CN107060448A - 一种层流水池及其施工方法 - Google Patents
一种层流水池及其施工方法 Download PDFInfo
- Publication number
- CN107060448A CN107060448A CN201710264449.2A CN201710264449A CN107060448A CN 107060448 A CN107060448 A CN 107060448A CN 201710264449 A CN201710264449 A CN 201710264449A CN 107060448 A CN107060448 A CN 107060448A
- Authority
- CN
- China
- Prior art keywords
- layer
- sink body
- cushion layer
- plain concrete
- grid
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H7/00—Construction or assembling of bulk storage containers employing civil engineering techniques in situ or off the site
- E04H7/02—Containers for fluids or gases; Supports therefor
- E04H7/18—Containers for fluids or gases; Supports therefor mainly of concrete, e.g. reinforced concrete, or other stone-like material
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- General Engineering & Computer Science (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
本发明涉及一种层流水池及其施工方法,包括砂垫层、素混凝土垫层、滑动层、水池主体、网格箱体,步骤一:按照传统施工方式对施工区域进行开挖,开挖至设计深度,并在水池主体周围挖设降水井,铺设砂垫层;步骤二:下素混凝土垫层、滑动层、上素混凝土垫层依次施工;步骤三:水池主体的钢筋绑扎、支模,混凝土主体浇筑,形成水池主体;步骤四:网格箱体钢筋绑扎、支模,混凝土主体浇筑,形成网格箱主体;步骤五:配重填充物填充到网格箱体内;步骤六:水池主体试运行,主体工程结束。本发明根据层冷水池顶部运行水位低的特点,利用顶部水位死区,采用网格箱式布置方式,在箱内充填普通土代替混凝土配重,最终达到抗浮平衡的层冷水池设置方式。
Description
技术领域
本发明涉及轧钢冷却设施领域,具体涉及一种层流水池及其施工方法。
背景技术
现有已建热轧层冷水池由于深度较大,抗浮设计一般采用两种方式:一是增加混凝土用量,使用厚底板增加水池整体重量;二是采取混凝土抗浮桩的方式,在水池底部或侧面增加抗浮桩。
现有技术的缺点:(1)土建开挖方量大,工作难度大;(2)混凝土总用量大,施工费用高;(3)水池水温流动性差,温度不均匀;(4)水池冬季散热量大,水温变动幅度大。
发明内容
为克服所述不足,本发明的目的在于提供了一种层流水池及其施工方法,将大量地下施工工作量提高到工作高度,降低现场施工难度,减少混凝土用量,费用得到降低。
本发明解决其技术问题所采用的技术方案是:一种层流水池,包括砂垫层、素混凝土垫层、滑动层、水池主体、网格箱体,所述素混凝土垫层设有两层,分别为下素混凝土垫层、上素混凝土垫层,所述砂垫层上铺设一层下素混凝土垫层,下素混凝土垫层上铺设一层滑动层,滑动层上再铺设一层上素混凝土层,上素混凝土垫层上设有水池主体,所述水池主体的上部均匀设有网格箱体,网格箱体内填充有配重填充物。
进一步,所述水池主体由钢筋混凝土组成,与传统做法一致,整体浇筑。
进一步,所述网格箱体由混凝土组成。
进一步,所述配重填充物由回填砂、回填土构成。
进一步,所述水池主体底部设有导流墙,导流墙一侧的水池主体底部高于另一侧的水池主体底部。
一种层流水池施工方法,包括以下步骤:
步骤一:按照传统施工方式对施工区域进行开挖,开挖至设计深度,并在水池主体周围挖设降水井,铺设砂垫层;
步骤二:下素混凝土垫层、滑动层、上素混凝土垫层依次施工;
步骤三:水池主体的钢筋绑扎、支模,混凝土主体浇筑,形成水池主体;
步骤四:网格箱体钢筋绑扎、支模,混凝土主体浇筑,形成网格箱主体;
步骤五:配重填充物填充到网格箱体内;
步骤六:水池主体试运行,主体工程结束,降水井拆除回填。
本发明具有以下有益效果:本发明根据层冷水池顶部运行水位低的特点,利用顶部水位死区,采用网格箱式布置方式,在箱内充填普通土代替混凝土配重,最终达到抗浮平衡的层冷水池设置方式。
优点有:(1)减少开挖土方量,降低工作难度,减少混凝土用量,降低工程施工费用;(2)网格箱体式配重即满足抗浮要求,又通过网格箱体的间隙加强散热提高夏季水池冷却效果;(3)内部设置导流墙优化水流方向,保证池内水温稳定;(4)冬季通过封堵部分网格开口减少散热,实现热连轧水温恒定,提高热轧产品质量。
附图说明
图1是本发明的俯视图。
图2是本发明的剖面图。
图3是本发明的底部结构示意图。
图中1砂垫层,2素混泥土垫层,21下素混凝土垫层,22上素混凝土垫层,3滑动层,4水池主体,5网格箱体,6配重填充物。
具体实施方式
现在结合附图对本发明作进一步详细的说明。
根据图1、图2、图3所示的一种层流水池,包括砂垫层1、素混凝土垫层2、滑动层3、水池主体4、网格箱体5,所述素混凝土垫层2设有两层,分别为下素混凝土垫层21、上素混凝土垫层22,所述砂垫层1上铺设一层下素混凝土垫层21,下素混凝土垫层21上铺设一层滑动层3,滑动层3上再铺设一层上素混凝土层22,上素混凝土垫层2上设有水池主体4,所述水池主体4的上部均匀设有网格箱体5,网格箱体5内填充有配重填充物6;
其中,砂垫层1为水池底部的平整层,主要起场地平整的作用;素混凝土垫层2分为上素混凝土垫层22、下素混凝土垫层21,下素混凝土垫层21与砂垫层1连成一体,保证施工场地平整,上素混凝土垫层22与水池池体4连接在一起;滑动层3位于上素混凝土层21与下素混凝土层22之间,由两层防水塑胶布及细沙构成,减少水池横向受力变形。
进一步,所述水池主体4由钢筋混凝土组成,与传统做法一致,整体浇筑。
进一步,所述网格箱体5由混凝土组成。
进一步,所述配重填充物6由回填砂、回填土构成,代替混凝土配重。
进一步,所述水池主体4周边设有降水井,用于施工降水,施工后完成回填。
进一步,所述水池主体4底部设有导流墙7,导流墙7一侧的水池主体4底部高于另一侧的水池主体4底部。
一种层流水池施工方法,包括以下步骤:
步骤一:按照传统施工方式对施工区域进行开挖,开挖至设计深度,并在水池主体4周围挖设降水井,铺设砂垫层1;
步骤二:下素混凝土垫层21、滑动层3、上素混凝土垫层22依次施工;
步骤三:水池主体4的钢筋绑扎、支模,混凝土主体浇筑,形成水池主体4;
步骤四:网格箱体5钢筋绑扎、支模,混凝土主体浇筑,形成网格箱主体5;
步骤五:配重填充物6填充到网格箱体5内;
步骤六:水池主体4试运行,主体工程结束,降水井拆除回填。
本发明不局限于所述实施方式,任何人应得知在本发明的启示下作出的结构变化,凡是与本发明具有相同或相近的技术方案,均落入本发明的保护范围之内。
本发明未详细描述的技术、形状、构造部分均为公知技术。
Claims (6)
1.一种层流水池,其特征在于:包括砂垫层、素混凝土垫层、滑动层、水池主体、网格箱体,所述素混凝土垫层设有两层,分别为下素混凝土垫层、上素混凝土垫层,所述砂垫层上铺设一层下素混凝土垫层,下素混凝土垫层上铺设一层滑动层,滑动层上再铺设一层上素混凝土层,上素混凝土垫层上设有水池主体,所述水池主体的上部均匀设有网格箱体,网格箱体内填充有配重填充物。
2.根据权利要求1所述的一种层流水池,其特征在于:所述水池主体由钢筋混凝土组成,与传统做法一致,整体浇筑。
3.根据权利要求1所述的一种层流水池,其特征在于:所述网格箱体由混凝土组成。
4.根据权利要求1所述的一种层流水池,其特征在于:所述配重填充物由回填砂、回填土构成。
5.根据权利要求1所述的一种层流水池,其特征在于:所述水池主体底部设有导流墙,导流墙一侧的水池主体底部高于另一侧的水池主体底部。
6.一种层流水池施工方法,其特征在于:包括以下步骤:
步骤一:按照传统施工方式对施工区域进行开挖,开挖至设计深度,并在水池主体周围挖设降水井,铺设砂垫层;
步骤二:下素混凝土垫层、滑动层、上素混凝土垫层依次施工;
步骤三:水池主体的钢筋绑扎、支模,混凝土主体浇筑,形成水池主体;
步骤四:网格箱体钢筋绑扎、支模,混凝土主体浇筑,形成网格箱主体;
步骤五:配重填充物填充到网格箱体内;
步骤六:水池主体试运行,主体工程结束,降水井拆除回填。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710264449.2A CN107060448B (zh) | 2017-04-21 | 2017-04-21 | 一种层流水池及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710264449.2A CN107060448B (zh) | 2017-04-21 | 2017-04-21 | 一种层流水池及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107060448A true CN107060448A (zh) | 2017-08-18 |
CN107060448B CN107060448B (zh) | 2019-11-12 |
Family
ID=59601199
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710264449.2A Active CN107060448B (zh) | 2017-04-21 | 2017-04-21 | 一种层流水池及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107060448B (zh) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000249295A (ja) * | 1999-03-04 | 2000-09-12 | Ishikawajima Harima Heavy Ind Co Ltd | タンク建設工法 |
JP2000272690A (ja) * | 1999-03-24 | 2000-10-03 | Ishikawajima Constr Materials Co Ltd | タンク及びその構築方法 |
CN104074374A (zh) * | 2014-07-16 | 2014-10-01 | 中国能源建设集团广东省电力设计研究院 | 具有护壁式无桩浅基础抗浮结构的超大型水池 |
CN104863398A (zh) * | 2015-05-12 | 2015-08-26 | 中国五洲工程设计集团有限公司 | 一种敞口超深水池受力壁板结构 |
CN205616638U (zh) * | 2016-05-18 | 2016-10-05 | 江苏大湖环境工程有限公司 | 一种可抗浮的生物滤池 |
CN106277688A (zh) * | 2016-08-30 | 2017-01-04 | 北海运龙环保材料有限责任公司 | 缠绕玻璃钢化粪池的安装工艺 |
-
2017
- 2017-04-21 CN CN201710264449.2A patent/CN107060448B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000249295A (ja) * | 1999-03-04 | 2000-09-12 | Ishikawajima Harima Heavy Ind Co Ltd | タンク建設工法 |
JP2000272690A (ja) * | 1999-03-24 | 2000-10-03 | Ishikawajima Constr Materials Co Ltd | タンク及びその構築方法 |
CN104074374A (zh) * | 2014-07-16 | 2014-10-01 | 中国能源建设集团广东省电力设计研究院 | 具有护壁式无桩浅基础抗浮结构的超大型水池 |
CN104863398A (zh) * | 2015-05-12 | 2015-08-26 | 中国五洲工程设计集团有限公司 | 一种敞口超深水池受力壁板结构 |
CN205616638U (zh) * | 2016-05-18 | 2016-10-05 | 江苏大湖环境工程有限公司 | 一种可抗浮的生物滤池 |
CN106277688A (zh) * | 2016-08-30 | 2017-01-04 | 北海运龙环保材料有限责任公司 | 缠绕玻璃钢化粪池的安装工艺 |
Non-Patent Citations (1)
Title |
---|
万美好: "小型地下钢筋混凝土池防水防渗施工技术", 《建筑工人》 * |
Also Published As
Publication number | Publication date |
---|---|
CN107060448B (zh) | 2019-11-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894445B (zh) | 一种装配叠合式综合管廊及其建造方法 | |
CN104790428B (zh) | 一种超高整体钢塑格栅加筋土桥台挡墙结构及其施工方法 | |
CN106381866A (zh) | 一种富水软土地区超深地下连续墙施工方法 | |
CN103758113B (zh) | 一种格栅围箍抗液化地基加固方法 | |
CN107419630A (zh) | 一种有效控制工后沉降的软土地基高填方路堤及施工方法 | |
CN106049213B (zh) | 一种公路软土路基不均匀沉降的控制方法及结构 | |
CN206902488U (zh) | 一种有效控制工后沉降的软土地基高填方路堤 | |
WO2019007176A1 (zh) | 一种泡沫轻质土铁路路基结构及工法 | |
CN203213136U (zh) | 一种加固地基的沉箱与桩组合基础 | |
CN102660936A (zh) | 一种用聚氯乙烯膜进行坝墙防渗的方法 | |
CN106759133A (zh) | 一种均质土石坝与面板堆石坝的混合坝型结构及施工方法 | |
CN109208545B (zh) | 一种具有消能效果的人工景观溢流坝施工方法 | |
CN109487641A (zh) | 一种高速铁路整体式电缆槽结构及基床表层施工方法 | |
CN108797636A (zh) | 一种上字型挡土墙结构及其施工方法 | |
CN203334154U (zh) | 一种高架桥下桩基承台伸入路基的路堤结构 | |
CN102493485B (zh) | 一种填方边坡防护挡土墙构筑方法 | |
CN106836034B (zh) | 一种高填方盖板涵柔性减载体系及施工方法 | |
CN103981880A (zh) | 一种扩顶扩底cfg桩复合地基处理方法 | |
CN209723024U (zh) | 复合地基加筋扶壁式挡墙结构 | |
CN209428870U (zh) | 一种高地下水位低填浅挖膨胀土路基结构 | |
CN206815379U (zh) | 一种装配叠合式综合管廊 | |
CN207211176U (zh) | 一种超高大沉井 | |
CN107060448B (zh) | 一种层流水池及其施工方法 | |
CN207727514U (zh) | 一种库盆防渗抗抬动结构 | |
CN109653241A (zh) | 复合地基加筋扶壁式挡墙结构及施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 276800 Shandong Province, Rizhao City Arashiyama District Shugang Avenue Applicant after: SHANDONG IRON AND STEEL GROUP RIZHAO CO., LTD. Address before: 276800 Ji'nan Road, Donggang District, Shandong, No. 396, No. Applicant before: SHANDONG IRON AND STEEL GROUP RIZHAO CO., LTD. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |