CN107035349A - 一种层间压差注水吞吐抽油管柱 - Google Patents
一种层间压差注水吞吐抽油管柱 Download PDFInfo
- Publication number
- CN107035349A CN107035349A CN201710434970.6A CN201710434970A CN107035349A CN 107035349 A CN107035349 A CN 107035349A CN 201710434970 A CN201710434970 A CN 201710434970A CN 107035349 A CN107035349 A CN 107035349A
- Authority
- CN
- China
- Prior art keywords
- low pressure
- layer
- high pressure
- oil
- pressure layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 24
- 125000004122 cyclic group Chemical group 0.000 title claims abstract description 8
- 239000011229 interlayer Substances 0.000 title claims abstract description 8
- 230000000638 stimulation Effects 0.000 title claims abstract description 8
- 238000005086 pumping Methods 0.000 title claims abstract description 6
- 239000010410 layer Substances 0.000 claims abstract description 61
- 238000007789 sealing Methods 0.000 claims abstract description 15
- 230000008878 coupling Effects 0.000 claims abstract description 4
- 238000010168 coupling process Methods 0.000 claims abstract description 4
- 238000005859 coupling reaction Methods 0.000 claims abstract description 4
- 238000004519 manufacturing process Methods 0.000 claims abstract description 4
- 239000007788 liquid Substances 0.000 claims description 10
- PEDCQBHIVMGVHV-UHFFFAOYSA-N Glycerine Chemical compound OCC(O)CO PEDCQBHIVMGVHV-UHFFFAOYSA-N 0.000 claims description 3
- 238000009434 installation Methods 0.000 claims 1
- 239000003921 oil Substances 0.000 abstract description 27
- 239000010779 crude oil Substances 0.000 abstract description 6
- 230000008901 benefit Effects 0.000 abstract description 5
- 239000003129 oil well Substances 0.000 abstract description 4
- 238000013508 migration Methods 0.000 abstract description 3
- 230000005012 migration Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 4
- 238000002347 injection Methods 0.000 description 3
- 239000007924 injection Substances 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Removal Of Floating Material (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
Abstract
一种层间压差注水吞吐抽油管柱,油管下入套管内,抽油杆的下部连接杆式泵后下入油管内,高压层、低压层与套管联通,在油管上安装密封座、封隔器,封隔器处于高压层与低压层之间,封隔器坐封后与套管密封,密封座上有联通孔,杆式泵的下部连接密封装置,杆式泵坐于密封座上时,密封装置堵塞所述的联通孔,上提杆式泵后,高压层的水流可以经过联通孔注入到低压层里,使低压层的能量得到补充,将杆式泵再下放到位,使高压层与低压层再次分隔,经过一段时间的关井,低压层的油水运移重新分布,产生油水分离,油气处于低压层的上井段,开井生产时就能抽出低压层的原油。可将层间压差大的油井中的低压层的原油充分开采出来,具有显著的经济效益。
Description
技术领域
本发明是是油田油水井生产管柱,是利用层间压力差进行注水采油的管柱,具体是一种层间压差注水吞吐抽油管柱。
背景技术
注水开发油田的油水井一般射开了多个层位,在同一口井里,有对应注水井或有边水驱动的层位压力高,无对应注水井或无边水驱动的层位压力低,一般是高压层开采速度快、水淹含水高或全部为水,低压层含水低,含油量高。这种井如果合采,高压层会影响低压层,形成干扰,使低压层的原油不能被开采出来,结果采出的液体几乎为全水,油井作无用功,经济效益为负。这种井如果下封隔器封隔高压层,只采低压层,又会由于低压层能量低,无压力补充,动液面会不断下降,出现采不出油的情况。因此,一口井里有高压层、低压层时,目前的开采方法不能将井的原油开采出来。为了解决上述问题,油田地质工作者采用井网布局的办法,采用专用注水井给低压层注水,这需要进行系统布局,从低压层的各个方向对其注水才能实现注水驱油的目的。这种方法见效慢,为系统工程,实施难度大,投入费用高。
发明内容
本发明的目的是针对上述技术中存在的不足,设计一种层间压差注水吞吐抽油管柱,使其克服上述问题,减少投资,提高油田开发效益。
本发明的目的是这样实现的:包括套管、油管、抽油杆、杆式泵、密封装置、密封座、高压层、封隔器、低压层,油管下入套管内,抽油杆的下部连接杆式泵后下入油管内,高压层、低压层与套管联通,在油管上安装密封座、封隔器,封隔器处于高压层与低压层之间,封隔器坐封后与套管密封,使高压层的液流不能通过封隔器与套管之间的间隙流到低压层里,密封座上有联通孔,杆式泵的下部连接密封装置,杆式泵坐于密封座上时,密封装置堵塞所述的联通孔,使高压层的液流不能通过所述的联通孔流到低压层里,并使杆式泵抽到油管内的液流不能向下流走。
本发明的有益效果是:将杆式泵提离密封座后,高压层的水流可以经过联通孔注入到低压层里,使低压层的能量得到补充,将杆式泵再下放到位,使高压层与低压层再次分隔,经过一段时间的关井,低压层的油水运移重新分布,产生油水分离,油气处于低压层的上井段,开井生产时就能抽出低压层的原油。本发明的技术方案可使所述类型的油井中的低压层进行注水吞吐,能将层内原油充分开采出来,与现有的开采方法相比,具有投资少,见效快,可实施的优点,具有显著的经济效益。
附图说明
图1是本发明的示意图。
图2是本发明注水状态示意图。
具体实施方式
下面结合附图对本发明的实施例进行说明。
如图1所示,本发明的实施例包括套管1、油管2、抽油杆3、杆式泵4、密封装置5、密封座7、高压层8、封隔器9、低压层10,油管2下入套管1内,抽油杆3的下部连接杆式泵4后下入油管2内,高压层8、低压层10与套管1联通,在油管2上安装密封座7、封隔器9,封隔器9处于高压层8与低压层10之间,封隔器9坐封后与套管1密封,使高压层8的液流不能通过封隔器9与套管1之间的间隙流到低压层10里,密封座7上有联通孔6,杆式泵4的下部连接密封装置5,杆式泵4坐于密封座7上时,密封装置5堵塞所述的联通孔6,使高压层8的液流不能通过所述的联通孔6流到低压层10里,并使杆式泵4抽到油管2内的液流不能向下流走。如图1所示。
高压层8的压力大大的高于低压层10的压力,高压层8为水层,低压层10的压力较低,但含水较低,油量丰富,低压层10被杆式泵4开采到能量枯竭时,就采不出油了。此时,上提抽油杆3,将杆式泵4提离密封座7,密封装置5不再堵塞所述的联通孔6,所述的联通孔6将高压层8和低压层10联通,如图2所示,高压层8的高压水流经过联通孔6注入到低压层10里,使低压层10的能量得到补充,地层压力升高,下放抽油杆3,杆式泵4重新坐落在密封座7上,所述的联通孔6再次被密封装置5堵塞,使高压层8与低压层10再次被分隔,关开半月到6个月,低压层10的油水运移重新分布,产生油水分离,油气处于低压层10的上井段,开井生产,低压层10实现注水吞吐式开采,能抽出低压层10的原油。
高压层8、低压层10在现场普通技术人员来说具有明确的概念,不存在表达不清的问题。
Claims (1)
1.一种层间压差注水吞吐抽油管柱,包括套管(1)、油管(2)、抽油杆(3)、杆式泵(4)、密封装置(5)、密封座(7)、高压层(8)、封隔器(9)、低压层(10),油管(2)下入套管(1)内,抽油杆(3)的下部连接杆式泵(4)后下入油管(2)内,高压层(8)、低压层(10)与套管(1)联通,其特征是:在油管(2)上安装密封座(7)、封隔器(9),封隔器(9)处于高压层(8)与低压层(10)之间,封隔器(9)坐封后与套管(1)密封,使高压层(8)的液流不能通过封隔器(9)与套管(1)之间的间隙流到低压层(10)里,密封座(7)上有联通孔(6),杆式泵(4)的下部连接密封装置(5),杆式泵(4)坐于密封座(7)上时,密封装置(5)堵塞所述的联通孔(6),使高压层(8)的液流不能通过所述的联通孔(6)流到低压层(10)里,并使杆式泵(4)抽到油管(2)内的液流不能向下流走,低压层(10)被杆式泵(4)开采到能量枯竭时,上提抽油杆(3),将杆式泵(4)提离密封座(7),密封装置(5)不再堵塞所述的联通孔(6),所述的联通孔(6)将高压层(8)和低压层(10)联通,高压层(8)的高压水流经过联通孔(6)注入到低压层(10)里,使低压层(10)的能量得到补充,地层压力升高,下放抽油杆(3),杆式泵(4)重新坐落在密封座(7)上,所述的联通孔(6)再次被密封装置(5)堵塞,使高压层(8)与低压层(10)再次被分隔,关开半月到(6)个月,开井生产。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710434970.6A CN107035349B (zh) | 2017-06-10 | 2017-06-10 | 一种层间压差注水吞吐抽油管柱 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710434970.6A CN107035349B (zh) | 2017-06-10 | 2017-06-10 | 一种层间压差注水吞吐抽油管柱 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107035349A true CN107035349A (zh) | 2017-08-11 |
CN107035349B CN107035349B (zh) | 2024-07-02 |
Family
ID=59542456
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710434970.6A Active CN107035349B (zh) | 2017-06-10 | 2017-06-10 | 一种层间压差注水吞吐抽油管柱 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107035349B (zh) |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2132455C1 (ru) * | 1997-05-15 | 1999-06-27 | Нефтегазодобывающее управление "Лениногорскнефть" АО "Татнефть" | Способ закачки воды в нагнетательную скважину и насосная установка для его осуществления |
CN1354317A (zh) * | 2000-11-21 | 2002-06-19 | 中国石化胜利油田有限公司采油工艺研究院 | 一种井下采注方法及一体化管柱 |
CN1448614A (zh) * | 2002-04-02 | 2003-10-15 | 长庆石油勘探局工程技术研究院 | 油田本井水采注工艺及设备 |
CN201193602Y (zh) * | 2008-04-14 | 2009-02-11 | 王敬瑶 | 杆式泵与电潜泵复合分采泵 |
RU2010122701A (ru) * | 2010-06-03 | 2011-12-10 | Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU) | Устройство для добычи скважинной продукции и закачки воды в пласт |
CN102359363A (zh) * | 2011-09-07 | 2012-02-22 | 赵铭 | 小井组间用降粘剂循环回注对稠油进行降粘的冷采新工艺 |
CN202228058U (zh) * | 2011-10-13 | 2012-05-23 | 中国石油天然气股份有限公司 | 可洗井平衡注水管柱 |
CN103470233A (zh) * | 2013-08-20 | 2013-12-25 | 中国石油天然气股份有限公司 | 一种稠油油藏天然气吞吐采油工艺系统及采油方法 |
RU2539060C1 (ru) * | 2013-11-07 | 2015-01-10 | Открытое акционерное общество "Газпром" | Способ восстановления самозадавливающейся газовой скважины с аномально низким пластовым давлением |
CN204267005U (zh) * | 2014-11-20 | 2015-04-15 | 中国石油化工股份有限公司 | 一种可实现分层酸化、分层注水的多功能管柱 |
CN105089571A (zh) * | 2014-05-24 | 2015-11-25 | 天津大港油田钻采技术开发公司 | 无地面流程的注水管柱及其注水工艺方法 |
CN105178947A (zh) * | 2015-09-18 | 2015-12-23 | 中国石油天然气股份有限公司 | 一种水平井找堵水一体化方法 |
CN106437642A (zh) * | 2016-05-06 | 2017-02-22 | 中国石油天然气股份有限公司 | 一种裂缝性油藏水平井注采异步开采方法 |
-
2017
- 2017-06-10 CN CN201710434970.6A patent/CN107035349B/zh active Active
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2132455C1 (ru) * | 1997-05-15 | 1999-06-27 | Нефтегазодобывающее управление "Лениногорскнефть" АО "Татнефть" | Способ закачки воды в нагнетательную скважину и насосная установка для его осуществления |
CN1354317A (zh) * | 2000-11-21 | 2002-06-19 | 中国石化胜利油田有限公司采油工艺研究院 | 一种井下采注方法及一体化管柱 |
CN1448614A (zh) * | 2002-04-02 | 2003-10-15 | 长庆石油勘探局工程技术研究院 | 油田本井水采注工艺及设备 |
CN201193602Y (zh) * | 2008-04-14 | 2009-02-11 | 王敬瑶 | 杆式泵与电潜泵复合分采泵 |
RU2010122701A (ru) * | 2010-06-03 | 2011-12-10 | Открытое Акционерное Общество "Татнефть" имени В.Д. Шашина (RU) | Устройство для добычи скважинной продукции и закачки воды в пласт |
CN102359363A (zh) * | 2011-09-07 | 2012-02-22 | 赵铭 | 小井组间用降粘剂循环回注对稠油进行降粘的冷采新工艺 |
CN202228058U (zh) * | 2011-10-13 | 2012-05-23 | 中国石油天然气股份有限公司 | 可洗井平衡注水管柱 |
CN103470233A (zh) * | 2013-08-20 | 2013-12-25 | 中国石油天然气股份有限公司 | 一种稠油油藏天然气吞吐采油工艺系统及采油方法 |
RU2539060C1 (ru) * | 2013-11-07 | 2015-01-10 | Открытое акционерное общество "Газпром" | Способ восстановления самозадавливающейся газовой скважины с аномально низким пластовым давлением |
CN105089571A (zh) * | 2014-05-24 | 2015-11-25 | 天津大港油田钻采技术开发公司 | 无地面流程的注水管柱及其注水工艺方法 |
CN204267005U (zh) * | 2014-11-20 | 2015-04-15 | 中国石油化工股份有限公司 | 一种可实现分层酸化、分层注水的多功能管柱 |
CN105178947A (zh) * | 2015-09-18 | 2015-12-23 | 中国石油天然气股份有限公司 | 一种水平井找堵水一体化方法 |
CN106437642A (zh) * | 2016-05-06 | 2017-02-22 | 中国石油天然气股份有限公司 | 一种裂缝性油藏水平井注采异步开采方法 |
Non-Patent Citations (2)
Title |
---|
李继强, 杨承林, 许春娥, 任干能, 涂兴万: "黄河南地区无能量补充井的单井注水吞吐开发", 石油与天然气地质, vol. 22, no. 03, 30 September 2001 (2001-09-30), pages 221 - 224 * |
秦世群, 宋三信, 杨芳, 李东辉, 苏建栋, 刘今朝: "高含水油井下部高压层封堵工艺技术", 河南石油, vol. 16, no. 04, 25 April 2002 (2002-04-25), pages 43 - 45 * |
Also Published As
Publication number | Publication date |
---|---|
CN107035349B (zh) | 2024-07-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201165866Y (zh) | 水平井分采合采管柱 | |
CN101864921B (zh) | 水平井的完井、采油管柱及其完井、采油工艺 | |
CN1056211C (zh) | 从地层中生产流体的方法 | |
CN207122305U (zh) | 可提高降水增油能力的油气井完井结构 | |
CN106194131A (zh) | 多级压裂水平井缝间间隔co2驱采油方法 | |
CN108060915B (zh) | 可提高降水增油能力的完井结构 | |
CN205936557U (zh) | 一种注水采油管柱 | |
CN105756634A (zh) | 多级压裂水平井缝间间隔注水吞吐采油方法 | |
CN201705276U (zh) | 水平井的完井、采油管柱 | |
CN105822276A (zh) | 多级压裂水平井缝间间隔同时注水采油方法 | |
CN107740685A (zh) | 一种带潜油电泵的下采上注完井生产管柱 | |
CN103452531A (zh) | 欠平衡下油管、不压井气举、转抽、检泵和检修油管的方法 | |
CN203239303U (zh) | 用于同井注采的开采装置 | |
CN109138932A (zh) | 一种直井充填结合化学封隔体分段控水完井方法 | |
CN107387020A (zh) | 一种两气共采装置 | |
CN107780904A (zh) | 一种注水采油管柱 | |
CN206769887U (zh) | 一种层间压差注水吞吐抽油管柱 | |
CN202731870U (zh) | 用于井下油-水分离的采注装置 | |
CN105370253A (zh) | 一种同井蒸汽辅助重力泄油热采方法及其设备 | |
CN204941498U (zh) | 一种双电潜泵同井注采一体管柱 | |
CN202165064U (zh) | 一种保护油层分层采油工艺管柱 | |
CN107035349A (zh) | 一种层间压差注水吞吐抽油管柱 | |
CN101649732A (zh) | 不动防砂管柱再次防砂工艺 | |
CN203808954U (zh) | 三管地面分层注水装置 | |
CN107558931B (zh) | 一种全井筒重力分离有杆泵同井采注方法及工艺管柱 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |