CN107059926A - A kind of pipe gallery temporary plugging wall construction method - Google Patents
A kind of pipe gallery temporary plugging wall construction method Download PDFInfo
- Publication number
- CN107059926A CN107059926A CN201710408041.8A CN201710408041A CN107059926A CN 107059926 A CN107059926 A CN 107059926A CN 201710408041 A CN201710408041 A CN 201710408041A CN 107059926 A CN107059926 A CN 107059926A
- Authority
- CN
- China
- Prior art keywords
- pipe gallery
- wallboard
- piping lane
- outside
- block wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/02—Retaining or protecting walls
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/16—Arrangement or construction of joints in foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2220/00—Temporary installations or constructions
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D2300/00—Materials
- E02D2300/0001—Rubbers
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Hydrology & Water Resources (AREA)
- Building Environments (AREA)
Abstract
The present invention relates to a kind of construction method of pipe gallery temporary plugging wall, it is characterised in that the construction method comprises the following steps:A, pipe gallery the wallboard pre-buried circle waterstop in end, one end of waterstop is extended to outside pipe gallery wallboard, and exposure is outside, sets protection steel plate to protect the waterstop of exposure outside on the outside of waterstop;B, away from piping lane end certain distance position set block wall.The present invention is in the case of pipe gallery built by separate periods, the end for building piping lane in advance can be blocked, and build piping lane spare interface to be at a specified future date, block wall is removed in the case where not destroying overall structure and carries out extension construction, and ensures the water resistance of piping lane in advance and newly-built piping lane in deformation joint.
Description
Technical field
The present invention relates to the technical field of pipe gallery, specifically consider that being completed pipe gallery will build with expection
Pipe gallery between linking when, a kind of adoptable construction method of brand-new pipe gallery block wall.
Background technology
Pipe gallery is one of important symbol of 21 century new city civilian infrastructure construction of modern, and it is avoided
Cause road surface to repeat the trouble excavated due to embedded or repairing pipeline, because pipeline does not contact soil and groundwater, therefore keep away
Corrosion of the soil to pipeline is exempted from, has extended service life, it also needs to have reserved the underground space of preciousness for planning and development.Together
When be also active response " it is first-class plan, it is first-class design, first-class construction, first-class quality " construction requirements.The Department of Science and Technology,
One municipal pipeline of pipe gallery as New Town Construction, old city modernization overlay has all been integrated arrangement by the Ministry of Construction, the Ministry of Finance
New science and technology is doing in-depth study and popularization.
Under such overall background, in recent years, all parts of the country all plan or built substantial amounts of municipal administration in urban construction
Pipe gallery, and develop towards into the direction of networking, architecture, farthest play piping lane using the advantage of systematization
Function.
Because the piping lane engineering construction cycle is long, coverage is wide, and construction cost is high, and complete piping lane system can not be short-term
Interior build completes, but needs one by one, paragraph by paragraph to implement according to planning, therefore same piping lane also likely to be present on building time
Difference.In addition, with the expansion and the extension of road in city, having built the pipe gallery of completion, there is also continue what is extended
Possibility.
General, after the completion of the pipe gallery in a stage is built, it usually needs take temporary plugging in piping lane end
Measure, to meet the normal operation that piping lane builds up section, and extension construction for following piping lane provides interface.Pipe gallery is respectively built
Even several years several months is may differ by between phase, block wall needs to meet the security and good water proofing property in structure during this period
Energy.Simultaneously, when piping lane progress extension is built, block wall needs to be easy to remove, and does not interfere with original structure after dismounting
Security.Accordingly, it would be desirable to which a kind of new temporary plugging wall construction, can ensure the safety of structure and waterproof of service stage
Property while, accomplish remove when economy it is convenient.
