CN107035211A - Anchorage shoe - Google Patents
Anchorage shoe Download PDFInfo
- Publication number
- CN107035211A CN107035211A CN201710353038.0A CN201710353038A CN107035211A CN 107035211 A CN107035211 A CN 107035211A CN 201710353038 A CN201710353038 A CN 201710353038A CN 107035211 A CN107035211 A CN 107035211A
- Authority
- CN
- China
- Prior art keywords
- bracing wire
- end socket
- bending
- inserted sheet
- crimped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005452 bending Methods 0.000 claims abstract description 17
- 238000010276 construction Methods 0.000 abstract description 2
- 238000002788 crimping Methods 0.000 abstract description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/20—Side-supporting means therefor, e.g. using guy ropes or struts
Abstract
Anchorage shoe.Simple in construction there is provided one kind, convenient operation connects reliable anchorage shoe.Including the pressure pipe for being crimped in bracing wire, the pressure pipe includes body, and the bracing wire has on bracing wire body and bracing wire bending body, and the body is crimped on bracing wire body and bracing wire bending body;The top and bottom of the body, which are respectively equipped with through hole, the through hole, is provided with end socket.The present invention is at work, body is initially passed through into bracing wire body, bracing wire body is then passed through connection fixture, then, bracing wire body carries out bending and forms bracing wire bending body, bracing wire body and bracing wire bending body is carried out into crimping fixation finally by body, the top and bottom of body are tamping by end socket respectively, avoid antitheft, reliability height.It is convenient and practical present invention saves the set-up time.
Description
Technical field
The present invention relates to power industry aid, more particularly to anchorage shoe.
Background technology
In the prior art, in power circuit erection process, the installation of bracing wire is typically to initially pass through fixture(Such as base), so
Bending afterwards, finally, end socket seals fixation;And the end socket of line guy still uses galvanized wire colligation or steel wire clamp, but galvanized wire
The problems such as corrosion, easily stolen steel wire clamp, attractive in appearance, the practicality of first-class power distribution network are affected always.
The content of the invention
The present invention, there is provided one kind is simple in construction, is conveniently operated for problem above, is connected reliable bracing wire and is fixed dress
Put.
The technical scheme is that:Including the pressure pipe for being crimped in bracing wire, the pressure pipe includes body, the drawing
Line has on bracing wire body and bracing wire bending body, and the body is crimped on bracing wire body and bracing wire bending body;
The top and bottom of the body, which are respectively equipped with through hole, the through hole, is provided with end socket.
The section of the end socket is in up big and down small trapezoidal.
The side of the end socket is provided with flexible inserted sheet, and the flexible inserted sheet is used for the centre for inserting body;On the body
Top and bottom flexible inserted sheet respectively be located at body both sides.
The both sides of the end socket are respectively equipped with flexible inserted sheet, and the flexible inserted sheet is used for the centre for inserting body.
Body at work, is initially passed through bracing wire body, bracing wire body is then passed through connection fixture, then by the present invention, is drawn
Line body carries out bending and forms bracing wire bending body, and bracing wire body and bracing wire bending body are carried out into crimping fixation finally by body,
The top and bottom of body are tamping by end socket respectively, it is to avoid antitheft, and reliability is high.It is convenient present invention saves the set-up time
It is practical.
Brief description of the drawings
Fig. 1 is the structural representation of the present invention,
Fig. 2 is the sectional view one in A-A faces in Fig. 1,
Fig. 3 is the sectional view two in A-A faces in Fig. 1;
1 is bracing wire in figure, and 11 be bracing wire body, and 12 be bracing wire bending body, and 2 be body, and 20 be through hole, and 3 be end socket, and 4 be flexible
Inserted sheet;
The arrow of horizontal direction represents the middle part that body is extruded by external force in Fig. 2,3.
Embodiment
As Figure 1-3, including the pressure pipe for being crimped in bracing wire, the pressure pipe includes body 2 to the present invention, described to draw
Line 1 has on bracing wire body 11 and bracing wire bending body 12, and the body 2 is crimped on bracing wire body and bracing wire bending body;
The top and bottom of the body, which are respectively equipped with through hole 20, the through hole, is provided with end socket 3.In work, body is socketed in
On bracing wire body and bracing wire bending body, then it is fixed by end socket.
The section of the end socket 3 is in up big and down small trapezoidal, the reliability that raising is compressed.
As shown in Fig. 2 the side of the end socket 3 is provided with flexible inserted sheet 4, the flexible inserted sheet 4 is used to insert in body
Between;The flexible inserted sheet on top and bottom on the body is located at the both sides of body respectively.In work, when end socket is compressed, then match somebody with somebody
Close in the middle of flexible inserted sheet extruding body so that body further compresses bracing wire, operation is reliable.
As shown in figure 3, the both sides of the end socket 3 are respectively equipped with flexible inserted sheet 4, the flexible inserted sheet is used to insert body
It is middle.In work, when end socket is compressed, then coordinate in the middle of flexible inserted sheet extruding body so that body further compresses bracing wire, operation
Reliably.
Claims (4)
1. anchorage shoe, it is characterised in that including the pressure pipe for being crimped in bracing wire, the pressure pipe includes body, institute
Stating bracing wire has on bracing wire body and bracing wire bending body, and the body is crimped on bracing wire body and bracing wire bending body;
The top and bottom of the body, which are respectively equipped with through hole, the through hole, is provided with end socket.
2. anchorage shoe according to claim 1, it is characterised in that the section of the end socket is in up big and down small ladder
Shape.
3. anchorage shoe according to claim 1 or 2, it is characterised in that inserted provided with flexible the side of the end socket
Piece, the flexible inserted sheet is used for the centre for inserting body;The flexible inserted sheet on top and bottom on the body is located at pipe respectively
The both sides of body.
4. anchorage shoe according to claim 1 or 2, it is characterised in that the both sides of the end socket are respectively equipped with soft
Property inserted sheet, the flexible inserted sheet is used to insert the centre of body.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353038.0A CN107035211A (en) | 2017-05-18 | 2017-05-18 | Anchorage shoe |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710353038.0A CN107035211A (en) | 2017-05-18 | 2017-05-18 | Anchorage shoe |
Publications (1)
Publication Number | Publication Date |
---|---|
CN107035211A true CN107035211A (en) | 2017-08-11 |
Family
ID=59538698
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710353038.0A Pending CN107035211A (en) | 2017-05-18 | 2017-05-18 | Anchorage shoe |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107035211A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456523A (en) * | 2020-04-08 | 2020-07-28 | 贵州电网有限责任公司 | Multipurpose tool for binding power transmission line |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB174760A (en) * | 1920-11-05 | 1922-02-06 | Louis Camillis | An improved nipple for use on cables or wires |
DE1946544U (en) * | 1965-08-23 | 1966-09-22 | Paul Gerhard Rohland | ROPE CLAMP. |
CN101201093A (en) * | 2006-12-15 | 2008-06-18 | 上海盛峰电气有限公司 | Puncture internal expansion connector |
CN201615182U (en) * | 2009-12-17 | 2010-10-27 | 刘洪贵 | Fastening steel cap sleeve for ends of steel cable |
EP2775167A1 (en) * | 2013-03-07 | 2014-09-10 | Unithermo S.r.l. | Clamping device for wire ropes |
CN206111945U (en) * | 2016-10-31 | 2017-04-19 | 扬州广源集团有限公司 | Join in marriage rural power grids circuit head of acting as go -between |
-
2017
- 2017-05-18 CN CN201710353038.0A patent/CN107035211A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB174760A (en) * | 1920-11-05 | 1922-02-06 | Louis Camillis | An improved nipple for use on cables or wires |
DE1946544U (en) * | 1965-08-23 | 1966-09-22 | Paul Gerhard Rohland | ROPE CLAMP. |
CN101201093A (en) * | 2006-12-15 | 2008-06-18 | 上海盛峰电气有限公司 | Puncture internal expansion connector |
CN201615182U (en) * | 2009-12-17 | 2010-10-27 | 刘洪贵 | Fastening steel cap sleeve for ends of steel cable |
EP2775167A1 (en) * | 2013-03-07 | 2014-09-10 | Unithermo S.r.l. | Clamping device for wire ropes |
CN206111945U (en) * | 2016-10-31 | 2017-04-19 | 扬州广源集团有限公司 | Join in marriage rural power grids circuit head of acting as go -between |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111456523A (en) * | 2020-04-08 | 2020-07-28 | 贵州电网有限责任公司 | Multipurpose tool for binding power transmission line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205123185U (en) | Non -maintaining insulator wire fixation clamp | |
CN107035211A (en) | Anchorage shoe | |
CN203499033U (en) | Anchoring piece | |
CN101201093A (en) | Puncture internal expansion connector | |
CN206928740U (en) | Anchorage shoe | |
CN206111945U (en) | Join in marriage rural power grids circuit head of acting as go -between | |
CN206878384U (en) | Bracing wire erection joint | |
CN102842771A (en) | Compression joint branched bus bar and branched compression joint method thereof | |
CN206758670U (en) | A kind of Wiring card for electric wire firmly installed | |
RU2592083C2 (en) | Extensible anchor bolt | |
CN201598739U (en) | Large-deformation buried rubber waterstop | |
CN106906978A (en) | A kind of combined wall board bracket and the wall body structure using the bracket | |
CN208122125U (en) | A kind of portable new-type fixture | |
CN108487660B (en) | Traditional residential green brick wall righting method | |
CN207277633U (en) | Glass for the concealed glass curtain wall of super large is plugged into pawl and its mounting structure | |
CN206428810U (en) | Tongue and groove square tube composite roof truss | |
CN209943296U (en) | Anchor for fastener | |
CN207200219U (en) | A kind of strain clamp | |
CN204662432U (en) | A kind of rock-reinforcing device of quick assembling | |
CN205451814U (en) | Ground wire | |
CN219491507U (en) | Sealing device for airtight treatment of grain bungalow house roof board seam | |
CN211351562U (en) | Cable support fixture for construction | |
CN207039124U (en) | A kind of new tubular construction that continues | |
CN210464243U (en) | Energy-gathering pipe expansion fixing device | |
CN208723122U (en) | The buried grounding body of the nonmetallic grounded screen of multi-purpose type connects part |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20170811 |
|
RJ01 | Rejection of invention patent application after publication |