CN107059923A - The full encirclement skin-type structure and construction method of a kind of underground pipe gallery - Google Patents

The full encirclement skin-type structure and construction method of a kind of underground pipe gallery Download PDF

Info

Publication number
CN107059923A
CN107059923A CN201710339981.6A CN201710339981A CN107059923A CN 107059923 A CN107059923 A CN 107059923A CN 201710339981 A CN201710339981 A CN 201710339981A CN 107059923 A CN107059923 A CN 107059923A
Authority
CN
China
Prior art keywords
layer
aqueous uncured
construction
aqueous
coating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710339981.6A
Other languages
Chinese (zh)
Other versions
CN107059923B (en
Inventor
冯永
沈春林
褚建军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGYIN CHAMPION CHEMICALS Co Ltd
Original Assignee
JIANGYIN CHAMPION CHEMICALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JIANGYIN CHAMPION CHEMICALS Co Ltd filed Critical JIANGYIN CHAMPION CHEMICALS Co Ltd
Priority to CN201710339981.6A priority Critical patent/CN107059923B/en
Publication of CN107059923A publication Critical patent/CN107059923A/en
Application granted granted Critical
Publication of CN107059923B publication Critical patent/CN107059923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D31/00Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
    • E02D31/02Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Environmental & Geological Engineering (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Hydrology & Water Resources (AREA)
  • Road Paving Structures (AREA)

Abstract

The present invention relates to waterproof construction technology field, more particularly to the waterproof technique of underground pipe gallery, it discloses the full encirclement skin-type structure and construction method of a kind of underground pipe gallery, the full encirclement skin-type structure of the underground pipe gallery includes bottom, top layer, side facing and the movement joint set along piping lane length direction merogenesis, the bottom, top layer, side facing surrounds one and forms hollow structure, in the bottom, top layer, aqueous uncured dope layer and film enhancement layer are provided with the gap face of side facing and movement joint, and the aqueous uncured dope layer in bottom, aqueous uncured dope layer sideways, the aqueous uncured dope layer in top, the aqueous uncured dope layer in gap face forms the full encirclement structure of integration seamless connection.The drawbacks of easily there is global failure or local seam crossing easy to leak instant invention overcomes the waterproofing work of underground pipe gallery in the prior art.