In addition, piping lane is built in advance movement joint is generally set with later stage construction piping lane seam crossing, therefore managed in advance
Needed during corridor temporary plugging in the pre-buried rubber fastening band of wall panels end,.In the case where lacking safeguard measure, in the soil body
Rubber fastening band easily destroyed so that influence future deformations stitch water resistance.Therefore need to stop for pre-buried rubber
Water band is equipped with effectively, while being easy to the following safeguard measure removed.
The content of the invention
It is an object of the invention to provide a kind of construction method of pipe gallery temporary plugging wall, built by stages in pipe gallery
If in the case of, the end that piping lane is built in advance can be blocked, and piping lane spare interface is built to be at a specified future date.
To achieve these goals, the technical scheme is that:A kind of construction method of pipe gallery temporary plugging wall,
It is characterized in that the construction method comprises the following steps:A, pipe gallery the wallboard pre-buried circle waterstop in end, waterstop
One end is extended to outside pipe gallery wallboard, and exposure outside, on the outside of waterstop set protection steel plate to exposure outside only
Water band is protected;B, away from piping lane end certain distance position set block wall.
According to a preferred embodiment of the invention, comprise the following steps again in stepb:A, pipe gallery wallboard with closure
Dabbing processing is carried out at the linkage interface of wall until exposing reinforcing bar;B, the brill on the linkage interface of pipe gallery wallboard and block wall
Bar planting is simultaneously inserted in hole;C, the circle hydro-expansive rubber bar of linkage interface intermediate arrangement one in pipe gallery wallboard and block wall;d、
Clean linkage interface and brush one of cement mortar;D, pour block wall.
According to a preferred embodiment of the invention, the construction method also includes step C, removes block wall and protection steel plate;D、
Formwork pours the piping lane wallboard of newly-built section of piping lane, is located at embedded water stop band and newly pours wallboard center line.
According to a preferred embodiment of the invention, block wall is arranged on apart from 280 ~ 320mm of piping lane end position.
According to a preferred embodiment of the invention, in step A, the protection steel plate is using stainless steel plate formation one end open
Flange connector is set at shell structure, opening, and the shell structure is set on the outside of rubber fastening band, and its flange connector is using swollen
Swollen bolt is arranged on pipe gallery wallboard.
According to a preferred embodiment of the invention, the bar planting is double-layer double-direction bar planting, and integrated pipe is inserted in described bar planting one end
In corridor wallboard, the other end is cast in block wall after stretching out pipe gallery wallboard, and the inner side of block wall sets inner side bar planting, envelope
The outside of wall sets outside bar planting, and hydro-expansive rubber bar is arranged between inner side bar planting and outside bar planting.
The present invention is easy to the block wall of dismounting by setting, and is embedded in the waterstop of the wall end of piping lane four, in needs pair
When piping lane is extended, block wall can be removed in the case where not destroying overall structure and carries out extension construction, and is ensured in advance
The water resistance of piping lane and newly-built piping lane in deformation joint.When needing to carry out extension to piping lane to build, can first by block wall and
Stainless steel plate is removed, then formwork pours newly-built section of piping lane wallboard, is located at embedded water stop band and is newly poured wallboard center line.Due to envelope
Wall is handled with piping lane wallboard linkage interface by above-mentioned measure, and removing block wall will be more convenient, and will not cause piping lane
Structural damage.Block wall can not also be first removed, can be to building in advance by the block wall in later stage extension piping lane construction
If piping lane is protected, it is ensured that build the normal operation of piping lane in advance.
Brief description of the drawings
Fig. 1 illustrates for temporary plugging wall construction plane
Fig. 2 is that block wall is connected and waterstop protection signal with wallboard
Fig. 3 is that block wall is connected cross section signal with wallboard
Fig. 4 is piping lane extension plane signal after block wall is removed.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
Figure includes the connection of pipe gallery wallboard 1, block wall 2, rubber fastening band 3, pipe gallery wallboard and block wall
Interface 4, stainless steel plate 5, hydro-expansive rubber bar 6, bar planting 7.
