CN107052324A - A kind of attachment structure of tundish to crystallizer - Google Patents

A kind of attachment structure of tundish to crystallizer Download PDF

Info

Publication number
CN107052324A
CN107052324A CN201710277774.2A CN201710277774A CN107052324A CN 107052324 A CN107052324 A CN 107052324A CN 201710277774 A CN201710277774 A CN 201710277774A CN 107052324 A CN107052324 A CN 107052324A
Authority
CN
China
Prior art keywords
oxidation
ring
inflation ring
tundish
inflation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710277774.2A
Other languages
Chinese (zh)
Other versions
CN107052324B (en
Inventor
王书常
杜雯雯
王德文
许伟华
张显炜
王利
周洁敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huzhou Yongxing Special Stainless Steel Co ltd
Original Assignee
YONGXING SPECIAL STAINLESS STEEL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YONGXING SPECIAL STAINLESS STEEL CO Ltd filed Critical YONGXING SPECIAL STAINLESS STEEL CO Ltd
Priority to CN201710277774.2A priority Critical patent/CN107052324B/en
Publication of CN107052324A publication Critical patent/CN107052324A/en
Application granted granted Critical
Publication of CN107052324B publication Critical patent/CN107052324B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/502Connection arrangements; Sealing means therefor
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B22CASTING; POWDER METALLURGY
    • B22DCASTING OF METALS; CASTING OF OTHER SUBSTANCES BY THE SAME PROCESSES OR DEVICES
    • B22D41/00Casting melt-holding vessels, e.g. ladles, tundishes, cups or the like
    • B22D41/50Pouring-nozzles
    • B22D41/58Pouring-nozzles with gas injecting means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Continuous Casting (AREA)
  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The invention belongs to field of steel-making, and in particular to a kind of attachment structure of tundish to crystallizer.Including being connected to the upper hose with filling pipe end of tundish bottom, on crystallizer and upper end mouthpiece cover is connected to the downcomer with collector nozzle of the upper hose bottom outside, also include the correspondence upper hose and a circle seam top winding and anti-oxidation inflation ring with hollow pipe cavity to be formed is socketed with the downcomer, it is provided with the inside of the anti-oxidation inflation ring outside some ventholes, outside and is connected with snorkel.Hard swing pipe of the connection with the tube chamber communicated with the hollow pipe cavity of the anti-oxidation inflation ring on the outside of the anti-oxidation inflation ring, the snorkel is connected to outer end of the hard swing pipe away from the anti-oxidation inflation ring and supplied gas by the tube chamber of snorkel for anti-oxidation inflation ring.By carrying out sending argon gas around anti-oxidation inflation ring abutment joint, so as to form the sealing gland starvation of seaming position, and then molten steel is prevented to be oxidized during streaming.

Description

A kind of attachment structure of tundish to crystallizer
Technical field
The invention belongs to field of steel-making, and in particular to a kind of attachment structure of tundish to crystallizer.
Background technology
In steelmaking process tundish to crystallizer send the molten steel to be crystallized when, sealing between the upper and lower mouth of a river of docking compared with Difference, during cast, oxygen enters from abutment joint, so as to cause secondary oxidation to part molten steel, reduces the degree of purity of steel, causes folder Debris content rises, and then influences the quality of product.Particularly when producing titaniferous stainless steel, serious nozzle blocking can be caused Phenomenon, or even the mouth of a river can be caused to block and interrupt cast, cause the waste of molten steel, the yield rate reduction of steel-making.Existing connection Structure member is miscellaneous, and precision Gao Qiugao, cost is very high, and installs inconvenient, while security is poor, poor controllability.And it is existing New-type attachment structure is used primarily on crystallizer, without on the link position of upper collector nozzle, so that original old-fashioned Upper collector nozzle can not ensure sealing gland, the big part of crystallizer will be connected if changing to be changed, and cost is larger.
The content of the invention
The purpose of the present invention is that a kind of attachment structure of tundish to crystallizer is provided to solve the above problems.
The present invention above-mentioned technical purpose technical scheme is that:
A kind of tundish including is connected to the upper hose with filling pipe end of tundish bottom, set to the attachment structure of crystallizer The downcomer with collector nozzle of the upper hose bottom outside, in addition to correspondence institute are connected on crystallizer and upper end mouthpiece cover State upper hose and a circle seam top winding and anti-oxidation inflation ring with hollow pipe cavity to be formed be socketed with the downcomer, It is provided with the inside of the anti-oxidation inflation ring outside some ventholes, outside and is connected with snorkel.
By carrying out sending argon gas around anti-oxidation inflation ring abutment joint, so that the sealing gland starvation of seaming position is formed, And then prevent molten steel to be oxidized during streaming.Supply gas so as to will not be when anti-oxidation inflation ring is installed snorkel outer end Tracheae is pullled on ladle side nearby, operation of components safety is not easy to damage, while controllability is stronger.
Communicated preferably, connecting to have on the outside of the anti-oxidation inflation ring with the hollow pipe cavity of the anti-oxidation inflation ring Tube chamber hard swing pipe, the snorkel is connected to outer end of the hard swing pipe away from the anti-oxidation inflation ring, described The lifting rope for suspending hard swing pipe in midair is fixed with the middle part of hard swing pipe, the outer end of the hard swing pipe is detachably connected with counterweight Block.
Said structure mode causes anti-oxidation inflation ring contraposition, removes convenient, such as bolt hard fixed without others, It is easy to staff's remote-controlled operation, it is safer.Balancing weight not only can be set to removably, while can also be adjustable With weight, an even brandreth basket is such as hung in hard swing pipe outer end, balancing weight is added in brandreth basket, is particularly filled anti-oxidation After compression ring is aligned, balancing weight can be added again in brandreth basket, to reach that correspondence is even closer firm.
Preferably, the anti-oxidation inflation ring top coordinates balancing weight provided with being used on the tundish bottom surface is butted on The fixed high piece or fixed high cover positioned to the anti-oxidation inflation ring.
Fixed high piece upper end is against under tundish, so that the anti-oxidation inflation ring lifted under balancing weight effect is positioned In the height and position of needs.If from fixed high cover, preferably can carry out sealing gland by abutment joint, form argon gas ring one bigger Border.
Opened preferably, the anti-oxidation inflation ring is provided with for the opposite side relative with the side for connecting the hard swing pipe The split ring of mouth, symmetrical centre of the anti-oxidation inflation ring inner side at least adjacent to the two ends of the opening of split ring and two ends is each Provided with a venthole, and the venthole be located at the bottom on the inside of the anti-oxidation inflation ring towards the upper hose with it is described under Water pipe is socketed the circle top seam to be formed and set.
The anti-oxidation inflation ring of the application is split ring, consequently facilitating split ring is set to downcomer by operator's far-end operation On, it is safer away from high-temperature area.
Preferably, the downcomer includes positioned at top and gradually thicker socket section and is connected to set from the bottom to top Connect the straight of section bottom and draw section, the A/F of the split ring is more than the straight diameter for drawing section, outer less than the socket section Footpath.
Preferably, the anti-oxidation inflation ring bottom is less than the centring ring of socket section upper surface external diameter provided with internal diameter Portion, centring ring portion upper surface is provided with limiting platform, and the lateral surface of the socket section is provided with and limiting platform face face The cooperation platform being affixed.
The setting of said structure causes anti-oxidation inflation ring easily can both be set on downcomer, while again can be in set It is stuck in during first-class upper lift due to the change of water pipe external diameter on water pipe, so as to further carry out precisely determining to anti-oxidation inflation ring Position, while aspectant docking, more stablizes in use.
Preferably, being provided with suspension ring in the middle part of the hard swing pipe, the lifting rope is connected with the suspension ring, the lifting rope upper end In the outside wall surface for connecting the tundish;The hard swing pipe outer end is connected with to be fixed on by the opposite two ends being rotarily formed The handle of the both sides of the hard swing pipe vertically, the handle includes the guiding that one end connects hard swing pipe, the other end raises up Portion and the handle portion being connected between guide portion.
The guide portion raised up coordinates handle portion so as to be easy to staff to operate when being operated on the spot, while assembling is also more saved Power.
Preferably, the upper hose extend downward into it is described directly draw in section, it is described socket section on be further opened with through set The bleed hole of section wall is connect, the bleed hole is the inclined hole that ecto-entad is tilted down, and external port is a vertically arranged word Mouthful, provided with the air cavity connected with the hollow pipe cavity in the centring ring portion, the centring ring portion is provided with the correspondence bleed The injection well connected with the air cavity that hole is opened up, it is minimum that the tundish bottom extends below the socket section provided with lower extension The position guiding rod of position leads a part, and the hard swing pipe sidepiece correspondence is described to be led a part and be provided with towards downcomer side Opening and up/down perforation with the position guiding rod coordinate socket draw a groove.
Position guiding rod coordinates with drawing a groove, it is ensured that bleed hole is corresponding with the injection well in centring ring portion accurate.1-shaped open is set The required precision for reducing bleed hole and injection well contraposition is put, production and the convenience used is improved.And molten steel will not be from Overflow in bleed hole.
Sealing ring can be provided with platform is coordinated, the external port in bleed hole is located at below the sealing ring, at the top of 1-shaped open Should be local upwards beyond the bottom surface of sealing ring, it is ensured that effectively contraposition is supplied gas.
Preferably, the position guiding rod bottom is from top to bottom diminishing boot segment, the position guiding rod is along described hard The groove insied width that a groove is overlooked draws described in being equal in the projection width of matter swing pipe axial direction.
Said structure, which had both facilitated position guiding rod and drawn a groove, to be aligned, while by position guiding rod with drawing the engaging of a groove finally, very Easily just it is transferred to level.It ensure that supplying gas comprehensively in the middle part of socket section so that upper collector nozzle is docked in the seam to be formed Oxygen fully driven away comprehensively.And the sealing gland at the top of cooperation seam, it is ensured that catch up with oxygen to be followed by sewing what feeding came Ar gas environment is surrounded.
Preferably, the docking port of the correspondence hollow pipe cavity and hard swing pipe is provided with even gas in the anti-oxidation inflation ring Baffle plate, the even gas baffle plate extends along the hollow pipe cavity to both sides to be extended;It is provided with the top of the anti-oxidation inflation ring and is butted on institute The fixed height for coordinating balancing weight to position the anti-oxidation inflation ring stated on tundish bottom surface covers, and the fixed height covers edge Edge, which is enclosed, on the anti-oxidation inflation ring sets, and cover wall top offers some passages, the passage;The fixed height covers and anti- The corresponding one end of oxidation inflation ring can be pushed away by push pedal provided with retraction stretches the opening of filling up the anti-oxidation inflation ring The pars contractilis of vacant locations, the pars contractilis rear end is provided with the push pedal outwards paid, and the pars contractilis correspondence is described anti-oxidation to fill The position of compression ring is socketed on outside the anti-oxidation inflation ring and inner side offers venthole.
Determining high cover more fully can carry out comprehensive gas shield by abutment joint environment, and causing for pars contractilis is higher to sealing gland requirement When can be formed one closure anti-oxidation inflation ring so that further improve sealing gland.Pars contractilis is without function of supplying gas, also not with preventing The connection of inflation ring inner chamber is aoxidized, so as to ensure that anti-oxidation inflation ring is supplied gas uniformly.Track is set in inflation ring, then passes through push pedal Promotion releases pars contractilis along track.
In summary, the invention has the advantages that:
1st, by carrying out sending argon gas around anti-oxidation inflation ring abutment joint, so as to form the sealing gland starvation of seaming position, enter And prevent molten steel to be oxidized during streaming.
2nd, the setting of the application structure causes anti-oxidation inflation ring easily can both be set on downcomer, while again can be with It is stuck in when covering and being lifted on first-class due to the change of water pipe external diameter on water pipe, so as to further be carried out to anti-oxidation inflation ring accurate Positioning, while aspectant docking, more stablizes in use.
3rd, the application is simple in construction, easy to process, and cost is low, and using effect is good, uses safety.
Brief description of the drawings:
Fig. 1 is the application structural representation;
Fig. 2 is anti-oxidation inflation ring structural representation one;
Fig. 3 is anti-oxidation inflation ring structural representation two;
Fig. 4 is the structural representation of embodiment two;
Fig. 5 is the application structural representation with bleed hole;
Fig. 6 is the inflation ring structural representation with contraction flow region;
Fig. 7 is hard swing pipe structural representation;
Fig. 8 is position guiding rod and draws a slot structure schematic diagram.
Embodiment
The present invention is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only explanation of the invention, and it is not limitation of the present invention, those skilled in the art The modification without creative contribution can be made to the present embodiment as needed after this specification is read, but as long as in this hair All protected in bright right by Patent Law.
Embodiment one:
A kind of tundish to crystallizer attachment structure, including be connected to the bottom of tundish 1 the upper hose 2 with filling pipe end, On crystallizer and upper end mouthpiece cover is connected to the downcomer 4 with collector nozzle of the upper hose bottom outside, in addition to pair It is answering that the upper hose is socketed winding at the top of the circle seam to be formed with the downcomer and fill with the anti-oxidation of hollow pipe cavity It is provided with the inside of compression ring 5, the anti-oxidation inflation ring outside some ventholes, outside and is connected with snorkel 6.
By carrying out sending argon gas around anti-oxidation inflation ring abutment joint, so that the sealing gland starvation of seaming position is formed, And then prevent molten steel to be oxidized during streaming.
Connection is with the tube chamber communicated with the hollow pipe cavity of the anti-oxidation inflation ring on the outside of the anti-oxidation inflation ring Hard swing pipe 61, the snorkel is connected to outer end of the hard swing pipe away from the anti-oxidation inflation ring.
The lifting rope 62 for suspending hard swing pipe in midair is fixed with the middle part of the hard swing pipe, the outer end of the hard swing pipe is connected with Balancing weight 63.Suspension ring are provided with the middle part of the hard swing pipe, the lifting rope is connected with the suspension ring.
Said structure mode causes anti-oxidation inflation ring contraposition, removes convenient, such as bolt hard fixed without others, It is easy to staff's remote-controlled operation, it is safer.
The anti-oxidation inflation ring top coordinates balancing weight to described anti-provided with being used on the tundish bottom surface is butted on Fixed high piece 65 or fixed high cover that oxidation inflation ring is positioned.
Fixed high piece upper end is against under tundish, so that the anti-oxidation inflation ring lifted under balancing weight effect is positioned In the height and position of needs.If from fixed high cover, preferably can carry out sealing gland by abutment joint, form argon gas ring one bigger Border.
The anti-oxidation inflation ring is the opening that the opposite side relative with connecting the side of the hard swing pipe is provided with opening One is respectively provided with the inside of ring, the anti-oxidation inflation ring at least adjacent to the two ends of opening of split ring and the symmetrical centre at two ends to go out Stomata, and the bottom that the venthole is located on the inside of the anti-oxidation inflation ring is socketed towards the upper hose and the downcomer The circle top seam formed is set.
The anti-oxidation inflation ring of the application is split ring, consequently facilitating split ring is set to downcomer by operator's far-end operation On, it is safer away from high-temperature area.
The downcomer includes positioned at top and gradually thicker socket section 41 and is connected to socket section bottom from the bottom to top The straight of portion draws section 42, and the A/F of the split ring is more than the straight diameter for drawing section, less than the external diameter of the socket section.
Embodiment two:
Unlike the embodiments above be in is less than outside the socket section upper surface in the anti-oxidation inflation ring bottom provided with internal diameter The spacing collar portion 7 in footpath.
Centring ring portion upper surface is provided with limiting platform 71, the lateral surface of the socket section be provided with it is described spacing flat The cooperation platform that table top face is affixed.
The setting of said structure causes anti-oxidation inflation ring easily can both be set on downcomer, while again can be in set It is stuck in during first-class upper lift due to the change of water pipe external diameter on water pipe, so as to further carry out precisely determining to anti-oxidation inflation ring Position, while aspectant docking, more stablizes in use.
Embodiment three:
Unlike the embodiments above be in the middle part of the hard swing pipe is provided with suspension ring, and the lifting rope is connected with the suspension ring, institute Lifting rope upper end is stated to connect in the outside wall surface of the tundish;The hard swing pipe outer end is connected with opposite by what is be rotarily formed Two ends are fixed on the handle of the both sides of the hard swing pipe vertically, and the handle includes one end connection hard swing pipe, the other end The guide portion 611 raised up and the handle portion 612 being connected between guide portion.
Example IV:
It is unlike the embodiments above be in the upper hose extend downward into it is described directly draw in section, it is described socket section on also open up Have through the bleed hole 401 of socket section wall, the bleed hole is the inclined hole that ecto-entad is tilted down, and external port is vertical Provided with the air cavity that connect with the hollow pipe cavity in the 1-shaped open of setting, the centring ring portion, the centring ring portion is provided with pair The injection well 501 connected with the air cavity that the bleed hole is opened up is answered, the tundish bottom is extended below provided with lower extension The position guiding rod 81 of the socket section extreme lower position leads a part, and the hard swing pipe sidepiece correspondence is described to lead a part provided with having Have and draw a groove 82 towards what the side opening of downcomer one and up/down perforation and the position guiding rod coordinated socket.The position guiding rod bottom For diminishing boot segment 811 from top to bottom, projection width of the position guiding rod along hard swing pipe axial direction is equal to described Draw the groove insied width that a groove is overlooked.
Position guiding rod coordinates with drawing a groove, it is ensured that bleed hole is corresponding with the injection well in centring ring portion accurate.1-shaped open is set The required precision for reducing bleed hole and injection well contraposition is put, production and the convenience used is improved.
Sealing ring can be provided with platform is coordinated, the external port in bleed hole is located at below the sealing ring, at the top of 1-shaped open Should be local upwards beyond the bottom surface of sealing ring, it is ensured that effectively contraposition is supplied gas.
Said structure, which had both facilitated position guiding rod and drawn a groove, to be aligned, while by position guiding rod with drawing the engaging of a groove finally, very Easily just it is transferred to level.It ensure that supplying gas comprehensively in the middle part of socket section so that upper collector nozzle is docked in the seam to be formed Oxygen fully driven away comprehensively.And the sealing gland at the top of cooperation seam, it is ensured that catch up with oxygen to be followed by sewing what feeding came Ar gas environment is surrounded.
Embodiment five:
It is unlike the embodiments above be in the correspondence hollow pipe cavity in the anti-oxidation inflation ring and hard swing pipe dock Mouth is provided with even gas baffle plate 502, and the even gas baffle plate extends along the hollow pipe cavity to both sides to be extended;The anti-oxidation inflation ring top Portion is provided with the fixed height for coordinating balancing weight to position the anti-oxidation inflation ring being butted on the tundish bottom surface and covered, Fixed high cover edge along along the anti-oxidation inflation ring, which is enclosed, to be set, and cover wall top offers some passages, the passage;Institute State fixed high cover one end corresponding with anti-oxidation inflation ring and stretched provided with being pushed away by push pedal of being retracted and fill up described and anti-oxidation fill The pars contractilis 9 of the vacant locations of the opening of compression ring, the pars contractilis rear end is provided with the push pedal outwards paid, the pars contractilis correspondence The position of the anti-oxidation inflation ring is socketed on outside the anti-oxidation inflation ring.Even gas plate washer is located at the middle part of hollow pipe cavity, and Its height is less than the hollow pipe cavity diameter.
Determining high cover more fully can carry out comprehensive gas shield by abutment joint environment, and causing for pars contractilis is higher to sealing gland requirement When can be formed one closure anti-oxidation inflation ring so that further improve sealing gland.Pars contractilis is without function of supplying gas, also not with preventing The connection of inflation ring inner chamber is aoxidized, so as to ensure that anti-oxidation inflation ring is supplied gas uniformly.Track is set in inflation ring, then passes through push pedal Promotion releases pars contractilis along track.
Inflation ring is set to by aperture position during installation and directly drawn in section, then under lifting rope point action, balancing weight Under effect, and lift on fulcrum in conjunction with handle manpower effect inflation ring, position guiding rod and draws the contraposition socket of groove, inflation ring after Continuous upper lift, in position guiding rod with drawing in the presence of a groove gradually engages so that bleed hole is aligned with injection well, inflation ring is installed in place. Pars contractilis is can also adjust if needed, pushing is promoted, and pars contractilis fills up opening position and forms a closed loop.
The application is simple in construction, easy to process, and cost is low, and using effect is good, uses safety.

Claims (10)

1. a kind of tundish is to the attachment structure of crystallizer, it is characterised in that:Including being connected to tundish(1)Having for bottom is upper The upper hose at the mouth of a river(2), on crystallizer and upper end mouthpiece cover is connected to the upper hose bottom outside has collector nozzle Downcomer(4), in addition to the correspondence upper hose is socketed to be formed a circle seam top winding with the downcomer and has The anti-oxidation inflation ring of hollow pipe cavity(5), the anti-oxidation inflation ring inner side, which is provided with outside some ventholes, outside, is connected with snorkel (6).
2. attachment structure of a kind of tundish to crystallizer according to claim 1, it is characterised in that:The anti-oxidation inflation Hard swing pipe of the connection with the tube chamber communicated with the hollow pipe cavity of the anti-oxidation inflation ring on the outside of ring(61), the snorkel It is connected in the middle part of outer end of the hard swing pipe away from the anti-oxidation inflation ring, the hard swing pipe and is fixed with hard swing pipe The lifting rope of suspention(62), the outer end of the hard swing pipe is detachably connected with balancing weight(63).
3. attachment structure of a kind of tundish to crystallizer according to claim 2, it is characterised in that:The anti-oxidation inflation Ring top coordinates balancing weight to determining that the anti-oxidation inflation ring is positioned provided with being used on the tundish bottom surface is butted on High piece(65)Or fixed high cover.
4. attachment structure of a kind of tundish to crystallizer according to claim 2, it is characterised in that:The anti-oxidation inflation Ring is on the inside of the split ring that the opposite side relative with connecting the side of the hard swing pipe is provided with opening, the anti-oxidation inflation ring Symmetrical centre at least adjacent to the two ends of the opening of split ring and two ends is respectively provided with a venthole, and the venthole is located at institute State the bottom on the inside of anti-oxidation inflation ring and the circle top seam setting to be formed is socketed towards the upper hose and the downcomer.
5. attachment structure of a kind of tundish to crystallizer according to claim 4, it is characterised in that:The downcomer includes Positioned at top and gradually thicker socket section from the bottom to top(41)Draw section with the straight of socket section bottom is connected to(42), it is described to open The A/F of choma is more than the straight diameter for drawing section, less than the external diameter of the socket section.
6. attachment structure of a kind of tundish to crystallizer according to claim 5, it is characterised in that:The anti-oxidation inflation Ring bottom is less than the centring ring portion of socket section upper surface external diameter provided with internal diameter(7), centring ring portion upper surface is provided with limit Bit platform(71), the lateral surface of the socket section is provided with the cooperation platform being affixed with limiting platform face face.
7. attachment structure of a kind of tundish to crystallizer according to claim 3, it is characterised in that:In the hard swing pipe Portion is provided with suspension ring, and the lifting rope is connected with the suspension ring, and the lifting rope upper end is connected in the outside wall surface of the tundish;It is described hard Matter swing pipe outer end is connected with the handle that the both sides of the hard swing pipe vertically are fixed on by the opposite two ends being rotarily formed, The handle includes the guide portion that one end connects hard swing pipe, the other end raises up(611)And it is connected to the handle between guide portion Hand(612).
8. attachment structure of a kind of tundish to crystallizer according to claim 6, it is characterised in that:The upper hose is downward Extend to the bleed hole directly drawn in section, be further opened with running through socket section wall in the socket section(401), the bleed hole The inclined hole tilted down for ecto-entad, and external port is vertically arranged 1-shaped open, in the centring ring portion provided with it is described The air cavity of hollow pipe cavity connection, the centring ring portion opened up provided with the correspondence bleed hole with supplying gas that the air cavity is connected Hole(501), the tundish bottom provided with it is lower extension extend below it is described socket section extreme lower position position guiding rod(81)Lead position Part, hard swing pipe sidepiece correspondence is described lead a part provided with have towards the side opening of downcomer one and up/down perforation with The position guiding rod coordinates what is be socketed to draw a groove(82).
9. attachment structure of a kind of tundish to crystallizer according to claim 8, it is characterised in that:The position guiding rod bottom For diminishing boot segment from top to bottom(811), projection width of the position guiding rod along hard swing pipe axial direction is equal to institute State and draw the groove insied width that a groove is overlooked.
10. attachment structure of a kind of tundish to crystallizer according to claim 8, it is characterised in that:It is described anti-oxidation to fill The docking port of the correspondence hollow pipe cavity and hard swing pipe is provided with even gas baffle plate in compression ring(502), the even gas baffle plate is described in Hollow pipe cavity extends to both sides to be extended;The anti-oxidation inflation ring top coordinates provided with being used on the tundish bottom surface is butted on Enclose on the fixed height cover that balancing weight is positioned to the anti-oxidation inflation ring, fixed high cover edge along along the anti-oxidation inflation ring If, and cover wall top offers some passages, the passage;The fixed height covers one end corresponding with anti-oxidation inflation ring and set Have retraction can push away the pars contractilis for the vacant locations for stretching the opening for filling up the anti-oxidation inflation ring by push pedal(9), institute State pars contractilis rear end and be provided with the push pedal outwards paid, the position of the pars contractilis correspondence anti-oxidation inflation ring is socketed on described Outside anti-oxidation inflation ring.
CN201710277774.2A 2017-04-25 2017-04-25 Connecting structure from tundish to crystallizer Active CN107052324B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710277774.2A CN107052324B (en) 2017-04-25 2017-04-25 Connecting structure from tundish to crystallizer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710277774.2A CN107052324B (en) 2017-04-25 2017-04-25 Connecting structure from tundish to crystallizer

Publications (2)

Publication Number Publication Date
CN107052324A true CN107052324A (en) 2017-08-18
CN107052324B CN107052324B (en) 2023-01-31

Family

ID=59604401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710277774.2A Active CN107052324B (en) 2017-04-25 2017-04-25 Connecting structure from tundish to crystallizer

Country Status (1)

Country Link
CN (1) CN107052324B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107737914A (en) * 2017-12-06 2018-02-27 江苏永钢集团有限公司 It is a kind of to be used to prevent molten steel in the argon seal ring of casting process secondary oxidation

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000052004A (en) * 1998-08-14 2000-02-22 Nippon Steel Corp Molten steel continuous casting method
CN201287197Y (en) * 2008-09-19 2009-08-12 济南麦哈勃冶金技术开发有限公司 Tundish metering nozzle gas protection pouring quick-changing device
CN202070730U (en) * 2011-05-25 2011-12-14 济南麦哈勃冶金技术开发有限公司 Metering nozzle gas protection pouring quick-change device
CN102416452A (en) * 2011-12-13 2012-04-18 北京科技大学 Device for continuous casting protective casting and method for protective casting
CN203565856U (en) * 2013-11-07 2014-04-30 广东韶钢松山股份有限公司 Long nozzle locating and argon blowing ring
CN204108308U (en) * 2014-09-22 2015-01-21 莱芜钢铁集团有限公司 The device of the large water-coating port sealed argon-blowing protection of continuous casting
CN206662261U (en) * 2017-04-25 2017-11-24 永兴特种不锈钢股份有限公司 A kind of attachment structure of tundish to crystallizer

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000052004A (en) * 1998-08-14 2000-02-22 Nippon Steel Corp Molten steel continuous casting method
CN201287197Y (en) * 2008-09-19 2009-08-12 济南麦哈勃冶金技术开发有限公司 Tundish metering nozzle gas protection pouring quick-changing device
CN202070730U (en) * 2011-05-25 2011-12-14 济南麦哈勃冶金技术开发有限公司 Metering nozzle gas protection pouring quick-change device
CN102416452A (en) * 2011-12-13 2012-04-18 北京科技大学 Device for continuous casting protective casting and method for protective casting
CN203565856U (en) * 2013-11-07 2014-04-30 广东韶钢松山股份有限公司 Long nozzle locating and argon blowing ring
CN204108308U (en) * 2014-09-22 2015-01-21 莱芜钢铁集团有限公司 The device of the large water-coating port sealed argon-blowing protection of continuous casting
CN206662261U (en) * 2017-04-25 2017-11-24 永兴特种不锈钢股份有限公司 A kind of attachment structure of tundish to crystallizer

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107737914A (en) * 2017-12-06 2018-02-27 江苏永钢集团有限公司 It is a kind of to be used to prevent molten steel in the argon seal ring of casting process secondary oxidation

Also Published As

Publication number Publication date
CN107052324B (en) 2023-01-31

Similar Documents

Publication Publication Date Title
CN206662261U (en) A kind of attachment structure of tundish to crystallizer
CN107052324A (en) A kind of attachment structure of tundish to crystallizer
CN202155494U (en) Stuffing sand pouring device
CN106120784A (en) A kind of ocean platform shoe
CN203599517U (en) Molten metal die casting device
CN203124731U (en) Long nozzle manipulator of square billet continuous casting steel ladle
CN202591589U (en) Feeding device for ladle stuffing sand
CN102642016A (en) Ladle drainage sand adding device and drainage sand adding method thereof
CN212761102U (en) Overflow-proof ladle long nozzle for continuous casting full-protection pouring
CN210676934U (en) Easily empty ladle structure
CN210877531U (en) Argon protective cover for pouring special steel
CN208728673U (en) A kind of bottom water outlet of ladle, ventilating structure
CN105945274A (en) Continuous casting steel ladle no-drainage casting device
CN110345760B (en) Flow guide device for aluminum ingot overturning melting furnace
CN205662533U (en) Prevent overtum equipment of ladle refining furnace water cooled cover and lift stand
CN217205464U (en) Folding umbrella type fire receiving bucket for welding operation of primary high-altitude steel structure
CN207209759U (en) One kind lifting copper plate of crystallizer special hanger
CN212443239U (en) Ladle is with drainage sand instrument of adding sand
CN205990892U (en) A kind of kelly bar draws and send device
CN113814389B (en) Ladle drainage sand receiving device of continuous casting ladle turret and using method thereof
CN205519612U (en) Quantitative casting machine is used in casting
CN205414390U (en) Improve row's sediment device of middle bao lian rate of watering of conticaster
CN205341909U (en) A seat ground package for cast iron pouring usefulness
CN218611663U (en) Lifting type capping and uncapping machine with upward overturning and avoiding interdigital mechanism
CN204957409U (en) Bottom discharge formula connects storage bucket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 313000, Huzhou Huzhou economic and Technological Development Zone, Zhejiang province Yongxing special stainless steel Limited by Share Ltd

Applicant after: Yongxing special material technology Co.,Ltd.

Address before: 313000, Huzhou Huzhou economic and Technological Development Zone, Zhejiang province Yongxing special stainless steel Limited by Share Ltd

Applicant before: YONGXING SPECIAL STAINLESS STEEL Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230105

Address after: Building 46, No. 618, Tianshuiqiao Road, Huzhou City, Zhejiang Province, 313000

Applicant after: Huzhou Yongxing Special Stainless Steel Co.,Ltd.

Address before: 313000 Yongxing Special Stainless Steel Co., Ltd., Yangjiabu, Huzhou Economic and Technological Development Zone, Huzhou City, Zhejiang Province

Applicant before: Yongxing special material technology Co.,Ltd.

GR01 Patent grant
GR01 Patent grant