CN107059894A - 落石柔性分导系统 - Google Patents

落石柔性分导系统 Download PDF

Info

Publication number
CN107059894A
CN107059894A CN201710414125.2A CN201710414125A CN107059894A CN 107059894 A CN107059894 A CN 107059894A CN 201710414125 A CN201710414125 A CN 201710414125A CN 107059894 A CN107059894 A CN 107059894A
Authority
CN
China
Prior art keywords
falling rocks
longitudinal
support column
rope
guiding systems
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710414125.2A
Other languages
English (en)
Inventor
岳超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Xintu Technology Co ltd
Sichuan Ost Slope Protection Engineering Co ltd
Sichuan Ruitie Technology Co ltd
Original Assignee
Sichuan Shu Cheng Cheng Construction Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Shu Cheng Cheng Construction Services Co Ltd filed Critical Sichuan Shu Cheng Cheng Construction Services Co Ltd
Priority to CN201710414125.2A priority Critical patent/CN107059894A/zh
Publication of CN107059894A publication Critical patent/CN107059894A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site
    • E01F7/04Devices affording protection against snowslides, avalanches or falling rocks, e.g. avalanche preventing structures, galleries
    • E01F7/045Devices specially adapted for protecting against falling rocks, e.g. galleries, nets, rock traps

Abstract

本发明提供一种落石柔性分导系统,包括柔性的纵向落石引导坡面和柔性的横向落石分流坡面。本发明将帘式网的“引导”理念和“分流”的理念相结合,有效地实现了落石的安全引导及定向堆积,可对山地落石进行分流引导以及定向堆积,实现对目标建造物的有效防护。

Description

落石柔性分导系统
技术领域
本发明涉及边坡防护工程领域,具体来讲,是涉及一种落石柔性分导系统。
背景技术
目前,国内铁路边坡柔性防护领域主要包括主动网、被动网、帘式网、棚洞等。根据各自防护原理分别对各自适用的边坡类型都能很好的发挥落石防护的作用。但在诸如铁路隧道洞口上方边坡的防护中上述防护方式都存在着一定的不足:比如对于铁路隧道洞口上方的边坡落石防护,目前大多数新建线和既有线都通过设置边坡主、被动防护网以及明洞、棚洞等结构来防治落石,但因为工程量大、造价高等,也存在一定局限。
1、主动网:短期内可以有效稳固落石,但随着边坡岩石的不断风化,主动网会出现两个弊端:金属网片会出现“鼓肚子”现象,清理工作量大,长年累月可能会引发防护网垮塌;防护网纵横向支撑绳对岩石施加的预应力丧失而导致主动网失效。
2、被动网:由于被动网在拦截落石的过程中网片会发生较大变形,被动网设得太低,较大的缓冲距离势必伤及铁路上的电气化设备及列车;被动网设得太高,又无法防护被动网下部坡面的落石;同时,无论是主动网还是被动网,被拦截的落石都很难清理,过多的累积又会形成安全隐患。
3、帘式网:帘式网底部要求有足够的落石收集区域,而隧道洞口顶部往往不具备这样的条件。
4、明洞、棚洞:明洞对基础要求很高,而很多工程由于地形复杂,无法满足这一条件,而且在一定程度上来说,明、棚洞的抗冲击能力有限。
发明内容
为了解决上述类似于隧道洞口边坡防护技术不足的情况,本发明设计了一种落石柔性分导系统。
为了实现上述目的,本发明采用的技术方案如下:
本发明提供一种落石柔性分导系统,包括由拦截网5形成的柔性的纵向落石引导坡面和柔性的横向落石分流坡面。
优选的,所述落石柔性分导系统包括:沿纵坡方向布置的若干支撑柱1;在所述支撑柱1柱顶及两侧边布置的纵向支撑绳3,两侧边的纵向支撑绳3向外倾斜;在支撑柱1两侧沿横坡方向设置的横向支撑绳2,横向支撑绳2一端连接在支撑柱1柱顶上,另一端锚固于山体上,连接在支撑柱1柱顶的两横向支撑绳2锚固点之间的距离从上往下逐渐增大;连接在纵向支撑绳3和横向支撑绳2上的拦截网5,拦截网5在纵坡上端起始位置及纵向侧边均贴地闭合,形成柔性的纵向落石引导坡面和横向落石分流坡面。
优选的,所述支撑柱1的长度沿坡面向下逐渐增加。
优选的,在所述支撑柱1两侧边布置的纵向支撑绳3至少一根贴地布置。
优选的,所述支撑柱1柱顶及两侧边布置的纵向支撑绳3顶端交汇并锚固在一起。
优选的,在所述支撑柱1两侧设置有拉锚绳4。
优选的,所述落石柔性分导系统左右对称设置,其中轴线沿山地纵坡布置,所述若干支撑柱1布置在所述中轴线上。
优选的,在所述柔性引导系统的上部区域布置有帘式网。
本发明的原理为:通过构建人造坡面(纵、横两方向),将通过上部帘式网进行拦截、耗能减速后的落石进行拦截及分流引导,落石只能在网面上方运动,并沿坡向滚落至指定位置。
与现有技术相比,本发明具有以下有益效果:
(1)本发明将帘式网的“引导”理念和“分流”的理念相结合,有效地实现了落石的安全引导及定向堆积。系统可对山地落石进行分流引导以及定向堆积,实现对目标建造物的有效防护;
(2)本发明可以有效解决落石堆积难于清理的问题;
(3)本发明构造简单,便于维修,更换构件;
(4)本发明具有良好的适配性,可与明、棚洞相互补充,降低明、棚洞的配置要求和设计难度。
附图说明
图1为本发明的正视示意图。
图2为本发明的侧视示意图。
图3为本发明的轴测示意图。
1- 支撑柱,2-横向支撑绳,3-纵向支撑绳,4-拉锚绳,5-拦截网。
具体实施方式
下面结合附图和实施例对本发明作进一步说明,本发明的实施方式包括但不限于下列实施例。
实施例
如图所示,本发明的柔性分层系统包括柔性的纵向落石引导坡面和柔性的横向落石分流坡面。所述落石柔性分导系统包括:沿纵坡方向布置的若干支撑柱1,较佳的,本系统左右对称设置,其中轴线沿山地纵坡布置,中轴线上布置若干支撑柱1,为了使支撑柱1更加稳固,可以在支撑柱1两侧设置有拉锚绳4;在所述支撑柱1柱顶及两侧布置的纵向支撑绳3,纵向支撑绳3可以是多根,至少一根贴地布置。所述纵向支撑绳3顶端交汇并锚固在一起,两侧边的纵向支撑绳3向外倾斜,形成如锥形布置;在支撑柱1两侧沿横坡方向设置的横向支撑绳2,横向支撑绳2一端连接在支撑柱1柱顶上,另一端锚固于山体上,连接在支撑柱1柱顶的两横向支撑绳2锚固点之间的距离从上往下逐渐增大,即沿纵坡方向连接在各支撑柱1上的两横向支撑绳2锚固点之间的距离逐渐增大,在本实施例中,所横向支撑绳2另一端锚固在所述纵向支撑绳3所在位置的山体上;连接在纵向支撑绳3和横向支撑绳2上的拦截网5,拦截网5在纵坡上端起始位置及纵向侧边均贴地闭合,形成柔性的纵向落石引导坡面和横向落石分流坡面。为了更好的实现引导和分流,支撑柱1的长度沿坡面向下逐渐增加,以使拦截网5顶端沿坡面距坡面距离逐渐增加。
落石柔性分导系统为隧道洞口落石防护的辅助措施,通过在落石柔性分导系统的上部区域布置帘式网,使落石以较低的速度进入该落石柔性分导系统,以防落石冲击速度过大造成落石较大的反弹或击穿网面。
分流宽度B、引导长度L、末端拦截高度H以及布置跨数均可根据不同坡度、落石轨迹、防护能级等实际情况来考虑,实例中,落石经过上方帘式网以较小的速度值进入该落石柔性分导系统,由于拦截网5在纵坡上端起始位置及纵向侧边均贴地闭合,落石将只能在网面上运动,又由于网面具有足够的刚度而且具有纵、横两方向的坡度,使得落石难以在而网面停留,只能沿坡面滚落至两侧,实现分流引导及定向堆积的功效。
本发明所指的落石,当然也包括崩岩、散土块等,按照上述实施例,便可很好地实现本发明。值得说明的是,基于上述设计原理的前提下,为解决同样的技术问题,即使在本发明所公开的内容基础上做出的一些无实质性的改动或润色,所采用的技术方案的实质仍然与本发明一样,故其也应当在本发明的保护范围内。

Claims (8)

1.一种落石柔性分导系统,其特征在于,包括由拦截网(5)形成的柔性的纵向落石引导坡面和柔性的横向落石分流坡面。
2.如权利要求1所述的落石柔性分导系统,其特征在于,所述落石柔性分导系统包括:沿纵坡方向布置的若干支撑柱(1);在所述支撑柱(1)柱顶及两侧边布置的纵向支撑绳(3),两侧边的纵向支撑绳(3)向外倾斜;在支撑柱(1)两侧沿横坡方向设置的横向支撑绳(2),横向支撑绳(2)一端连接在支撑柱(1)柱顶上,另一端锚固于山体上,连接在支撑柱(1)柱顶的两横向支撑绳(2)锚固点之间的距离从上往下逐渐增大;布置在纵向支撑绳(3)和横向支撑绳(2)上的拦截网(5),拦截网(5)在纵坡上端起始位置及纵向侧边均贴地闭合,形成柔性的纵向落石引导坡面和横向落石分流坡面。
3.如权利要求2所述的落石柔性分导系统,其特征在于,所述支撑柱(1)的长度沿坡面向下逐渐增加。
4.如权利要求3所述的落石柔性分导系统,其特征在于,在所述支撑柱(1)两侧边布置的纵向支撑绳(3)至少一根贴地布置。
5.如权利要求4所述的落石柔性分导系统,其特征在于,所述支撑柱(1)柱顶及两侧边布置的纵向支撑绳(3)顶端交汇在一起。
6.如权利要求5所述的柔性引导系统,其特征在于,在所述支撑柱(1)两侧设置有拉锚绳(4)。
7.如权利要求6所述的落石柔性分导系统,其特征在于,所述落石柔性分导系统左右对称设置,其中轴线沿山地纵坡布置,所述若干支撑柱(1)布置在所述中轴线上。
8.如权利要求1-7任一项所述的柔性引导系统,其特征在于,在所述柔性引导系统的上部区域布置有帘式网。
CN201710414125.2A 2017-06-05 2017-06-05 落石柔性分导系统 Pending CN107059894A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710414125.2A CN107059894A (zh) 2017-06-05 2017-06-05 落石柔性分导系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710414125.2A CN107059894A (zh) 2017-06-05 2017-06-05 落石柔性分导系统

Publications (1)

Publication Number Publication Date
CN107059894A true CN107059894A (zh) 2017-08-18

Family

ID=59616685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710414125.2A Pending CN107059894A (zh) 2017-06-05 2017-06-05 落石柔性分导系统

Country Status (1)

Country Link
CN (1) CN107059894A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681228A (zh) * 2018-12-04 2019-04-26 西南交通大学 一种用于隧道洞口落石灾害的立体防护设计方法
CN112818453A (zh) * 2021-02-08 2021-05-18 西南交通大学 高陡边坡落石灾害的柔性防护4d能量控制设计方法
CN113174961A (zh) * 2021-03-31 2021-07-27 中海建筑有限公司 一种边坡基坑支护方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08302621A (ja) * 1995-05-10 1996-11-19 Tokyo Seiko Co Ltd 吊式尖頭状防護柵
JP3811180B1 (ja) * 2005-10-07 2006-08-16 有限会社奥宮工業 落石誘導ユニットを有する落石防護網とその落石誘導ユニット
JP2010174598A (ja) * 2009-02-02 2010-08-12 Shigeru Sezaki 斜面の地滑り防止安定化工法
JP5236104B1 (ja) * 2012-08-07 2013-07-17 日本ゼニスパイプ株式会社 防護柵
JP5349706B1 (ja) * 2013-04-10 2013-11-20 株式会社シビル 落石防護施設及びその構築方法
JP2014074311A (ja) * 2012-10-05 2014-04-24 Fukasawa Komusho:Kk 落石防護ネット及び落石防護方法
WO2015092829A1 (ja) * 2013-12-17 2015-06-25 株式会社プロテックエンジニアリング 防護柵
CN105603893A (zh) * 2016-03-07 2016-05-25 中国科学院、水利部成都山地灾害与环境研究所 隧道口柔性鼻形滚石排导棚洞结构体及其设计方法
CN207828986U (zh) * 2017-06-05 2018-09-07 四川蜀通顺成建筑劳务有限公司 落石柔性分导系统

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08302621A (ja) * 1995-05-10 1996-11-19 Tokyo Seiko Co Ltd 吊式尖頭状防護柵
JP3811180B1 (ja) * 2005-10-07 2006-08-16 有限会社奥宮工業 落石誘導ユニットを有する落石防護網とその落石誘導ユニット
JP2010174598A (ja) * 2009-02-02 2010-08-12 Shigeru Sezaki 斜面の地滑り防止安定化工法
JP5236104B1 (ja) * 2012-08-07 2013-07-17 日本ゼニスパイプ株式会社 防護柵
JP2014074311A (ja) * 2012-10-05 2014-04-24 Fukasawa Komusho:Kk 落石防護ネット及び落石防護方法
JP5349706B1 (ja) * 2013-04-10 2013-11-20 株式会社シビル 落石防護施設及びその構築方法
WO2015092829A1 (ja) * 2013-12-17 2015-06-25 株式会社プロテックエンジニアリング 防護柵
CN105603893A (zh) * 2016-03-07 2016-05-25 中国科学院、水利部成都山地灾害与环境研究所 隧道口柔性鼻形滚石排导棚洞结构体及其设计方法
CN207828986U (zh) * 2017-06-05 2018-09-07 四川蜀通顺成建筑劳务有限公司 落石柔性分导系统

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘强: "采用引导式和分离式柔性防护网综合整治崩塌落石病害", 《中小企业管理与科技(上旬刊)》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109681228A (zh) * 2018-12-04 2019-04-26 西南交通大学 一种用于隧道洞口落石灾害的立体防护设计方法
CN112818453A (zh) * 2021-02-08 2021-05-18 西南交通大学 高陡边坡落石灾害的柔性防护4d能量控制设计方法
CN112818453B (zh) * 2021-02-08 2022-06-07 西南交通大学 高陡边坡落石灾害的柔性防护4d能量控制设计方法
CN113174961A (zh) * 2021-03-31 2021-07-27 中海建筑有限公司 一种边坡基坑支护方法

Similar Documents

Publication Publication Date Title
CN107059894A (zh) 落石柔性分导系统
CN109681228B (zh) 一种用于隧道洞口落石灾害的立体防护设计方法
CN205295975U (zh) 主被动混合拖尾式高性能防护网
CN107059670A (zh) 柔性分导系统
CN105256730B (zh) 主被动混合拖尾式高性能防护网
CN207419555U (zh) 一种保护周边既有建筑物的高铁桥墩路基隔离纠偏结构
CN107761744A (zh) 一种灌注桩桩间土连续防护构造
CN104727239A (zh) 用于高风速风沙地区的高立式防沙障
CN107165068A (zh) 随风自提式阻沙栅栏及阻沙设施
AU2020101111A4 (en) Cantilever truss supported resilient flexible protective shed tunnel
CN110359381B (zh) 柔性网与缓冲垫层组合式自清理棚洞系统及其设计方法
CN207267975U (zh) 一种用于盾构隧道下穿河流的河床加固结构
CN204000898U (zh) 新型抗冲击被动防护系统
CN207828986U (zh) 落石柔性分导系统
CN208219457U (zh) 一种危岩落石被动拦挡构造
CN209429141U (zh) 公路边坡复合防护结构
CN208293455U (zh) 一种三悬索索网防落石结构
CN204825783U (zh) 一种堤坝迎水面生态护坡结构
CN212294401U (zh) 柔性分导系统
CN108049319A (zh) 适用于起伏地形的道路风沙防治体系及其构建方法
CN105019369A (zh) 主副索体系的柔性防护网
CN109537597A (zh) 一种用于清理高陡边坡上主动柔性防护网内堆积落石的施工方法
CN204825681U (zh) 主副索体系的柔性防护网
CN206070542U (zh) 一种用于崩塌防治的新型拦石网索结构
CN210561796U (zh) 采用附加变形约束的柔性拦挡网

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20181008

Address after: 610083 99 Golden Phoenix Road, Jinniu District, Chengdu, Sichuan.

Applicant after: SICHUAN RUITIE TECHNOLOGY Co.,Ltd.

Applicant after: SICHUAN OST SLOPE PROTECTION ENGINEERING Co.,Ltd.

Applicant after: CHENGDU XINTU TECHNOLOGY Co.,Ltd.

Address before: 618308 9 groups of Qing Yue Village, Xiangyang Town, Guanghan City, Deyang, Sichuan

Applicant before: SICHUAN SHUTONG SHUNCHENG CONSTRUCTION SERVICE CO.,LTD.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818

RJ01 Rejection of invention patent application after publication