Pipe gallery temporary plugging wall construction is provided with block wall 2, rubber fastening band 3 and its protection stainless steel plate 5.Rubber
Glue waterstop 3 is embedded in piping lane end wallboard center, and is encircled into a circle;Block wall 2 is arranged on apart from piping lane end
300mm position, as shown in Figure 1.
The thin portion measure of the temporary plugging wall construction is as shown in Figure 2.The side exposed outside in waterstop uses protection steel
Plate is wrapped in around waterstop and protected.The protection steel plate forms the housing knot of one end open using the thick stainless steel plates 5 of 4mm
Flange connector is set at structure, opening, and the shell structure is set on the outside of rubber fastening band, and its flange connector uses expansion bolt
On pipe gallery wallboard 1.Dabbing processing has been carried out at the linkage interface 4 of pipe gallery wallboard and block wall until exposing
Reinforcing bar.Drilled on the linkage interface 4 of pipe gallery wallboard and block wall and insert bar planting 7, bar planting is arranged using way and double-layer,
Bar planting one end is located in pipe gallery wallboard 1, and the other end is stretched into block wall 2, and the length stretched into block wall 2 is 200mm
Left and right(Preferably 180 ~ 220mm).Block wall and piping lane wall are used as in the circle hydro-expansive rubber of linkage interface intermediate arrangement one bar 6
The waterproof measure of plate linkage interface.Cleaning linkage interface is needed before block wall is poured and high-grade cement mortar is brushed together, most
After-pouring block wall 2.Piping lane cross section is as shown in Figure 3 at block wall.
When needing to carry out piping lane 8 in advance extension construction, first block wall 2 and stainless steel plate 5 can be removed, then formwork is poured
The piping lane wallboard of newly-built section of piping lane 9 is built, is located at embedded water stop band and newly pours wallboard center line.Rear piping lane plane is built up in extension
Signal is as shown in Figure 4.Because block wall and piping lane wallboard linkage interface are handled by above-mentioned measure, removing block wall will be more
It is convenient, and the destruction of Pipe rack will not be caused.
Above content is to combine specific preferred embodiment further description made for the present invention, it is impossible to assert
Present invention specific implementation is confined to these above-mentioned explanations.For general technical staff of the technical field of the invention,
Without departing from the inventive concept of the premise, some simple deduction or replace can also be made, the present invention should be all considered as belonging to
Protection domain.
Claims (6)
1. a kind of construction method of pipe gallery temporary plugging wall, it is characterised in that the construction method comprises the following steps:It is A, comprehensive
The pre-buried circle waterstop in end of piping lane wallboard is closed, one end of waterstop is extended to outside pipe gallery wallboard, and exposure is outside,
Protection steel plate is set to protect the waterstop of exposure outside on the outside of waterstop;B, in the position away from piping lane end certain distance
Install block wall.
2. the construction method of a kind of pipe gallery temporary plugging wall according to claim 1, it is characterised in that in step B
Comprise the following steps again:A, at the linkage interface of pipe gallery wallboard and block wall dabbing processing is carried out until expose reinforcing bar;
B, drilled on the linkage interface of pipe gallery wallboard and block wall and insert bar planting;C, in pipe gallery wallboard and block wall
Linkage interface intermediate arrangement one encloses hydro-expansive rubber bar;D, cleaning linkage interface simultaneously brush one of cement mortar;D, pour envelope
Wall.
3. a kind of construction method of pipe gallery temporary plugging wall according to claim 1, it is characterised in that the construction party
Method also includes step C, removes block wall and protection steel plate;D, formwork pour the piping lane wallboard of newly-built section of piping lane, make embedded water stop
Band, which is located at, newly pours wallboard center line.
4. the construction method of a kind of pipe gallery temporary plugging wall according to claim 1, it is characterised in that block wall is set
Put in the position apart from 280 ~ 320mm of piping lane end.