Description

The full encirclement skin-type structure and construction method of a kind of underground pipe gallery
Technical field
The present invention relates to waterproof construction technology field, more particularly to underground pipe gallery waterproof technique.
Background technology
The underground waterproof engineerings such as underground pipe gallery can use a variety of waterproof constructions and construction technology, and have a variety of waterproof materials It is available, such as rigid waterproofing, flexible water, firm, soft combination waterproof.Wherein flexible water (waterproofing industry general significance in the industry On waterproof) be roughly divided into coating waterproofing, waterproof coiled material, film and coiled material composite water-proof again.Its water-proof mechanism is in concrete The waterproof layer of one layer of structural outer cladding, multilayer or MULTILAYER COMPOSITE, makes to block between structure and peripheral water source, isolates, reach anti- Water purpose.Thus when agent structure and peripheral structure deform, the integrality of waterproof layer itself and with agent structure Tightness degree is pasted, waterproof effect can be directly affected.
Compare the waterproof measure of main flow at present, be that so-called skin-type waterproof is formed outside concrete structure.It is such as wet Spread self-adhesive coiled material, it is pre-installed and inverted adhered, uncured compound with coiled material, etc..But with regard to current present situation, wall face and top plate accomplish skin-type Waterproof is easier to accomplish, waterproof layer is easier with regard to that can accomplish to combine closely with structural slab.But for the bottom plate of underground engineering But it is difficult to accomplish.Reason is that the waterproof layer of bottom plate is bonded with concrete cushion mostly, and is bonded with concrete structure, Full encirclement truly, skin-type waterproof can not be formed.After structural slab construction, if the water and soil migration under bottom plate, or Person's other factors cause concrete cushion to sink or ftracture, then waterproof layer can be damaged, due to waterproof layer and structural slab It is that physics is overlayed, it is easy to which the sinking and cracking for following bed course depart from concrete structural slab, form channeling water layer.Deposited in structural slab Seepage occurs in the case of defect.Even using relatively good pre-installed and inverted adhered technique is combined, difficulty of construction is also larger, does not do Protective layer directly easily injures waterproof layer on waterproof layer during reinforcing bar colligation, does protective layer, and waterproof layer and agent structure are reduced again Integraty.
Therefore traditional underground waterproof technology, has short slab in bottom parts.Particularly from overall waterproof construction, Due to eventually becoming the rigid structure material that have cured after the construction of its waterproof material, if as diastrophism, settle, collapse Reason, waterproof layer follows the sinking of bed course and cracking to depart from concrete structural slab with structural slab, forms channeling water layer, causes waterproof The global failure of structure;In addition there is seam in the lap-joint due to waterproof roll in construction, the weak link as its waterproof. Therefore, the drawbacks of there is easy global failure or local seam crossing easy to leak using the underground waterproof engineering of above-mentioned prior art.
The content of the invention
In order to solve the above-mentioned technical problem, the present invention proposes the full encirclement skin-type structure and construction party of a kind of underground pipe gallery Method, its technical scheme is as follows:
A kind of full encirclement skin-type structure of underground pipe gallery, including bottom, top layer, side facing and along piping lane length direction point The movement joint set is saved, the bottom, top layer, side facing surround one and form hollow structure, and the bottom is wrapped from bottom to up Include the lower concrete bed course for linking one, bottom rubber asphalt waterproof coating layer, the aqueous uncured dope layer in bottom, bottom thin Film enhancement layer, lower concrete basal layer;The side facing includes side concrete foundation layer, in the side concrete foundation The outside of layer is sequentially provided with the aqueous uncured dope layer in side, side film enhancement layer, side waterproof layer, the side waterproof layer For rubber asphalt waterproof coating layer or waterproof roll layer;The top layer includes top concrete basal layer, in the top coagulation The outside of earth foundation layer is sequentially provided with the aqueous uncured dope layer in top, top film enhancement layer, top waterproof layer, the top Waterproof layer is rubber asphalt waterproof coating layer or waterproof roll layer;Gap is sequentially provided with the concrete crack face of the movement joint The aqueous uncured dope layer in face, gap face film enhancement layer, gap face rubber asphalt waterproof coating layer.
The present invention is in overall structure, the aqueous uncured dope layer in its bottom, the aqueous uncured dope layer in side, top water Property uncured dope layer, the aqueous uncured dope layer in gap face form the full encirclement structure of integration seamless connection.Consider simultaneously The length of underground pipe gallery is longer, therefore is provided with movement joint along piping lane length direction merogenesis, and it can be prevented effectively from due to ground Change causes underground pipe gallery agent structure to crack.
Preferably, the bottom thin film enhancement layer, side film enhancement layer, top film enhancement layer, gap face film add Strong layer is non-woven fabrics.
Preferably, the aqueous uncured dope layer in the bottom, the aqueous uncured dope layer in side, the aqueous uncured painting in top The bed of material, the aqueous uncured dope layer in gap face are the aqueous uncured dope layer of spary coating type.
It is highly preferred that the aqueous uncured dope layer in bottom, the aqueous uncured dope layer in side, the aqueous uncured coating in top Layer, the thickness of the aqueous uncured dope layer in gap face are 0.5-4mm.
Additionally, it is preferred that bottom rubber asphalt waterproof coating layer, side rubber asphalt waterproof coating layer, gap face rubber asphalt The thickness of waterproof coating layer is 0.5-4mm.
It is as follows according to a kind of construction method of the full encirclement skin-type structure of above-mentioned underground pipe gallery:
Step 1, bottom construction, it includes:
Step 1-1, underground engineering concrete cushion construction finish after, under conditions of Wu Mingshui, sprayed using mechanization Apply, construct as the thick rubber asphalt waterproof coatings of 0.5-4mm;
After step 1-2, rubber asphalt waterproof coating construction are finished (also can followed by synchronous construction), be sprayed using mechanization It is the thick aqueous uncured coating of 0.5-4mm to apply construction;
Synchronous paving non-woven fabrics when step 1-3, aqueous uncured coating application;
After step 1-4, non-woven fabrics paving are finished, directly in top snap the line assembling reinforcement, formwork supporting plate carries out concrete and poured Build.
Step 2, side are constructed, and it includes:
After step 2-1, basement side wall concrete construction are finished, automatic arc spraying construction 0.5-4mm is thick aqueous uncured Coating;
When step 2-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 2-3, treat that aqueous uncured coating separates out moisture content volatilization and finished, it is thick using the automatic arc spraying 0.5-4mm that constructs Rubber asphalt waterproof coating or laying water-proof coiled material layer;
Extruded sheet or other protection facilities are directly laid in step 2-4, construction after finishing.
Step 3, top layer construction, it includes:
After step 3-1, basement roof concrete are finished, the thick aqueous uncured coating of automatic arc spraying construction 0.5-4mm;
During the aqueous uncured construction of step 3-2, spary coating type, synchronous paving non-woven fabrics,
Step 3-3, treat that aqueous uncured coating internal moisture volatilization is finished, it is thick using the automatic arc spraying 0.5-4mm that constructs Rubber asphalt waterproof coating or laying water-proof coiled material layer;
Step 4, gap surface construction, it includes:
Step 4-1, basement gap surface concrete construction (including in movement joint it is preset in buried rubber watertight strip Construction) finish after, the thick aqueous uncured coating of automatic arc spraying construction 0.5-4mm.
When step 4-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 4-3, treat aqueous uncured internal moisture volatilization to a certain extent, constructed 0.5-4mm using automatic arc spraying Thick rubber asphalt waterproof coating;
Step 5, bottom plate and side wall, gap face transition construction:Waterproof layer edge is extended to and is no less than beyond main structure body 500mm, to realize the seamless connection of adjacent surface.
Step 6, the construction of gap face closure.
The beneficial effects of the invention are as follows:
First, the present invention uses aqueous uncured coating and the spary coating type rubber asphalt waterproof coating of spary coating type as main material, Using two kinds of respective advantages of material, with film enhancement layer (non-woven fabrics) for auxiliary material, constructed using automatic arc spraying, applied to ground The waterproof of lower piping lane, can form full encirclement truly, high-performance, skin-type waterproof construction.
Second, the aqueous uncured coating in the present invention has superpower cohesive force, constructs in the surface of structure, can not only be with Structure is intimately associated in itself, and enhancement layer can adhere to each other to realize the full encirclement to structure.
3rd, the aqueous uncured coating in the present invention never solidifies and with creep function, thus when structure in itself because When being ftractureed for reasons such as sedimentation, displacements, can fracture repaired automatically, so as to realize to the dynamic of structure guarantor Shield.
4th, spraying application is used during aqueous uncured coating application in the present invention, artificial, efficiency high is saved, can be big Amplitude shortens the duration.
5th, the aqueous uncured coating in the present invention is without solvent, without smell, no noxious gas emission, it is ensured that Workmen's is healthy, is a kind of green coating of safety and environmental protection.
6th, the aqueous uncured coating in the present invention is two-component product, is mixed outside rifle, moment shaping can be effective Ground prevents hanging from above during elevation construction, is had a clear superiority compared with the uncured coating of traditional heat molten type.
7th, the aqueous uncured coating in the present invention can be with cold construction, without heating, it is to avoid catch fire and scald, it is ensured that The safety of job site, while the substantial amounts of energy can also be saved.
8th, the present invention in film enhancement layer use non-woven fabrics, can conveniently walking and coiled material overlay positioning, for rear Continuous construction is more convenient.
9th, the present invention in aqueous uncured coating and non-woven fabrics R. concomitans, can cause structure adjacent surface it Between connection and transition it is more safe and reliable.
Tenth, the present invention in aqueous uncured coating itself the characteristics of make its with after non-woven fabrics paving, its by from While body pressure, non-woven fabrics can be penetrated and bonded with structural concrete gapless, channeling water is effectively prevented.
Brief description of the drawings
Fig. 1 is a kind of schematic diagram of the full encirclement skin-type structure of underground pipe gallery;
Fig. 2 is Fig. 1 partial enlarged drawing.
In figure:A1, lower concrete bed course, A2, bottom rubber asphalt waterproof coating layer or waterproof roll, A3, bottom water Property uncured dope layer, A4, bottom thin film enhancement layer, A5, lower concrete basal layer;
In figure:B2, side waterproof layer (side rubber asphalt waterproof coating layer or waterproof roll), B3, side are aqueous non-solid Change dope layer;B4, side film enhancement layer, B5, side concrete foundation layer;
In figure:C2, top waterproof layer (top rubber asphalt waterproofing paint layer or waterproof roll), C3, top are aqueous non-solid Change dope layer;C4, top film enhancement layer, C5, top concrete basal layer;In figure, D is the gap face of movement joint.
Embodiment
With reference to the accompanying drawings and examples, the embodiment to the present invention is further described.Following examples are only For clearly illustrating technical scheme, and it can not be limited the scope of the invention with this.
Embodiment 1:
Such as the full encirclement skin-type structure that Fig. 1 to 2 is a kind of underground pipe gallery, including bottom, top layer, side facing and along piping lane The movement joint D that length direction merogenesis is set, the bottom, top layer, side facing surround one and form hollow structure, the bottom Sequentially consist of lower concrete bed course A1, bottom rubber asphalt waterproof coating layer A2, the aqueous uncured dope layer in bottom A3, bottom thin film enhancement layer A4, lower concrete basal layer A5;The side facing includes side concrete foundation layer B5, in institute State and be sequentially provided with the aqueous uncured dope layer B3 in side, side film enhancement layer B4, side outside the concrete foundation layer B5 of side Face waterproof layer B2, the side waterproof layer B2 are rubber asphalt waterproof coating layer or waterproof roll layer;The top layer includes top Concrete foundation layer C5, be sequentially provided with outside the top concrete basal layer C5 the aqueous uncured dope layer C3 in top, Top film enhancement layer C4, top waterproof layer C2, the top waterproof layer C2 are rubber asphalt waterproof coating layer or waterproof roll Layer.The aqueous uncured dope layer in gap face, gap face film is sequentially provided with the concrete crack face of the movement joint D to strengthen Layer, gap face rubber asphalt waterproof coating layer.
In the present embodiment, the aqueous uncured dope layer A3 in bottom, the aqueous uncured dope layer B3 in side, top are aqueous non-solid Change dope layer C3, the aqueous uncured dope layer in gap face forms the full encirclement structure of integration seamless connection.
Wherein, bottom thin film enhancement layer A4, side film enhancement layer B4, top film enhancement layer C4, gap face film add Strong layer is non-woven fabrics.
Preferably, the aqueous uncured dope layer A3 in bottom, the aqueous uncured dope layer B3 in side, the aqueous uncured painting in top Bed of material C3, the aqueous uncured dope layer in gap face are the aqueous uncured dope layer of spary coating type.
Preferably, the aqueous uncured dope layer A3 in bottom, the aqueous uncured dope layer B3 in side, the aqueous uncured painting in top Bed of material C3, the thickness of the aqueous uncured dope layer in gap face are preferably 2mm.
Bottom rubber asphalt waterproof coating layer, side rubber asphalt waterproof coating layer, the drip of gap face rubber in the present embodiment The thickness of blue or green waterproof coating layer is 2mm.
The aqueous uncured water-repellent paint used in the present embodiment, it, which constitutes meter by weight, includes:Anion rubber Elastomer-modified 70~80 parts of emulsified asphalt, solid content for 42~70% 8~13 parts of modified resin emulsion, coagulant 0.05~ 2 parts, 0.005~0.9 part of defoamer, 0.003~0.3 part of dispersant, 0.05~1 part of stabilizer, 5~20 parts of filler, wherein cloudy The main composition of ionic rubber modified emulsifying asphalt be matrix pitch, SBS rubber grains, SBR rubber powder, NBR rubber powder, go from Sub- water, anion emulsifier, nonionic surfactant and selected from least one of aromatic naphtha and naphthenic oil.Wherein, promote solidifying Agent is combined by alum and calcium chloride.
Embodiment 2:
The construction method of the full encirclement skin-type structure of underground pipe gallery in embodiment 1 is as follows:
Step 1, bottom construction, it includes:
Step 1-1, underground engineering concrete cushion construction finish after, under conditions of Wu Mingshui, sprayed using mechanization Apply, construct as the thick rubber asphalt waterproof coatings of 2mm;
After step 1-2, rubber asphalt waterproof coating construction are finished (also can followed by synchronous construction), be sprayed using mechanization It is the thick aqueous uncured coating of 2mm to apply construction;
Synchronous paving non-woven fabrics when step 1-3, aqueous uncured coating application;
After step 1-4, non-woven fabrics paving are finished, directly in top snap the line assembling reinforcement, formwork supporting plate carries out concrete and poured Build.
Step 2, side are constructed, and it includes:
After step 2-1, basement side wall concrete construction are finished, the thick aqueous uncured coating of automatic arc spraying construction 2mm;
When step 2-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 2-3, treat that aqueous uncured coating separates out moisture content volatilization and finished, constructed the thick rubber of 2mm using automatic arc spraying Asphalt waterproofing paint or laying water-proof coiled material layer;
Extruded sheet or other protection facilities are directly laid in step 2-4, construction after finishing.
Step 3, top layer construction, it includes:
After step 3-1, basement roof concrete are finished, the thick aqueous uncured coating of automatic arc spraying construction 2mm;
During the aqueous uncured construction of step 3-2, spary coating type, synchronous paving non-woven fabrics,
Step 3-3, treat that aqueous uncured coating internal moisture volatilization is finished, constructed the thick rubber of 2mm using automatic arc spraying Asphalt waterproofing paint or laying water-proof coiled material layer;
Step 4, gap surface construction, it includes:
Step 4-1, basement gap surface concrete construction (including in movement joint it is preset in buried rubber watertight strip Construction) finish after, the thick aqueous uncured coating of automatic arc spraying construction 2mm.
When step 4-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 4-3, treat aqueous uncured internal moisture volatilization to a certain extent, constructed the thick rubbers of 2mm using automatic arc spraying Glue asphalt waterproofing paint;
Step 5, bottom plate and side wall, gap face transition construction:Waterproof layer edge is extended to and is no less than beyond main structure body 500mm, to realize the seamless connection of adjacent surface.
Step 6, the construction of gap face closure.
Described above is only the preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, some improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (7)

1. a kind of full encirclement skin-type structure of underground pipe gallery, including bottom, top layer, side facing and along piping lane length direction merogenesis The movement joint of setting, the bottom, top layer, side facing surround one and form hollow structure, and the bottom is from bottom to up successively For lower concrete bed course, bottom rubber asphalt waterproof coating layer, the aqueous uncured dope layer in bottom, bottom thin film enhancement layer, Lower concrete basal layer;The side facing includes side concrete foundation layer, in the outside of side concrete foundation layer The aqueous uncured dope layer in side, side film enhancement layer, side waterproof layer are sequentially provided with, the side waterproof layer drips for rubber Blue or green waterproof coating layer or waterproof roll layer;The top layer includes top concrete basal layer, in the top concrete basal layer Outside be sequentially provided with the aqueous uncured dope layer in top, top film enhancement layer, top waterproof layer, the top waterproof layer is Rubber asphalt waterproof coating layer or waterproof roll layer;It is aqueous non-that gap face is sequentially provided with the concrete crack face of the movement joint Coating material solidified layer, gap face film enhancement layer, gap face rubber asphalt waterproof coating layer.
2. a kind of full encirclement skin-type structure of underground pipe gallery according to claim 1, it is characterized in that:The bottom is aqueous Uncured dope layer, the aqueous uncured dope layer in side, the aqueous uncured dope layer in top, the aqueous uncured dope layer in gap face Form the full encirclement structure that integration is seamlessly connected.
3. a kind of full encirclement skin-type structure of underground pipe gallery according to claim 1, it is characterized in that:The bottom thin film Enhancement layer, side film enhancement layer, top film enhancement layer, gap face film enhancement layer are non-woven fabrics.
4. a kind of full encirclement skin-type structure of underground pipe gallery according to claim 1, it is characterized in that:The bottom is aqueous Uncured dope layer, the aqueous uncured dope layer in side, the aqueous uncured dope layer in top, the aqueous uncured dope layer in gap face For the aqueous uncured dope layer of spary coating type.
5. a kind of full encirclement skin-type structure of underground pipe gallery according to claim 1, it is characterized in that:The bottom is aqueous Uncured dope layer, the aqueous uncured dope layer in side, the aqueous uncured dope layer in top, the aqueous uncured dope layer in gap face Thickness be 0.5-4mm.
6. a kind of full encirclement skin-type structure of underground pipe gallery according to claim 1, it is characterized in that:Bottom rubber asphalt Waterproof coating layer, side rubber asphalt waterproof coating layer, the thickness of gap face rubber asphalt waterproof coating layer are 0.5-4mm.
7. a kind of a kind of construction party of the full encirclement skin-type structure of underground pipe gallery as any one of claim 1 to 6 Method, it is characterized in that being constructed in accordance with the following steps:
Step 1, bottom construction, it includes:
Step 1-1, underground engineering concrete cushion construction finish after, under conditions of Wu Mingshui, using automatic arc spraying, apply Work is the thick rubber asphalt waterproof coatings of 0.5-4mm;
After step 1-2, rubber asphalt waterproof coating construction are finished (also can followed by synchronous construction), be applied using automatic arc spraying Work is the thick aqueous uncured coating of 0.5-4mm;
Synchronous paving non-woven fabrics when step 1-3, aqueous uncured coating application;
After step 1-4, non-woven fabrics paving are finished, directly in top snap the line assembling reinforcement, formwork supporting plate carries out concreting.
Step 2, side are constructed, and it includes:
After step 2-1, basement side wall concrete construction are finished, the thick aqueous uncured coating of automatic arc spraying construction 0.5-4mm;
When step 2-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 2-3, treat that aqueous uncured coating separates out moisture content volatilization and finished, constructed the thick rubber of 0.5-4mm using automatic arc spraying Asphalt waterproofing paint or laying water-proof coiled material layer;
Extruded sheet or other protection facilities are directly laid in step 2-4, construction after finishing.
Step 3, top layer construction, it includes:
After step 3-1, basement roof concrete are finished, the thick aqueous uncured coating of automatic arc spraying construction 0.5-4mm;
During the aqueous uncured construction of step 3-2, spary coating type, synchronous paving non-woven fabrics,
Step 3-3, treat that aqueous uncured coating internal moisture volatilization is finished, constructed the thick rubber of 0.5-4mm using automatic arc spraying Asphalt waterproofing paint or laying water-proof coiled material layer;
Step 4, gap surface construction, it includes:
Step 4-1, basement gap surface concrete construction, including in movement joint it is preset in buried rubber watertight strip construction After finishing, the thick aqueous uncured coating of automatic arc spraying construction 0.5-4mm
When step 4-2, aqueous uncured coating application, synchronous paving non-woven fabrics;
Step 4-3, treat aqueous uncured internal moisture volatilization to a certain extent, constructed the thick rubbers of 0.5-4mm using automatic arc spraying Glue asphalt waterproofing paint;
Step 5, bottom plate and side wall, gap face transition construction:Waterproof layer edge is extended to and is no less than beyond main structure body 500mm, to realize the seamless connection of adjacent surface.
Step 6, the construction of gap face closure.
CN201710339981.6A 2017-05-15 2017-05-15 Full-surrounding skin type structure of underground pipe gallery and construction method Active CN107059923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710339981.6A CN107059923B (en) 2017-05-15 2017-05-15 Full-surrounding skin type structure of underground pipe gallery and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710339981.6A CN107059923B (en) 2017-05-15 2017-05-15 Full-surrounding skin type structure of underground pipe gallery and construction method

Publications (2)

Publication Number Publication Date
CN107059923A true CN107059923A (en) 2017-08-18
CN107059923B CN107059923B (en) 2023-09-12

Family

ID=59609271

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710339981.6A Active CN107059923B (en) 2017-05-15 2017-05-15 Full-surrounding skin type structure of underground pipe gallery and construction method

Country Status (1)

Country Link
CN (1) CN107059923B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489166A (en) * 2017-08-24 2017-12-19 威海齐德新型建材有限公司 A kind of impervious corrosion resistant concrete earthwork is contained
CN109056813A (en) * 2018-09-27 2018-12-21 大连美宸特环保节能产品有限公司 A kind of subway open-cut station side wall waterproofing of movement joints construction method
CN109469102A (en) * 2018-12-27 2019-03-15 中国二冶集团有限公司 Piping lane expansion joint method for waterproofing
CN109797781A (en) * 2019-01-24 2019-05-24 四汇建设集团有限公司 A method of preventing basement leakage
CN113216260A (en) * 2021-06-17 2021-08-06 北京城建集团有限责任公司 Waterproof structure of buried water plant, buried water plant and construction method of buried water plant
CN114370275A (en) * 2021-12-27 2022-04-19 山东黄金矿业股份有限公司新城金矿 Bedrock bolting-grouting impervious supporting structure and construction method thereof

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120198787A1 (en) * 2011-02-08 2012-08-09 Yu-Cheng Mo Pre-pave Waterproof Construction Method
CN103465540A (en) * 2013-09-13 2013-12-25 北京东方雨虹防水工程有限公司 Preparation method and construction method of non-cured rubber asphalt paint and coil composite waterproof layer
CN103589340A (en) * 2013-10-31 2014-02-19 江苏凯伦建材股份有限公司 Creep type non-cured rubber asphalt based waterproof coating and preparation method thereof
CN103627258A (en) * 2012-08-23 2014-03-12 山东北方创信防水技术有限公司 Spraying quick-setting rubber asphalt waterproof coating material
CN104806273A (en) * 2015-05-11 2015-07-29 贵州省材料产业技术研究院 Seamlessly-overlapped and rapidly-condensed waterproof material with water discharging function and application method
CN105038593A (en) * 2015-08-05 2015-11-11 山东大山路桥工程有限公司 Water-based non-curable rubber asphalt coating and preparation method thereof
CN106398536A (en) * 2016-09-18 2017-02-15 科顺防水科技股份有限公司 Anionic water-based non-curing rubber asphalt waterproof coating and preparation method thereof
CN106436777A (en) * 2016-09-12 2017-02-22 中国建筑第五工程局有限公司 Subway station skin waterproof structure and construction method thereof
CN207314375U (en) * 2017-05-15 2018-05-04 江阴正邦化学品有限公司 A kind of the complete of underground pipe gallery surrounds skin-type structure

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120198787A1 (en) * 2011-02-08 2012-08-09 Yu-Cheng Mo Pre-pave Waterproof Construction Method
CN103627258A (en) * 2012-08-23 2014-03-12 山东北方创信防水技术有限公司 Spraying quick-setting rubber asphalt waterproof coating material
CN103465540A (en) * 2013-09-13 2013-12-25 北京东方雨虹防水工程有限公司 Preparation method and construction method of non-cured rubber asphalt paint and coil composite waterproof layer
CN103589340A (en) * 2013-10-31 2014-02-19 江苏凯伦建材股份有限公司 Creep type non-cured rubber asphalt based waterproof coating and preparation method thereof
CN104806273A (en) * 2015-05-11 2015-07-29 贵州省材料产业技术研究院 Seamlessly-overlapped and rapidly-condensed waterproof material with water discharging function and application method
CN105038593A (en) * 2015-08-05 2015-11-11 山东大山路桥工程有限公司 Water-based non-curable rubber asphalt coating and preparation method thereof
CN106436777A (en) * 2016-09-12 2017-02-22 中国建筑第五工程局有限公司 Subway station skin waterproof structure and construction method thereof
CN106398536A (en) * 2016-09-18 2017-02-15 科顺防水科技股份有限公司 Anionic water-based non-curing rubber asphalt waterproof coating and preparation method thereof
CN207314375U (en) * 2017-05-15 2018-05-04 江阴正邦化学品有限公司 A kind of the complete of underground pipe gallery surrounds skin-type structure

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107489166A (en) * 2017-08-24 2017-12-19 威海齐德新型建材有限公司 A kind of impervious corrosion resistant concrete earthwork is contained
CN109056813A (en) * 2018-09-27 2018-12-21 大连美宸特环保节能产品有限公司 A kind of subway open-cut station side wall waterproofing of movement joints construction method
CN109469102A (en) * 2018-12-27 2019-03-15 中国二冶集团有限公司 Piping lane expansion joint method for waterproofing
CN109797781A (en) * 2019-01-24 2019-05-24 四汇建设集团有限公司 A method of preventing basement leakage
CN113216260A (en) * 2021-06-17 2021-08-06 北京城建集团有限责任公司 Waterproof structure of buried water plant, buried water plant and construction method of buried water plant
CN114370275A (en) * 2021-12-27 2022-04-19 山东黄金矿业股份有限公司新城金矿 Bedrock bolting-grouting impervious supporting structure and construction method thereof

Also Published As

Publication number Publication date
CN107059923B (en) 2023-09-12

Similar Documents

Publication Publication Date Title
CN107059923A (en) The full encirclement skin-type structure and construction method of a kind of underground pipe gallery
CN106930331A (en) Waterproof structure system of underground pipe gallery expansion joint and construction method thereof
CN108411939A (en) The spliced prefabricated pipe gallery of one kind and its construction method
CN206545228U (en) A kind of piping lane with waterproof construction
KR100278173B1 (en) Double waterproof sheet for concrete structure
CN207314375U (en) A kind of the complete of underground pipe gallery surrounds skin-type structure
CN103276858B (en) Drainage structure for inverted roof and construction method of drainage structure
CN205502264U (en) Waterproof structure of movement joint
CN108842817A (en) A kind of subway station overlays waterproof roll structure and its construction technology
CN107083780A (en) The full encirclement skin-type structure and construction method of a kind of underground waterproof engineering
CN104251140A (en) Composite waterproof layer for underground construction and manufacturing and construction method thereof
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN109183844A (en) A kind of construction method of piping lane bottom plate pre-installed and inverted adhered type TPO waterproof roll
CN108842816A (en) A kind of waterproofing for subway station structure and its construction technology
CN108642996A (en) A kind of first floor or basement roof and road/square deformation joint and its construction method
CN208455463U (en) A kind of wet seam anti-corrosion component of steel-concrete composite beam
CN206829200U (en) A kind of full encirclement skin-type structure of underground waterproof engineering
CN112144581A (en) Large integral underground space waterproof construction structure and construction method thereof
CN209179060U (en) The deformation joint structure of underground pipe gallery
RU2685513C2 (en) Method of making hydro-sealed surfaces from cement-based materials
CN208685664U (en) A kind of city branch line underground pipe gallery construction system
CN208870199U (en) A kind of side wall waterproof structure for deformation seams
CN107882327B (en) A kind of construction technology preventing coiled material channeling water
KR20110127763A (en) The adiabatic and waterproofing structure using x-mat
CN206396625U (en) A kind of prefabricated beam-ends joint filling construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant