CN107044290A - The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel - Google Patents

The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel Download PDF

Info

Publication number
CN107044290A
CN107044290A CN201710482684.7A CN201710482684A CN107044290A CN 107044290 A CN107044290 A CN 107044290A CN 201710482684 A CN201710482684 A CN 201710482684A CN 107044290 A CN107044290 A CN 107044290A
Authority
CN
China
Prior art keywords
tunnel
slip casting
floral tube
steel floral
casting steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710482684.7A
Other languages
Chinese (zh)
Inventor
张玉芳
王安福
刘广宇
李健
袁坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Engineering Research Institute of CARS
Original Assignee
张玉芳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 张玉芳 filed Critical 张玉芳
Priority to CN201710482684.7A priority Critical patent/CN107044290A/en
Publication of CN107044290A publication Critical patent/CN107044290A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/15Plate linings; Laggings, i.e. linings designed for holding back formation material or for transmitting the load to main supporting members
    • E21D11/152Laggings made of grids or nettings

Abstract

A kind of vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel, vertical slip casting steel floral tube is inserted in the range of initial support structure, and extend to tunnel inverted arch top surface;Grouting and reinforcing is carried out to the Rock And Soil in tunnel contour line setting range by slip casting steel floral tube;Slip casting steel floral tube in cut barrel;Slip casting steel floral tube, first branch I-steel, bar-mat reinforcement and advance support are welded together to form an entirety with ductule with U-shaped dowel, integral reinforcing effect is improved.It is an advantage of the invention that:Steel floral tube, the injecting cement paste of spray of molten steel tube end is turned into monocoque structure with first Zhi Xianglian by welding procedure, help to form stable overlying arch ring, solve the Problem of Shallow in tunnel and the biasing problem in tunnel.The vertical slip casting steel floral tube in Tunnel top props up the integral reinforcing method being combined at the beginning of tunnel, is a kind of Tunnel top reinforcement technique with development prospect with advanced technology, economical rationality, the advantage such as quick of constructing.

Description

The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel
Technical field
A kind of vertical slip casting steel floral tube in Tunnel top of present invention design props up the integral reinforcing method being combined at the beginning of tunnel, fits Tunnel reinforcement engineering for highway, railway, mine, municipal administration etc..
Background technology
As China's Large scale construction extends to mountain area, shallow embedding, bias are inevitably run into during tunnel excavation The problem of, solve the method for problem and mainly have surface grouting, the strong supporting measure such as steel tube shed and advanced conduit, these measures in hole It is often independent to implement, it is difficult to reach integral reinforcing effect.
The content of the invention
The present invention props up the integral reinforcing method being combined for a kind of vertical slip casting steel floral tube in Tunnel top at the beginning of tunnel, be Shallow embedding more serious present in tunnel excavation process, bias is preferably solved on traditional construction reinforcement Process ba- sis to ask Topic.
The technical scheme is that:A kind of vertical slip casting steel floral tube in tunnel top props up the integral reinforcing side being combined at the beginning of tunnel Method, it is characterised in that comprise the following steps:
1) the initial support structure construction in tunnel:The initial support structure includes first branch I-steel, bar-mat reinforcement and advanced branch Shield ductule, the construction of initial support structure is carried out according to routine techniques;
2) construction of slip casting steel floral tube:Vertical slip casting steel floral tube is inserted in the range of described initial support structure, and Extend to tunnel inverted arch top surface;
3) grouting and reinforcing is carried out to the Rock And Soil in tunnel contour line setting range by slip casting steel floral tube;
4) slip casting steel floral tube in cut barrel:During tunnel excavation, slip casting steel floral tube is run into, according to steel floral tube cut Terminated line, carries out cut by the slip casting steel floral tube in barrel, its length is intersected a segment length with first branch I-steel, intersects Length by do not influence it is final two lining contour line be defined;
5) weld and form monocoque structure:With U-shaped dowel by slip casting steel floral tube, first branch I-steel, bar-mat reinforcement and Advance support is welded together to form an entirety with ductule, improves integral reinforcing effect.
Described step 3) in, the tunnel contour line setting range of grouting and reinforcing is 5-7m.
Described step 4) in, the length that the cut length of slip casting steel floral tube intersects with first branch I-steel is 10-20cm.
Described step 5) in, U-shaped special reinforcing bar uses φ 25mm spirals, the long 70cm in dowel two ends, bending section It is engaged with the periphery of slip casting steel floral tube.
It is an advantage of the invention that:The technological merit of upright controling slip casting steel floral tube and constructing tunnel initial support is combined, Steel floral tube, the injecting cement paste of spray of molten steel tube end is turned into monocoque structure with first Zhi Xianglian by welding procedure, help to be formed Stable overlying arch ring, not only solves the Problem of Shallow in tunnel but also also solves the biasing problem in tunnel.Erect on Tunnel top The integral reinforcing method being combined is propped up at the beginning of tunnel to slip casting steel floral tube, it is quick etc. excellent with advanced technology, economical rationality, construction Gesture, is a kind of Tunnel top reinforcement technique with development prospect.
Brief description of the drawings
Fig. 1 is the tunnel longitudinal cross-section structural representation of the present invention;
Fig. 2 is the tunnel cross sectional structural representation of the present invention;
Fig. 3 is the enlarged drawing at M in Fig. 1;
Fig. 4 is Fig. 3 top view;
Fig. 5 is a Fig. 4 left side (right side) view;
Fig. 6 is the enlarged drawing at N in Fig. 1;
Fig. 7 is Fig. 6 top view.
Description of symbols in figure:1-U types dowel, 2- I-steel, 3- (Tunnel top is vertical) slip casting steel floral tube, 4- welding Place, 5- advanced tubules, 6- bar-mat reinforcements, 7- (at the beginning of tunnel prop up during) by the steel floral tube of cut, D- steel floral tube cuts terminated line, G- ground, P- tunnels, L1- slip casting steel floral tubes are longitudinally arranged spacing, L2- I-steel arrangement spacing, H-I-steel height, B-work At word steel leg width, A-slip casting tempering pipe and I-steel at vault intersection location, B-slip casting steel floral tube with I-steel in haunch Intersection location.
Embodiment
1) construction of the vertical slip casting steel floral tube 3 in Tunnel top:
Before tunnel in-cavity construction, by performing vertical slip casting steel floral tube 3 on Tunnel top, the insertion of steel floral tube 3 is propped up at the beginning of tunnel In the range of and extend to tunnel inverted arch top surface, added by controlling slip casting to carry out slip casting to the Rock And Soil in the range of tunnel contour line 6m Gu, improve the intensity of Rock And Soil around tunnel.
2) processing of U-shaped special reinforcing bar 1:
Using φ 25mm spirals, the long 70cm in dowel two ends, bending section calculates its radius according to Fig. 2 marks, so Made afterwards of angle bender.
3) slip casting steel floral tube 3 in cut barrel:
During tunnel excavation, slip casting steel floral tube 3 is run into, according to steel floral tube cut terminated line, by barrel Slip casting steel floral tube 3 carries out cut, its length is intersected about 15cm with first branch I-steel 2, and specific length is not to influence final two lining Contour line is defined, to weld.
4) weld and form monocoque structure:
Steel floral tube 3 is welded together with branch I-steel 2 at the beginning of tunnel by U-shaped special reinforcing bar 1, such as run into advanced tubule 5th, bar-mat reinforcement 6 etc. also welds together in the lump, makes monocoque structure.

Claims (4)

1. a kind of vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel, it is characterised in that including with Lower step:
1) the initial support structure construction in tunnel:The initial support structure includes first branch I-steel, bar-mat reinforcement 6 and advance support and used Ductule, the construction of initial support structure is carried out according to routine techniques;
2) construction of slip casting steel floral tube:Vertical slip casting steel floral tube 3 is inserted in the range of described initial support structure, and is extended To tunnel inverted arch top surface;
3) grouting and reinforcing is carried out to the Rock And Soil in tunnel contour line setting range by slip casting steel floral tube;
4) slip casting steel floral tube in cut barrel:During tunnel excavation, slip casting steel floral tube is run into, is terminated according to steel floral tube cut Line, carries out cut by the slip casting steel floral tube in barrel, its length is intersected a segment length, intersecting length with first branch I-steel Degree is not to influence final two linings contour line to be defined;
5) weld and form monocoque structure:With U-shaped dowel by slip casting steel floral tube, first branch I-steel, bar-mat reinforcement and advanced Supporting is welded together to form an entirety with ductule, improves integral reinforcing effect.
2. the vertical slip casting steel floral tube in tunnel top according to claim 1 props up the integral reinforcing method being combined at the beginning of tunnel, its It is characterised by, described step 3) in, the tunnel contour line setting range of grouting and reinforcing is 5-7m.
3. the vertical slip casting steel floral tube in tunnel top according to claim 1 props up the integral reinforcing method being combined at the beginning of tunnel, its It is characterised by, described step 4) in, the length that the cut length of slip casting steel floral tube intersects with first branch I-steel is 10-20cm.
4. the vertical slip casting steel floral tube in tunnel top according to claim 1 props up the integral reinforcing method being combined at the beginning of tunnel, its It is characterised by, described step 5) in, U-shaped special reinforcing bar uses φ 25mm spirals, the long 70cm in dowel two ends, bending section It is engaged with the periphery of slip casting steel floral tube.
CN201710482684.7A 2017-06-22 2017-06-22 The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel Pending CN107044290A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710482684.7A CN107044290A (en) 2017-06-22 2017-06-22 The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710482684.7A CN107044290A (en) 2017-06-22 2017-06-22 The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel

Publications (1)

Publication Number Publication Date
CN107044290A true CN107044290A (en) 2017-08-15

Family

ID=59547450

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710482684.7A Pending CN107044290A (en) 2017-06-22 2017-06-22 The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel

Country Status (1)

Country Link
CN (1) CN107044290A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020248596A1 (en) * 2019-06-13 2020-12-17 河南理工大学 Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321490A (en) * 2006-06-02 2007-12-13 Shimizu Corp Tunnel excavation method
CN104100280A (en) * 2014-07-07 2014-10-15 中冶交通工程技术有限公司 Primary double-wing outrigger support structure and tunnel construction method thereof
CN104165056A (en) * 2014-03-11 2014-11-26 中交一公局厦门工程有限公司 Construction method for excavating water-rich shallow underground excavation tunnel
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN105863677A (en) * 2016-04-12 2016-08-17 中国电建集团成都勘测设计研究院有限公司 Strengthening method for preliminary tunnel support
CN106499413A (en) * 2016-11-19 2017-03-15 中铁十二局集团有限公司 A kind of Shallow-buried section tunnel stratum consolidation construction method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007321490A (en) * 2006-06-02 2007-12-13 Shimizu Corp Tunnel excavation method
CN104165056A (en) * 2014-03-11 2014-11-26 中交一公局厦门工程有限公司 Construction method for excavating water-rich shallow underground excavation tunnel
CN104100280A (en) * 2014-07-07 2014-10-15 中冶交通工程技术有限公司 Primary double-wing outrigger support structure and tunnel construction method thereof
CN104818991A (en) * 2015-03-30 2015-08-05 中铁二十四局集团福建铁路建设有限公司 Construction method of residual slope wash tunnel with shallow cover and unsymmetrical pressure
CN104847374A (en) * 2015-04-24 2015-08-19 长安大学 Soft rock large-deformation tunnel supporting system and construction method thereof
CN105863677A (en) * 2016-04-12 2016-08-17 中国电建集团成都勘测设计研究院有限公司 Strengthening method for preliminary tunnel support
CN106499413A (en) * 2016-11-19 2017-03-15 中铁十二局集团有限公司 A kind of Shallow-buried section tunnel stratum consolidation construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
鲁荣刚;: "超浅埋偏压隧道加固前后施工力学分析" *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020248596A1 (en) * 2019-06-13 2020-12-17 河南理工大学 Protection structure for preventing ground heave caused by tunnel grouting reinforcement and grouting method

Similar Documents

Publication Publication Date Title
CN106351670B (en) A kind of closed pre support tunnel structure
CN104533446A (en) Construction method and structure of two-layer preliminary support for preventing geological disaster of large-section weak surrounding rock tunnel
CN103437795B (en) Longitudinally, quick advanced support method is combined in hoop anchoring
CN105822312A (en) Construction method for earth pressure balance shield construction pressure launching in subway tunnel engineering
CN102979535B (en) Draining type section of jurisdiction is used in a kind of tunnel lining
CN101539021B (en) Road tunnel excavation method
CN111502696A (en) Dense-mesh type advanced support system of underground excavation tunnel and construction method
CN103628885A (en) Tunnel exit cover-excavation construction method of Ultra-shadow buried tunnel
CN205117357U (en) Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN104989434A (en) Method for treating landslide of tunneling working face with pipe penetration combined lagging jacks
CN102587936A (en) Fully-enclosed integral assembly grid concrete support method
CN110005439A (en) A kind of construction method in the nearly excessively leading tunnel of spacing of shield
CN210068174U (en) Large deformation section supporting structure of carbon slate tunnel
CN206830198U (en) The vertical slip casting steel floral tube in tunnel top just props up the integral reinforcing structure being combined with tunnel
CN107044290A (en) The vertical slip casting steel floral tube in tunnel top props up the integral reinforcing method being combined at the beginning of tunnel
CN110424971A (en) The method for handling jacked piles with small section landslide
CN204436407U (en) The structure that the pre-Geological disaster prevention of the double-deck preliminary bracing of a kind of big cross section Support System in Soft Rock Tunnels occurs
CN109372521A (en) New pipe-roof method construction technology and construction pipe suspension device
CN211851855U (en) Roadway supporting structure through argillaceous broken zone
CN102606173A (en) Construction method for treating tunnel deformation segment and accelerating tunneling
CN202215261U (en) Soft soil layer top moving wheel type steel casing for inclined hole construction
CN209115124U (en) Rich water sand tomography tunnel per-fore pouring liquid with small pipe constructing structure
CN209067230U (en) Advanced solid matter ductule loess tunnel is into hole ruggedized construction
CN104832188B (en) Concrete filled steel tube roadside support system used for large-section gob-side entry retaining and support method thereof
CN201896623U (en) Pipe curtain device for penetration of deep lane of coal mine through fault and fracture zone

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20220129

Address after: 100081 Beijing city Haidian District Daliushu Road No. 2

Applicant after: CARS RAILWAY ENGINEERING Research Institute

Address before: 100081 Institute of railway architecture, China Academy of Railway Sciences, No. 2 Daliushu Road, Haidian District, Beijing

Applicant before: Zhang Yufang

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20170815