5. a kind of construction method of pipe gallery temporary plugging wall according to claim 2, it is characterised in that the bar planting
For double-layer double-direction bar planting, described bar planting one end is inserted in pipe gallery wallboard, and the other end is poured after stretching out pipe gallery wallboard
In block wall, the inner side of block wall sets inner side bar planting, and the outside of block wall sets outside bar planting, and hydro-expansive rubber bar is set
Put between inner side bar planting and outside bar planting.
6. the construction method of a kind of pipe gallery temporary plugging wall according to claim 1, it is characterised in that in step A,
The protection steel plate is formed using stainless steel plate sets flange connector, the housing knot at the shell structure of one end open, opening
Structure is set on the outside of rubber fastening band, and its flange connector is arranged on pipe gallery wallboard using expansion bolt.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710408041.8A CN107059926A (en) | 2017-06-02 | 2017-06-02 | A kind of pipe gallery temporary plugging wall construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710408041.8A CN107059926A (en) | 2017-06-02 | 2017-06-02 | A kind of pipe gallery temporary plugging wall construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107059926A true CN107059926A (en) | 2017-08-18 |
Family
ID=59616016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710408041.8A Pending CN107059926A (en) | 2017-06-02 | 2017-06-02 | A kind of pipe gallery temporary plugging wall construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107059926A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360564A (en) * | 2018-04-17 | 2018-08-03 | 中国冶集团有限公司 | A kind of foundation bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108505538A (en) * | 2018-04-17 | 2018-09-07 | 中国冶集团有限公司 | A kind of city integrated piping lane temporary plugging method |
CN108532627A (en) * | 2018-04-17 | 2018-09-14 | 中国冶集团有限公司 | A kind of bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108571012A (en) * | 2018-06-01 | 2018-09-25 | 海门市帕源路桥建设有限公司 | Piping lane construction joint integrated installation mold construction technology |
CN112942426A (en) * | 2021-03-30 | 2021-06-11 | 中冶京诚工程技术有限公司 | Temporary plugging structure and plugging method for comprehensive pipe gallery |
CN114960742A (en) * | 2022-03-28 | 2022-08-30 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050082101A (en) * | 2004-02-17 | 2005-08-22 | 주식회사 토암산업 | A concrete manhole, connecting structure and method between manhole and pipe |
CN202273688U (en) * | 2011-09-29 | 2012-06-13 | 沈阳铝镁设计研究院有限公司 | Temporary plugging structure for underground vestibule |
CN104099942A (en) * | 2013-04-09 | 2014-10-15 | 上海市政工程设计研究总院(集团)有限公司 | Construction method of underground reinforced concrete box culvert structure temporary closure wall |
CN104099943A (en) * | 2014-06-30 | 2014-10-15 | 中铁四局集团第四工程有限公司 | Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method |
CN105401604A (en) * | 2015-11-20 | 2016-03-16 | 上海市政工程设计研究总院(集团)有限公司 | Reserved connecting port structure for underground pipe gallery and implementation method thereof |
CN205475350U (en) * | 2015-11-20 | 2016-08-17 | 上海市政工程设计研究总院(集团)有限公司 | A reserved interface structure for utility tunnel |
-
2017
- 2017-06-02 CN CN201710408041.8A patent/CN107059926A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20050082101A (en) * | 2004-02-17 | 2005-08-22 | 주식회사 토암산업 | A concrete manhole, connecting structure and method between manhole and pipe |
CN202273688U (en) * | 2011-09-29 | 2012-06-13 | 沈阳铝镁设计研究院有限公司 | Temporary plugging structure for underground vestibule |
CN104099942A (en) * | 2013-04-09 | 2014-10-15 | 上海市政工程设计研究总院(集团)有限公司 | Construction method of underground reinforced concrete box culvert structure temporary closure wall |
CN104099943A (en) * | 2014-06-30 | 2014-10-15 | 中铁四局集团第四工程有限公司 | Underground diaphragm wall and deserted underground civil air defense engineering intersection processing method |
CN105401604A (en) * | 2015-11-20 | 2016-03-16 | 上海市政工程设计研究总院(集团)有限公司 | Reserved connecting port structure for underground pipe gallery and implementation method thereof |
CN205475350U (en) * | 2015-11-20 | 2016-08-17 | 上海市政工程设计研究总院(集团)有限公司 | A reserved interface structure for utility tunnel |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108360564A (en) * | 2018-04-17 | 2018-08-03 | 中国冶集团有限公司 | A kind of foundation bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108505538A (en) * | 2018-04-17 | 2018-09-07 | 中国冶集团有限公司 | A kind of city integrated piping lane temporary plugging method |
CN108532627A (en) * | 2018-04-17 | 2018-09-14 | 中国冶集团有限公司 | A kind of bolt fixes the piping lane port temporary plugging method of prefabricated board |
CN108571012A (en) * | 2018-06-01 | 2018-09-25 | 海门市帕源路桥建设有限公司 | Piping lane construction joint integrated installation mold construction technology |
CN108571012B (en) * | 2018-06-01 | 2019-11-08 | 海门市帕源路桥建设有限公司 | Piping lane construction joint integrated installation mold construction technology |
CN112942426A (en) * | 2021-03-30 | 2021-06-11 | 中冶京诚工程技术有限公司 | Temporary plugging structure and plugging method for comprehensive pipe gallery |
CN114960742A (en) * | 2022-03-28 | 2022-08-30 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
CN114960742B (en) * | 2022-03-28 | 2024-05-14 | 中建五局土木工程有限公司 | New and old pipe gallery connection construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107059926A (en) | A kind of pipe gallery temporary plugging wall construction method | |
CN107190778A (en) | A kind of extensible end well of pipe gallery and its construction method | |
CN103981898B (en) | A kind of inverse underground engineering construction method done of overall open cut node | |
CN211113772U (en) | Post-cast strip structure for top plate of underground chamber | |
CN106285725B (en) | A kind of stopper structure and its installation method being mounted between formwork jumbo and country rock | |
CN105401604A (en) | Reserved connecting port structure for underground pipe gallery and implementation method thereof | |
CN105350581A (en) | Advanced sealing structure for basement top slab settlement post-cast strips | |
CN106013471A (en) | Anti-seepage construction method for expansion joint | |
CN108894256A (en) | A kind of advanced plugging construction method of poured band of outer wall of basement | |
CN207143994U (en) | A kind of pipe gallery temporary plugging wall construction | |
CN104846935B (en) | Head-tank treating seepage remodeling method | |
CN108808594A (en) | The cable penetration sleeve structure and its construction method of slip casting sealing | |
CN207130775U (en) | A kind of extensible pipe gallery end well | |
CN101705717B (en) | Internal liner of drainage pipe or dirt discharge pipe for operation with water and construction method thereof for operation with water | |
CN204023592U (en) | The advanced quick blocking structure of a kind of foundation ditch drainage well | |
CN206352508U (en) | A kind of stopper structure being arranged between formwork jumbo and country rock | |
CN208153035U (en) | A kind of waterproof system for vcehicular tunnel corrugated steel preliminary bracing structure | |
CN206539353U (en) | A kind of tunnel-liner infiltration punishment is reserved to check aperture apparatus | |
WO2022242153A1 (en) | Waterproof structure for side wall and tunnel in subway main body structure | |
CN214738262U (en) | Temporary plugging structure for comprehensive pipe rack | |
KR100701630B1 (en) | Center Wall of Two Arch Tunnel | |
CN211646488U (en) | A device that is used for subway lid to dig reverse construction method construction joint water repellent | |
CN208072929U (en) | Scaffold wall connecting piece | |
CN209243781U (en) | It is a kind of for underground engineering main body construction seam and post-cast strip waterproof construction | |
CN105908778A (en) | Comprehensive pipe rack for corrugated spiral pipe structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |