CN107036798A - A kind of method for the main tension compensator floor loading experiment of drilling well - Google Patents

A kind of method for the main tension compensator floor loading experiment of drilling well Download PDF

Info

Publication number
CN107036798A
CN107036798A CN201710398062.6A CN201710398062A CN107036798A CN 107036798 A CN107036798 A CN 107036798A CN 201710398062 A CN201710398062 A CN 201710398062A CN 107036798 A CN107036798 A CN 107036798A
Authority
CN
China
Prior art keywords
tension compensator
main tension
fix bar
force cell
experiment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710398062.6A
Other languages
Chinese (zh)
Inventor
鲁宁
黄天颖
董利民
刘佳
张桂萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dalian Shipbuilding Industry Co Ltd
Original Assignee
Dalian Shipbuilding Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dalian Shipbuilding Industry Co Ltd filed Critical Dalian Shipbuilding Industry Co Ltd
Priority to CN201710398062.6A priority Critical patent/CN107036798A/en
Publication of CN107036798A publication Critical patent/CN107036798A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of method for the main tension compensator floor loading experiment of drilling well, comprise the following steps:S1, the bottom setting base portion (1) positioned at main tension compensator (7);S2, each You Ding top setting force cell (8) positioned at main tension compensator (7);S3, the upper surface of each force cell (8) placed a upper cover plate part (3) by adjust pad (4) laminating;Top fix bar is designed with the middle part of S4, the upper cover plate part (3);Bottom fix bar is provided with the middle part of the base portion (1);Connected up between the top fix bar and the bottom fix bar by flange (5) in same erect;S5, each oily teeming oil by hydraulic oil inlet (6) to main tension compensator (7) so that the uniform jacking in oil top of the main tension compensator (7);S6, force cell (8), which reach, keeps a period of time after measured value, until completing load test.The invention has the advantages that, experiment has a wide range of application, tests that safely controllable, experiment opportunity is flexible, test procedure is simple, test accuracy is high.

Description

A kind of method for the main tension compensator floor loading experiment of drilling well
Technical field
The present invention relates to field of ocean engineering, more specifically to a kind of suitable for there is brill, well function is adopted The main tension compensator load test method of ocean engineering product.
Background technology
With drilling well, adopt the ocean engineering product of well function, such as self-elevating drilling platform, semisubmersible drilling platform, brill Well ship etc., is provided with auxiliary drill, adopts the main tension compensator of well operations thereon.Derrick system and tension compensator under regular situation Installed on built product after terminating, shipowner may require that actual job of the simulation actual job operating mode to main tension compensator It can be tested, to verify that can main tension compensator meet design requirement after installation.
Conventional test method is:By taking self-elevating drilling platform as an example, main tension compensator is generally arranged near well head, After utilizing cantilever beam sliding overhanging during experiment, special connecting tooling is set on main tension compensator, with being loaded on surface barge Frock is connected, and then will load frock jack-up by the hydraulic cylinder jacking on tension compensator departs from barge, so as to verify master The use validity of tension compensator.This test method applies more in self-elevating drilling platform, because jack-up rigs are flat The cantilever beam and rig floor of platform it is protractile go out main hull, the test tool weight of loading can be placed directly within below main tension compensator Barge on, test it is more convenient.
But for drill ship, because derrick thereon is fixed structure, the centre in hull or platform, under well head Side is the maritime mouth of all round closure, so required during the experiment of main tension compensator can not be placed in below derrick with loading load, this Sample can not just use the method for directly lifting frock weight to carry out the load test of main tension compensator.Semi-submerged platform is with respect to drilling well The external condition that ship completes main tension compensator load test is slightly good, and the stage under water that may be selected completes, and loading frock can be placed Lighter and completed to derrick from side in the middle of floating body on barge, due to being operation under water, therefore to experiment timing, peace The tools such as full strick precaution, performance accuracy have high requirements.Experiment opportunity can only select the increase of stage completion under water to debug work under water first Measure, the extraneous restriction condition of the meteorological sea situation such as influence safety factor wind, wave, stream is relatively more under water, and underwater operation in addition exists Not as accurate in land or depressed place on performance accuracy.
The content of the invention
The present invention, which solves drill ship, can not use the method and the main tension compensator water of semi-submerged platform of directly lifting frock Lower load test by restraining factors it is excessive the problem of.
In order to achieve the above object, the present invention provides one kind and loaded on land using fixed frock is closed, and leads to Cross the test method that sensor reading determines loading load value.Specifically, it is a kind of to be used for the main tension compensator floor loading of drilling well The method of experiment, comprises the following steps:
S1, the bottom setting base portion positioned at main tension compensator;
S2, each You Ding top setting force cell positioned at main tension compensator;
S3, the upper surface of each force cell placed a upper cover plate part by adjust pad laminating;
Top fix bar is designed with the middle part of S4, the upper cover plate part;Bottom is provided with the middle part of the base portion Fix bar;Connected up between the top fix bar and the bottom fix bar by flange in same erect;
S5, by hydraulic oil inlet give tension compensator oily teeming oil so that the oil top of the main tension compensator is equal Even jacking;
S6, force cell, which reach, keeps a period of time after measured value, until completing load test.
Advantages of the present invention:Conventional carry weight test method is changed into by being passed after jacking by dynamometry by the present invention Sensor reading reaches a kind of new test method of test objective, can save lot of experiments material and required test space.Can To implement on land, external condition such as tide when reducing underwater test, restrict with safety factors such as rope, load of platform, test Opportunity is flexibly safe and reliable.Self-elevating drilling platform, semisubmersible drilling platform, the main tension compensator of drill ship can be met to bear Lotus is tested, and has a wide range of application.Load value is determined using force cell reading, it is ensured that experiment precision.
Brief description of the drawings
Fig. 1 is that the frontal planar that drilling well is assembled with main tension compensator floor loading experimental provision with main tension compensator shows It is intended to.
Fig. 2 is when being tested after drilling well is assembled with main tension compensator floor loading experimental provision and main tension compensator Schematic perspective view.
Fig. 3 is frontal planar schematic diagram of the drilling well with main tension compensator floor loading experimental provision base portion.
Fig. 4 is drilling well main tension compensator floor loading experimental provision base portion and facing that tension compensator is assembled Floor map.
Fig. 5 is being opened after drilling well is assembled with main tension compensator floor loading experimental provision base portion and tension compensator The schematic diagram of force cell is installed on force compensating device.
Wherein:1st, base portion;2nd, fastening bolt;3rd, upper cover plate part;4th, adjust pad;5th, flange;6th, hydraulic oil is noted Entrance;7th, main tension compensator;8th, force cell.
Embodiment
As shown in Fig. 1~5, drilling well is divided into base portion 1 with main tension compensator floor loading experimental provision in the present invention With upper cover plate part 3.
The installation of the present invention and experimental method:
Drilling well need to be negative according to the main appearance and size of tension compensator 7 and experiment with main tension compensator floor loading experimental provision The condition particular production such as lotus test bit, base portion of the invention and the position of spacer flanger 5 of upper cover plate part are using fastening Bolt 2 is connected.As shown in Fig. 3, Fig. 5, the base portion of the present invention is first fixed before experiment on special place, it is ensured that during experiment The factor of the influence safety such as displacement is not produced.Main tension compensator is positioned in the base portion fixed, power benefit is being advocated Setting force cell 8 on each hydraulic cylinder of device is repaid, then, upper cover plate part 3 is covered and appropriate in force cell and upper lid The contact surface addition adjust pad 4 of plate part is to keep being horizontally mounted, the connection in the middle of fastening upper cover plate part and base portion Bolt, as shown in Figure 4.
Hydraulic oil is gradually filled by the hydraulic oil inlet 6 reserved in base portion during experiment, makes the slow jack-up in oil top Until top is to capping frock top, the data of active force can be shown by force cell, after display data sum is added Reach after design requirement, kept for a period of time judge whether to meet design requirement by regulation, as shown in Figure 2.
The main tension compensator floor loading experimental rig of the present invention be it is a kind of be connected by screw bolts can closed frock knot Structure.Main tension compensator is placed in inside frock during experiment, frock forms closing space after being bolted fastening, advocated Sensor is set between at the top of the oily top ends and frock of force compensating device, surveying number by sensor after oil top hydraulic cylinder jacking reaches The charge number of test requirements document is met, so as to realize the purpose for completing experiment.The present invention is to the ocean work for boring, adopting well function The main tension compensator experiment of journey product provides a kind of new test method, compared with similar technique, has the following advantages that:Examination Test and have a wide range of application, test that safely controllable, experiment opportunity is flexible, test procedure is simple, test accuracy is high.
The foregoing is only a preferred embodiment of the present invention, but protection scope of the present invention be not limited thereto, Any one skilled in the art in the technical scope of present disclosure, technique according to the invention scheme and its Inventive concept is subject to equivalent substitution or change, should all be included within the scope of the present invention.

Claims (1)

1. a kind of method for the main tension compensator floor loading experiment of drilling well, it is characterised in that comprise the following steps:
S1, the bottom setting base portion (1) positioned at main tension compensator (7);
S2, each You Ding top setting force cell (8) positioned at main tension compensator (7);
S3, the upper surface of each force cell (8) placed a upper cover plate part by adjust pad (4) laminating (3);
Top fix bar is designed with the middle part of S4, the upper cover plate part (3);It is provided with down in the middle part of the base portion (1) Portion's fix bar;Connected up between the top fix bar and the bottom fix bar by flange (5) in same erect;
S5, by hydraulic oil inlet (6) give tension compensator (7) oiling so that the main tension compensator (7) uniformly push up Rise;
S6, force cell (8), which reach, keeps a period of time after measured value, until completing load test.
CN201710398062.6A 2017-05-31 2017-05-31 A kind of method for the main tension compensator floor loading experiment of drilling well Pending CN107036798A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710398062.6A CN107036798A (en) 2017-05-31 2017-05-31 A kind of method for the main tension compensator floor loading experiment of drilling well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710398062.6A CN107036798A (en) 2017-05-31 2017-05-31 A kind of method for the main tension compensator floor loading experiment of drilling well

Publications (1)

Publication Number Publication Date
CN107036798A true CN107036798A (en) 2017-08-11

Family

ID=59539568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710398062.6A Pending CN107036798A (en) 2017-05-31 2017-05-31 A kind of method for the main tension compensator floor loading experiment of drilling well

Country Status (1)

Country Link
CN (1) CN107036798A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296821A (en) * 2019-06-27 2019-10-01 宝鸡石油机械有限责任公司 A kind of wire rope type riser stretcher compensation function experimental rig and test method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0964238A3 (en) * 1998-06-10 2000-04-05 Dr.Ing. h.c.F. Porsche Aktiengesellschaft Test bench for testing exhaust arrangements of a combustion engine
CN102829986A (en) * 2011-06-17 2012-12-19 南京梅山冶金发展有限公司 Jack detection device
CN103308300A (en) * 2013-06-06 2013-09-18 北京大学 Buffer device for super-heavy-load tensile tester
CN203595603U (en) * 2013-10-21 2014-05-14 沈阳仪表科学研究院有限公司 Multifunctional test loading detection machine of horizontal sleeve compensator
CN105424347A (en) * 2015-12-11 2016-03-23 重庆长安空港汽车配件有限责任公司 Jack pressure detection equipment
CN108225648A (en) * 2018-01-12 2018-06-29 四川省泰禾机械有限公司 A kind of spring tensioner assembling test equipment and its application method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0964238A3 (en) * 1998-06-10 2000-04-05 Dr.Ing. h.c.F. Porsche Aktiengesellschaft Test bench for testing exhaust arrangements of a combustion engine
CN102829986A (en) * 2011-06-17 2012-12-19 南京梅山冶金发展有限公司 Jack detection device
CN103308300A (en) * 2013-06-06 2013-09-18 北京大学 Buffer device for super-heavy-load tensile tester
CN203595603U (en) * 2013-10-21 2014-05-14 沈阳仪表科学研究院有限公司 Multifunctional test loading detection machine of horizontal sleeve compensator
CN105424347A (en) * 2015-12-11 2016-03-23 重庆长安空港汽车配件有限责任公司 Jack pressure detection equipment
CN108225648A (en) * 2018-01-12 2018-06-29 四川省泰禾机械有限公司 A kind of spring tensioner assembling test equipment and its application method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曹晓光等: ""PTPL型喷油器试验台液压夹紧装置压力稳定性研究"", 《湘潭大学自然科学学报》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110296821A (en) * 2019-06-27 2019-10-01 宝鸡石油机械有限责任公司 A kind of wire rope type riser stretcher compensation function experimental rig and test method

Similar Documents

Publication Publication Date Title
Sarkar et al. Study on a new method for installing a monopile and a fully integrated offshore wind turbine structure
CN106437698A (en) Underwater platform for exploration sampling or in-situ test and using method thereof
Bai et al. Experimental investigation on motions behavior and loads characteristic of floatover installation with T-shaped barge
Qin et al. Review on recent research and technical challenges of floatover installation operation
Lieng et al. Deep penetrating anchor: further development, optimization and capacity verification
CN107036798A (en) A kind of method for the main tension compensator floor loading experiment of drilling well
Lu et al. Deepwater Dry Tree Semi Technology Readiness: Perspectives of Operator and Classification Society
Xin et al. A safety assessment approach of the salvage based on salvor–cable–wreck coupled simulations
CN107796603A (en) A kind of platform cantilever beam load test method
CN109178226A (en) A method of reducing the drinking water of semi-submersible offshore engineering platform
Matsuoka et al. Development of 12MW cross-shaped semi-submersible floating offshore wind turbine
CN217542424U (en) Offshore test platform for large-tonnage sunken ship salvage hydraulic buffer synchronous lifting system
Agostoni et al. TSG-integrated storage platform for early production in the North Sea
Ju et al. Engineering investigation of a deepwater turret mooring suction pile inverse catenary based on BV and DNVGL rules
Zeng et al. Challenges and solutions of an ultra-deepwater dry tree system for drilling and production in the Gulf of Mexico
CN211810156U (en) Self-floating underwater caisson cover plate
Maher et al. Floatover deck installation for spars
Xiao et al. Experimental and numerical study on motion characteristics of a bucket foundation during immersion process
CN205620216U (en) Ocean vane shear test's auxiliary device
Risoey et al. The pencil buoy method-a subsurface transportation and installation method
Ommani et al. Hydrodynamic modelling and estimating response of glacial ice near a drilling rig
Rodríguez et al. Anchoring systems for marine renewable energies offshore platforms
KR20190000193A (en) Method for load test of derrick
Dunn Deepwater Production: 1950-2000
Yang Numerical modeling of nonlinear coupling between lines/beams with multiple floating bodies

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170811

RJ01 Rejection of invention patent application after publication