is proposed that useization fills waterproof and changes filling-electricity seepage control technique, changes drainage grade, tunnel Drainpipe is put into the bacterium of carbonic anhydrase, pressurization and removes tamper and tunnel, adds the measures such as scale remover;Zhang Xuefu, refined etc. People has published some patents, such as (the publication number CN of patent 1 in removing tunneling drain Crystallization Plugging thing field 104196563A, publication date 2014.12.10), patent 2 (publication number CN 104196564A, publication date 2014.12.10), patent 3 (publication number CN104196565A, publication date 2014.12.10), observed by arranging overflow pipe drainpipe stopping state, Change water velocity to prevent the generation of crystallization, arrange that spiral shell twisted axis etc. is constructed to remove Crystallization Plugging thing in drainpipe.More than Measure, or there is the problem of construction is complicated, removing is not thorough enough, or only short run effect is effective, or need to enter the structure in tunnel Row changes, or cost is higher, the problem of generally can not being fully solved current tunnel drainage blockage.In above measure, Tunnel drainage system can not be carried out intuitively checking and directly clearing up, more drainage system can not be changed and safeguarded.
The content of the invention
The technical problem to be solved in the present invention is to provide the inspection window and its application method of a kind of tunnel drainage system, solve Drainage system cleaning and the problem of Maintenance Difficulty during tunnel is runed, guarantee tunnel drainage system it is unimpeded.
In order to solve the above technical problems, the technical solution adopted in the present invention is:
A kind of inspection window of tunnel drainage system, including casing, casing are arranged in the secondary lining of draining pipe surface;Case Removable cover is connected with the top of body, bottom is surrounded by the edge of a wing;The edge of a wing is connected with splash guard, bottom half overlay area it is anti- Covering on inspection socket, inspection socket is offered on water plate and is connected with inspection cover plate.
According to such scheme, the casing is rectangle, trapezoidal or ladder perpendicular to the cross sectional shape of drainpipe axis direction Shape.
According to such scheme, the height of the casing and the consistency of thickness of secondary lining, removable cover and secondary lining Flush.
According to such scheme, the removable cover is provided with what is matched with lock provided with lock, the top of the casing Keyhole, is connected between removable cover and casing by lock and keyhole.
According to such scheme, insulation material is filled with the casing.
A kind of application method of the inspection window of tunnel drainage system, its step is as follows:
Step 1:Ring direction drainpipe and longitudinal drainage pipe are laid on the preliminary bracing surface in tunnel;
Step 2:In the reserved ring direction drainpipe of inspections window portion position scope and the both sides laying depth of longitudinal drainage pipe and Plastic draining belt that drainpipe is highly flushed simultaneously is fixed with plastic draining belt nailing;
Step 3:Non-woven fabrics and splash guard are laid, and non-woven fabrics is fixed with non-woven fabrics nailing;
Step 4:The inspection socket of drainage system is cut off in waterproof plate surface, double sided self-adhesive tape is pasted on inspection socket periphery, And cover inspection socket with inspection cover plate;
Step 5:The edge of a wing double sided self-adhesive tape of casing is connected with splash guard, the inspection mouth region of drainage system is covered Domain, and ensure to be connected firmly;
Step 6:The keyhole that removable cover is buckled into casing top is closed;
Step 7:Secondary lining is applied, and ensures that removable cover is flushed with secondary lining surface;
Step 8:When needing to carry out repair and maintenance to ring direction drainpipe and longitudinal drainage pipe during tunnel operation, open and check The removable cover of window;
Step 9:The inspection cover plate on splash guard is removed, ring direction drainpipe and longitudinal drainage pipe are cleared up and safeguarded;
Step 10:After the cleaning and maintenance work of ring direction drainpipe and longitudinal drainage pipe are finished, the inspection on splash guard is reinstalled Cover plate is looked into, and buckles the removable cover for checking window.
Compared with prior art, the beneficial effects of the invention are as follows:Pattern is simple, install convenient, and tunnel can be with during runing Examination and maintenance easily are carried out to tunnel drainage guard system, the unimpeded of tunnel drainage system are ensured, and do not influence tunnel existing Structure type.
Brief description of the drawings
The embodiment to the present invention is described further below in conjunction with the accompanying drawings, wherein:
Fig. 1 is the trapezoidal cabinet and removable cover schematic diagram of the present invention;
Fig. 2 is the stairstepping casing and removable cover schematic diagram of the present invention;
Fig. 3 is the connected mode schematic diagram at the inspection socket position of the present invention;
Fig. 4 is organigram of the present invention in composite lining of tunnel structure;
Fig. 5 is the schematic diagram that the present invention is applied to composite lining tunnel guarded drainage system (half bag water proof type);
Fig. 6 is Fig. 5 1-1 cross-sectional views;
Fig. 7 is Fig. 5 2-2 cross-sectional views.
Each label is interpreted as in figure:1- splash guards, 2- casings, 3- removable covers, the 4- edges of a wing, 5- keyholes, 6- locks, 7- The edge of a wing of casing and splash guard binding site, 8- check cover plate, and 9- checks cover plate and the inspection socket connecting portion on splash guard, 10- inspection sockets, 11- drainpipes, 12- plastic draining belts, 13- plastic draining belt nailings, 14- non-woven fabrics nailings, 15- non-woven fabrics, 16- preliminary bracings, 17- secondary linings, 18- ring direction drainpipes, 19- longitudinal drainage pipes, 20- rings check window, and 21- is longitudinally checked Window.
Embodiment
Inspection window of the present invention is mainly made up of casing 2 and removable cover 3.Casing 2 is perpendicular to the axle center of drainpipe 11 The cross sectional shape in direction is rectangle, trapezoidal or stairstepping, is arranged in secondary lining 17, is made using metal material, is led to The mode for crossing welding is fixed, can also be by the bar connecting in reinforcement fabrication attachment fastener, with secondary lining 17, with guard box Body 2 will not be moved or be destroyed in the concreting of secondary lining 17.Casing 2 can also be made using plastic material.Case The height of body 2 and the consistency of thickness of secondary lining 17, removable cover 3 are flushed with the surface of secondary lining 17.It is relatively low in temperature Can insert insulation material under environment, in casing 2 prevents drainpipe 11 from freezing.
Removable cover 3 is connected to the top of casing 2, can open and buckle when the drainpipe 11 to tunnel is checked Close.Removable cover 3 is provided with lock 6, and the top of casing 2 is provided with the keyhole 5 matched with lock 6, removable cover 3 and casing 2 Between by lock 6 and keyhole 5 connect.The side of folding other can also be facilitated by hinge etc. between removable cover 3 and casing 2 Formula is attached.
The edge of a wing 4 of the bottom surrounding of casing 2 is connected by double sided self-adhesive tape with splash guard 1, can also use heating welding Mode is connected with splash guard 1.
Inspection socket 10 is provided with the splash guard 1 in the bottom footprint domain of casing 2, with the material system with the same material of splash guard 1 Conduct a survey cover plate 8.Check that inspection socket 10 covering of the cover plate 8 by double sided self-adhesive tape with being opened on splash guard 1 is connected, be easy to Open and close during inspection.Check that cover plate 8 other can also facilitate the connected mode of folding to inspection socket 10 by hinge etc. Position covering closing.
Inspection window of the present invention is broadly divided into ring and checks that window 20 and longitudinal direction check window 21, and ring checks that window 20 is set Local in tunnel ring direction drainpipe 18, longitudinal direction checks that window 21 is arranged on the part of longitudinal drainage pipe 19, and the present invention can also be arranged on The joint area of ring direction drainpipe 18 and longitudinal drainage pipe 19.Checking the length of window can be connected using multiple casings 2 as needed Connect composition.
The surface layout ring direction drainpipe 18 of supporting in the early stage 16, ring direction drainpipe 18 are longitudinally spaced-apart along tunnel Laying scope be from side arch springing to opposite side arch springing;Along the surface layout of the arch springing position supporting in the early stage 16 of tunnel longitudinal direction Longitudinal drainage pipe 19, arch springing arrangement of the longitudinal drainage pipe 19 along tunnel both sides.The position first selected on the surface of anchor bar of waterproof plate in tunnels 1, Along ring direction drainpipe 18 move towards arrangement inspection socket 10 and with inspection cover plate 8 cover, move towards cloth along longitudinal drainage pipe 19 Put inspection socket 10 and covered with inspection cover plate 8, then install and fix the casing 2 of ring direction drainpipe 18 and longitudinal drainage pipe 19 Inspection socket 10 is covered with removable cover 3, formation tunnel ring after the concrete of secondary lining 17 has been poured and has checked that window 20 and longitudinal direction are examined Window 21 is looked into, to carry out inspection and maintenance to ring direction drainpipe 18 and longitudinal drainage pipe 19 during runing.
The specifically used method of the present invention is as follows:
Step 1:Ring direction drainpipe 18 and longitudinal drainage pipe 19 are laid on the surface of preliminary bracing 16 in tunnel;
Step 2:Laid in the reserved ring direction drainpipe 18 of inspection window portion position scope and the both sides of longitudinal drainage pipe 19 thick Spend the plastic draining belt 12 flushed with the height of drainpipe 11 and fixed with plastic draining belt nailing 13;
Step 3:Non-woven fabrics 15 and splash guard 1 are laid, and non-woven fabrics 15 is fixed with non-woven fabrics nailing 14;
Step 4:The inspection socket 10 of drainage system is cut off on the surface of splash guard 1, double-sided self-adhesive is pasted on the periphery of inspection socket 10 Adhesive tape, and cover inspection socket 10 with the bigger inspection cover plate 8 of area;
Step 5:The edge of a wing 4 of casing 2 is connected with double sided self-adhesive tape with splash guard 1, the inspection of drainage system is covered 10 regions of mouth, and ensure to be connected firmly;
Step 6:The keyhole 5 that removable cover 3 is buckled into the top of casing 2 is closed;
Step 7:Secondary lining 17 is applied, and ensures that removable cover 3 is flushed with the surface of secondary lining 17;
Step 8:When needing to carry out repair and maintenance to ring direction drainpipe 18 and longitudinal drainage pipe 19 during tunnel operation, open Check the removable cover 3 of window;
Step 9:Remove the inspection cover plate 8 on splash guard 1, ring direction drainpipe 18 and longitudinal drainage pipe 19 are carried out cleaning and Safeguard;
Step 10:After the cleaning and maintenance work of ring direction drainpipe 18 and longitudinal drainage pipe 19 are finished, reinstall on splash guard 1 Inspection cover plate 8, and buckle check window removable cover 3.
By above method, ring direction drainpipe 18 and longitudinal direction that can be during tunnel is runed to the behind of secondary lining 17 be arranged Water pipe 19 carries out periodic inspection and maintenance, it is ensured that tunnel drainage it is unobstructed.

Claims (6)

1. a kind of inspection window of tunnel drainage system, it is characterised in that:Including casing (2), casing (2) is arranged on drainpipe (11) In the secondary lining (17) on surface;Removable cover (3) is connected with the top of casing (2), bottom is surrounded by the edge of a wing (4);The edge of a wing (4) it is connected with splash guard (1), inspection socket (10), inspection socket is offered on the splash guard (1) in casing (2) bottom footprint domain (10) covering is connected with inspection cover plate (8) on.
2. a kind of inspection window of tunnel drainage system according to claim 1, it is characterised in that:The casing (2) is vertical In drainpipe (11) axis direction cross sectional shape be rectangle, trapezoidal or stairstepping.
3. a kind of inspection window of tunnel drainage system according to claim 1, it is characterised in that:The height of the casing (2) The consistency of thickness of degree and secondary lining (17), the flush of removable cover (3) and secondary lining (17).
4. a kind of inspection window of tunnel drainage system according to claim 1, it is characterised in that:The removable cover (3) Provided with lock (6), the top of the casing (2) is provided with the keyhole (5) matched with lock (6), removable cover (3) and casing (2) connected between by latching (6) and keyhole (5).
5. a kind of inspection window of tunnel drainage system according to claim 1, it is characterised in that:Filled out in the casing (2) Filled with insulation material.
6. a kind of application method of the inspection window of tunnel drainage system, it is characterised in that:
Step 1:Ring direction drainpipe (18) and longitudinal drainage pipe (19) are laid on preliminary bracing (16) surface in tunnel;
Step 2:Laid in the reserved ring direction drainpipe (18) of inspection window portion position scope and the both sides of longitudinal drainage pipe (19) thick Spend the plastic draining belt (12) highly flushed with drainpipe (11) and fixed with plastic draining belt nailing (13);
Step 3:Non-woven fabrics (15) and splash guard (1) are laid, and non-woven fabrics (15) is fixed with non-woven fabrics nailing (14);
Step 4:The inspection socket (10) of drainage system is cut off on splash guard (1) surface, stickup is two-sided certainly on inspection socket (10) periphery Adhesive tape, and cover inspection socket (10) with inspection cover plate (8);
Step 5:The edge of a wing (4) of casing (2) is connected with double sided self-adhesive tape with splash guard (1), the inspection of drainage system is covered Mouth (10) region is looked into, and ensures to be connected firmly;
Step 6:The keyhole (5) that removable cover (3) is buckled at the top of casing (2) is closed;
Step 7:Secondary lining (17) is applied, and ensures that removable cover (3) is flushed with secondary lining (17) surface;
Step 8:When needing to carry out repair and maintenance to ring direction drainpipe (18) and longitudinal drainage pipe (19) during tunnel operation, open Check the removable cover (3) of window;
Step 9:The inspection cover plate (8) on splash guard (1) is removed, ring direction drainpipe (18) and longitudinal drainage pipe (19) are carried out clear Reason and maintenance;
Step 10:After the cleaning and maintenance work of ring direction drainpipe (18) and longitudinal drainage pipe (19) are finished, splash guard (1) is reinstalled On inspection cover plate (8), and buckle check window removable cover (3).
CN201710173336.1A 2017-03-22 2017-03-22 A kind of the inspection window and its application method of tunnel drainage system Active CN107060878B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710173336.1A CN107060878B (en) 2017-03-22 2017-03-22 A kind of the inspection window and its application method of tunnel drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710173336.1A CN107060878B (en) 2017-03-22 2017-03-22 A kind of the inspection window and its application method of tunnel drainage system

Publications (2)

Publication Number Publication Date
CN107060878A true CN107060878A (en) 2017-08-18
CN107060878B CN107060878B (en) 2019-10-25

Family

ID=59620040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710173336.1A Active CN107060878B (en) 2017-03-22 2017-03-22 A kind of the inspection window and its application method of tunnel drainage system

Country Status (1)

Country Link
CN (1) CN107060878B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825272A (en) * 2018-09-07 2018-11-16 西南交通大学 Lining construction seam infiltration drain structure and its implementation method
CN114412565A (en) * 2022-01-26 2022-04-29 中国有色金属工业昆明勘察设计研究院有限公司 Plugging and dredging device suitable for water burst and mud burst in tunnel

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN104612721A (en) * 2015-01-04 2015-05-13 西南交通大学 Deep buried central gutterway inspection well structure for cold region tunnel
CN205654378U (en) * 2016-04-29 2016-10-19 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot of a wall drainage system
CN205677030U (en) * 2015-10-20 2016-11-09 江苏澳洋园林科技发展有限公司 A kind of drainage inspection well backfill structure
CN206625870U (en) * 2017-03-22 2017-11-10 西南交通大学 A kind of inspection window of tunnel drainage system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661171A (en) * 2012-05-02 2012-09-12 中铁十一局集团第五工程有限公司 Frost damage prevention drainage system for tunnel
CN104612721A (en) * 2015-01-04 2015-05-13 西南交通大学 Deep buried central gutterway inspection well structure for cold region tunnel
CN205677030U (en) * 2015-10-20 2016-11-09 江苏澳洋园林科技发展有限公司 A kind of drainage inspection well backfill structure
CN205654378U (en) * 2016-04-29 2016-10-19 广东华路交通科技有限公司 Novel visual operation highway tunnel side wall foot of a wall drainage system
CN206625870U (en) * 2017-03-22 2017-11-10 西南交通大学 A kind of inspection window of tunnel drainage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108825272A (en) * 2018-09-07 2018-11-16 西南交通大学 Lining construction seam infiltration drain structure and its implementation method
CN114412565A (en) * 2022-01-26 2022-04-29 中国有色金属工业昆明勘察设计研究院有限公司 Plugging and dredging device suitable for water burst and mud burst in tunnel

Also Published As

Publication number Publication date
CN107060878B (en) 2019-10-25

Similar Documents

Publication Publication Date Title
WO2021227383A1 (en) Method for treating tunnel leakage water in alpine region
WO2021109537A1 (en) Ultra-long tunnel sewage disposing and separation drainage structure suitable for cold regions
CN104005419B (en) The box culvert structure of sinking method construction and construction method
KR101039316B1 (en) Drainage structure for tunnel
CN106869999A (en) A kind of tunnel drainage sleeve pipe and its application method for removing crystallization and silting thing
CN109488371B (en) Waterproof system of full-enclosed waterproof station and dynamic setting and quantity-limiting drainage method
CN111851587B (en) Telescopic vibration-damping anchor-tying type suspension tunnel end connecting device and construction method
CN108757027B (en) Multifunctional drainage system in tunnel
KR20070003550A (en) Construction method of meddle wall of three arch excavation tunnel
CN204082174U (en) A kind of tunnel water-stopping structure with blind pipe
CN107060878B (en) A kind of the inspection window and its application method of tunnel drainage system
KR101017117B1 (en) Method and device for waterproofing steel pipe loop structure by a water drainage process for constructing underground structure by non-excavation
CN104847375A (en) Supporting method for small-clear-distance four-lane shallow-buried large-span tunnel
CN104847365A (en) Construction method for small-clear-distance four-lane shallow-buried large-span tunnel
CN207004570U (en) A kind of tunnel longitudinal drainage blind pipe fixed structure
CN109024135A (en) A kind of concrete road surface green upgradeable architecture and remodeling method
CN206000553U (en) The shield end soil body reinforcement system in high water head deep and thick sand area
CN206625870U (en) A kind of inspection window of tunnel drainage system
CN103031849B (en) Method for construction of arranging dewatering well in foundation pit and flexibly closing dewatering well
Goel Status of tunnelling and underground construction activities and technologies in India
CN206625869U (en) A kind of tunnel drainage sleeve pipe for being used to remove crystallization and silting thing
CN107386320B (en) Pass through the construction method of the underground pipe gallery of buried concrete waterpipe
CN216198256U (en) Connection channel structure of subway interval main line with unequal height and pump room
KR100689968B1 (en) 2-arch tunnel and method for constructing the same
CN208473932U (en) Multi-functional lobby water system in a kind of tunnel

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant