CN107059820A - A kind of river surface processing unit of environmental protection - Google Patents

A kind of river surface processing unit of environmental protection Download PDF

Info

Publication number
CN107059820A
CN107059820A CN201710116203.0A CN201710116203A CN107059820A CN 107059820 A CN107059820 A CN 107059820A CN 201710116203 A CN201710116203 A CN 201710116203A CN 107059820 A CN107059820 A CN 107059820A
Authority
CN
China
Prior art keywords
baffle plate
combined
plate
rubbish
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710116203.0A
Other languages
Chinese (zh)
Other versions
CN107059820B (en
Inventor
蔡海潮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Shengyefang Environmental Management Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201710116203.0A priority Critical patent/CN107059820B/en
Publication of CN107059820A publication Critical patent/CN107059820A/en
Application granted granted Critical
Publication of CN107059820B publication Critical patent/CN107059820B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/0842Devices for reducing the polluted area with or without additional devices for removing the material adapted to be towed for operation
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B15/00Cleaning or keeping clear the surface of open water; Apparatus therefor
    • E02B15/04Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
    • E02B15/08Devices for reducing the polluted area with or without additional devices for removing the material
    • E02B15/085Details of connectors

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention discloses a kind of river surface processing unit of environmental protection, including two pillar constructions being symmetricly set at the position of both sides riverbank, barrier assembly is combined between two pillar constructions, drive component is provided between the top of two pillar constructions;Increase the setting stability of the present apparatus by pillar construction, effective rubbish can be also formed in the anxious river course in current end to stop, it is to avoid collapse, service life 8 20 years, complete to float without floating body simultaneously, the wave even if in river course is larger also to efficiently accomplish the obstruction of rubbish;By the height of controllable register, water layer that can be according to residing for rubbish completes to intercept, and effectively intercepts the rubbish under river surface that swims on river surface or rise and fall, and reduces the probability that rubbish is passed through, effectively maintains the clean and tidy of river surface, it is to avoid water pollution;The rubbish that baffle plate is stopped can be put in order by drive component so that river course cleaning workman can realize the salvaging of rubbish on riverbank.

Description

A kind of river surface processing unit of environmental protection
Technical field
The present invention relates to environmental protection facility, and in particular to a kind of river surface processing unit of environmental protection.
Background technology
At present, while urban construction is developed rapidly, it is different with house refuse that many river courses in city receive municipal refuse The pollution of degree, but the cleaning to these rubbish is main based on artificial salvage, cost is high, efficiency is low.
Patent announcement number(CN 104532811 B)A kind of river surface rubbish sweeper is disclosed, the device is tiltedly placed on river surface On, floating body is fixed by floating body fixed mount, and river surface rubbish sweeper is swum on river surface by the buoyancy of floating body, is led by means of sliding Rail tilts floating plate by river surface with river and intercepted with water surface height adjust automatically, rubbish, and gathers on one side, collects and is received in rubbish Collect in basket, when people rotates handle, torque is transferred to spool by gear train, and the rotation of spool makes hawser by pulling force Moved inside wirerope guide rail, wire-blocking board makes rope collection in certain interval, and interior pulling refuse collection basket, refuse collection basket is logical Cross roller to walk upwards along rolling wheel guide rails, walking to be at the end is limited block and blocks, and one group will pour rubbish with hand, complete River surface garbage-cleaning works.
There is problems with the device:
(1)How floating plate is tilted by river surface to store the rubbish floated on river surface at rubbish salvaging portion;
(2)Part rubbish is suspended in water, close at water surface site, and river surface tilts floating plate and is suspended on river surface, because This is for that can not form effective stop below the water surface, rubbish can be by the water surface below by way of river surface inclination floating plate, therefore rises Less than the effect for preferably stopping rubbish;
(3)Even if rubbish can tilt floating plate by river surface and be brought on one side, also automatically rubbish can not be stored to rubbish Rubbish is collected in basket, it is desired nonetheless to fiddle with rubbish to refuse collection inframe, therefore design existing defects by manpower;
(4)Whole mechanism is arranged on riverbank by rail plate, and river surface, which tilts floating plate, to be supported on river by floating body On face, and rubbish salvage the lower section of part and be not provided with it is any the part of buoyancy can be provided, therefore the device can not be stable It is placed on river surface, and open file does not disclose rubbish yet and salvages the mounting means of part, therefore there is design defect.
The content of the invention
The technical problem to be solved in the present invention is to provide a kind of stabilized structure, river surface rubbish effectively can be stopped and concluded The river surface processing unit of environmental protection.
To solve the above problems, the present invention is adopted the following technical scheme that:
A kind of river surface processing unit of environmental protection, including two pillar constructions being symmetricly set at the position of both sides riverbank, two Barrier assembly is combined between the individual pillar construction, drive component is provided between the top of two pillar constructions;
The pillar construction includes steel reinforcement cage, and pours the concrete structure outside the steel reinforcement cage;
The obstruction component includes two symmetrically arranged pipe fittings, and the two ends circular arc of the pipe fitting is bent to pillar construction direction, The angle of bend at the pipe fitting two ends is 90 ° ± 0.5 °, and the two ends of the pipe fitting are provided with mounting seat, the pipe fitting assign to In the mounting seat, the screw of the fixed pipe fitting is provided with the outer ring position of the mounting seat, the screw annular is set More than three are equipped with, that one end of the mounting seat away from the pipe fitting has card, the card is casting with the mounting seat Integral structure is made, the first screw is combined between the card and the pillar construction, the first screw annular is provided with More than three, baffle plate is combined between two pipe fittings, the two ends of the baffle plate are symmetrically arranged with four sliding sleeves, the cunning Set coordinates the pipe fitting, is combined between the sliding sleeve and the pipe fitting in the second screw, the plate face of the baffle plate and is provided with two Water-carrying groove more than individual, the water-carrying groove runs through the baffle plate;
The drive component includes motor and screw rod, is provided with bearing, the bearing and institute described in side at the top of pillar construction State and be combined with the 3rd screw between pillar construction, the motor is arranged on the top of pillar construction described in opposite side, the motor The 4th screw is combined between the pillar construction, the motor has output end, and the output end of the motor is fixed with axle Set, one end of the screw rod is assigned into the axle sleeve, and bolt is combined between the screw rod and the axle sleeve, the screw rod The other end is assigned into the bearing, is interference fitted, is matched somebody with somebody on the screw rod between the other end of the screw rod and the bearing Conjunction has travelling nut, and scraper plate is provided with below the travelling nut, and the scraper plate is arranged at the anterior position of the baffle plate Place, the vertical baffle plate of the scraper plate, the scraper plate is provided with groove at the baffle plate 0.2mm, the plate face of the scraper plate, The network of rivers was provided with the groove, described cross between the network of rivers and the scraper plate is combined with the first bolt;
Guide rod is combined between two pillar constructions, the pillar construction has coordinate the guide rod first Mounting seat, is combined with the 5th screw, first mounting seat and the column between first mounting seat and the guide rod It is combined between structure in the 6th screw, the plate face of the scraper plate and is horizontally arranged with guide sleeve, the guide rod is led through described To set, the guide rod be arranged in parallel with the screw rod, the vertical scraper plate of the guide rod, is set at the rear of the baffle plate Have and left and right at the close baffle position at the top of the installation frame of cuboid, the installation frame be symmetrically arranged with two pieces of connections Plate, is combined with the 7th screw between the connecting plate and the baffle plate, the bottom surface of the installation frame, rear end face, left surface and Backstop is provided with right flank position, the water-carrying groove is relative with the front end face of the installation frame.
The present apparatus is fixed at the riverbank of both sides by columns assemblies, and columns assemblies carry out internal support by steel reinforcement cage, lead to Cross concrete structure and carry out external support, with preferably structural strength, the obstruction in river course is then realized by baffle plate, baffle plate Extend partially on the water surface, can be on the water surface or underwater forms effective obstruction partly below the water surface, it is to avoid or subtract Few rubbish is passed through, it is ensured that river course it is clean and tidy, the height of baffle plate can be adjusted by the movement of sliding sleeve, pass through to adjust and slide The cooperation position of set and pipe fitting can reach the effect of controllable register height so that the present apparatus can carry out flexible according to water level Regulation, the movement of scraper plate can be driven by the rotation of screw rod, controlled, will can be intercepted on river surface by the rotating of motor Rubbish dial at the position of riverbank, facilitate river course to clear up workman and salvaging processing carried out to rubbish, effectively safeguard that river course is whole It is clean.
Preferably, the rear end face of the sliding sleeve be provided with the equipped pipe fitting match somebody with somebody tankage, it is described with tankage with it is described Interference fits between pipe fitting, it is convenient overall by the way that sliding sleeve with tankage sliding sleeve convenient for assembly, can be equipped with again after bending pipe fitting Assembling.
Preferably, covered with protective cover between the top of two pillar constructions, the bearing, motor and screw rod are equal The inside of the protective cover is coated on, the bottom of the protective cover, which is provided with cell body, the arranged on left and right sides position of the cell body, to be set The first connecting plate is equipped with, the 8th screw is combined between first connecting plate and the pillar construction, the protective cover is not Become rusty steel cage, and the surface of the protective cover, which is brushed, anticorrosive paint, by setting protective cover preferably to protect motor and screw rod, Motor entering water is avoided, it is ensured that the normal operation of motor, motor mainly carries out the supply of power supply by civil power, by switching control electricity The rotating of machine.
Preferably, the steel reinforcement cage include it is more than two pour ring, it is more than two described to pour ring and go to upper and lower position Be arranged in parallel, it is more than two it is described pour to be vertically provided between ring pour bar, the burr shape that pours is provided with two More than, described to pour bar and described pour is combined with steel wire between ring, the ring that pours is described to be obtained after the bending of reinforcing bar circular arc Pour bar be arranged at it is described pour at the inner ring position of ring, reinforced steel bar ring after manually bending by obtaining, by concrete structure Inside set steel reinforcement cage can increase the stress-bearing capability of concrete structure.
Preferably, the length of the screw rod is 2000mm ~ 3600mm.
Preferably, the baffle plate is steel plate or PVC plastic flitch, when the baffle plate uses steel plate, the thickness of the baffle plate For 5mm ~ 15mm, when the baffle plate uses PVC plastic flitch, the thickness of the baffle plate is 25mm ~ 45mm.
Preferably, the height of the baffle plate is 300mm ~ 1000mm, and the height that the baffle plate is extended to outside the water surface is not small In 100mm.
Preferably, the concrete structure by following mass percent material composition:Sand 25% ~ 45%, silicate cement Mud 15% ~ 18%, stone 15% ~ 22%, stone flour 15% ~ 20% and flyash 10% ~ 15%.
Preferably, the sand uses particle diameter for 0.25 ~ 0.35mm fine sand, the stone flour use particle diameter for 0.25 ~ 0.5mm middle sand powder, the flyash is using the cinder below the mesh of particle diameter 60.
The present apparatus when mounted, the perforate first at riverbank, in the hole for being then arranged on out steel reinforcement cage, then in reinforcing bar The outside of cage sets mould, is shaped by mould, then prepares concrete, will prepare the Concrete Filled completed in mould Inside, after concrete structure shaping after remove mould, that is, obtain pillar construction, then based on by pillar construction, Barrier assembly and drive component are installed.
The beneficial effects of the invention are as follows:
1)Increase the setting stability of the present apparatus by pillar construction, can also form effective in the anxious river course in current end Rubbish is stopped, it is to avoid collapsed, service life 8-20, while complete floating without floating body, though wave in river course compared with It can also efficiently accomplish the obstruction of rubbish greatly;
2)By the height of controllable register, water layer that can be according to residing for rubbish completes to intercept, effectively intercepts and swim on river surface Or rubbish of the sink-float under river surface, the probability that rubbish is passed through is reduced, effectively the clean and tidy of river surface is maintained, it is to avoid water pollution;
3)The rubbish that baffle plate is stopped can be put in order by drive component, by the way that rubbish is put in order to close to riverbank position Place so that river course cleaning workman can realize the salvaging of rubbish on riverbank, without using equipment such as refuse fishing vessels, reduce rubbish The cost of rubbish cleaning;
4)Installation frame is set in the thickness of baffle plate, the small garbage through water-carrying groove can be stored, facilitate the later stage to enter Row is focused on, and the stress of baffle plate can be reduced by water-carrying groove, it is to avoid baffle plate deforms after a long time use.
Brief description of the drawings
In order to illustrate more clearly about the embodiment of the present invention or technical scheme of the prior art, below will be to embodiment or existing There is the accompanying drawing used required in technology description to be briefly described, it should be apparent that, drawings in the following description are only this Some embodiments of invention, for those of ordinary skill in the art, on the premise of not paying creative work, can be with Other accompanying drawings are obtained according to these accompanying drawings.
Fig. 1 is structural representation of the invention;
Fig. 2 is the partial enlarged drawing at the A of the present invention;
Fig. 3 is the cooperation schematic diagram of scraper plate and baffle plate;
Fig. 4 is the cooperation schematic diagram of baffle plate and installation frame;
Fig. 5 is the stereogram of installation frame;
Fig. 6 is the upward view of protective cover;
Fig. 7 is the top view of protective cover;
Fig. 8 is the top view of steel reinforcement cage;
Fig. 9 is installment state figure of the invention.
Embodiment
The preferred embodiments of the present invention are described in detail below in conjunction with the accompanying drawings, so that advantages and features of the invention energy It is easier to be readily appreciated by one skilled in the art, apparent is clearly defined so as to be made to protection scope of the present invention.
Dress is handled refering to a kind of river surface of environmental protection shown in Fig. 1, Fig. 2, Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7, Fig. 8 and Fig. 9 Put, including two pillar constructions being symmetricly set at the position of both sides riverbank, resistance is combined between two pillar constructions Component is kept off, drive component is provided between the top of two pillar constructions;
The pillar construction includes steel reinforcement cage 101, and pours the concrete structure 102 outside the steel reinforcement cage 101;
The obstruction component includes two symmetrically arranged pipe fittings 201, and the two ends circular arc of the pipe fitting 201 is to pillar construction direction Bending, pipe fitting uses hollow stainless steel pipe, a diameter of 25mm of caliber, and the angle of bend at the two ends of pipe fitting 201 is 90 °, The two ends of the pipe fitting 201 are provided with mounting seat 202, and the pipe fitting 201 is assigned to the mounting seat 202, described to install The screw 211 of the fixed pipe fitting 201 is provided with the outer ring position of seat 202, the mounting seat 202 is away from the pipe fitting 201 that one end has card 212, and the card 212 is casting integrated formula structure, the card 212 with the mounting seat 202 The first screw 213 is combined between the pillar construction, baffle plate 203, the gear are combined between two pipe fittings 201 The two ends of plate 203 are symmetrically arranged with four sliding sleeves 204, and the sliding sleeve 204 coordinates the pipe fitting 201, the sliding sleeve 204 with it is described It is combined between pipe fitting 201 in second screw 214, the plate face of the baffle plate 203 and is provided with more than two water-carrying grooves 215, institute Water-carrying groove 215 is stated through the baffle plate 203;
The drive component includes motor 301 and screw rod 302, is provided with bearing 303 described in side at the top of pillar construction, described The 3rd screw 311 is combined between bearing 303 and the pillar construction, the motor 301 is arranged on column knot described in opposite side The top of structure, is combined with the 4th screw 312 between the motor 301 and the pillar construction, the motor 301 has output End, the output end of the motor 301 is fixed with axle sleeve 304, and one end of the screw rod 302 is assigned into the axle sleeve 304, described Bolt 313 is combined between screw rod 302 and the axle sleeve 304, the other end of the screw rod 302 is assigned into the bearing 303, It is interference fitted between the other end and the bearing 303 of the screw rod 302, travelling nut is combined with the screw rod 302 305, scraper plate 306 is provided with the lower section of the travelling nut 305, the scraper plate 306 is arranged at the front position of the baffle plate 203 Put place, the vertical baffle plate 203 of the scraper plate 306, the scraper plate 306 is apart from the baffle plate 0.2mm, the plate of the scraper plate 306 Groove 316 is provided with face, the network of rivers 317 was provided with the groove 316, it is described cross the network of rivers 317 and the scraper plate 306 it Between be combined with the first bolt 318;
Guide rod 401 is combined between two pillar constructions, the pillar construction, which has, coordinates the guide rod 401 to use The first mounting seat 402, the 5th screw 411, described are combined between first mounting seat 402 and the guide rod 401 It is combined with the 6th screw 412, the plate face of the scraper plate 306 and is horizontally arranged between one mounting seat 402 and the pillar construction Guide sleeve 326, the guide rod 401 passes through the guide sleeve 326, and the guide rod 401 be arranged in parallel with the screw rod 302, The vertical scraper plate 306 of the guide rod 401, the installation frame 501 of cuboid is provided with the rear of the baffle plate 203, It is left and right at the position of close baffle plate 203 at the top of installation frame 501 to be symmetrically arranged with two pieces of connecting plates 511, the connecting plate The 7th screw 512, bottom surface, rear end face, left surface and the right side of the installation frame 511 are combined between 511 and the baffle plate 203 Backstop 513 is provided with lateral location, the water-carrying groove 215 is relative with the front end face of the installation frame 511.
The present apparatus is fixed at the riverbank of both sides by columns assemblies, and columns assemblies carry out internal support by steel reinforcement cage, lead to Cross concrete structure and carry out external support, with preferably structural strength, the obstruction in river course is then realized by baffle plate, baffle plate Extend partially on the water surface, can be on the water surface or underwater forms effective obstruction partly below the water surface, it is to avoid or subtract Few rubbish is passed through, it is ensured that river course it is clean and tidy, the height of baffle plate can be adjusted by the movement of sliding sleeve, pass through to adjust and slide The cooperation position of set and pipe fitting can reach the effect of controllable register height so that the present apparatus can carry out flexible according to water level Regulation, the movement of scraper plate can be driven by the rotation of screw rod, controlled, will can be intercepted on river surface by the rotating of motor Rubbish dial at the position of riverbank, facilitate river course to clear up workman and salvaging processing carried out to rubbish, effectively safeguard that river course is whole It is clean.
A preferred embodiment in the present invention, the rear end face of the sliding sleeve 204 is provided with the equipped pipe fitting 201 It is described to match somebody with somebody interference fits between tankage 224 and the pipe fitting 201 with tankage 224.
Covered with protective cover 6 between the top of two pillar constructions, the bearing 303, motor 301 and screw rod 302 are coated on the inside of the protective cover 6, and the bottom of the protective cover 6 is provided with cell body 601, a left side for the cell body 601, The first connecting plate 602 is provided with right two side positions, the 8th is combined between first connecting plate 602 and the pillar construction Screw 611, the protective cover 6 is stainless steel cage, and the surface of the protective cover, which is brushed, anticorrosive paint.
The steel reinforcement cage 101 include it is more than two pour ring 121, it is more than two described to pour ring 121 and go to upper and lower position Put and be arranged in parallel, it is more than two it is described pour to be vertically provided between ring 121 pour bar 131, it is described to pour the annular of bar 131 It is provided with more than two, described to pour bar 131 and described pour is combined with steel wire 141 between ring 121, the ring 121 that pours is Obtained after the bending of reinforcing bar circular arc, the bar 131 that pours is arranged at described pour at the inner ring position of ring 121.
The length of the screw rod 302 is 2000mm.
The baffle plate 203 is steel plate or PVC plastic flitch, when the baffle plate 203 is using steel plate, the thickness of the baffle plate 203 Spend for 5mm, when the baffle plate 203 is using PVC plastic flitch, the thickness of the baffle plate 203 is 25mm.
The height of the baffle plate 203 is 1000mm, and the height that the baffle plate 203 is extended to outside the water surface is 200mm.
The concrete structure by following mass percent material composition:Sand 25%, portland cement 18%, stone 22%th, stone flour 20% and flyash 15%.
The sand uses particle diameter for 0.35mm fine sand, and the stone flour uses particle diameter for 0.5mm middle sand powder, described Flyash is using the cinder below the mesh of particle diameter 60.
The beneficial effects of the invention are as follows:
1)Increase the setting stability of the present apparatus by pillar construction, can also form effective in the anxious river course in current end Rubbish is stopped, it is to avoid collapsed, service life 8-20, while complete floating without floating body, though wave in river course compared with It can also efficiently accomplish the obstruction of rubbish greatly;
2)By the height of controllable register, water layer that can be according to residing for rubbish completes to intercept, effectively intercepts and swim on river surface Or rubbish of the sink-float under river surface, the probability that rubbish is passed through is reduced, effectively the clean and tidy of river surface is maintained, it is to avoid water pollution;
3)The rubbish that baffle plate is stopped can be put in order by drive component, by the way that rubbish is put in order to close to riverbank position Place so that river course cleaning workman can realize the salvaging of rubbish on riverbank, without using equipment such as refuse fishing vessels, reduce rubbish The cost of rubbish cleaning;
4)Installation frame is set in the thickness of baffle plate, the small garbage through water-carrying groove can be stored, facilitate the later stage to enter Row is focused on, and the stress of baffle plate can be reduced by water-carrying groove, it is to avoid baffle plate deforms after a long time use.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent is defined.

Claims (9)

1. a kind of river surface processing unit of environmental protection, it is characterised in that:It is symmetricly set in including two at the position of both sides riverbank Pillar construction, barrier assembly is combined between two pillar constructions, is set between the top of two pillar constructions It is equipped with drive component;
The pillar construction includes steel reinforcement cage(101), and pour in the steel reinforcement cage(101)Outside concrete structure(102);
The obstruction component includes two symmetrically arranged pipe fittings(201), the pipe fitting(201)Two ends circular arc to pillar construction Direction is bent, the pipe fitting(201)The angle of bend at two ends is 90 ° ± 0.5 °, the pipe fitting(201)Two ends be provided with peace Fill seat(202), the pipe fitting(201)Assign to the mounting seat(202)It is interior, the mounting seat(202)Outer ring position at set It is equipped with the fixed pipe fitting(201)Screw(211), the screw(211)Annular is provided with more than three, the mounting seat (202)Away from the pipe fitting(201)That one end there is card(212), the card(212)With the mounting seat(202)For Casting integrated formula structure, the card(212)The first screw is combined between the pillar construction(213), first spiral shell Silk(213)Annular is provided with more than three, in two pipe fittings(201)Between be combined with baffle plate(203), the baffle plate (203)Two ends be symmetrically arranged with four sliding sleeves(204), the sliding sleeve(204)Coordinate the pipe fitting(201), the sliding sleeve (204)With the pipe fitting(201)Between be combined with the second screw(214), the baffle plate(203)Plate face on be provided with two with On water-carrying groove(215), the water-carrying groove(215)Through the baffle plate(203);
The drive component includes motor(301)And screw rod(302), bearing is provided with the top of pillar construction described in side (303), the bearing(303)The 3rd screw is combined between the pillar construction(311), the motor(301)It is arranged on The top of pillar construction described in opposite side, the motor(301)The 4th screw is combined between the pillar construction(312), The motor(301)With output end, the motor(301)Output end be fixed with axle sleeve(304), the screw rod(302)'s One end assigns into the axle sleeve(304)It is interior, the screw rod(302)With the axle sleeve(304)Between be combined with bolt(313), institute State screw rod(302)The other end assign into the bearing(303)It is interior, the screw rod(302)The other end and the bearing(303) Between be interference fitted, in the screw rod(302)On be combined with travelling nut(305), in the travelling nut(305)Lower section set It is equipped with scraper plate(306), the scraper plate(306)It is arranged at the baffle plate(203)Anterior position at, the scraper plate(306)Vertically The baffle plate(203), the scraper plate(306)Apart from the baffle plate 0.2mm, the scraper plate(306)Plate face at be provided with groove (316), in the groove(316)Inside it was provided with the network of rivers(317), it is described to cross the network of rivers(317)With the scraper plate(306)Between match somebody with somebody Conjunction has the first bolt(318);
Guide rod is combined between two pillar constructions(401), the pillar construction, which has, coordinates the guide rod (401)First mounting seat(402), first mounting seat(402)With the guide rod(401)Between be combined with the 5th spiral shell Silk(411), first mounting seat(402)The 6th screw is combined between the pillar construction(412), the scraper plate (306)Plate face on be horizontally arranged with guide sleeve(326), the guide rod(401)Through the guide sleeve(326), it is described to lead To bar(401)With the screw rod(302)It is arranged in parallel, the guide rod(401)The vertical scraper plate(306), in the baffle plate (203)Rear be provided with the installation frame of cuboid(501), the installation frame(501)The close baffle plate at top(203) It is left and right at position to be symmetrically arranged with two pieces of connecting plates(511), the connecting plate(511)With the baffle plate(203)Between be combined with 7th screw(512), the installation frame(511)Bottom surface, rear end face, left surface and right flank position at be provided with backstop (513), the water-carrying groove(215)With the installation frame(511)Front end face it is relative.
2. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The sliding sleeve(204)Rear end Face is provided with the equipped pipe fitting(201)Match somebody with somebody tankage(224), it is described to match somebody with somebody tankage(224)With the pipe fitting(201)Between mistake Cross cooperation.
3. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:In two pillar constructions Covered with protective cover between top(6), the bearing(303), motor(301)And screw rod(302)It is coated on the protective cover (6)Inside, the protective cover(6)Bottom be provided with cell body(601), the cell body(601)Arranged on left and right sides position at set It is equipped with the first connecting plate(602), first connecting plate(602)The 8th screw is combined between the pillar construction(611), The protective cover(6)For stainless steel cage, the surface of the protective cover, which is brushed, anticorrosive paint.
4. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The steel reinforcement cage(101)Including It is more than two to pour ring(121), it is more than two described to pour ring(121)Go to upper and lower position to be arranged in parallel, in two or more Described pour ring(121)Between be vertically provided with and pour bar(131), it is described to pour bar(131)Annular is provided with more than two, It is described to pour bar(131)Ring is poured with described(121)Between be combined with steel wire(141), it is described to pour ring(121)For reinforcing bar circular arc Obtained after bending, it is described to pour bar(131)Ring is poured described in being arranged at(121)Inner ring position at.
5. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The screw rod(302)Length For 2000mm ~ 3600mm.
6. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The baffle plate(203)For steel plate Or PVC plastic flitch, when the baffle plate(203)During using steel plate, the baffle plate(203)Thickness be 5mm ~ 15mm, when the gear Plate(203)During using PVC plastic flitch, the baffle plate(203)Thickness be 25mm ~ 45mm.
7. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The baffle plate(203)Height For 300mm ~ 1000mm, the baffle plate(203)The height extended to outside the water surface is not less than 100mm.
8. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The concrete structure is by following The material composition of mass percent:Sand 25% ~ 45%, portland cement 15% ~ 18%, stone 15% ~ 22%, the He of stone flour 15% ~ 20% Flyash 10% ~ 15%.
9. the river surface processing unit of environmental protection according to claim 1, it is characterised in that:The sand use particle diameter for 0.25 ~ 0.35mm fine sand, the stone flour uses particle diameter for 0.25 ~ 0.5mm middle sand powder, and the flyash uses particle diameter 60 Cinder below mesh.
CN201710116203.0A 2017-03-01 2017-03-01 A kind of river surface processing unit of environmental protection Active CN107059820B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710116203.0A CN107059820B (en) 2017-03-01 2017-03-01 A kind of river surface processing unit of environmental protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710116203.0A CN107059820B (en) 2017-03-01 2017-03-01 A kind of river surface processing unit of environmental protection

Publications (2)

Publication Number Publication Date
CN107059820A true CN107059820A (en) 2017-08-18
CN107059820B CN107059820B (en) 2019-02-26

Family

ID=59622069

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710116203.0A Active CN107059820B (en) 2017-03-01 2017-03-01 A kind of river surface processing unit of environmental protection

Country Status (1)

Country Link
CN (1) CN107059820B (en)

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326884A (en) * 2017-08-31 2017-11-07 陈秋菊 River channel cleaning equipment convenient to salvage
CN107524129A (en) * 2017-08-31 2017-12-29 中山市程博工业产品设计有限公司 A kind of efficiently river garbage cleaning equipment
CN107558441A (en) * 2017-09-12 2018-01-09 国家电网公司 A kind of trash rack sewage cleaning device
CN107587491A (en) * 2017-08-31 2018-01-16 陈秋菊 River surge garbage cleaning equipment
CN107600792A (en) * 2017-08-31 2018-01-19 中山诺顿科研技术服务有限公司 A kind of rubbish marine salvage equipment
CN107593576A (en) * 2017-10-30 2018-01-19 天津市益多利来水产养殖有限公司 A kind of culture of Penaeus vannamei system of removing contamination
CN108517853A (en) * 2018-05-02 2018-09-11 项正 A kind of river course clear up device that stability is good
CN108867563A (en) * 2018-07-24 2018-11-23 环境保护部华南环境科学研究所 A kind of environmental protection irrigation canals and ditches sundries retention device
CN109019719A (en) * 2018-09-20 2018-12-18 谭沛卿 Suspended matter strainer in a kind of cesspool
CN109663762A (en) * 2019-01-21 2019-04-23 中国人民武装警察部队海警学院 A kind of anticollision conservancy trash machine structure of port engineering
CN110984096A (en) * 2019-11-22 2020-04-10 徐州工程学院 Automatic change river course rubbish fishing device
CN111335284A (en) * 2020-03-10 2020-06-26 郑素花 Continuous river dirt collecting and cleaning system
CN111350405A (en) * 2020-03-12 2020-06-30 山东理工职业学院 Ecological environment wetland protection device
CN112160294A (en) * 2020-10-06 2021-01-01 安徽省萧县黄河故道园艺场 Small-size reservoir dam rubbish cleaning device
CN113957864A (en) * 2021-10-14 2022-01-21 易甲贵 Debris cleaning device in ditch for hydraulic engineering irrigation
CN115125920A (en) * 2022-07-11 2022-09-30 临沂市生态环境局临沭县分局 Be used for river course sewage to administer cleaning device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6117336A (en) * 1998-02-20 2000-09-12 Sachse; Marvin H. Self-cleaning water powered helix boom
CN205576877U (en) * 2016-03-25 2016-09-14 诸暨天昊环保设备有限公司 River course cuts dirty automatic lifting device

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6117336A (en) * 1998-02-20 2000-09-12 Sachse; Marvin H. Self-cleaning water powered helix boom
CN205576877U (en) * 2016-03-25 2016-09-14 诸暨天昊环保设备有限公司 River course cuts dirty automatic lifting device

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107600792B (en) * 2017-08-31 2019-08-16 中山诺顿科研技术服务有限公司 A kind of rubbish marine salvage equipment
CN107524129A (en) * 2017-08-31 2017-12-29 中山市程博工业产品设计有限公司 A kind of efficiently river garbage cleaning equipment
CN107587491A (en) * 2017-08-31 2018-01-16 陈秋菊 River surge garbage cleaning equipment
CN107600792A (en) * 2017-08-31 2018-01-19 中山诺顿科研技术服务有限公司 A kind of rubbish marine salvage equipment
CN107326884A (en) * 2017-08-31 2017-11-07 陈秋菊 River channel cleaning equipment convenient to salvage
CN107524129B (en) * 2017-08-31 2019-09-24 中山市程博工业产品设计有限公司 A kind of efficiently river garbage cleaning equipment
CN107587491B (en) * 2017-08-31 2019-08-23 陈秋菊 River surge garbage cleaning equipment
CN107326884B (en) * 2017-08-31 2019-06-04 陈秋菊 River channel cleaning equipment convenient to salvage
CN107558441A (en) * 2017-09-12 2018-01-09 国家电网公司 A kind of trash rack sewage cleaning device
CN107558441B (en) * 2017-09-12 2022-11-04 国家电网公司 Trash rack filth cleaning device
CN107593576A (en) * 2017-10-30 2018-01-19 天津市益多利来水产养殖有限公司 A kind of culture of Penaeus vannamei system of removing contamination
CN108517853A (en) * 2018-05-02 2018-09-11 项正 A kind of river course clear up device that stability is good
CN108867563A (en) * 2018-07-24 2018-11-23 环境保护部华南环境科学研究所 A kind of environmental protection irrigation canals and ditches sundries retention device
CN109019719A (en) * 2018-09-20 2018-12-18 谭沛卿 Suspended matter strainer in a kind of cesspool
CN109019719B (en) * 2018-09-20 2021-08-24 南京幸庄科技创新产业园管理有限公司 Device is dragged for to suspended solid in sewage pond
CN109663762A (en) * 2019-01-21 2019-04-23 中国人民武装警察部队海警学院 A kind of anticollision conservancy trash machine structure of port engineering
CN110984096A (en) * 2019-11-22 2020-04-10 徐州工程学院 Automatic change river course rubbish fishing device
CN111335284A (en) * 2020-03-10 2020-06-26 郑素花 Continuous river dirt collecting and cleaning system
CN111335284B (en) * 2020-03-10 2021-08-06 山东水总有限公司 Continuous river dirt collecting and cleaning system
CN111350405A (en) * 2020-03-12 2020-06-30 山东理工职业学院 Ecological environment wetland protection device
CN112160294A (en) * 2020-10-06 2021-01-01 安徽省萧县黄河故道园艺场 Small-size reservoir dam rubbish cleaning device
CN113957864A (en) * 2021-10-14 2022-01-21 易甲贵 Debris cleaning device in ditch for hydraulic engineering irrigation
CN115125920A (en) * 2022-07-11 2022-09-30 临沂市生态环境局临沭县分局 Be used for river course sewage to administer cleaning device
CN115125920B (en) * 2022-07-11 2024-03-22 临沂市生态环境局临沭县分局 Be used for river course sewage treatment cleaning device

Also Published As

Publication number Publication date
CN107059820B (en) 2019-02-26

Similar Documents

Publication Publication Date Title
CN107059820A (en) A kind of river surface processing unit of environmental protection
CN103964547B (en) Method for removing oxidation ditch scum
CN112593534B (en) Hydraulic engineering is with floating rubbish intercepting device
CN205307897U (en) A central transmission inhales mud scraper for two heavy ponds
CN206174086U (en) Concrete pump washing wastewater recovery unit
CN106493144B (en) A kind of refuse disposal installation and installation method for gaolu wetland
CN203876958U (en) Movable building water foundation with shock resistance, wind resistance and flood control
CN109356099A (en) A kind of river blocks dirty equipment
CN115300956A (en) Municipal administration sewage is sewage purification unit for sewage pipe network
CN112009434B (en) Automatic flushing structure for environment-friendly and energy-saving construction site engineering truck
CN115324184A (en) A desilting equipment for hydraulic engineering pipeline
CN206385459U (en) A kind of portable bridge cleaning device
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
KR20150007271A (en) Friendly eco-friendly water purification system that recovers river ecosystem while producing electricity using eco-friendly multifunctional movable water gate composed of eco-friendly eco-friendly method
CN215252718U (en) Hydraulic engineering is with high-efficient fence of decontaminating
CN215166450U (en) Automatically cleaning sewage treatment pond
CN211395510U (en) Road and bridge guardrail belt cleaning device
CN218713181U (en) Basic waterproof device
CN218713203U (en) Hydraulic engineering construction drainage device
CN221761220U (en) Dual-purpose pipeline system for pump washing water and building garbage collection in super high-rise construction
CN215165195U (en) Wading retaining wall water filtering layer
CN110847172B (en) Multi-ring multi-hole construction device for cutting unset cement concrete pile head
CN212561453U (en) Water trap for hydraulic engineering
CN210331773U (en) Concrete tailing classified recovery system for super high-rise building
CN213978849U (en) Pipeline for hydraulic engineering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190118

Address after: 528000 Fengjian Avenue, Fengjian Village Committee, Xingtan Town, Shunde District, Foshan City, Guangdong Province

Applicant after: Guangdong Shengyefang Environmental Management Co., Ltd.

Address before: 311418 Caijiawu Village 402, Lingqiao Town, Fuyang District, Hangzhou City, Zhejiang Province

Applicant before: Cai Haichao

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant