CN107059855A - A kind of new pre-threaded pile tube and its construction method - Google Patents

A kind of new pre-threaded pile tube and its construction method Download PDF

Info

Publication number
CN107059855A
CN107059855A CN201710406539.0A CN201710406539A CN107059855A CN 107059855 A CN107059855 A CN 107059855A CN 201710406539 A CN201710406539 A CN 201710406539A CN 107059855 A CN107059855 A CN 107059855A
Authority
CN
China
Prior art keywords
pile tube
pile
threaded
new pre
screw thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710406539.0A
Other languages
Chinese (zh)
Inventor
陈溯源
冯娜
邱伟迪
陈修和
赵博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710406539.0A priority Critical patent/CN107059855A/en
Publication of CN107059855A publication Critical patent/CN107059855A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0038Production methods using an auger, i.e. continuous flight type

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention provides a kind of new pre-threaded pile tube and its construction method, it is related to technical field of buildings;Including pile tube body and the prefabricated screw thread in pile tube outer body, the width of thread is 2 30cm, thickness is 2 6cm, flight pitch is 10 80cm, is 10 40 ° with horizontal plane spiral angle, during construction, pre-threaded pile tube merogenesis is transported to scene, driven piles after positioning, using welding manner connection between often section stake, finally in the connector of the reserved welding of pile crown;The present invention adds the rigidity of foundation pile, improves bending resistance, the shear resistance of foundation pile by designing side thread;Auger drilling form of construction work is used during construction, drilling resistance is reduced, accelerates rate of penetration, improve efficiency of construction, under the conditions of identical geology, improve pile bearing capacity, designing pile length is reduced, construction costs is saved.

Description

A kind of new pre-threaded pile tube and its construction method
Technical field
The present invention relates to technical field of buildings, and in particular to a kind of new pre-threaded pile tube and its construction method.
Background technology
Prefabricated prestressing pipe pile consumption in foundation engineering is big, but conventional prefabricated prestressing pipe pile is due to side wall extremely light Sliding, small with Rock And Soil frictional force, pile bearing capacity is smaller, typically by increasing stake footpath or the increase long raising bearing capacity of stake, still Consequence is increase cost caused by so.How to find new precast concrete pilework turns into the crucial skill of concrete tubular pile Art.
The content of the invention
(1) technical problem solved
In view of the shortcomings of the prior art, the invention provides a kind of new pre-threaded pile tube and its construction method so that Pile tube increases with ground frictional force, bearing capacity enhancing.
(2) technical scheme
To realize object above, the present invention is achieved by the following technical programs:
A kind of new pre-threaded pile tube, including pile tube body and the prefabricated screw thread in pile tube outer body.
It is preferred that, the screw thread is the screw thread that turns clockwise.
It is preferred that, the width of thread is 2-30cm, and thickness is 2-6cm, and flight pitch is 10-80cm, with horizontal plane spiral shell It is 10-40 ° to revolve angle.
It is preferred that, the pile tube body uses any one in normal concrete, high-strength concrete or prestressed concrete Kind.
It is preferred that, reinforcing bar or steel wire are provided with the pile tube body, pile tube section is hollow or solid.
It is preferred that, the pile tube often saves length for 2-14m.
A kind of construction method of new pre-threaded pile tube, comprises the following steps:(1) by prefabrication screw thread pile tube, point Section is transported to job site;(2) screw thread pile tube is positioned, takes bonding mode spud pile after accurate positioning with piling machine Body, clock wise spirals squeeze into Rock And Soil;(3) saved under and use welding manner between stake and the stake of upper section, welding edge contact pin is set, protected 360 ° of card is welded without dead angle total cross-section;(4) after the completion of driving piles, the connector of the reserved welding of pile crown.
It is preferred that, when the pile tube is hollow pile, steel reinforcement cage is set up after step (3) and concrete fills core.
(3) beneficial effect
The invention provides one kind the invention provides a kind of new pre-threaded pile tube, by designing side thread, increase Add the rigidity of foundation pile, improve bending resistance, the shear resistance of foundation pile;Auger drilling form of construction work is used during construction, brill is reduced Enter resistance, accelerate rate of penetration, improve efficiency of construction, under the conditions of identical geology, improve pile bearing capacity, reduce Designing pile length, saves construction costs.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is schematic structural view of the invention;
Fig. 2 is the pile tube top view in Fig. 1.
Embodiment
To make the purpose, technical scheme and advantage of the embodiment of the present invention clearer, below in conjunction with the embodiment of the present invention, Technical scheme in the embodiment of the present invention is clearly and completely described, it is clear that described embodiment is the present invention one Divide embodiment, rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not making The every other embodiment obtained under the premise of creative work, belongs to the scope of protection of the invention.
Embodiment 1:
A kind of new pre-threaded pile tube, including pile tube body 1 and the prefabricated screw thread 2 in pile tube outer body, screw thread 2 is Turn clockwise screw thread, and the width of screw thread 2 is 15cm, and thickness is 4cm, and flight pitch is 40cm, is with horizontal plane spiral angle 25°。
Pile tube body 1 uses normal concrete.
Reinforcing bar is provided with pile tube body 1, pile tube section is hollow.
Pile tube often saves length for 14m.
A kind of construction method of new pre-threaded pile tube, comprises the following steps:(1) by prefabrication screw thread pile tube, point Section is transported to job site;(2) screw thread pile tube is positioned, takes bonding mode spud pile after accurate positioning with piling machine Body, clock wise spirals squeeze into Rock And Soil 3;(3) saved under and use welding manner between stake and the stake of upper section, welding edge contact pin is set, protected 360 ° of card is welded without dead angle total cross-section;(4) steel reinforcement cage is set up in hollow pile and concrete fills core;(5) after the completion of driving piles, stake The connector of the reserved welding of head.
Embodiment 2:
A kind of new pre-threaded pile tube, including pile tube body 1 and the prefabricated screw thread 2 in pile tube outer body, screw thread 2 is Turn clockwise screw thread, and the width of screw thread 2 is 2cm, and thickness is 2cm, and flight pitch is 10cm, is 10 ° with horizontal plane spiral angle.
Pile tube body 1 uses high-strength concrete.
Reinforcing bar is provided with pile tube body 1, pile tube section is solid.
Pile tube often saves length for 8m.
A kind of construction method of new pre-threaded pile tube, comprises the following steps:(1) by prefabrication screw thread pile tube, point Section is transported to job site;(2) screw thread pile tube is positioned, takes bonding mode spud pile after accurate positioning with piling machine Body, clock wise spirals squeeze into Rock And Soil 3;(3) saved under and use welding manner between stake and the stake of upper section, welding edge contact pin is set, protected 360 ° of card is welded without dead angle total cross-section;(4) after the completion of driving piles, the connector of the reserved welding of pile crown.
Embodiment 3:
A kind of new pre-threaded pile tube, including pile tube body 1 and the prefabricated screw thread 2 in pile tube outer body, screw thread 2 is Turn clockwise screw thread, and the width of screw thread 2 is 30cm, and thickness is 6cm, and flight pitch is 80cm, is with horizontal plane spiral angle 40°。
Pile tube body 1 uses prestressed concrete.
Steel wire is provided with pile tube body 1, pile tube section is hollow.
Pile tube often saves length for 2m.
A kind of construction method of new pre-threaded pile tube, comprises the following steps:(1) by prefabrication screw thread pile tube, point Section is transported to job site;(2) screw thread pile tube is positioned, takes bonding mode spud pile after accurate positioning with piling machine Body, clock wise spirals squeeze into Rock And Soil 3;(3) saved under and use welding manner between stake and the stake of upper section, welding edge contact pin is set, protected 360 ° of card is welded without dead angle total cross-section;(4) steel reinforcement cage is set up in hollow pile and concrete fills core;(5) after the completion of driving piles, stake The connector of the reserved welding of head.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or deposited between operating In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability is included, so that process, method, article or equipment including a series of key elements not only will including those Element, but also other key elements including being not expressly set out, or also include being this process, method, article or equipment Intrinsic key element.In the absence of more restrictions, the key element limited by sentence "including a ...", it is not excluded that Also there is other identical element in process, method, article or equipment including the key element.
The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although with reference to the foregoing embodiments The present invention is described in detail, it will be understood by those within the art that:It still can be to foregoing each implementation Technical scheme described in example is modified, or carries out equivalent substitution to which part technical characteristic;And these modification or Replace, the essence of appropriate technical solution is departed from the spirit and scope of various embodiments of the present invention technical scheme.

Claims (8)

1. a kind of new pre-threaded pile tube, it is characterised in that including pile tube body and the prefabricated screw thread in pile tube outer body.
2. new pre-threaded pile tube as claimed in claim 1, it is characterised in that the screw thread is the screw thread that turns clockwise.
3. new pre-threaded pile tube as claimed in claim 1, it is characterised in that the width of thread is 2-30cm, thickness For 2-6cm, flight pitch is 10-80cm, is 10-40 ° with horizontal plane spiral angle.
4. new pre-threaded pile tube as claimed in claim 1, it is characterised in that the pile tube body uses common coagulation Any one in soil, high-strength concrete or prestressed concrete.
5. new pre-threaded pile tube as claimed in claim 1, it is characterised in that reinforcing bar or steel are provided with the pile tube body Silk, pile tube section is hollow or solid.
6. new pre-threaded pile tube as claimed in claim 1, it is characterised in that the pile tube often saves length for 2-14m.
7. the construction method of new pre-threaded pile tube as claimed in claim 1, it is characterised in that comprise the following steps:(1) By prefabrication screw thread pile tube, merogenesis is transported to job site;(2) screw thread pile tube is positioned, with piling after accurate positioning Machine takes the mode of bonding to fix pile body, and clock wise spirals squeeze into Rock And Soil;(3) saved under and use welding side between stake and the stake of upper section Formula, sets welding edge contact pin, it is ensured that 360 ° are welded without dead angle total cross-section;(4) after the completion of driving piles, the connection of the reserved welding of pile crown Mouthful.
8. the construction method of new pre-threaded pile tube as claimed in claim 7, it is characterised in that the pile tube is hollow pile When, steel reinforcement cage is set up after step (3) and concrete fills core.
CN201710406539.0A 2017-06-02 2017-06-02 A kind of new pre-threaded pile tube and its construction method Pending CN107059855A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710406539.0A CN107059855A (en) 2017-06-02 2017-06-02 A kind of new pre-threaded pile tube and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710406539.0A CN107059855A (en) 2017-06-02 2017-06-02 A kind of new pre-threaded pile tube and its construction method

Publications (1)

Publication Number Publication Date
CN107059855A true CN107059855A (en) 2017-08-18

Family

ID=59617715

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710406539.0A Pending CN107059855A (en) 2017-06-02 2017-06-02 A kind of new pre-threaded pile tube and its construction method

Country Status (1)

Country Link
CN (1) CN107059855A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853536A (en) * 2019-01-29 2019-06-07 哈尔滨鸿盛建筑材料制造股份有限公司 A kind of spiral foundation pile

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201121323Y (en) * 2007-09-03 2008-09-24 中冶沈勘工程技术有限公司 Anti-twist steel reinforced concrete prefabricated spiral pipe pile
CN103195055A (en) * 2013-04-03 2013-07-10 天津大学 Prefabricated helical pile head for assisting prestressed high-strength concrete (PHC) pipe pile in pile sinking and construction method
CN106400797A (en) * 2015-07-28 2017-02-15 上海城地建设股份有限公司 Prestress prefabricate spiral bamboo joint pile and construction method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201121323Y (en) * 2007-09-03 2008-09-24 中冶沈勘工程技术有限公司 Anti-twist steel reinforced concrete prefabricated spiral pipe pile
CN103195055A (en) * 2013-04-03 2013-07-10 天津大学 Prefabricated helical pile head for assisting prestressed high-strength concrete (PHC) pipe pile in pile sinking and construction method
CN106400797A (en) * 2015-07-28 2017-02-15 上海城地建设股份有限公司 Prestress prefabricate spiral bamboo joint pile and construction method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853536A (en) * 2019-01-29 2019-06-07 哈尔滨鸿盛建筑材料制造股份有限公司 A kind of spiral foundation pile

Similar Documents

Publication Publication Date Title
CN203701334U (en) Reinforced and prefabricated type shear wall structure
CN210562157U (en) Post-grouting composite pile
CN203821625U (en) Fiber cloth-reinforced mortar-free reinforced masonry shear wall
CN202730749U (en) Prefabricated reinforced concrete H-shaped support pile
CN108612122B (en) Ultra-large plane-size open caisson foundation structure and construction method thereof
CN208534081U (en) A kind of reconstruction structure of old building constructional column
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN104153463B (en) Assembled integrated frame system and construction method thereof
CN107059855A (en) A kind of new pre-threaded pile tube and its construction method
CN103924676B (en) Prestressing force connects beams of concrete concrete-filled circular steel tube column node
CN204151798U (en) A kind of steel reinforced concrete anti-slide pile structure
CN106948476B (en) The frame and its construction method that prestressing with bond combination beam is constituted
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN203487542U (en) Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls
CN205530819U (en) Steel frame structure of embedded precast concrete shear force wall bending resistance simultaneously
CN102852279B (en) A kind of prestressed reinforced concrete composite beam of convex-concave superposed surfaces
CN105178355B (en) The stratum pre-reinforcement processing method of underground space construction
CN207775874U (en) Prestressed reinforced concrete solid square pile
CN203878590U (en) Post-reinforcement structure for cast-in-place piles
CN208347063U (en) The prefabricated double board wall units of one kind, shear-wall element and assembly concrete shear wall
CN103452101B (en) Prestressed-concrete pile and supporting piling wall
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN207109810U (en) A kind of new pre-threaded pile tube
CN108643356A (en) A kind of assembled coal gangue haydite concrete-type girder steel column node structure
CN210887193U (en) High-strength concrete pipe pile

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170818